FLEXIBLE PAVEMENT

1
2
3
4
5
6

Two lane -Single lane carriage way


Intial traffic in the year of completion of construction
Traffic growth rate per annum
Design life
Vechile damage Factor
Design CBR of sub grade soil
Design caliclations

:-

Distribution factor :- Para 3.3.5


Cumulative number of standard axiles to be
catered for in the design
N
N
Total pavement thickness for CBR 4 % and Traffic 0.10
msa
Granular sub base
Granular base
PC
Total crust
Note :-

sub base 435mm granular material of CBR not less than 20 percent

CBR 3.5%
7.00
20 CV/DAY
7.50 percent
15 years
1.5
3.5 percent

75 percent
Para 3.3.6.1
214497/ 1000000

R not less than 20 percent

0.21 msa

550 mm Thickness
435 mm
225mm
20mm
550 mm

FLEXIBLE PAVEMENT (CBR- 4% AND INTIAL TRAFFICE- 600 CVPD)


1
2
3
4
5
6

Two lane -Single lane carriage way


Intial traffic in the year of completion of construction
Traffic growth rate per annum
Design life
Vechile damage Factor
Design CBR of sub grade soil
Design caliclations

:-

Distribution factor :- Para 3.3.5


Cumulative number of standard axiles to be
catered for in the design
Para 3.3.6.1

N
N

Say
Total pavement thickness for CBR 4 % and for Cumulative Traffic 10
msa

Bituminous Surfacing

Binder Course
Wearing Coat

Granular sub base


Granular base
DBM
SDBC
Total crust

AFFICE- 600 CVPD)


7.00
600
7.5
15
1.5
4

75

CVPD
%
years
%

6434912.10397918
6.434912104
msa
7
msa
700

mm

330
250
80
40
700

mm
mm
mm
mm
mm

FLEXIBLE PAVEMENT (CBR- 4% AND INTIAL TRAFFICE- 400 CVPD)


1
2
3
4
5
6

Two lane -Single lane carriage way


Intial traffic in the year of completion of construction
Traffic growth rate per annum
Design life
Vechile damage Factor
Design CBR of sub grade soil
Design caliclations

:-

Distribution factor :- Para 3.3.5


Cumulative number of standard axiles to be
catered for in the design
Para 3.3.6.1

N
N

Say
Total pavement thickness for CBR 4 % and for Cumulative Traffic 5
msa

Bituminous Surfacing

Binder Course
Wearing Coat

Granular sub base


Granular base
DBM
SDBC
Total crust

AFFICE- 400 CVPD)


7.00
400
7.5
15
1.5
4

75

CVPD
%
years
%

4289941.40265279
4.2899414027
msa
5
msa
620

mm

285
250
60
25
620

mm
mm
mm
mm
mm

FLEXIBLE PAVEMENT

1
2
3
4
5
6

Two lane -Single lane carriage way


Intial traffic in the year of completion of construction
Traffic growth rate per annum
Design life
Vechile damage Factor
Design CBR of sub grade soil
Design caliclations

:-

Distribution factor :- Para 3.3.5


Cumulative number of standard axiles to be
catered for in the design
N
N
Total pavement thickness for CBR 4 % and Traffic 0.10
msa
Granular sub base
Granular base
PC
Total crust
Note :-

sub base 225mm granular material of CBR not less than 20 percent

NT
CBR -4.0%
7.00
400 CV/DAY
7.50 percent
15 years
1.5
4 percent

75 percent
Para 3.3.6.1
107248.50/ 1000000
0.1 msa

R not less than 20 percent

480 mm Thickness
255 mm
225mm
20mm
480mm