People. Evolution. Competence. Trust.

Company Brochure

>
Table of Contents
About Passavant Energy & Environment
Services and Capabilities

3
4-6

Wastewater Treatment

Water Treatment

Sludge Treatment

Waste Treatment

Energy Re-Use

Export Finance

Operation & Maintenance

In-house Technology

Certifications and Accreditations

Project History

10

Reference Projects

11

COMPANY INTRODUCTION

About

Passavant Energy & Environment

Passavant-Roediger GmbH has evolved into Passavant Energy &


Environment (PE&E), thereby expanding its portfolio to include Green
Energy solutions and complement project delivery from full turnkey
EPC contracts to holistic solutions for Water, Sludge and Energy
Re-Use. PE&Es solution provision is well-defined as a comprehensive
benefit: PE&E offers EPC contracting, O&M service provision and
financing, as required by the client, but under the umbrella of a
global water and energy resource optimization scheme. PE&E is able
to offer both financial and technological long-term and sustainable
benefits.
Established in 1842 in Germany, Passavant developed ground
breaking technologies and processes in municipal wastewater,
sludge, water and industrial wastewater treatment, including the
companys in-house world renowned sludge digestion technology,

which is a pioneering system for the production of usable materials


from sewage sludge. In the process PE&E has continuously re-defined
positively industry norms and its systems have been adopted by
hundreds of waste water treatment plants all over the world. The
company also brought the Lamella separator technology for water
treatment to excellence, which is a PE&E state-of-the-art four stage
process used for water treatment.
Today, PE&Es steady growth and the establishment of various
subsidiaries in Europe, the MENA region and Asia open a gate to
acquire businesses in new markets. The company has won awards for
projects world-wide, including, but not limited to North Africa, UAE,
Saudi Arabia, Iraq, Lebanon, Turkey, Europe and Asia, including China
and Vietnam amounting to 500 million Euros.

SERVICES AND CAPABILITIES

Passavant Energy & Environment

Services and Capabilities

Wastewater
Treatment
MORE THAN 150 YEARS OF
EXPERIENCE
Headquartered in Frankfurt am Main,
Germany, PE&E has a long history of
developing new technology in the field of
effluent and sludge treatment. PE&E has
been proactively leading trends in industry
and evolving clients demands in municipal
and industrial wastewater treatment, which
has made PE&E a worldwide leader in water
reuse and sludge treatment technologies.

MUNICIPAL WASTEWATER
TREATMENT
PE&E offers advanced wastewater and
sludge treatment technologies with the
unique ability to develop custom solutions
for every stage of wastewater treatment.
These comprise the mechanical, biological
and clarification stage, including advanced
wastewater treatment technologies for
reuse applications like irrigation and
agriculture.

INDUSTRIAL WASTEWATER
TREATMENT
Industrial Wastewater is a complex and
challenging output since it has more toxic
and harmful contents than municipal
wastewater, which usually is of biological
origin. Disposal of industrial wastewater
requires proper care to ensure that
no harm is done to the surrounding
ecosystem as well. PE&Es well-honed
portfolio of physical-chemical processes
for the treatment of industrial waste water
can offer a variety of ways to separate
solids from liquids. Passavants patented
technologies and systems are adept at
removing dissolved organic and inorganic
deposits from waste water.

PASSAVANT ENERGY & ENVIRONMENT

Water Treatment

Sludge Treatment

The 4th UN World Water Development Report 2012 warns of an


impending water crisis. With global population rising rapidly, there
is a steady increase in demand for water, which is lowering water
supplies worldwide.

PE&E has led from the front in the development of anaerobic sludge
stabilization technology and equipment. PE&E is considered widely
to be the leader in the design and optimization of sludge digestion,
which is now considered to be an integral part of biological waste
energizing projects.

CLEAN WATER IS A RIGHT, NOT A PRIVILEGE

The need of the hour is to increase amount of available water,


reduce losses and reuse water. Governments worldwide are focusing
on maximizing the usage of water. PE&Es technologies are well
equipped to overcome local bottlenecks in water supply.

WATER TREATMENT CAPABILITIES


PE&Es water treatment solutions are capable of realizing steady and
secure water supply, scaling and adapting to the nature of source
origin, including:
Surface water (which is affected by human impact and
natural influences)
Ground or spring water (which has a geogenic

character and is utilized heavily in agriculture)
Industrial or Process Water
Brackish Water
Seawater

RENEWABLE ENERGIES FOR THE FUTURE

PE&E has unmatched success in sludge treatment, as evidenced by


its involvement in more than 1,500 plants worldwide of varying sizes
and complexity. Passavant Energy & Environments technologies have
proven themselves many times over in the field of sludge treatment,
as witnessed at Shanghai Bailonggang. At the time of its construction,
the Shanghai Bailonggang plant was the worlds largest sludge
treatment plant and a resounding endorsement of Passavant Energy
& Environments technological knowhow and skilled workforce.

SLUDGE TREATMENT ADVANTAGES

Reduction of sludge volume by about 50%


Maximum utilization of space, which leads to smaller
aggregates and plants
Reduction of waste disposal costs
Production of biogas as renewable energy resource

PE&Es approach lays emphasis on sustainable reuse and recycling


especially for agricultural and industrial consumption.

SERVICES AND CAPABILITIES

Waste Treatment
FROM WASTE TO ENERGY

PE&Es highly regarded waste treatment


technology has proved itself all over the
world. With the assistance of PE&E it is
possible to segregate toxic, non-recyclable
elements from waste in waste water
treatment plants and to generate electricity
as an end product with the traditional
German efficiency.
PE&Es highly efficient sludge treatment
processes lead to a low waste discharge
facility by utilizing renewable energy.

Energy Re-use

SUSTAINABLE AND EFFICIENT

In the fields of Wastewater, Sludge and


Waste Treatment, PE&E can extract the most
from biogas to the benefit of the customer.
Due to the configuration of our system, the
client is offered the maximization of its asset
value. The produced biogas is converted
into energy: PE&Es Energy Re-Use concept
offers the most suitable technology to the
client. Moreover, we secure an electricity
production with highest efficiciency rates
among peers in the industry.
We need to focus on energy saving in
terms of water or electricity to work (cost)
efficiently and at the same time protect
these valuable resources.

Export Finance

TAILORMADE SOLUTIONS

PE&E offers a diversified portfolio of tailormade solutions, even with respect to project
financing.
The unique financing opportunity through
Export Finance is linked to our EPC and
Operation & Maintenance capabilities and is
backed by a national Export Credit Agency
(i.e. Euler Hermes AG). The client benefits
from low bank interest rates from Germany
tied to high quality products from Germany,
too.
Financial transactions are made transparent
to the parties with PE&E operating only as a
mediator.

PASSAVANT ENERGY & ENVIRONMENT

Operation & Maintenance

OPERATION & MAINTENANCE


Passavant Energy & Environment also has the capability to undertake
full responsibility for the operation and maintenance of treatment
plants. The focus on preventive maintenance in an operator-friendly
and safe environment allows to create trouble-free and efficient
operation.

SUPERIOR SERVICE AND QUALITY


Passavant Energy & Environments fast and efficient After Sales
Service works in close coordination with the client or plant operator,
and tailors individual solutions to troubleshoot unforeseen situations
on site.
Passavant Energy & Environments solutions feature adaptable
capabilities to measure up to any challenges and requirements.

TECHNOLOGY

Passavant Energy & Environments

In-house Technology

Passavant Energy & Environment is constantly developing and creating its own technologies, thus setting new standards around the world.
These patented technologies have been extensively field-tested and proven to deliver results in different environments around the world.

SEQUENTIAL GAS LANCE MIXING SYSTEM

TURBO-LME PROCESS

Passavant Energy & Environment innovated the technique of injecting


gas directly above the digester bottom, via flexible insert lances. This
method delivers three crucial advantages. It prevents the buildup
of deposits, even in shallow digester bottoms. It also eliminates
the need for continuous operation of the mixing system which
brings down operation costs. It also facilitates easier maintenance
of digesters by allowing for cleanup work while the digester is still
operating without having to empty the digester.

One of the biggest challenges in water treatment and


purification is binding the impurities than can be separated
from water by using sedimentation processes. Passavant Energy
& Environments unique Multi-chamber flocculation, combined
with a lamella separator, achieves optimal sludge concentration
by thickening the separated floc in a single stage. The unique
lamella geometry creates a high quality of effluent that was not
achievable previously. The system is able to operate under high
hydraulic loads with additional maximum sludge thickening.

ADVANTAGES OF SEQUENTIAL GAS LANCE


MIXING SYSTEM

ADVANTAGES OF TURBO LME


Compact and space-saving design

A proven track record spanning over 30 years of


continuous development and enhancement
High efficiency mixing for optimum biogas recovery
Can be retro-fitted to almost any digester configuration
Long-term utilization for the entire digester volume

Optimum cleaning performance by a unique multichamber turbo-flocculation process


Optimal sludge thickening due to the integrated
thickener with rake unit

No moving components within the process tanks

Resistant to flow fluctuations

Eliminates deposits

Short start-up and shut-down times as well as short

Easy scum removal


Maintenance without interruption of digester operation
Operation independent of sludge level

Maximum settling area on small base area

retention times

PASSAVANT ENERGY & ENVIRONMENT

Certifications

& Accreditations

CERTIFIED QUALITY MANAGEMENT


Passavant Energy & Environment operates under strict operational conditions, adhering
to stringent internal quality standards, technical expertise, safety and quality. In order
to achieve this objective, Passavant Energy & Environment remains committed and
are subject to establish and maintain effective and efficient quality systems compliant
with ISO 9001, ISO 14001 as well as OHSAS 18001.
Passavant Energy & Environments activities are systematically planned and executed
subject to procedural control, to ensure that projects are processed step by step in
a controlled way until completion. This is another reason why Passavant Energy &
Environments clients trust the companys certified quality and services.

EXCERPT OF PE&ES PROJECTS

Project

History
Selected Reference Projects

Shanghai, China

Braila, Romania

Budapest, Hungary

Saigon, Vietnam

Nablus, Palestine
Batman, Turkey

Wadi Shallala, Jordan

Saida, Lebanon

Khalifa City, UAE

Botosani, Romania

10

COMPLETED PROJECTS

Selected

Reference Projects
Location

Type

Scope of Works

Year of
Completion

Shanghai Municipal
Sewerage Company

Shanghai,
China

Sludge
Digestion

Design, Supply and installation of 8 digesters (egg-shape), 12,400 m/


each for a Wastewater Treatment Plant with a Total capacity of 2,000,000
m Sludge /d serving a population equivalent of 4.3 Million

2011

Compania de Utilitati Publice


Unarea Area Braila

Braila,
Romania

Wastewater
Treatment
Plant

Design, supply, installation, and construction of a Wastewater Treatment


Plant with a total capacity of 100,000 m3/day, serving a population
equivalent of 270,000.

2011

Fvrosi Csatornzsi Mvek


Mrnki Rszvnytrsasg
Szolgltatsok Fsztlya

Budapest,
Hungary

Wastewater
Treatment
Plant

Wastewater Treatment Plant, capacity 200,000 m/day including Nutrient


and Phosphorus Removal, Digester and Sludge System, including Biogas
Treatment and 3 CHP Units for 834 kw elect. Power

2011

Thu Duc III


Saigon Wastewater
Investment Company

Saigon,
Vietnam

Water
Treatment
Plant

Design, construction and installation of Water Treatment Plant with a


total capacity of 300,000 m/d

Ongoing

Water Supply and Sanitation


Department, Nablus

Nablus,
Palestine

Turnkey
Projects

Municipal Wastewater Treatment Plant including Sludge digestion


and dewatering, commissioning, testing and 2 years operation. Total
Capacity: 150.000 PE

2014

Ministry of Water and


Irrigation Water Authority of
the Hashemite Kingdom of
Jordan

Wadi
Shallala,
Jordan

Turnkey
Projects

Municipal Wastewater Treatment Plant:


with anaerobic Sludge Digesters and Biogas Treatment Total Capacity:
164,000 PE

2014

Municipality of Batman/
BASKI

Batman,
Turkey

Wastewater
Treatment
Plant

Design, construction, supply and commissioning of mechanical and


electrical equipment for mechanical plant with sludge treatment and CHP
serving a population equivalent of 320,000. 2 years Operation of the plant

2011

Client

Botosani
(Bucecea &
Catamarasti),
Romania

Water
Treatment
Plant

Government of Lebanon

Saida,
Lebanon

Waste
Treatment
Plants

Drake & Scull Water and


Power

Khalifa City,
Abu Dhabi,
U.A.E.

Waterworks

CFCU Central Finance and


Contracting Unit

Passavant Energy & Environment commissioned to construct two


water works in Botosani county was responsible for the rehabilitation
and extension including Civil works, supply and commissioning of
mechanical and electrical equipment for two turn-key water works
(mechanical and chemical treatment and sludge treatment).

2011

The Bucecea treatment plant had a capacity of 700 l/s and the
Catamarasti Treatment Plant also required the construction of
Hydropower Plant (turbine), new laboratory, rehabilitation of
2 x 10,000 m storage tanks.
PE&E was appointed as General contractor for complete equipment for
treatment of organic rich waste fraction with anaerobic digestion. The
following treatment steps are undertaken:
feed preparation
dewatering
heavy reject removal
gas cleaning
intensified digestion
gas utilization in CHP 99,000 t/a

Total Capacity 3500 m3/d Reverse Osmosis Plant using 5 micron


Cartridge Filters

2011

Ongoing

11

LOCATION

CONTACT PERSON

EMAIL ADDRESS

TURKEY, Istanbul

Hasan Taskin

hasan.taskin@passavant-ee.com

KOSOVO, Pristina

Otto Hofmann

otto.hofmann@passavant-ee.com

IRAQ, Baghdad

Hasan Taskin

hasan.taskin@passavant-ee.com

INDIA, New Delhi

Dilesh Gathani

dilesh.gathani@passavant-ee.com

CHINA, Beijing

Yanbin Han

han@passavant-ee.com

MENA

Hazem Numan

hazem.numan@passavant-ee.com

ROMANIA, Bucharest

NinoFoti Rossito

nino.foti@passavant-ee.com

GERMANY, Frankfurt am Main

Christian Schulmerich

christian.schulmerich@passavant-ee.com

EGYPT, Cairo

Ireny Estmalek

ireny.estmalek@passavant-ee.com

VIETNAM, Ho Chi Minh

Udo Stumpf

udo.stumpf@passavant-ee.com

ALGERIA, Algier

Christian Schulmerich

christian.schulmerich@passavant-ee.com

Passavant Energy & Environment GmbH

Herriotstrasse 1 | 60528 Frankfurt am Main, Germany


Phone : +49 (0) 69 94 74 15-0
Fax : +49 (0) 69 94 74 15-111
info@passavant-ee.com | www.passavant-ee.com

GENERAL PROFILE

Our Ref: - General Profile Passavant Energy & Environment GmbH

Passavant E&E General Profile - 3QTR 2015_ English.doc -

1 of 49

1.0

COMPANY INTRODUCTION .............................................................................................................. 3

2.0

OFFICE LOCATIONS ........................................................................................................................... 8

3.0

PROCESSES AND PRODUCTS ............................................................................................................. 8

4.0

WASTEWATER TREATMENT ...........................................................................................................11

5.0

SLUDGE TREATMENT ......................................................................................................................20

6.0

WATER TREATMENT ........................................................................................................................29

7.0

WASTE TO ENERGY ..........................................................................................................................36

8.0

TECHNOLOGY SPECIFIC INFORMATION .....................................................................................38

9.0

QUALITY ASSURANCE.......................................................................................................................42

10.0

HEALTH AND SAFETY ......................................................................................................................45

11.0

ENVIRONMENTAL POLICY .............................................................................................................47

Passavant E&E, General Profile - 4QTR 2015_ English

2 of 49

1.0

COMPANY INTRODUCTION

1.1

General Company Background


Passavant Energy & Environment GmbH is a European-Based Subsidiary of Drake and
Skull International PJSC, which is a U.A.E. based, public joint stock company. Passavant
Energy & Environment GmbH operates in process engineering and mechanical, electrical,
instrumentation, control and automation (MEICA) engineering as well as construction and
construction management, providing a design and build service for water, wastewater, sludge
and waste treatment systems. Passavant Energy & Environment GmbH operates globally,
throughout Europe, the Middle East, the Far East, including China, North Africa and many
other overseas countries.
Having the necessary experience and the ability to be independent in the selection of the best
process and equipment for each system allows the Passavant Energy & Environment
GmbH to provide clients with the most appropriate and cost-effective solution to meet their
requirements.
Passavant Energy & Environment GmbH has an integrated team of dedicated
professionals with an unparalleled level of expertise that enables the company to undertake
projects in the ranging from mid-size (several millions) to major projects as a general EPC
contractor (turnkey contracts with values up to hundreds of millions of Euros).
From the companys German headquarters in Frankfurt, Passavant Energy & Environment
GmbH operates throughout the country and has wide representation through agents, fellow
group companies and licensees in various European, Asian, African and Middle East countries
which enables the company to service its multi-national clients.

1.2

Group Organisation
The following diagram highlights the Passavant Energy & Environment GmbH
Organisation Structure:

Passavant E&E, General Profile - 4QTR 2015_ English

3 of 49

1.3

Design Capability
PASSAVANT ENERGY & ENVIRONMENTs design facility plays a vital role in every
stage of a project or contract, employing its vast experience in formulating cost effective
solutions to water, wastewater, sludge and waste treatment problems.
This process and MEICA engineering expertise is fully utilised in designing all types of
installation from a complex automatic air, water or wastewater processing plant, to a single
piece of equipment for integrating into an existing system.
All mechanical and process design is undertaken in-house either in Germany or within the
local subsidiaries.

1.4

Project Management
When undertaking Turnkey contracts Passavant Energy & Environment GmbH controls
all elements of the civil and MEICA engineering to ensure that progress, quality and cash flow
are all tightly maintained.
This involves Passavant Energy & Environment GmbH in the detailed programming of
the works, strict budgeting and time control of the sub-contractors, formulating and applying
quality assurance procedures and liaison with the client to ensure that the project is brought in
on-time, on budget and to specification.

1.5

Computerisation
Computerisation is part of PASSAVANT ENERGY & ENVIRONMENTs commitment
to implement the latest technology in data processing. The systems implemented and utilised
range from simple word processing to the most sophisticated computer aided design software.
All computers within the company are connected through one duty and standby network that
allows easy access and sharing of data between the different users.
The latest issue of Autocad is used for producing drawings, ensuring efficient operation and
neat presentation. Bills of materials along with all the related specifications are extracted from
the drawings and presented in custom built reports.
Hydraulic analyses and process calculations are generated using in-house written programmes.
Projects are planned, budgeted and monitored through the aid of computer management
systems and HAZOP studies are conducted using a proprietary software package.
Accounting data is completely stored and processed by the Groups own in-house written
package which incorporates the Group accounting procedures and allows easy enhancements.
Instant access to drawings and project engineering details are available worldwide using
PASSAVANT ENERGY & ENVIRONMENTs computer communication facility.
PASSAVANT ENERGY & ENVIRONMENTs trained engineers and staff are always
developing new ideas to optimise the use of computers and thus improve the efficiency and
quality for the ultimate benefit of clients.
According to the clients request, we are able to control and to operate the plants via internet
connection with the plants operational software. This allows a fast reaction in case of
problems.

1.6

Installation of Plant and Equipment


During the plant installation, integrated planning and control for both the client and the
supplier is essential to avoid any delay or disruption to the clients site area or production
programme.

Passavant E&E, General Profile - 4QTR 2015_ English

4 of 49

Whenever possible, Passavant Energy & Environment GmbH will schedule the installation
work to minimise or eliminate any possible disruption by utilising the clients quiet periods,
such as plant shut-downs and low production periods.
The companys success in achieving these aims is demonstrated by the client often placing
additional contracts with Passavant Energy & Environment GmbH even before the initial
contract has been completed.
1.7

Plant Commissioning
To ensure the optimum operation of any process plant it is imperative that the plant is
correctly and fully commissioned. This requires a total understanding of both the process and
equipment, in addition to the plants capabilities and operating procedures.
Prior to completion of all contracts, Passavant Energy & Environment GmbH provides its
commissioning team to test and commission the plant equipment and the overall process.
Several sets of working drawings and operating manuals are always supplied with each
contract.

1.8

Operator Training
If the plant is to be operated at peak performance, it is essential that the plant operators are
fully aware of the plants functions and capabilities.
Passavant Energy & Environment GmbH provides a custom designed, on-site training
programme that ensures the plant operatives and the client are familiar with the process,
equipment and operating procedures of the plant installation.
Together with working drawings and operation manuals, the training programme provides the
operatives with the knowledge to enable the plant to operate at its optimum performance.
In addition, Passavant Energy & Environment GmbH offers a technical back-up service
that fully supports the client and can be particularly useful during the initial period of the plant
operation, when the operators are acquiring their experience.

1.9

Operation Contracts
Passavant Energy & Environment GmbH holds contracts for the operation and
maintenance of water, wastewater, sludge and waste treatment plants. Passavant Energy &
Environment GmbH employees who are adequately qualified and trained for each contract
carry out the required O&M works. These contracts involve the responsibility for producing
treated water/wastewater suitable for discharge to supply mains or to receiving streams and
include all operational costs.

1.10

After Sales Advice


Arrangements can be made for plant audits to be conducted on a regular basis so that
operational performance is maximised thus enabling minimum operating costs to be realised.
This service can range from weekly monitoring of operating data up to regular planned visits
to an agreed schedule.

1.11

Financial Resources
Since its establishment Passavant Energy & Environment GmbH has been successful in
maintaining a high rate of growth and has always been able to fulfil its financial commitments
and obligations. It has established very strong trusting and professional relationships with its
bankers, clients and suppliers.
In order to continue with its ambitious growth Passavant Energy & Environment GmbH
joined the Drake & Scull International PJSC Group of companies in 2009. The strong

Passavant E&E, General Profile - 4QTR 2015_ English

5 of 49

financial resources and stability of DSI PJSC means that Passavant Energy &
Environment GmbH can undertake projects of ANY value.
DSI PJSC is a leading force in the international construction industry with its operations
extending throughout the Middle East, Central Asia, Africa, and Europe.
1.12

Global Engineering Resources


In addition to the head office resources in Frankfurt, Passavant Energy & Environment
GmbH also has the facility of utilising the engineering staff of its branches and subsidiaries
based throughout the Far East, Middle East and of course European Regions. The following
provides an idea of these additional resources:Romania

U.A.E

China

Turkey

India

Iraq

Passavant Energy & Environment GmbH also has the facility of utilising the engineering
staff of DSI PJSC based throughout the MENA Region, the following provides an idea of
these additional resources:-

1.13

UAE

Saudi Arabia

Qatar

Oman

Kuwait

Bahrain

Egypt

Sudan

Thailand

In-house Full Turnkey Solutions - Diversified Engineering Resources


In addition to the head office resources in Frankfurt, Passavant Energy & Environment
GmbH also has the facility of utilising the sister company engineering services of DSI PJSC
encompassing:-

1.14

Civil Engineering Construction

MEP Works

Infrastructure

Private Financial Initiatives


Through DSI, Passavant Energy & Environment GmbH is able to advance beyond the
traditional method of financing a turnkey project. For example the Group can undertake the
responsibility of project financing.
A second possibility involves building and operating the scheme and the client can benefit by
realising projects today whilst payment is made over an extended period of operation.
Passavant Energy & Environment GmbH is happy to discuss various options of
build/operate, build/own/operate, build/own/operate/transfer, etc.

1.15

Quality and ISO Accreditation


During its 50 years of operation Quality has always been the most important objective and
this philosophy has been prioritised by PASSAVANT ENERGY & ENVIRONMENT.
Through its commitment to quality Passavant Energy & Environment GmbH has been
able to build a proud reputation with its clients, suppliers, competitors and all the people with
which it deals.

Passavant E&E, General Profile - 4QTR 2015_ English

6 of 49

PASSAVANT ENERGY & ENVIRONMENTs quality assurance procedures and


manuals were designed to meet the highest standards, with emphasis placed on continuous
improvement in quality for the benefit of the customers. Passavant Energy & Environment
GmbH has a Quality Management System certified by BSI Quality Assurance as conforming
to DIN EN ISO 9001.
Furthermore Passavant Energy & Environment GmbH operates a Safety, Health &
Environment Management System complying with the OHSAS regulation (SHE Management
System OHSAS 18001).
1.16

Environmental Accreditation
Being an environmentally orientated company Passavant Energy & Environment GmbH
naturally has an immense awareness for the protection of the environment. Passavant
Energy & Environment GmbH secured its ISO 14001 certification in 2009 and has
continually driven to improve awareness of its employees, subcontractors and clients.

1.17

Partnering
Partnering is a method that Passavant Energy & Environment GmbH has adopted several
times to the mutual benefit of the client and the company. It avoids the adversarial aspects
common with the usual forms of contract, and by forming a team with the client ensures that
the client receives what he wants at the right price and on time.
By working together the project is properly scoped, defined, feasibility determined, innovation
considered, value engineered, specification optimised and the project is harmoniously
progressed to its completion.
Both parties share in the pain and the gain. The performance would be measured through
Key Performance Indicators (KPIs) such as time, cost, quality, innovation, safety record,
reporting, relations and environmental awareness.

Passavant E&E, General Profile - 4QTR 2015_ English

7 of 49

2.0

OFFICE LOCATIONS

2.1

German Head Office


Office
Passavant Energy & Environment GmbH
Herriots
Herriotstrae 1
60528 Frankfurt
Germany
Tel. +49 (0) 69 94 74 15-0
Fax +49 (0) 69 94 74 15-222
Web: www.passavant-ee.com
E-Mail: info@passavant-ee.com

2.2

Global Contacts
Office

Name

E-Mail

ALGERIA

Christian Schulmerich christian.schulmerich@passavant-ee.com

TURKEY

Hasan Taskin

hasan.taskin@passavant-ee.com

EAST EUROPE

Hasan Taskin

hasan.taskin@passavant-ee.com

IRAQ

Hasan Taskin

hasan.taskin@passavant-ee.com

INDIA

Dilesh Gathani

dilesh.gathani@passavant-ee.com

CHINA

Yanbin Han

han@prabj.com

SAUDI ARABIA Hazem Numan

Hazem.Numan@passavant-ee.com

EUROPE

Otto Hofmann

otto.hofmann@passavant-ee.com

MIDDLE EAST

Hazem Numan

hazem.numan@passavant-ee.com

ROMANIA

Simona Luther

simona.luther@passavant-ee.com

GERMANY

Christian Schulmerich christian.schulmerich@passavant-ee.com

EGYPT

Ireny Estmalek

ireny.estmalek@passavant-ee.com

If your region/country does not appear above, please contact our Head Office:
otto.hofmann@passavant-ee.com

Passavant E&E, General Profile - 4QTR 2015_ English

8 of 49

3.0

PROCESSES AND PRODUCTS


Passavant Energy & Environment GmbH offers clients an extensive range of processes
and products, a few of which are listed below:

3.1

Water Treatment

Flocculation

Clarification

Gravity and Pressure Filtration

Carbon Filtration

Membrane Treatment processes including, Reverse Osmosis, Ultrafiltration,


Nanofiltration and Microfiltration for:
- Drinking Water
- Seawater Desalination
- Brackish Water Treatment
- Water Softening
- Nitrate Reduction
- Iron Removal
- Industrial Effluent Recycling
- Grey water Treatment and Recycling
- Colour Removal
- Colour Concentration

3.2

Ion Exchange for: High Purity Water

Wastewater and Sludge Treatment

Aeration using air or pure oxygen.

Anaerobic systems

Dissolved air flotation

pH correction systems

Flocculation

Chemical storage and dosing

Domestic Sewage treatment

Effluent Treatment

Grey water Treatment and Recycling

Oil/water separation

Sand filtration

MBR: Membrane Bio Reactors

SBR: Sequence Batch Reactors

Sludge consolidation/dewatering

Passavant E&E, General Profile - 4QTR 2015_ English

9 of 49

3.3

3.4

Sludge Digestion and CHP + Energy Recovery

Industrial Water Special Solutions

Waste Treatment

Waste to Energy Plants

Mechanical Sorting Plants

Municipal Solid Waste Treatment Plants

Wet Waste Treatment

Fertilizer Production

Services
Passavant Energy & Environment GmbH is able to offer the following services:

Full turnkey projects, including EPC and DBO contracts

Feasibility / Technical studies

Pilot plant studies

Laboratory scale studies

Electrical control logistics

Project Management

Procurement

Installation

Testing / Commissioning

Operator Training

Planned Maintenance

Plant / Process refurbishment and overhaul

Full technical support

Plant audits

After Sales Service

Operation & Maintenance

From initial feasibility study to full turnkey plant installation, Passavant Energy &
Environment GmbH has the solution for any water, wastewater, sludge or waste treatment
project.

Passavant E&E, General Profile - 4QTR 2015_ English

10 of 49

4.0

WASTEWATER TREATMENT

4.1

Overview
Passavant Energy & Environment GmbH offers engineering, technology, complete
equipment delivery and technical services to municipal and industrial customer groups
worldwide. The business has developed a sound track record for the delivery of turnkey
plants. Sophisticated wastewater treatment technology from the inlet to the outlet inclusive of
sludge treatment as well as customized process technologies for every step of the process, be
it the mechanical, biological or clarification stage or even advanced wastewater treatment
technologies for reuse applications.
PASSAVANT ENERGY & ENVIRONMENTs Process Engineering capabilities include
important mechanical processes like inlet pumping, pre-treatment as well as primary,
secondary and tertiary wastewater treatment. In addition, chemical processes such as emulsion
division, flocculation/precipitation, neutralization, oxidation and disinfection are applied.
Physical process technology includes sedimentation, flotation, filtration, the use of membranes
and adsorption.

4.2

Advantages
As a specialized expert, Passavant Energy & Environment GmbH offers conventional
activated sludge treatment with carbon and nitrogen removal as well as chemical advanced
biological nutrient removal systems. SBR, MBR and bio-film technology (fixed and fluidized
beds) are part of PASSAVANT ENERGY & ENVIRONMENTs scope as well.

4.3

References Wastewater Treatment

Plant location

Country

Al Gabal Asfar

Egypt

Sarajevo

Nathdwara

Ford

Description

Municipal wastewater treatment plant


Joint Venture with ACCIONA AGUA.
Design, Delivery and Installation of Mechanical
and Electrical Equipment
Bosnia and Municipal wastewater treatment plant
Herzegovina Rehabilitation of all existing civil structures and
buildings.
Design, Engineering, Supply, Installation, and
Commissioning of all mechanical, electrical and
automation equipment with sludge treatment
India
Sewer System, pumping station and pumping
main
Design, engineering, supply, construction,
commissioning, operation and maintenance (10
years) of all civil, mechanical, electrical and
automation works
India
Industrial wastewater treatment plant:
Design, construction, supply and commissioning
of mechanical and electrical equipment. The
WWTP comprises of screening, oil removal,
biological treatment using membrane bioreactor
process

Passavant E&E, General Profile - 4QTR 2015_ English

Size

Status

Capacity:
500.000 m3/d
2,700,000 PE

ongoing

Capacity:
170.000 m3/d
600,000 PE

ongoing

Capacity:
81.2 km pipe sewer

ongoing

Capacity:
4.500 m3/d

completed
2015

11 of 49

Adiyaman

Turkey

Municipal wastewater treatment plant:


Capacity Stage 1
Design, construction, supply and commissioning of
185,119 PE
mechanical and electrical equipment for mechanical
plant for sludge dewatering. Activated sludge plant Capacity Stage 2
with primary clarifiers, biological
252,190 PE
nitrification/denitrification and biological/chemical
phosphorous removal and anaerobic stabilisation of
sludge in sludge digesters
Municipal wastewater treatment plant Rehabilitation
Capacity:
including Pretreatment, Screening, Aeration Tanks,
60.000 m3/d
Final Sedimentation, Phosphorous Removal, Sludge
Dewatering
PR action as a lead JV partner with DSWP to build
Capacity:
the new pumping station MPS8N which is
1600 l/s
adjustment to the existing pumping station MPS8 as
part of AD assets enhancement scheme
Construction, completion, commissioning and
handing over of new pumping station MPS8N
including associated works limited to electrial
substation, Surge control system, Odour removal
system, and standby power generation
Municipal wastewater treatment plant:
Capacity:
Design, construction, supply and commissioning of
24.000 PE
mechanical and electrical equipment for mechanical
plant with sludge treatment

ongoing

Fraiha

Iraq

Abu Dhabi

UAE

Weilerbach

Germany

Sinaia and Breaza

Romania

Municipal wastewater treatment plant:


Rehabilitation and extension
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment
Civil works, supply and commissioning of
mechanical and electrical equipment for a turn-key
water works (mechanical and chemical treatment
and sludge treatment)
Municipal wastewater treatment plant Rehabilitation
including Pretreatment, Screening, Aeration Tanks,
Final Sedimentation, Phosphorous Removal, Sludge
Dewatering

Capacity:
70.000 PE

ongoing

Campina and
Plopeni

Romania

Capacity:
86.000 PE

ongoing

Galati

Romania

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment

Capacity
280,000 PE

ongoing

Roman

Romania

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment

115.400 PE

ongoing

Reghin

Romania

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment

55,000 PE

ongoing

Kerbala

Iraq

12*3400 m3
700.000 PE

ongoing

STEP
Abu Dhabi

Abu Dhabi

Main Contract for Passavant Roediger Anaerobic


Sludge Treatment System including Gasmixing,
Combined Heat and Power Units, Sludge Handling,
Sludge Heating and Thickening System, Gas
Storage for 12 Concrete Digesters
each 3.400 m3
Strategic Tunnel Enhancement Program
Contract for the design of mechanical and electrical
Equipment including odour treatment for the major
pumping station

Capacity 15
m/sec
87.840 m/h

ongoing

Passavant E&E, General Profile - 4QTR 2015_ English

ongoing

ongoing

ongoing

12 of 49

Wadi Shallala

Jordan

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment.

Capacity:
164,000 PE

completed
2015

Poarta Alba

Romania

Municipal wastewater treatment plant:


Capacity 55,000 completed
Design, construction, supply and commissioning of
PE
2014
mechanical and electrical equipment for mechanical
plant with sludge treatment

Nablus

Palestine

Municipal wastewater treatment plant:


Capacity 150,000 completed
Design, construction, supply and commissioning of
PE
2014
mechanical and electrical equipment for mechanical
plant with sludge treatment.

Zellinger Becken

Germany

CSC9
China Steel

Taiwan

Bouira

Algeria

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment incl. sludge
treatment
Municipal wastewater treatment plant:
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant and related network.
Municipal wastewater treatment plant:
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant and related network.

Braila

Romania

Batman

Turkey

Zadar

25,000 PE

completed
2014

Capacity:
60.000m/d

completed
2013

Capacity:
150,000 PE

completed
2011

Municipal wastewater treatment plant: Design,


construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant, incl. aeration and sludge dewatering.
Municipal wastewater treatment plant:
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
plant with sludge treatment.

Capacity:
270,000 PE

completed
2011

Capacity:
320,000 PE

completed
2011

Croatia

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.

Capacity:
100,000 PE

completed
2010

Ramnicu Valcea

Romania

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.

Capacity:
130,000 PE

completed
2011

Montana

Bulgaria

Municipal wastewater treatment plant:


Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.

Capacity:
100,000 PE

completed
2009

Yanbu

Timgad

Saudi-Arabia Municipal wastewater treatment plant:


Capacity:
completed
Design, construction, supply and commissioning of
300,000 PE
2009
mechanical and electrical equipment for mechanical
and biological plant with multi-layer sand filtration,
Ultrafiltration and sludge treatment.
Algeria
Municipal wastewater treatment plant:
Capacity: 15,000 completed
Design, construction, supply and commissioning of
PE
2009
mechanical and electrical equipment for mechanical
and biological plant and related network.

Fujairah

U.A.E.

Budapest North

Hungary

Municipal wastewater treatment plant:


Capacity: 91,429 completed
Design, construction, supply and commissioning of
PE
2008
mechanical and electrical equipment for mechanical
and biological plant and related network.
Sludge treatment plant for municipal wastewater
treatment plant:
General contractor for the design, construction and
in commissioning of sludge digesters, 2 x 12,000 m

Passavant E&E, General Profile - 4QTR 2015_ English

Capacity:
1,333,333 PE

completed
2008

13 of 49

Yichang

China

La Gorgue

France

Szeged

Hungary

Katowice

Poland

Constanta North

Romania

Pfattertal

Germany

Shijiazhuang
(C4)

China

Niort

France

Honfleur

France

Chantilly

France

Kumanovo

Macedonia

Shijiazhuang
(M1)

China

Lianyungang

China

Sludge treatment plant for municipal wastewater


treatment plant:
Subcontractor for the design and commissioning of
sludge digesters with gas injection, 2 x 8,500 m;
1,840 kW
Wastewater and sludge treatment plant :
Consortium with Wangner Assainissement (sludge
process) and ECGC (civil works) for design,
construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant and related network.
Municipal wastewater treatment plant:
Consortium with Strabag Epito; Design,
construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.
Municipal wastewater treatment plant:
Consortium with Hydrobudowa-6. Design,
construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.
Municipal wastewater treatment plant:
Joint Venture with Themeliodomi S.A.
Construction and supply of mechanical and
electrical equipment for mechanical and biological
plant with sludge treatment.
Municipal wastewater treatment plant:
Consortium with Pfaffinger (Passau, Germany).
Design and supply of mechanical and electrical
equipment for mechanical and biological plant with
sludge treatment.
Municipal wastewater treatment plant:
Joint Venture with Bilfinger Berger. Design,
construction, supply and commissioning of sludge
treatment and energy recovery facilities.
Municipal wastewater treatment plant:
Consortium with Razel and Bilfinger Berger.
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.
Municipal wastewater treatment plant:
Joint Venture with Razel, Bilfinger Berger and
Ekoplant for the refurbishment of the plant. Design
and construction of mechanical and electrical
equipment for mechanical and biological plant.
Municipal wastewater treatment plant:
Design, construction, supply and commissioning of
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.

Capacity:
600,000 PE

completed
2007

Capacity: 20,000 completed


PE
2007

Capacity:
250,000 PE

completed
2007

Capacity:
180,000 PE

completed
2007

Capacity:
255,000 PE

completed
2011

Capacity: 18,000 completed


PE
2006

Capacity:
2,100,000 PE

completed
2006

Capacity: 81,000 completed


PE
2006

Capacity: 25,300 completed


PE
2006

Capacity: 35,000 completed


PE
2005

Municipal wastewater treatment plant:


Capacity: 91,000 completed
Design, construction, supply and commissioning of
PE
2005
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.
Municipal wastewater treatment plant (Qiaodong
WWTP):
Design, supply and commissioning of mechanical
and electrical equipment for mechanical and
biological plant.
Municipal wastewater treatment plant (extension):
Design, supply and commissioning of mechanical
and electrical equipment for mechanical and
biological plant with sludge treatment.

Passavant E&E, General Profile - 4QTR 2015_ English

Capacity:
2,100,000 PE

completed
2005

Capacity:
300,000 PE

completed
2004

14 of 49

Murska Sobota

Slovenia

Fuyang

China

Dinard

France

Kunming 1
Update

China

Kunming 1
Extension

China

Jining

China

Kunming (4B +
5)

China

Saint-Andr

France

Wiesbaden

Germany

Tengzhou

China

Berglen

Germany

Bad Emstal

Germany

Huaibei

China

Municipal wastewater treatment plant:


Subcontractor of SGP Pomgrad. Mechanical and
electrical equipment for mechanical and biological
plant with sludge treatment.

Capacity: 42,000 completed


PE
2004

Municipal wastewater treatment plant:


Capacity:
Design and supply of mechanical and electrical
320,000 PE
equipment for mechanical and biological plant,
including electrical measurement and process
control equipment.
Municipal wastewater treatment plant:
Capacity: 52,000
Joint Venture contract with Razel RNF, Bilfinger
PE
Berger and SPACE SA. Supply of mechanical,
electrical as well as measurement and process
control equipment for mechanical and biological
plant with sludge treatment and tertiary treatment
with sand filters.
Municipal wastewater treatment plant
Capacity:
(refurbishment):
125,000 PE
Design and supply of mechanical and electrical
equipment for mechanical and biological plant with
sludge treatment.
Municipal wastewater treatment plant (extension):
Capacity:
Design and supply of mechanical and electrical
250,000 PE
equipment for mechanical and biological plant.
Municipal Wastewater treatment plant:
Capacity:
Design and supply of mechanical and electrical
670,000 PE
equipment for mechanical and biological plant,
including electrical measurement and process
control equipment.
Two municipal wastewater treatment plants:
Capacity:
Design and supply of mechanical and electrical
220,000 PE +
equipment for mechanical and biological plant with
150,000 PE
sludge treatment.
Municipal wastewater treatment plant:
Capacity: 17,000
Joint Venture contract with Razel Pico Sud: Supply
PE
of mechanical and electrical equipment for
mechanical and biological plant including
measurement and process control equipment and
UV treatment as well as sludge treatment.
Municipal Wastewater treatment plant:
Capacity:
Supply, construction and commissioning of
325,000 PE
mechanical and electrical equipment for mechanical
and biological plant with sludge treatment.

completed
2004

Municipal wastewater treatment plant:


Design and supply of mechanical and electrical
equipment for mechanical and biological plant with
sludge treatment including electrical measurement
and process control equipment.
Municipal wastewater treatment plant
(refurbishment and turnkey extension):
Concrete redevelopment, mechanical and electric
equipment.
Municipal wastewater treatment plant:
Construction and supply of mechanical and
electrical equipment for mechanical and biological
plant including feeding pumping station, stormwater overflow tank, measurement and process
control Equipment
Sludge treatment plant for municipal wastewater
treatment plant:
Design and supply of mechanical and electrical
equipment for mechanical and biological plant with
sludge treatment, including electrical measurement
and process control equipment.

Capacity:
600,000 PE

completed
2002

Capacity: 9,500
PE

completed
2001

Capacity: 8,500
PE

completed
2001

Capacity:
260,000 PE

completed
2001

Passavant E&E, General Profile - 4QTR 2015_ English

completed
2003

completed
2003

completed
2003
completed
2003

completed
2003
completed
2003

completed
2003

15 of 49

Jena

Germany

Buchholzbach

Germany

Kriftel

Germany

Rbeland

Germany

Bautzen

Germany

Hangzhou

China

Schifflange

Naumburg

AnnabergSchnfeld

Weinstadt

Municipal wastewater treatment plant:


Joint Venture with Hochtief (Leipzig, Germany)
and Passavant EMSR-Technik (Aarbergen,
Germany). Construction and supply of mechanical
and electrical equipment for mechanical and
biological plant with sludge treatment, including
measurement and process control equipment
Municipal wastewater treatment plant:
Design, construction and supply of mechanical and
electrical equipment for mechanical and biological
plant including measurement and process control
equipment
Municipal wastewater treatment plant:
Joint Venture contract with civil engineering
company Mller (Hofheim, Germany).
Construction and supply of mechanical and
electrical equipment for mechanical and biological
plant with sludge treatment including measurement
and process control equipment
Municipal Wastewater Treatment Plant:
Construction and supply of mechanical and
electrical equipment for mechanical and biological
plant incl. measurement and process control
equipment
Municipal wastewater treatment plant:
Construction and supply mechanical and electrical
equipment for mechanical and biological plant with
digestion and biogas utilisation.

Municipal wastewater treatment plant:


Design and supply of mechanical and electrical
equipment for mechanical and biological plant with
sludge treatment including electrical measurement
and process control equipment.
Luxembourg Municipal wastewater treatment plant:
Consortium contract with Tralux
(Luxemburg). Construction and supply of
mechanical and electrical equipment for mechanical
and biological plant, incl. electrical measurement
and process control equipment, as well as
modernization and extension of sludge treatment
plant and biogas utilisation.
Germany
Municipal wastewater treatment plant:
Construction and supply of mechanical and
electrical equipment for mechanical and biological
plant including measurement and process control
equipment
Germany
Municipal and industrial wastewater treatment
plant:
Joint Venture with Purac (Merseburg, Germany).
Supply of mechanical and electrical equipment for
mechanical and biological plant including digestion
and industrial wastewater treatment (paper industry)
Germany
Municipal Wastewater treatment plant:
Supply of mechanical and electrical equipment for
mechanical and biological plant including
measurement and process control equipment

Capacity:
145,000 PE

Capacity:
PE

completed
2001

4,500 completed
2000

Capacity: 49,000 completed


PE
2000

Capacity: 45,000 completed


PE
2000

Capacity:
50,000/75,000
PE
Capacity:
Mio. PE

completed
2000

3.0 completed
2000

Capacity: 90,000 completed


PE
2003

Capacity:
PE

6,500 completed
1999

Capacity: 49,700 completed


PE
1999

Capacity:
75,000/ 94,500
PE

completed
1999

Gotha

Germany

Municipal wastewater treatment plant:


Design, construction and supply of mechanical and
electrical equipment for mechanical and biological
plant.

Capacity:
200,000 PE

completed
1993

SaarbrckenBurbach

Germany

Municipal wastewater treatment plant:


Design, construction and supply of mechanical and
electrical equipment for mechanical and biological
plant.

Capacity:
200,000 PE

completed
1990

Passavant E&E, General Profile - 4QTR 2015_ English

16 of 49

4.4

Case Histories Wastewater Treatment


The following provides a snap shot of PASSAVANT ENERGY & ENVIRONMENTs
involvement in the Wastewater Treatment business: -

Municipal Wastewater Treatment Plant Braila, Romania Capacity: 100,000 m/d

Size of plant: 275,000 PE


Sewage flows: Daily average
100,000 m/d
Peak storm weather flow
9,720 m/h
Treatment Process:
Primary Treatment, Coarse and Fine Screens, aerated Grit and Grease Chamber, Fine
Bubble Aeration, Final Sedimentation, Sludge Thickening and Dewatering
Status:

Order placed in 2009, Commissioning in 2011

Municipal Wastewater Treatment Plant Wiesbaden, Germany Capacity:


100,000 m/d

Size of plant: 325,000 PE


Sewage flows: Daily average
100,000 m/d
Dry weather flow 3,200 m/h
Mixed water flow 5,500 m/h
Treatment Process:
Preliminary clarification, activated sludge tank, secondary sedimentation tank, microstrainer of the clarified waste water, sludge treatment in fermentation tanks, sludge
dewatering in filter-presses and complete new electronic control
Status:

Order placed in 1997, Commissioning in 2003

Passavant E&E, General Profile - 4QTR 2015_ English

17 of 49

Municipal Wastewater Treatment Plant Hangzhou, China Capacity: 600,000 m/d

Sewage flows: Mechanical stage 600,000 m/d


Biological stage 400,000 m/d
Hourly peak: Mechanical stage 32,500 m/d
Biological stage
21,650 m/d
Treatment Process:
Mechanical stage with aerated grit chamber and primary sedimentation; Biological stage
with de-nitrification and fine bubble aeration; Sludge treatment with pre-thickening,
digestion and dewatering in belt filter presses; Energy, measuring and control technology
Status:
Order placed:
06 / 1996
Commissioning: Mechanical stage: 12 / 1998
Biological stage: 09 / 1999
Sludge treatment: 05 / 2000

Municipal Wastewater Treatment Plant Shijiazhuang, China Capacity: 500,000 m/d

Size of plant: 2,100,000 PE


Sewage flows: Daily average
500,000 m/d
Dry weather flow 20,883 m/h
Storm water flow 650,000 m/d
Treatment Process:
Primary sedimentation, activated sludge process, secondary sedimentation, sludge
thickening, sludge digestion, sludge dewatering, biogas treatment and electrical equipment
Status:
Date of contract: 12 / 2002
Commissioning: 12 / 2005 + 12 / 2006

Passavant E&E, General Profile - 4QTR 2015_ English

18 of 49

Municipal Wastewater Treatment Plant Kunming 4B/5, China (2 plants)


Capacity: 75,000 / 50,000 m/d

Size of plant: 220,000 / 150,000 PE


Sewage flows:
Average dry weather flow:
75,000 / 50,000 m/d
Maximum wet weather flow:
5,940 / 3,875 m/h
Treatment Process:
Mechanical stage; Biological stage with activated sludge process, fine bubble aeration and
final sedimentation; Sludge thickening and dewatering; Electrical equipment
Status:

Date of contract: 05 / 2000


Commissioning: 09 / 2003

Municipal Wastewater Treatment Plant Psyttalia, Greece Capacity: 800,000 m/d

Size of plant: 3,300,000 PE


BOD load of 220,000 kg/d
Treatment Process:
Mechanical stage:
6 x grab bar screens, 6 x fine screens, 2 x screw compactors,
192 x outlet baffle
Sludge treatment:
4 x anaerobic digesters (10,000 m each)
Status:

Date of contract:
Completion:

Passavant E&E, General Profile - 4QTR 2015_ English

1999
2004

19 of 49

Municipal Wastewater Treatment Plant and O&M Fujairah, U.A.E.


Capacity: 16,000 m, extension of 16,000 m ongoing Operation Period: 30 years

Size of plant: 91,400 PE


Sewage flows:
Daily average
16,000 m/d
Dry weather flow 1,200 m/h
Storm water flow 1,500 m/d
Treatment Process:
Pre-treatment, primary sedimentation, activated sludge process, secondary sedimentation,
tertiary treatment, sludge thickening, sludge digestion, sludge dewatering, biogas
treatment and odour control system with biofilters
Status:
Contract award: 05 / 2004
Contract Signature 22.09.2004
Commissioning in 11/2009
5.0

SLUDGE TREATMENT

5.1

Overview
Passavant Energy & Environment GmbH has had an essential share in the development
of anaerobic sludge stabilization and equipment: Moreover; our expertise obtained from the
supply, installation, commissioning and maintenance of more than 1,500 plants worldwide is
incorporated into the design of each new plant. We plan highly loaded digestion plants which
can be safely operated through digestion times of nearly 14 days.
Our modern digesters can also be used for the joint or exclusive treatment of bio waste.
In order to meet the manifold and sophisticated demands on modern digestion plants, the
following conditions are important for a good and quick digestion process:
The supplied raw sludge must be well and gently seeded with re-circled sludge.
A thorough mixing of the digestion tank is indispensable.
The temperature in the tank must be constant in time and place.
The solids content in the tank must be constant.
Long-term deposits must be prevented.
Closed layers of scums must be prevented and easy removal of floating solids must be
ensured.
Quick degassing of sludge must be possible and foam formation must be safely
detected.
The equipment must be reliable in operation.
Flexibility of the mode of operation must be guaranteed.

Passavant E&E, General Profile - 4QTR 2015_ English

20 of 49

Design of Digestion Plants


Due to the multiple demands on digestion plants, it is not possible to establish universal
design guidelines. The digester and its equipment are designed individually for each client and
are customized to their special needs.
The diagram of a modern digestion plant given below can thus only serve for the procedural
assignment of the various components of the equipment described in the following.
Equipment Components of Digestion Plants
The equipment components listed in this document are produced by Passavant Energy &
Environment GmbH as licensed professional firm according to DVGW G 301 (Rules of the
German Technical and Scientific Association for Gas and Water).
We set great store by supreme processing quality, as gas produced during the digestion process
is very corrosive. Our skilled welders are supervised by a professional welding engineer.
Moreover, all components made of stainless steel are pickled in a dipping bath in a
workmanlike manner after their production and are then passivated.
As a matter of course, we are able to supply proof for all used materials according to EN
10.204 by test report 3.1 B, as it is legally required in Germany for the gas sector.

5.2

Advantages
The residues from modern waste water treatment put the operating company to considerable
expense due to the necessary treatment and disposal measures.
Anaerobic sludge digestion was developed decades ago and today is an integral part of every
sophisticated sludge disposal concept. Passavant Energy & Environment GmbH is a
leader in the design and optimization of this process.
Benefits of the Passavant Energy & Environment GmbH system include:

5.3

Reduction of the sludge volume by about 50%, thus requiring smaller aggregates and
plants for dewatering, drying, incineration or dumping.
Reduction of the organic sludge volume by up to 50% without using expensive electric
energy, thus ensuring a relative odourless sludge as well as improved sludge dewatering
properties.
Reduction of the sludge volume, thus fewer chemical substances needed for
conditioning and reduced disposal expense.
Elimination of the difficulty to dispose of grease trap residues and simultaneous
fermentation in the digester.
Production of biogas whose energetically utilization can ensure in many cases the selfsufficient operation of treatment plants.
Reduced space required because the aeration tanks are much smaller due to higher
sludge load.
In conjunction with a pasteurization stage, the sludge can be safely disinfected and its
reuse can thus be regarded as hygienically safe.

References Sludge Digestion


Passavant Energy & Environment GmbH has globally proven sludge digestion experience.

Passavant E&E, General Profile - 4QTR 2015_ English

21 of 49

The following is the list of references our company has attained within the Middle East region,
which add to the 1,500 plants that Passavant Energy & Environment GmbH has
constructed throughout the world.
Plant location

Country

Description

Size

Status

Kassel

Germany

7,500 m
335,000 PE

ongoing

Reghin

Romania

1,500 m
55,000 PE

ongoing

Roman

Romania

1 x 2.300 m
1 x 1.500 m3
115.400 PE

ongoing

Kerbala

Iraq

12*3400 m3

completed
2014

Nablus

Palestine

1 x 3,650 m
150,000 PE

completed
2014

Poarta Alba

Romania

1 x 1,400 m3
55,000 PE

completed
2014

Shanghai
Bailonggang

China

8 x 12,400 m3
4,333,333 PE

completed
2011

Gut Grolappen

Germany

Supply and installation of mechanical


equipment, such as:
- sludge mixing system (draft tube mixer)
- sludge heating system
- pumps
- pipework
- gas system incl. special PR workshop
Equipment
Cylindrical Concrete Tank
Mixing:
- vertical mixer
Gas utilisation:
- ceramic filter
- gas holder
- gas flare
- heating system
- odour control system
Cylindrical Concrete Tank
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- ceramic filter
- gas tank
- heating system
EPC Contract for a Passavant Energy &
Environment Anaerobic Sludge
Treatment System including Gasmixing,
Combined Heat and Power Units, Sludge
Handling, Sludge Heating and
Thickening System, Gas Storage
for 12 Concrete Digesters each 3.400 m3
Cylindrical Concrete Tank
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
ceramic filter
- gas tank
- gas flare
- heating system
Clyindrical Concrete Tank
- Mixer
- sludge circulation pumps
Gas utilisation:
- gas boiler and CHP
Egg shape concrete tanks
- impeller mixer
Gas utilisation:
- gas holder
- gas flare
- 3 water boilers, 8 double-pipe heat
exchangers
Sludge Treatment Technology:
Mixing:
- sludge impeller mixer
Gas utilisation:
- sludge heating with heat exchanger

4 x 14,500 m
2,500,000 PE

completed
2007

Passavant E&E, General Profile - 4QTR 2015_ English

22 of 49

Fujairah

U.A.E.

Budapest North

Hungary

Yichang

China

Szeged

Hungary

Shijiazhuang

China

Katowice

Poland

Kumanovo

Macedonia

Cylindrical steel tanks


Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas boiler
Cylindrical steel tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engine for power generation
- gas boiler
- gas flare
Egg shape concrete tanks
Mixing:
- gas injection
Gas utilisation:
- desulphurisation
- gas tank
- gas flare
- heating system
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engine for power generation
- gas boiler
- gas flare
Egg shape concrete tanks
Mixing:
- impeller mixer
Gas utilisation:
3 x CHP directly coupled with blowers
2 x CHP
2 x gas/oil boiler
2 x gas tank
2 x gas flare
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- CHP
- digester and building heating
- gas flare
Cylindrical concrete tanks
Mixing:
- gas injection
Gas utilisation:
- low pressure biogas storage tank
(300m)
- biogas filtering system
- 2 x CHP (90kW each)
- heating
- gas flare

Passavant E&E, General Profile - 4QTR 2015_ English

1 x 2,800 m
100,000 PE

completed
2008

2 x 12,000 m
1,000,000 PE

completed
2008

2 x 8,000 m
600,000 PE

completed
2007

2 x 4,000 m
230,000 PE

completed
2006

6 x 11,500 m
2,100,000 PE

completed
2006

2 x 3,100 m
180,000 PE

completed
2006

1 x 1,600 m
91,000 PE

completed
2005

23 of 49

Nanchang

China

Bangkok

Thailand

Wiesbaden

Germany

Kubratovo/Sofia

Bulgaria

Psyttalia/Athens

Greece

Dihua

Taiwan

Jining

China

Tengzhou

China

Schifflange

Luxemburg

Diyarbakir

Turkey

Cylindrical concrete tanks


Mixing:
- impeller mixer
Gas utilisation:
- gas engine for power generation
- gas boiler
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating
- gas flare
Mixing (new digester):
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engine for power generation
- digester and building heating
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas system
Egg shape concrete tanks
Mixing:
- impeller mixer
Gas utilisation:
- CHP directly coupled with blowers
- gas boiler
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- CHP directly coupled with blowers
- gas boiler
Cylindrical concrete tanks
Mixing:
- sludge circulation pumps
- propeller mixer
Gas utilisation:
- gas engines for power generation
- digester and building heating
Cylindrical concrete tanks
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating

Passavant E&E, General Profile - 4QTR 2015_ English

2 x 8,000 m
467,500 PE

completed
2004

2 x 3,700 m
750,000 PE

completed
2004

3 x 5,000 m
325,000 PE

completed
2003

3 x 7,000 m
1,500,000 PE

completed
2002

4 x 10,000 m
3,500,000 PE

completed
2002

3 x 14,000 m
2,500,000 PE

completed
2002

2 x 12,700 m
1,150,000 PE

completed
2002

2 x 5,300 m
600,000 PE

completed
2002

2 x 2,800 m
90,000 PE

completed
2001

2 x 3,500 m
900,000 PE

completed
2001

24 of 49

Nongkhaem

Thailand

Quingdao Licunhe

China

Al Awir, Dubai

U.A.E.

Huweiliao

Taiwan

Zgorzelec

Poland

Hangzhou

China

Haikou

China

Quingdao
Tuandao

China

Kubratovo/Sofia

Bulgaria

Cylindrical concrete tanks


Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester heating
- gas flare
Cylindrical concrete tanks
Mixing:
- impeller mixer
Gas utilisation:
- CHP directly coupled with blowers
- gas boiler
Egg shape steel tanks
Anaerobic sludge digestion
Mixing:
- propeller mixer (3,000m/h)
- sludge circulation pumps
Gas utilisation:
- digester and building heating
- sludge drying
- gas flare
Cylindrical, flat bottom, concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating
Cylindrical concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating
Egg shape concrete
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engines for power generation
- digester and building heating
Cylindrical concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engines for power generation
- digester and building heating
Cylindrical concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating
Cylindrical concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engines for power generation
- digester and building heating

Passavant E&E, General Profile - 4QTR 2015_ English

2 x 12,000 m
4,000,000 PE

completed
2001

3 x 8,400 m
1,000,000 PE

completed
2000

2 x 9,000 m
1,700,000 PE

completed
2000

2 x 700 m
28,000 PE

completed
1998

1 x 2,247 m

completed
1998

3 x 10,900 m
3,000,000 PE

completed
1997

4 x 6,000 m
1,000,000 PE

completed
1997

4 x 7,500 m
750,000 PE

completed
1997

4 x 7,000 m
1,500,000 PE

completed
1996

25 of 49

5.4

Ankara

Turkey

Trondheim

Norway

Villanueva y
Geltr

Spain

Cylindrical, flat bottom, concrete shape


Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engines for power generation
- digester and building heating
Cylindrical, flat bottom, concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- gas engines for power generation
- digester and building heating
Cylindrical, flat bottom, concrete shape
Mixing:
- gas injection
- sludge circulation pumps
Gas utilisation:
- digester and building heating

8 x 11,250 m
4,000,000 PE

completed
1995

2 x 1,500 m
120,000 PE

completed
1995

1 x 3,500 m
95,000 PE

completed
1995

Case Histories Sludge Digestion


The following provides a snap shot of PASSAVANT ENERGY & ENVIRONMENTs
involvement in the sludge digestion business: -

WWTP Shanghai Bailonggang, China Volume: 8 x 12,400 m

Sludge Treatment Technology:


Mechanical thickening of excess sludge by centrifuges, anaerobic sludge digestion, internal
sludge recirculation by sludge impeller mixers, sludge dewatering system
Status: Realized between 2008 and 2011

WWTP Hangzhou, China Volume: 3 x 10,900 m

Sludge Treatment Technology:


Passavant E&E, General Profile - 4QTR 2015_ English

26 of 49

Static pre-thickening, digestion with gas injection, desulphurization plant, heating power
station, steam boiler, digested sludge dewatering with belt filter presses
Status: Commissioning of sludge treatment in May 2000

WWTP Munich, Germany Volume: 4 x 14,500 m

Sludge Treatment Technology:


Mixing: Sludge impeller mixer, gas purification, sludge heating with heat exchanger
Realized between 2005 and 2007

WWTP Shijiazhuang (C4), China Volume: 6 x 11,500 m

Sludge Treatment Technology:


Anaerobic digestion, pre-thickening with belt thickeners, sludge dewatering with
centrifuges
Status: Commissioning in 12 / 2006

WWTP Al Awir, Dubai, U.A.E. Volume: 3 x 9,000 m

Sludge Treatment Technology:


Anaerobic digestion, internal sludge recirculation by sludge mixer with draft tube, 3
sludge recirculation pumps, 2 tube-in-tube heat exchangers
Passavant E&E, General Profile - 4QTR 2015_ English

27 of 49

Status: Commissioning in 10 / 2000

WWTP Wiesbaden, Germany Volume: 3 x 5,000 m

Sludge Treatment Technology:


Sludge treatment in fermentation tanks, sludge dewatering plant with 2 chamber filter
presses, 3 gravity sludge thickeners
Status: Commissioning in 2003

Passavant E&E, General Profile - 4QTR 2015_ English

28 of 49

6.0

WATER TREATMENT

6.1

Overview
PASSAVANT ENERGY & ENVIRONMENTs technologies aim to overcome local
bottlenecks within various concepts of water supply. We give priority to sustainable re-use and
recycling with regard to agricultural and industrial consumption. For the supply of drinking
water, we develop centralized as well as de-centralized treatment concepts, with the overall
aim to maintain a secure supply, regardless of the variety of available raw water sources.

6.2

Advantages
Equal whether the available raw water resources are

Surface water with a more or less strong human impact and natural influences or

Ground- or spring water with a geogenic character and maybe agricultural influences,

Seawater

we will consider your overall treatment objective with all its requirements. This analysis will
lead to specific treatment solutions guaranteeing a steady state drinking-water of the required
quality and ensuring a continuous supply.
Our Technical Capabilities include

6.3

Particle Removal

Oxidation

Organics Removal

Softening/Hardening

Disinfection

Residual Treatment

References Water Treatment


Plant location

Country

Saigon
Thu Doc III

Vietnam

Sibiu

Romania

Ford

India

Description
Drinking Water Treatment Plant
including Main Pumping Stations and
Effluent Storage Tanks
Engineering, Civil, Mechanical and
Electrical Works on a turnkey basis
including commissioning and trial
operation
Drinking Water Treatment Plant
including two Pumping Stations and
Effluent Storage Tanks
Engineering, Civil, Mechanical and
Electrical Works on a turnkey basis
including commissioning and trial
operation
WTP Design, construction, supply and
commissioning of mechanical and
electrical equipment reverse osmosis
treatment and finally a demineralisation
treatment to produce high quality water
for reuse purposes.

Passavant E&E, General Profile - 4QTR 2015_ English

Capacity (m/d)

Status

300.000

ongoing

34.500

ongoing

8.000

completed
2015

29 of 49

Moorburg

Germany

Botosani
(Bucecea &
Catamarasti)

Romania

Wacker
Burghausen

Cooling tower make-up water treatment


plant, 2,800 m3/h, decarbonisation,
sedimentation, sludge pumping station,
sludge dewatering, storage and dosing of
chemicals, measuring and control
technology
Two water works in Botosani county
(rehabilitation and extension):
Civil works, supply and commissioning
of mechanical and electrical equipment
for two turn-key water works
(mechanical and chemical treatment and
sludge treatment)
2 Waterworks:
Turbo LME
Sand filter

Waterworks:
Grit chamber
Turbo LME
Sand filter
Karbala
Iraq
Waterworks:
Design
Sand filter
Kumanovo
Macedonia Waterworks:
Design
Sand filter
Heinrichsthal
Germany
Waterworks:
Membrane
Ultra filtration
Al Hunayy, Riyadh Saudi-Arabia Waterworks:
Design & supply
Ras El Ain
Wear Valley
Abu Zeighan
Heigenbrcken
Sipplinger Berg
Horsley
Debreczin

Germany

67.200

DWTP Bucecea:
700 l/s

completed
2013

completed
2011

DWTP Catamarasti:
700 l/s
- hydropower plant
(turbine)
- new laboratory
- rehabilitation of 2 x
10,000 m storage
tanks
I = 42,336
II = 42,336
500,000

2009

216,000

completed
2007

26,400

completed
2004

312

completed
2004

360,000

completed
2004

Waterworks:
Ultra Filtration

24,000

completed
2004

England/UK Waterworks:
Turbo LME
Sand filter
Jordan
Waterworks:
Desalination
Sand filter
Germany
Waterworks:
Ultra filtration

38,400

completed
2003

60,000

completed
2003

960

completed
2003

864,000

completed
2002

100,800

completed
2002

I = 76,800
II = 76,800
III = 30,000
28,800

completed
2002

48,000

completed
2000

1,608

completed
2000

Jordan

Germany

Waterworks:
Turbo LME
Sandfilter
England/UK Waterworks:
Turbo LME
Sand filter
Hungary
3 Waterworks:
Sand filter

Sagunto

Spain

Viet Tri

Vietnam

Klingenberg

Germany

Waterworks:
Turbo LME
Sand filter
Waterworks:
Sand filter
Waterworks: Lime water production for
deacidification and hardening of potable
water

Passavant E&E, General Profile - 4QTR 2015_ English

completed
2001

30 of 49

Carlsfeld

Germany

Anshun

China

Lichtenberg

Germany

Erlenhagen

Germany

Podol (Prague)

Czech
Republic

Leuna

Germany

Muldenberg

Germany

Stollberg

Germany

Altenberg

Germany

Dresden-Coschtz

Germany

Mnchberg

Germany

Egau

Germany

Herbringhausen

Germany

Erlenhagen

Germany

Mhlberg

Germany

Auchel ReichshofBrchermhle

Germany

Jou-les-Tours

France

Obermaubach

Germany

Biebesheim

Germany

Waterworks:
Lime
water
production
for
deacidification and hardening of potable
water
Waterworks:
LME
Sandfilter
Waterworks:
Lime water production for
deacidification and hardening of potable
wate
Waterworks:
Lime water production for deacidification and hardening of potable water
Waterworks:
Lime water production for
deacidification and hardening of potable
water
Waterworks:
Desalination and deionisation of
potable water
Waterworks:
Lime water production for
deacidification and hardening of potable
water
Waterworks:
Lime water production for
deacidification and hardening of potable
water
Waterworks:
Lime water production for
deacidification and hardening of potable
water
Waterworks:
Lime water production
Waterworks:
LME
Sand filter
Waterworks:
LME / sand filter
Lime water production for softening
Waterworks:
Lime water production for
deacidification and hardening of potable
water
Waterworks:
Turbo-LME
Waterworks:
LME
Sand filter
Waterworks:
Turbo-LME

1,200

completed
2000

100,800

completed
1999

1,200

completed
1999

1,608

completed
1998

6 x 2,016

completed
1997

8,400

completed
1997

1,200

completed
1996

240

completed
1996

480

completed
1996

6,000

completed
1995

1,224

completed
1995

25,920

completed
1995

6,000
192

completed
1994

4,800

completed
1994

4,800

completed
1994

48,000

completed
1992

Filtration
Waterworks:
Surface water

12,000
1,920

Waterworks:
Surface water from dam

36,000

completed
1990

130,000

completed
2002

Waterworks:
Turbo-LME
Gravel filtration
Passavant E&E, General Profile - 4QTR 2015_ English

completed
1991

31 of 49

6.4

Bad Blankenburg

Germany

Waterworks:
Surface water

4,800

completed
1989

Langenau

Germany

Waterworks:
Lime water production

14,688

completed
1989

Capacity (m/d)

Status

2,000

completed
2015

25,000

completed
2013

10,000

completed
2013

3,500

completed
2012

4 x 2,520

completed
2002

References Reverse Osmosis


Plant location

Country

Ford

India

Al Arar

Heart of Doha

Khalifa City

Rghaa

Description

Design, Supply, Installation and


Commissioning of the electromechanical
Works for an Industrial water treatment
and wastewater treatment plant with
physic-chemical and biological treatment
RO desalination plant
Water demineralization
Saudi-Arabia Design, Supply, Installation and
Commissioning of the electromechanical
Works for a Brackish Water Reverse
Osmosis Plant (BWRO)
Qatar
Design, Supply, Installation and
Commissioning of the electromechanical
Works for a Treated Sewage Effluent
RO Polishing Plant
UAE, Abu Design, Supply, Installation and
Dhabi
Commissioning of the electromechanical
Works for a Treated Sewage Effluent
RO Polishing Plant
Algeria
RO desalination plant:
Desalination

Passavant E&E, General Profile - 4QTR 2015_ English

32 of 49

6.5

Case Histories Water Treatment


The following provides a snap shot of the Groups involvement in the Water Treatment
business: -

Potable Water Treatment Plant Botosani, Romania Capacity : 118,000 m/d

Treatment Process :
Turbo-LME concept (coagulation and flocculation), open gravity filtration, sludge
treatment equipment
Status : Contract award in 2007
Completion in 2011

Potable Water Treatment Plant Sipplinger Berg, Germany Capacity: 864,000 m/d

Treatment Process:
Micro straining, Ozonization, Dual media filtration on activated Carbon/Sand, SCADA
system
Status: Contract award in 1987
Completion in 2002

Passavant E&E, General Profile - 4QTR 2015_ English

33 of 49

Potable Water Treatment Plant Biebesheim, Germany Capacity: 130,000 m/d

Treatment Process:
Flocculation unit with lamella separator (LME), agitators, chemical storage and dosing
stations, sludge dewatering with chamber filter presses, sludge storage silo, grit trap,
revolving scraper, static thickener
Status: Contract award in 1986
Completion in 1989

Potable Water Treatment Plant Viet Tri, Vietnam Capacity: 50,000 m/d

Treatment Process:
Mixing of alumina (Al2SO4) in the distribution chamber, aggregation of flocs in the
flocculation ponds, separation of flocs by sedimentation and following open rapid
filtration
Status: Completion in 2003

Passavant E&E, General Profile - 4QTR 2015_ English

34 of 49

Potable Water Treatment Plant Al Hunayy, Capacity: 360,000 m/d

Treatment Process:
Raw water: Ground Water
Micro-Filtration: Raw Water Pumping Station
Pre-treatment: Aeration
Sedimentation: Sand Filtration
Net Power Supply: Pure Water Chamber
Residue Treatment: Sludge Thickening
Status: Installation and commissioning between 2004 and 2005

Industrial Water Treatment Plant integrated in power plant Walsum, Germany


Capacity: 110 to/h

Main components: Raw water storage tank, feed pumping station, Passavant Turbo-LME
Water Treatment Process, clarified water recirculation, sludge pumps including flushing
system, lime preparation and dosing device, ferric chloride dosing system, flocculation aid
station
Plant designed for the clarification of process water highly loaded with suspended solids
arising from a calcium carbonate crystal production.
Nominal suspended solids feed water concentration: 4,000 to 6,000 mg/l
Suspended matter concentration is decreased to less than 10 mg/l in the outlet of a
double Turbo-LME treatment step
Realized between 2003 and 2005

Passavant E&E, General Profile - 4QTR 2015_ English

35 of 49

7.0

WASTE TO ENERGY

7.1

Overview
Passavant Energy & Environment GmbH has the necessary know-how to design suitable
waste treatment processes for different types of waste that can considerably contribute to
saving our resources. Our plant technology focuses mainly on the digestion of organic waste
fractions, yet equally involves using components which help to produce regenerative energy or
can treat excess process water.
In a very early process stage the waste stream is split into an organic rich waste fraction,
subject to anaerobic digestion and an overflow fraction, subject to sorting and recycling.
Anaerobic Digestion Process
As we know today the anaerobic methane digestion is running on three phases under
participation of different groups of microorganisms. It must be emphasised that all
degradation steps occur simultaneously at the same time in the digester. All groups of
bacteria live together in a tight symbiosis. To achieve a complete anaerobic
degradation of organic material each group of bacteria must be working as they are
strongly dependent from the intermediate products of another group.
Consequently from both the reaction kinetic point of view and the process point of
view Passavant Energy & Environment GmbH strongly recommends the single
step wet digestion carried out as intensified digestion with proper mixing, very low
temperature gradient and very low concentration gradient which supports the bacteria
symbiosis and guarantees highest biogas yields.
Furthermore hygienisation can be achieved by a thermophilic wet digestion.
Wet Waste Treatment
The fine fraction is fed to the feed preparation tank where it is transformed into a
liquid suspension by adding process water coming from the dewatering equipment and
clean water.
The feed preparation process is operated continuously. One of the most important
features at this stage is the unique opportunity to separate the mineral fraction
containing sand, stones, glass, ceramic etc. from the organic suspension which is fed to
the digesters with the Passavant Energy & Environment GmbH feed preparation
system.
It particularly is very important for industrial scale bio-waste treatment processes to
remove minerals which are contained in the waste in considerable amount and could
cause serious damage such as sand blockages, wear and tear of pumps, pipes and
valves if they were not properly removed.
This very important feature of heavy reject separation is performed by a special
backwashing and heavy reject removal procedure, which is periodically applied and
embedded in the Passavant Energy & Environment GmbH continuous feed
preparation process. The heavy reject separation must be followed by a wet digestion
process.
Fertilizer Product (from source separated bio waste)
The fertilizer can be used to improve the soil. A special characteristic is that it can
hold water over a long period. Degradation during fermentation is sufficient to
produce a fresh bio-solid product, which can be utilised for agricultural purposes, or
for land reclamation. The stabilised product can be marketed for horticultural,

Passavant E&E, General Profile - 4QTR 2015_ English

36 of 49

agriculture, forestry and gardening purposes. The stabilized fertilizer can also be used
without any dewatering as a liquid fertilizer.
7.2

Advantages

Excellent energy balance

Small footprint

No odor problems

Stable intensified digestion process for highest degradation rates

Low operation and maintenance costs

Valuable, homogenous, nutrient-rich fertilizer product

Well proven technology in over 1.500 installations around the world

Perspective on Waste treatment:

7.3

Minimizing the total solid waste to landfill

Recycling waste components (plastic, paper etc.)

Protection of the resources by utilization of the produced biogas

Reutilization of the waste water after treatment and disinfecting for irrigation or
industrial use

Recycling of the native organic waste components by special treatment including


stabilization and utilization as secondary fertilizer.

Case Histories Waste Treatment

Solid Waste Treatment Plant Saida, Lebanon Capacity: 230 tons/d

Mechanical pre-treatment and biological treatment using the principle of digestion


Mechanical-Biological Treatment (MBT) with anaerobic process to produce biogas and
generate energy from separated organic materials resulting from a mechanical sorting
process
No external energy necessary for plant operation
Output of the digestion process is a low-quality compost
Incl. equipment for management of waste water and odorous emissions, wastewater
generation is minimized as process water is reused in a closed-circuit, surplus water not
re-introduced into the system can be used for landscaping or be spread over the
composting piles
Passavant E&E, General Profile - 4QTR 2015_ English

37 of 49

Odorous emissions are treated by means of a biological system (biofilter) and a chemical
scrubber system
8.0

TECHNOLOGY SPECIFIC INFORMATION

8.1

Sludge Digestion Sequential Gas Lance Mixing System


Passavant Energy & Environment GmbH has gained experience in the installation of
more than 1,500 digestion tanks. On the basis of this expert knowledge and our experience
gained in the maintenance and operation sector, we have developed a special system for the
injection of digester gas. With this method, the gas is injected via flexible insert lances shortly
above the digester bottom. This allows, even in case of shallow digester bottoms to prevent
the formation of deposits.
In addition, the Passavant Energy & Environment GmbH digester gas injection system
provides for the possibility of maintenance works at the mixing system even during operation
of the plant. It is thus not necessary to empty the digester at regular intervals for maintenance
purposes. As an outstanding advantage of this system, however, has to be mentioned that
continuous operation of the mixing system is not required, thus considerably reducing
operation costs.
DIGESTION PROCESS
1 Manhole
2 Jacked Heat Exchanger
3 Seeding mixer
4 Scum Removal
5 Recirculation Pumps
6 Scum-Breaker
7 Gas hood
8/9 PASSAVANT ENERGY &
ENVIRONMENTs Gas
injection
10 Gravel Filter
11 Ceramic Filter
12 Condensate Drain
13A Gas flare
13B Concealed Burning
14 Height Adjustable
Sludge Discharge
15 Supernatant Discharge
16 Boiler
17 Gas Storage

Passavant E&E, General Profile - 4QTR 2015_ English

38 of 49

8.2

Turbo-LME
The Turbo LME principle is based on the combination of the turbo-flocculation process and
the lamella separator with integrated thickener-rake unit (LME).
In this process the multi-chamber flocculation is used for the production of an extremely
sedimentable floc which is separated from water in the adjoining lamella separator and which
is thickened in one single step in the thickener up to the optimum sludge concentrations.
Highly turbulent flocculation stages, contact sludge return and individually defined energy
input are component parts of the Passavant Energy & Environment GmbH system which
enables ideally use of the reaction kinetics.
Thanks to the special and unique lamella geometry, the process provides an up to now
unattainable effluent quality, even in the case of high hydraulic loads with additional maximum
sludge thickening.
Application fields of the Turbo-LME-Process:
The turbo-LME process can be adapted to the most diverse requirements by varying the
treatment stages.

Ground and surface water treatment for preparation of potable and service water,

Patented process for the production of extremely pure lime water hardening, pH
setting,

Treatment of sand filter backwash-water,

Treatment of cooling tower water by physical-chemical flocculation and/or


decarbonisation,

3rd treatment stage for elimination of phosphate and solids,

Pre-treatment stage for membrane processes.

Advantages of the Turbo-LME-Process:

The special plate geometry of the lamellas leads to a compact and space-saving design,

Maximum settling area on small ground area,

Optimum cleaning performance caused by a unique multi-chamber turbo-flocculation


process,

Leads to optimum sludge thickening due to integrated thickener with rake unit,

Resistant to flow fluctuations,

Short start-up and shut-down times,

Short retention times.

The process meets the continuously more stringent clear water quality requirements due to its
unique technology.

Passavant E&E, General Profile - 4QTR 2015_ English

39 of 49

8.3

Package Plants
Passavant Energy & Environment GmbH offers a wide range of standard design package
system for a lot of different applications, such as for water or sewage treatment (including
tertiary quality) or reverse osmosis plants.
Advantages of a package system are the quick deployment, remote area operation and of
course the proven technology and performance. In addition, delivery time to site is very short
(between 6 and 12 weeks), with only minimum start-up and de-commissioning times.
Relocation of a package system is always possible if required. The full automation provides for
an easy operation.

Example of a Passavant Energy & Environment GmbH


Package Water Treatment System

Passavant E&E, General Profile - 4QTR 2015_ English

40 of 49

Example of a Passavant Energy & Environment GmbH


Compact Sewage Treatment System MBR Technology

Example of a Passavant Energy & Environment GmbH


Reverse Osmosis Package Plant

Passavant E&E, General Profile - 4QTR 2015_ English

41 of 49

9.0

QUALITY ASSURANCE
The statement of the products and services provided by Passavant Energy & Environment
GmbH places particular emphasis on technical expertise, safety and quality.
The policy of Passavant Energy & Environment GmbH is to provide those products and
services in a manner that conforms to Company requirements, regulatory requirements and
accepted practice.
In order to achieve this objective Passavant Energy & Environment GmbH is committed
to establish and maintain effective and efficient quality systems conforming to the
requirements of the relevant sections of (ISO 9001).
The Quality Assurance Manual for Passavant Energy & Environment GmbH is designed
to ensure that the relevant requirements for quality are recognised and that consistent and
uniform control of these requirements is adequately maintained.
All Passavant Energy & Environment GmbH activities are performed in a planned and
systematic manner under procedural control to ensure that all projects are progressively
controlled / assured until completion of the work.
The objective of Passavant Energy & Environment GmbH is to implement Company
requirements for the Projects to the specified standard, within schedule and within budget.
Determination of conformance of work to Company and regulatory requirements is made on
the basis of objective evidence of quality of the project work.
All personnel working within the Company are responsible for the quality of their work and
perform their duties in accordance with the requirements of the manual and the referenced
procedures. No deviations are permitted without the written authority of the Management
and agreement of the Company.

Passavant E&E, General Profile - 4QTR 2015_ English

42 of 49

9.1

ISO 9001:2008 Certification

Passavant E&E, General Profile - 4QTR 2015_ English

43 of 49

9.2

Quality Policy Statement


The quality, environmental and safety (QUSM) policy of Passavant Energy & Environment
GmbH states
- the QUSM system as a business concept,
- the responsibilities of management for all quality, environmental protection and safety issues
- the involvement of all managers
- that all employees are committed to the procedures stated here
- plans to constantly improve our organization.
By stating our business policy and how the QUSM system works, all levels of the company
become committed to putting the QUSM policy into practice. Both the relevant legal
regulations as well as the continual improvement of our organization and of the procedures
from efficiency standpoints are to be taken into consideration here.
QUALITY is the fulfilment of agreed upon, established and required standards on our
products and services. The yardstick by which we measure quality is the criterion which the
customer and/ or the market requires and expects.
ENVIRONMENT refers to the surroundings in which we are active. These include the air,
water, land, natural resources, flora, fauna and mankind.
SAFETY means employees are not to be exposed to any inappropriate risks while at
work, health damages are not to be incurred and causing material damages is to be avoided.
Solely activities and authority may be delegated; overall responsibility may never be. The
overall responsibility lies with the management. However, the law ( 9 OWiG, 14 StGB and
13 ArbSchG) provides that management can instruct employees to perform a task on ones
own responsibility. The employees shall then carry the complete juristic responsibility for
these tasks.
Every superior should appropriately encourage and support his employees to constantly
identify themselves with our company, perform tasks independently and responsibly, discover
their creative skills and introduce innovative ideas.
Our Ten Quality Policies:
Quality determines how successful we are on the market. Quality ensures the companys
interests - those of both the customer and of the staff on a long-term basis. We define quality
as the fulfilment of agreed upon, established and required standards on our products and
services.
All activities of our employees and their work efforts must optimally correspond on the whole
to:
- the demands of the market and the customer
- legal regulations
- technical and commercial rules
- the interests of the company.

Passavant E&E, General Profile - 4QTR 2015_ English

44 of 49

The customers interests must be thoroughly considered during consulting and whenever
contacting customers, so that our supplying services and other services can lead to optimal
problem solving. It is our desire to train and motivate all of our employees so that they will
provide quality-oriented work on their own initiative. The quality of our efforts is born out of
personal conviction: each and every employee in the company and not merely those who
oversee quality contributes to assuring and improving quality.
Quality is not a matter of coincidence nor is it to be taken for granted; rather, it has to be
systematically planned and worked at. Thus, it is particularly important that intended plans be
checked for correctness early, intensely thought over and tested well in advance.
We prefer using measures which prevent mistakes from occurring in the first place for all
activities. Using a control system to identify mistakes and then correct them is of lesser value.
Costs and delivery deadlines may not be corrected at the cost of quality; according to the
definition of quality, they are subject to ones own efforts to provide quality.
Immaterial products of our company, such as sales activities, contacting customers, installation
and customer service, also fall expressly under the same quality guidelines.
10.0

HEALTH AND SAFETY

10.1

Responsibilities
All employees have the responsibility to co-operate with the directors/supervisors to achieve a
healthy and safe workplace and to assist them in attaining a high standard of compliance with
those duties.
This document and its contents do not exempt sub-contractors from their statutory duties on
health and safety, but are intended to assist them in attaining a high standard of compliance
with those duties.
Sub-contractors wishing further guidance are referred to the Standard Rules and Conditions
for Contractors as issued by Passavant Energy & Environment GmbH GmbH.
Safety training, inspections, accident investigations etc, are the responsibility of the directors
as named above depending upon the area concerned.

10.2

Special Training
Due to the very varied nature of the contracts undertaken by Passavant Energy &
Environment GmbH any project that may present unusual work conditions will only be
undertaken following any specialised training as may be deemed necessary.

10.3

Protective Equipment
Any requirement for the use of protective equipment must be adhered to. Passavant Energy
& Environment GmbH will issue Free of Charge any protective equipment found necessary
for its employees on the strict understanding that such equipment will be used and maintained
to a satisfactory level.
Any faulty equipment must be reported immediately and not used in any circumstances.
It is the responsibility of any sub-contractor to equip their personnel suitably for any work to
be undertaken. Passavant Energy & Environment GmbH reserve the right in any contract
to supply sub-contract employees the correct safety equipment required for the work to be
carried out if in the opinion of Passavant Energy & Environment GmbH that:

Passavant E&E, General Profile - 4QTR 2015_ English

45 of 49

a)

The sub-contractor, after notification, fails to supply suitable equipment.

b)

Any member of Passavant Energy & Environment GmbH staff may be


endangered as a result of section a).

c)

Any member of staff from the client may be endangered as a result of section a).

d)

Any third party may be put at risk due to the failure of the sub-contractor to
suitably allow for his protection.

Passavant E&E, General Profile - 4QTR 2015_ English

46 of 49

10.4 OHSAS 18001:2007 Certification

Passavant E&E, General Profile - 4QTR 2015_ English

47 of 49

11.0

ENVIRONMENTAL POLICY

11.1

ISO 14001:2009 Certification

Passavant E&E, General Profile - 4QTR 2015_ English

48 of 49

11.2

Environmental Policy Statement


Our Ten Environmental Protection and Safety Policies:
We are aware of our responsibility to the environment and to our employees and third parties.
Environmental protection and safety have the same value in our company as the other
corporate objectives.
We define environmental protection and safety at work as the fulfilment of legal, social and
of our own requirements in our direct and indirect surroundings.
All of the activities of our employees and their work results must
- contribute to the achievement of environmental and safety goals
- fulfil legal regulations
- create a basis for a constant improvement in environmental protection and in our safety level
with the help of our management system.
During customer consultations and whenever contacting customers, both the customers
interests as well as our environmental protection and safety rules must be thoroughly
considered so that our supplying services and other services can lead to optimal problem
solving for the benefit of the environment and of mankind.
It is our desire to train and motivate all of our employees so that they consider environmental
and safety issues on their own as they act.
Our goal is to develop and produce high quality plants which will equally fulfil economical,
safety and environmental friendliness requirements.
Already during the planning phase of our entire operational processes and while developing
our plants using the best available technology, we strive to minimize strains on the
environment and raise safety at the workplace.
In all of our activities, we pay particular attention to using raw materials, water and energy
sparingly in order to save resources and decrease waste by making it a priority to avoid
creating waste and to recycle.
Our suppliers and customers are also included in our active provisions for environmental
protection and safety.
We are open to contact with the public and will accordingly provide any information desired
concerning our environmental protection and safety activities.

Passavant E&E, General Profile - 4QTR 2015_ English

49 of 49

WASTEWATER & WATER


ENGINEERING
Reference List

Turnkey contracts

Passavant Energy & Environment GmbH


Herriot's
Herriotstrae 1
60528 Frankfurt
Tel: +49 (0)69 94 74 15 - 0
Fax: +49 (0) 69 94 74 15-111
www.passavant-ee.com
info@passavant-ee.com

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Value total
contract in
Mio Euro

Type of plant / Scope of works

Construction
duration

Ford
Ford India Pvt Ltd. /DURR India
Limited,
India Assembly Plant 2,
Revenue Survey No 1, Village
Northkotpur, Ahmedabad
Gujrat/ India - 382170
Tel.: +91 0271 7670004

0.3

Industrial Wastewater Treatment Plant


Design, Supply, Erection, Testing &
Commissioning of Ion Exchange
Demineralisation Plant
3
Capacity: 2 x 40 m /hr

2013-2014

Galati
APA CANAL S.A. GALATI
STR. C. BRANCOVEANU NR. 2,
800058 Galati/Romania
Tel.: +40 0236 473380
Fax: +40 0236 473367

7.6

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical plant with sludge
treatment
Capacity 280,000 PE

2013-2014

Roman
Compania Juedteana
APA Serv S.A. Neamt
610125 Neamt/Romania
Tel : +40 0233/ 233340
Tel.:
Fax: +40 0233/ 218937

9.9

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical plant with sludge
treatment
Capacity 115,400 PE

2013-2014

Reghin
S.C. COMPANIA AQUASERV S.A
1, Ks Kroly street
Targu Mures, Mures county, Romania
Tel. +40 265/ 208 809

5.2

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical plant with sludge
treatment
Capacity 55,000 PE

2012 - 2013

Thu Duc III

35.4

Design, construction, supply and


commissioning of mechanical and electrical
equipment for the DWTP as well as intake
pumping station and pressure main
Extension by adding additional trains with a
total capacity of 300,000 m/d

2012-2014

SAIGON CLEAN WATER BUSINESS AND


INVESTMENT JOINT STOCK COMPANY
(SWIC)
No. H2 Lot A, Phu My Hung , Nguyen Van
Linh Tan Phong Ward District 7 Ho
Chi
Minh City Viet Nam
Tel.: (08) 54122518
Fax: (08) 54122517

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 1 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Kerbala
Al Hanan Contracting
Baghdad - Al-watheek Sq.
karbala - Al-Baladia Sq.near Ghorfa
commerce .
P.O.BOX : 911 Karbala

Zellinger Becken
Zweckverband Abwasserbeseitigung
Zellinger Becken
Wrzburger Str. 26
97225 Zellingen, Germany
Tel.: +49 93 64/80 72-40
Fax.: +49 93 64/80 72-80

Value total
contract in
Mio Euro

16.5

0.7

Type of plant / Scope of works

Construction
duration

Main Contract for Passavant Roediger


Anaerobic Sludge Treatment System including
Gasmixing, Combined Heat and Power Units,
Sludge Handling, Sludge Heating and
Thickening System, Gas Storage
for 12 Concrete Digesters
each 3.400 m3
Capacity 700.000 PE

2012-2014

Municipal wastewater treatment plant: Design,


construction, supply and commissioning of
mechanical and electrical equipment, sludge
treatment
Capacity 25,000 PE

2012 - 2014

2012 - 2014

Poarta Alba
SC Raja SA Constanta
Str. Calarasi nr. 22-24
Constanta, Romania
Tel. +40 241.66.40.46

6.7

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning
g of mechanical and electrical
equipment for mechanical plant with sludge
treatment
Capacity 55,000 PE

STEP Abu Dhabi


Drake & Scull Water and Power L.L.C
(DSWP)
P O Box 65794, Dubai
United Arab Emirate
Dubai

22.5

Strategic Tunnel Enhancement Program


Contract for the design of mechanical and
electrical Equipment including odour
treatment for the major pumping station
Capacity 15m/sec
87.840 m/h

Klranlage Kassel
Kasselwasser
Germany

1.04

Supply and installation of mechanical


equipment, such as:
- sludge mixing system (draft tube mixer)
- sludge heating system
- pumps
- pipework
- gas system incl.special PR workshop
Equipment
Capacity 335,000 PE

2012-2013

10.2

Municipal wastewater treatment plant:


Consortium with mit Kinetics; Process,
mechanical and electrical design, delivery and
installation of mechanical and electrical
equipment for wastewater and sludge
treatment including digestion and sludge
dewatering, commissioning and testing.

2011 - 2014

Hr. Hr. Jordan


Tel. 0561-987 69

Nablus
Nablus Municipality
Water Supply & Sanitation Department
P.O. Box 218, Nablus / Palestine
Contact:
Eng. Suleiman Abu Ghosh
Tel. +972 9 239 0000 Ext. 1821
Fax +972 9 239 0019

2012-2014

Capacity:
p
y 150,000
,
PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 2 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Value total
contract in
Mio Euro

Type of plant / Scope of works

Construction
duration

Khalifa City
Drake & Scull Water and Power L.L.C
(DSWP)
P O Box 65794, Dubai
United Arab Emirates

0.75

Design, Supply, Installation and


2011 - 2012
Commissioning of the electromechanical
Works for a Treated Sewage Effluent Polishing
Plant (RO) 3,500 m3/d

Heart of Doha
Drake & Scull Water and Power L.L.C
(DSWP)
P O Box 65794, Dubai
United Arab Emirate

1.0

Design, Supply, Installation and


2011 - 2012
Commissioning of the electromechanical
Works for a Treated Sewage Effluent Polishing
Plant (RO) 6,500 m3/d

Al Arar
Krimmley Contr.Co.(KCC)
P.O.Box 1861,
Jeddah 21441.
Tel : 02 668 8429 Ext.122
Fax : 02 668 8459

5.2

Brackish Water Reverse Osmosis


PlantDesign, Supply, Installation and
Commissioning of the electromechanical
Works for a Brackish Water Reverse Osmosis
Plant (BWRO) 25,000 m3/d

Moorburg
Vattenfall Europe Power Consult GmbH
Kraftwerkstrae 22
03226 Vetschau, Germany
Mr. Dr. Ralf Paeslack
Tel: +49/35433/752362

3.5

Cooling tower make-up water treatment plant,


2,800 m3/h, decarbonisation, sedimentation,
sludge pumping station, sludge dewatering,
storage and dosing of chemicals, measuring
and control technology

Wadi Shallala
Ministry of Water and Irrigation Water
Authority of the Hashemite Kingdom of
Jordan
Tel. +9 62 6 56 52 265
Fax. +9 62 6 56 52 287

37.0

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical plant with sludge
treatment.
Capacity: 164,000 PE

Braila
Compania de Utilitati Publice Dunarea
Braila;
1st Piata Uzinei Street,
810140, Braila / Romania
Contact:
Mr. Mihail Chirita
Tel. +40 239 692900
Fax +40 239 693290

49.9

Municipal wastewater treatment plant:


Consortium with Sistemyapi; Design,
construction, sewer construction, supply and
installation of mechanical and electrical
equipment incl. SCADA system for pumping
stations and WWTP, commissioning, training
and operation for one year
Capacity: 270,000 PE

2011 - 2012

2011-2013

2009 - 2014

2009 - 2011

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 3 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Value total
contract in
Mio Euro

Type of plant / Scope of works

Batman
Municipality of Batman/BASKI
Atatrk Bulvari
72100 Batman / Turkey
Contact:
Mr. Isa Yildiz
Tel. +90 488 212 34 26
Fax +90 488 212 34 26

12.2

Cernavoda
C.N.E. Cernavoda
Str. Medgidiei nr.2
PO box: 42
Cernavoda 905200
Jud. Constanta
Tel: + 40 241 239 337
+ 40 241 239 338
+ 40 241 239 352
Fax: + 40 241 239 266
Web: www.cne.ro

11.3

Industrial Water Treatment Plant


2007 - 2012
Design, erection and commissioning of turnkey
IWTP including M&E and control & processing
technique
- Lamellar sedimentation
- Multilayer filtration
- Activated Carbon filtration
- Ion Exchanger demineralisation
- support systems: chemical dosing,
neutralisation, steam, air

Bouira
Office National de lAssainissement
Carrefour Sidi Arcine, Route de Baraki,
Kouba, Algier / Algeria

17.8

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
and related network.

Contact:
Ms. Vesna Grizelj imi
Tel. +385 21 309 400
Fax +385 21 309 491

2009 - 2011

Capacity: 320,000 PE / 450,000 PE

Contact:
Mr. Boubitoune
Tel. +213 21 51 13 16
Fax +213 21 51 16 76
Zadar
Hrvatske Vode (Croatian Waters)
Water Management Department
Vukovarska 35
21000 Split / Croatia

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical plant with sludge
treatment.

Construction
duration

2007 - 2011

Capacity: 150,000 PE

8.6

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

2008 - 2010

Capacity: 100,000 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 4 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Ramnicu Valcea
CFCU Central Finance and Contracting
Unit
Ministry of Public Finance
44, Mircea Voda Boulevard
Entrance B, Sector 3
Bucharest / Romania

Value total
contract in
Mio Euro

10.82

Type of plant / Scope of works

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

Construction
duration

2007 - 2011

Capacity: 130,000 PE

Contact:
Ms. Liana Olaru
Tel. +40 21 326 55 55
Fax +40 21 326 87 30

Montana
Ministry of Environment and Water
EU Funds for Environment Directorate
22, Maria Luiza blvd.
1000 Sofia / Bulgaria

11.2

2007 - 2009

Capacity: 100,000 PE

Contact:
Mr. Petrov
Tel. +359 2 940 6173
F +359 2 981 4393
Fax

Botosani (Bucecea & Catamarasti)


CFCU Central Finance and Contracting
Unit
Ministry of Public Finance
44, Mircea Voda Boulevard
Entrance B, Sector 3
Bucharest / Romania

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

10.63

Two water works in Botosani county


(rehabilitation and extension):
Civil works, supply and commissioning of
mechanical and electrical equipment for two
turn-key water works (mechanical and
chemical treatment and sludge treatment):

2007 - 2012

DWTP Bucecea (666 l/s)


Contact:
Ms. Aurelia Radu
Tel. +40 21 326 55 55
Fax +40 21 326 87 30

Timgad
Office National de lAssainissement
Carrefour Sidi Arcine, Route de Baraki,
Kouba, Algier / Algeria
Contact:
Mr. Mechai
Tel. +213 21 51 13 16
Fax +213 21 51 16 76

DWTP Catamarasti (700 l/s)


- hydropower plant (turbine)
- new laboratory
- rehabilitation of 2 x 10,000 m storage
tanks

5.0

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
and related network.

2007 - 2009

Capacity: 15,000 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 5 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Value total
contract in
Mio Euro

7.1

Yanbu
Aziz Co. Ltd.
P.O. Box 1459
Riyadh 11431 / Saudi Arabia
Contact:
Mr. Moussa
Tel. +332 99 16 00 00
Fax +332 99 46 58 77

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with multi-layer sand filtration and sludge
treatment.

Construction
duration

2001 - 2009

Capacity: 300,000 PE

9.9

Fujairah (A2)
Tanqia FZC
P.O. Box 5150, Fujairah
Dubai / United Arab Emirates
Contact:
Mr. Mowawses
Tel. +971 9 228 2103
Fax +971 9 228 2104

Budapest North
+B
Budapest
d
t Biologie
Bi l i
Fvrosi Csatornzsi Mvek
Mrnki Rszvnytrsasg
Szolgltatsok Fsztlya
1087 Budapest / Hungary

Type of plant / Scope of works

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
and related network.

2005 - 2008

Capacity: 91,429 PE

9.7
87
8.7

+ Sludge treatment plant for municipal


wastewater treatment plant:
General contractor for the design, construction
and in commissioning of sludge digesters, 2 x
12,000 m

2005 - 2008
2008 - 2011

Capacity: 1,333,333 PE
Contact:
Mr. Kovacsvlgyi
Tel. +36 1 455 43 85
Fax: +36 1 455 43 86

Yichang
Hubei Provincial Minmetals
International Trading Corp.
5F. 8 Jianghan North Road
430022 Wuhan / China

2.4

Contact:
Tel. +33 3 20 66 43 43
Fax +33 3 20 66 44 44

2000 - 2008

Capacity: 600,000 PE

Contact:
Tel. +86 27-8579611
Fax +86 27-85747511

La Gorgue
Rgie SIAN
23, avenue de la Marne, B.P. 101
59443 Wasquehal / France

Sludge treatment plant for municipal


wastewater treatment plant:
Subcontractor for the design and
commissioning of sludge digesters with gas
injection, 2 x 8,500 m; 1,840 kW

1.1

Wastewater and sludge treatment plant :


Consortium with Wangner Assainissement
(sludge process) and ECGC (civil works) for
design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
and related network.

2006 - 2007

Capacity: 20,000 PE
____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 6 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Szeged
Municipality of Szeged
Szchenyi tr 10
6720 Szeged / Hungary

Value total
contract in
Mio Euro

18.1
(8.86)

Contact:
Mr. Guyla Novak
Tel. +36 62 420 285
Fax +36 62 425 821

Katowice
Miasto Katowice
Urzad Miasta, ul. Mlynska 4
40-048 Katowice / Poland

Type of plant / Scope of works

Municipal wastewater treatment plant:


Consortium with Strabag Epito; Design,
construction, supply and commissioning of
mechanical and electrical equipment for
mechanical and biological plant with sludge
treatment.

Construction
duration

2004 - 2007

Capacity: 230,000 / 294,000 PE

20.9

Contact:
Mrs. Kobla
Tel. +48 32 25 93 601
Fax +48 32 25 98 930

Municipal wastewater treatment plant:


Consortium with Hydrobudowa-6. Design,
construction, supply and commissioning of
mechanical and electrical equipment for
mechanical and biological plant with sludge
treatment.

2004 - 2008

Capacity: 200,000 PE

Saida
International Business Consultants Inc.
194, 58th Street, P.O. Box 14/6300
Beirut / Lebanon

6.8

Waste treatment plant:


Design and construction of the complete
equipment for treatment of organic rich waste
fraction with anaerobic digestion.

2004 - 2007

Constanta North
Ministry of Public Finance
Central Finance and Contracts Unit
36-38 Mendeleev street, 4th floor
Sector 1, Bucharest / Romania

27.1

Municipal wastewater treatment plant:


Joint Venture with Themeliodomi S.A.
Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment.

2003 - 2010

Capacity: 255,000 PE

Contact:
Mrs. Carmen Rosu
Tel. +40 21 326 55 55
Fax +40 21 326 87 09

Pfattertal
BSM Betriebs- und
Sanierungsgesellschaft
Anhofener Str. 17
93098 Mintraching / Germany
Contact:
Mr. Wittmann
Tel. +49 9406 94140
Fax +49 9406 941459

4.6

Municipal wastewater treatment plant:


Consortium with Pfaffinger (Passau,
Germany). Design and supply of mechanical
and electrical equipment for mechanical and
biological plant with sludge treatment.

2005 - 2006

Capacity: 18,800 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 7 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Shijiazhuang (C4)
Shijiazhuang Wastewater Treatment
Co. Ltd.
No. 262 Zhaiying Street,
Shijiazhuang, Hebei / China

Value total
contract in
Mio Euro

34.69

1.2

Contact:
Mr. Stahl
Tel. +49 3442 30370

Niort
Communaut
C
t d'A
d'Agglomration
l ti d
de Ni
Niortt
Direction de l'Assainissement
Place Martin Bastard, BP 193
79006 Niort Cedex / France

9.1

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

2005 - 2006

Municipal wastewater treatment plant:


Consortium with Razel and Bilfinger Berger
Berger.
Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

2004 - 2006

Capacity: 81,000 PE

7.4

Contact:
Mr. Durand
Tel. +33 231 81 88 00
Fax +33 231 89 18 76

Al-Hunayy
Aziz Co. Ltd.
P.O. Box 1459
Riyadh 11431 / Saudi Arabia
Contact:
Mr. Moussa
Tel.: +966 147 83440
Fax: +966 147 83947

2005 - 2006

Capacity: 12,000 PE

Contact:
Mr. Caperan
Tel. +33 5 49 78 76 58
Fax +33 5 49 78 76 77

Honfleur
City of Honfleur
BP 80049
14602 Honfleur / France

Municipal wastewater treatment plant:


Joint Venture with Bilfinger Berger. Design,
construction, supply and commissioning of
mechanical and biological plant sludge
treatment and energy recovery facilities.

Construction
duration

Capacity: 2,100,000 PE

Contact:
Mr. Liu Guixiang
Tel. +86 311 5675962
Fax +86 311 5675956

Braunfels
Braunfels Municipal Utility
Httenweg 3
35619 Braunfels / Germany

Type of plant / Scope of works

Municipal wastewater treatment plant:


Joint Venture with Razel, Bilfinger Berger and
Ekoplant for the refurbishment of the plant.
Design and construction of mechanical and
electrical equipment for mechanical and
biological plant.

2002 - 2006

Capacity: 25,300 PE

6.4

Potable water treatment plant:


Design and supply of equipment for
mechanical, biological and sludge treatment
for groundwater.
Capacity: 360,000 m/d

2004 - 2005

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 8 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Chantilly
SICTEUV
Htel de Ville
60500 Chantilly / France

Value total
contract in
Mio Euro

10.5

Contact:
Mr. Bonnet
Tel. +33 4 72 32 56 68
Fax +33 4 78 37 42 90

Kumanovo
JP Vodovod Kumanovo
Fetka Naskova
1300 Kumanovo / Macedonia

9.8

2.1

Contact:
Mr. Wang Sen
Tel.: +86 558 2058157
Fax: +86 558 2292597

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

2003 - 2005

Municipal wastewater treatment plant


(extension):
Design, supply and commissioning of
mechanical and electrical equipment for
mechanical and biological plant with sludge
treatment.

2002 - 2004

Capacity: 750,000 PE

8.9

Municipal wastewater treatment plant:


Subcontractor of SGP Pomgrad. Mechanical
and electrical equipment for mechanical and
biological plant with sludge treatment.

2002 - 2004

Capacity: 42,000 PE

Contact:
M. Roland Tusar
Tel. +386 13 00 53 32
Fax +386 13 00 53 35

Fuyang
Fuyang Wastewater Treatment Plant
Yingzhou Street,
Fuyang, Anhui / China

2003 - 2005

Capacity: 91,000 PE

Contact:
Mr. Wang Shumin
Tel. +86 518 56055316
Fax +86 518 56055315

Murska Sobota
SGP Pomgrad
Bakovska Ulica 31
9000 Murska Sobota / Slovenia

Municipal wastewater treatment plant:


Design, construction, supply and
commissioning of mechanical and electrical
equipment for mechanical and biological plant
with sludge treatment.

Construction
duration

Capacity: 35,000 PE

Contact:
Mr. Ile Mitkovski
Tel. +389 31 425 025
Fax +389 31 423 144

Lianyungang
Lianyungang Sewage
Li
S
Treatment
T t
t Plant
Pl t
Preparation Office
No. 1 East Minzhu Road / China

Type of plant / Scope of works

5.0

Municipal wastewater treatment plant:


Design and supply of mechanical and
electrical equipment for mechanical and
biological plant, including electrical
measurement and process control equipment.

1999 - 2004

Capacity: 500,000 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 9 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Dinard
City of Dinard
47, boulevard Fart BP 120
35801 Dinard / France

Value total
contract in
Mio Euro

Municipal wastewater treatment plant:


Joint Venture contract with Razel RNF,
Bilfinger Berger and SPACE SA. Supply of
mechanical, electrical as well as measurement
and process control equipment for mechanical
and biological plant with sludge treatment and
tertiary treatment with sand filters.
Capacity: 52,000 PE

2001 - 2003

1.9

Municipal wastewater treatment plant


(refurbishment):
Design and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment.

2001 - 2003

Contact:
Mr. Mi Shiyun
Tel.: +86 871 3126336
Fax: +86 871 3126319
Kunming 1 - Extension
Kunming Municipal Sewerage Co. Ltd.
N 134 Shulin
No.
Sh li Street,
St t
Kunming City, Yunnan / China

Capacity: 125,000 PE

2.6

Contact:
Mr. Mi Shiyun
Tel.: +86 871 3126336
Fax: +86 871 3126319

Jining
City of Jining
Xu Zhuang Lian Zhuang Cun Bei
Shandong Province / China

Contact:
Mr. Mi Shiyun
Tel.: +86 871 3126336
Fax: +86 871 3126319

Municipal wastewater treatment plant


(extension):
Design and supply of mechanical and
electrical equipment for mechanical and
biological plant.

2001 - 2003

Capacity: 250,000 PE

9.92

Contact:
Mr. Wang Wang
Tel.: +86 537 2257-128 or -139
Fax: +86 537 2214 156 or -139

Kunming (4B + 5)
Kunming Municipal Sewerage Co. Ltd.
No. 134 Shulin Street,
Kunming City, Yunnan / China

Construction
duration

8.4

Contact:
Mr. Guillaume (Saunier Techna)
Tel.: +33 2 99 23 12 12
Fax: +33 2 99 46 58 77

Kunming 1 - Update
Kunming Municipal Sewerage Co. Ltd.
No. 134 Shulin Street,
Kunming City, Yunnan / China

Type of plant / Scope of works

Municipal Wastewater treatment plant:


Design and supply of mechanical and
electrical equipment for mechanical and
biological plant, including electrical
measurement and process control equipment.

1999 - 2003

Capacity: 670,000 PE

8.5

Two municipal wastewater treatment plants:


Design and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment.

2000 - 2003

Capacity: 730,000 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 10 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Schifflange
Syndicat Intercommunal Vocation
Ecologique (SIVEC)
PO Box 49
3801 Schifflange / Luxemburg

Value total
contract in
Mio Euro

16.1

Contact:
Mr. Bissen
Tel.: +352 548071400
Fax: +352 545519

Type of plant / Scope of works

Municipal wastewater treatment plant:


Consortium contract with Tralux
(Luxemburg).
Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant, including electrical
measurement and process control
equipment, as well as modernization and
extension of sludge treatment plant and
biogas utilisation.

Construction
duration

1999 - 2003

Capacity: 90,000 PE

Saint-Andr
Direction dpartementale de
lAgriculture et de la Fort
19, avenue de Grande Bretagne
66025 Perpignan Cedex / France

2.8

Contact:
Mr. Hnon
T l +33 4 68 51 95 54
Tel.:
Fax: +33 4 68 51 95 95

Wiesbaden
Entsorgungsbetriebe der
Landeshauptstadt Wiesbaden
65045 Wiesbaden / Germany

Contact:
Mr. Liu Chuantao
Tel.: +86 632 558 0725
or 558 0723
Fax: +86 632 558 0703

2001 - 2003

Capacity: 17,000 PE

87.0

Contact:
Mr. Bartels
Tel.: +49 611 319500
Fax: +49 611 313914

Tengzhou
City of Tengzhou
Daiyancunnan, Jiangzun
Tengzhou City, P.C. 277500
Shandong Province / China

Municipal wastewater treatment plant:


Joint Venture contract with Razel Pico Sud:
Supply of mechanical and electrical equipment
for mechanical and biological plant including
measurement and process control equipment
and UV treatment as well as sludge treatment.

Municipal Wastewater treatment plant:


Supply, construction and commissioning of
mechanical and electrical equipment for
mechanical and biological plant with sludge
treatment.

1997 - 2003

Capacity: 325,000 PE

6.57

Municipal wastewater treatment plant:


Design and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment including
electrical measurement and process control
equipment.

1999 - 2003

Capacity: 350,000 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 11 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Berglen
Community of Berglen
Beethovenstr. 14
73663 Berglen / Germany

Value total
contract in
Mio Euro

1.0

Type of plant / Scope of works

Municipal wastewater treatment plant


(refurbishment and turnkey extension):
Concrete redevelopment, mechanical and
electric equipment.

Construction
duration

2001

Capacity: 9,500 PE

Bad Emstal
Community of Bad Emstal
Kasseler Str. 57
34308 Bad Emstal / Germany

4.1

Contact:
Mr. Rhn
Tel.: +49 5624 999729

Municipal wastewater treatment plant:


Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant including feeding pumping
station, storm-water overflow tank,
measurement and process control
equipment

2000 - 2001

Capacity: 8,500 PE

Huaibei
Huaibei Sewerage Co. Ltd.
Huai Fang Middle Road
Huaibei City, Anhui / China

4.8

Contact:
Mr. Li Hongbin
Tel.: +86 561 3112559
Fax: +86 561 3115341

Jena
Jena Municipal Utility
Gschwitzer Str. 22
07745 Jena / Germany

Sludge treatment plant for municipal


wastewater treatment plant:
Design and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment,
treatment
including electrical measurement and process
control equipment.

2000 - 2001

Capacity: 213,333 PE

8.48

Contact:
Mr. Hierl
Tel.: +49 3641 688 0
Fax: +49 3641 688 200

Municipal wastewater treatment plant:


Joint Venture with Hochtief (Leipzig, Germany)
and Passavant EMSR-Technik (Aarbergen,
Germany). Construction and supply of
mechanical and electrical equipment for
mechanical and biological plant with sludge
treatment, including measure-ment and
process control equipment

1998 - 2001

Capacity: 145,000 PE

Buchholzbach
City of Bad Mnstereifel
Marktstr. 11 - 15
53902 Bad Mnstereifel / Germany
Contact:
Mr. Blindert
Tel.: +49 2253 505174

2.2

Municipal wastewater treatment plant:


Design, construction and supply of mechanical
and electrical equipment for mechanical and
biological plant including measurement and
process control equipment

1998 - 2000

Capacity: 4,500 PE

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 12 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Kriftel
Schwarzbachverband
Vincenzstr. 4
65174 Hofheim / Germany

Value total
contract in
Mio Euro

11.2

Contact:
Mr. Gbel
Tel.: +49 6192 991425
Fax: +49 6192 21297

Rbeland
Wasser- und Abwasser-Zweckverband
Oberharz
Susenburger Str. 14
38875 Elbingerrode / Germany

6.1

9.5

Municipal Wastewater Treatment Plant:


Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant including measurement and
process control equipment

1997 - 2000

Municipal wastewater treatment plant:


Construction and supply mechanical and
electrical equipment for mechanical and
biological plant with digestion and biogas
utilisation.

1996 - 2000

Capacity: 50,000 / 75,000 PE

10.9

Municipal wastewater treatment plant:


Design and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment including
electrical measurement and process control
equipment.

1996 - 2001

Capacity: 3.0 Mio. PE

Contact:
Mr. Han Youshu
Tel.: +86 571 5165875
Fax: +86 571 6969026

Erfurt
Hydropower Plant Falken
Thringer Energie AG
Schwerborner Str. 30
99009 Erfurt / Germany

1998 - 2000

Capacity: 45,000 PE

Contact:
Mr. Ebert
Tel.: +49 3591 3752 611
Fax: +49 3591 3752 666

Hangzhou
CHSIT Construction Headquarters of
the Grand Canal Sewage Intertreat
Project
New Zhaohui Road
Hangzhou 310014 / China

Municipal wastewater treatment plant:


Joint Venture contract with civil engineering
company Mller (Hofheim, Germany).
Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant with sludge treatment including
measurement and process control equipment

Construction
duration

Capacity: 49,000 PE

Contact:
Mr. Freystein
Tel.: +49 3945 4550 0
Fax: +49 3945 4550 101

Bautzen
Bautzen Sewage Board
Schfferstr. 44
02625 Bautzen / Germany

Type of plant / Scope of works

1.4

Hydropower plant:
Construction, steel structure, mechanical and
electrical equipment including measurement
and process control equipment, 2 x 200 kW.

1999

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 13 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Naumburg
City of Naumburg
Burgstr. 14
34311 Naumburg / Germany

Value total
contract in
Mio Euro

3.4

Contact:
Mr. Illian
Tel.: +49 561 98183 35
Fax: +49 561 98183 80

Annaberg-Schnfeld
AZV Oberes Zschopau- und Sehmatal
Sehmatalstr. 18
09458 Annaberg-Schnfeld / Germany

Municipal wastewater treatment plant:


Construction and supply of mechanical and
electrical equipment for mechanical and
biological plant including measurement and
process control equipment

Construction
duration

1998 - 1999

Capacity: 6,500 PE

9.2

Contact:
Mr. Dr. Zbisch
Tel. +49 3733 22179
Fax +49 3733 25335

Weinstadt
W
i t dt
City of Weinstadt
Poststr. 17
73184 Weinstadt-Beutelsbach /
Germany

Type of plant / Scope of works

Municipal and industrial wastewater treatment


plant:
Joint Venture with Purac (Merseburg,
Germany). Supply of mechanical and electrical
equipment for mechanical and biological plant
including digestion and industrial wastewater
treatment (paper industry)

1998 - 1999

Capacity: 49,700 PE

10 2
10.2

Municipal Wastewater treatment plant:


Supply of mechanical and electrical equipment
for mechanical and biological plant including
measurement and process control equipment

1997 - 1999

Capacity: 75,000 / 94,500 PE


Contact:
Mr. Bulling
Tel.: +49 7151 693 266
Fax: +49 7151 693 121

Mnster
Mnster Municipal Utility
Albersloher Str. 27-31
48155 Mnster / Germany

7.5

Biowaste treatment plant:


Construction and supply of mechanical and
electrical equipment for biowaste treatment
plant with gas conditioning for gas usage,
including measurement and process control
equipment.

Spichra
Hydropower plant
Thringer Energie AG
Schwerborner Str. 30
99009 Erfurt / Germany

2.65

Hydropower plant:
Construction, steel structure, mechanical and
electrical equipment including measurement
and process control equipment, 1,200 kW.

1997 & 1999

1998

____________________________________________________________
____________________________________________________________
Passavant Energy - Environment GmbH - Herriotstrasse 1 - 60528 Frankfurt / Germany
Page 14 of 15

Extract from the reference list


Turnkey contracts
Location /
Customer Address

Gotha
North Thuringian water supply and
wastewater treatment Ltd.
Haarbergstr. 37
99097 Erfurt / Germany

Value total
contract in
Mio Euro

42.2

Type of plant / Scope of works

Municipal wastewater treatment plant:


Design, construction and supply of mechanical
and electrical equipment for mechanical and
biological plant.

Construction
duration

1991 - 1993

Capacity: 200,000 PE
Contact:
Mr. Mller
Tel. +49 3621 38730
Fax +49 3621 387435

Saarbrcken-Burbach
City of Saarbrcken
Mainzer Str. 261
66121 Saarbrcken / Germany
Contact:
Mr. Bch
Tel. +49 681 600 00
Fax +49 681 670 53

36.3

Municipal wastewater treatment plant:


Design, construction and supply of mechanical
and electrical equipment for mechanical and
biological plant.

1989 - 1990

Capacity: 200,000 PE

____________________________________________________________
____________________________________________________________