Académique Documents
Professionnel Documents
Culture Documents
BUILDING SERVICES
COURSE CODE
ECM346
LEVEL OF OPENNESS
CATEGORY
TRADITIONAL
66
PERIOD OF ACTIVITY
1 WEEK
TITLE
PREAMBLE
JUNE-OCT 2016
In this laboratory activity, the students are required to observe the components
of the AC system. Student need to identify which part involved in the process of
releasing heat or absorbing heat by checking and recording the temperature
and pressure provided by the equipment. Illustrate the basic operation of the
AC system. Besides, students are also required to study the condition which
might influence the COP of the air conditioner. Each group need to show the
operating curve by plotting the P-H diagram and show the differences of COP
value.
3.1
Apparatus
The group must identify the availability of the chosen apparatus in the lab
before the right procedures can be identified.
3.2
WAYS & MEANS
Procedures
The group is required to find their own approach and search for the relevant
information to prepare procedures in order to do the investigation related to the
objectives and problems mentioned above. Any safety precautions of
conducting the laboratory activities need to be highlighted in the procedure.
3.3
Data Acquisition
The group is required to observe the mechanism of the AC system. All data
collected and observed during the lab activities must be tabulate in proper
format for easy verification and presentation of the technical report.
4
RESULTS
JUNE-OCT 2016