Vous êtes sur la page 1sur 7

LAHORE RING ROAD PROJECT, (REVISED ALIGNMENT / SOUTHERN LOOP)

INVITATION FOR INSTALLATION OF CONCRETE ROW PEGS


All registered Survey & Mapping companies are hereby invited to submit their competitive
quotations for Lahore Ring Road Project, (Revised Alignment / Southern Loop) for the
following Scope of Works in accordance with attached Specifications / sketch:1) Setting out of centre line / ROW Limits at 25 m intervals including main points of
curves i.e. TS/PC/ST/PT for a length of approx. 60 km.
2) Fixing of ROW concrete pegs

~5000 Nos.

The rates for setting out of centre line / ROW Limits plus fixing of ROW concrete pegs shall
include compensation for supply, transportation of all material, fixing of precast ROW
concrete pegs including excavation / backfilling (compacted) and salary of staff, costs of
labour, tools, profit, overhead, taxes and incidental charges necessary to complete the
work in all respect to the entire satisfaction of Nespak.
All survey activities shall be supervised by Nespak Surveyors at no extra cost to the
Contractor.
The item one is optional and it may be carried out by Nespak surveyors depending upon
the availability of staff.
Sealed quotation will be received on the following address by June 1, 2009 at 10:30 hours
and will be opened on the same date at 11:30 hours..

Vice President,
H&TE Division, NESPAK House,
1-C, Block-N, Model Town Extension,
Lahore.
(Download) Invitation for fixing of ROW Concrete Pegs for Lahore Ring Road Project,
(Revised Alignment / Southern Loop) and sketch

SETTING OUT OF CENTER LINE / ROW LIMITS AND INSTALLATION


OF CONCRETE ROW PEGS ON LAHORE RING ROAD PROJECT
ALONG REVISED ALIGNMENT AND SOUTHERN LOOP (~ 60 KM)
1.0

SPECIFICATIONS

1.1

General
The setting out of center line and subsequently ROW limits shall be the basic
requirement for installation of concrete ROW pegs at 25m intervals and main
points (i.e. start and end points) of all curves. Nespak desires to hire the services
of reputed and experienced registered private parties (Contractors / Survey
Company (ies). The work shall be carried out using modern instruments operated
by experienced surveyors and assisted by other technical staff to fix the quality
concrete Pegs.
The setting out of center line is optional and it may be carried by Nespak
surveyors.
All field works shall be carried out under the supervision of Nespak surveyor(s) at
no extra cost to the Contractor.

1.2

Location of Project
The project alignment follows an entirely new route in the suburb of Lahore
metropolis. The location map is attached for guidance of the bidders to acquaint
themselves with the project area and check the accessibility of site.

1.3

Scope of Works
The required Scope of Works shall mainly comprise the following items:

Setting out of centre line & ROW limits / boundaries at 25 m intervals


including main points of curve i.e. PC and PT for a length of approx. 60 km.

Fixing of ROW concrete pegs of the required concrete


Nos.
strength of 2400 psi

~5,000

Note: - The project shall be executed in stages according to finalized design of


different packages comprising each about 10 to 20 km each. If there is some
delay in finalization of design of any package, no extra cost towards mobilization
/ demobilized (if any) shall be entertained for such temporary stoppage of work.

1.4

Methodology of Work
The procedure to be adopted by the Contractor / Surveying Company for Scope
of Works shall require the following tasks:

1.4.1

Setting out of Centerline and Fixing of Concrete Pegs


The setting out of centerline and ROW limits shall be carried out by using modern
equipment in accordance with setting out data of horizontal alignment of the
project utilizing horizontal controls. The Contractor / Survey Company will set out
center line and fix ROW limits with wooden pegs at site or alternatively location of
pegs may be provided by Nespak Surveyor. The Contractor shall replace the
wooden pegs with precast concrete Pegs as per given Sketch / Plate No.1. The
area around concrete peg shall be filled back with common material and
compacted well to the satisfaction of the supervisor.

1.4.2

Handing over of Concrete Pegs


The completed work of concrete pegs shall be handed over to PMUs
Representative on weekly basis or as agreed at site.
The concrete pegs with defects in fabrication or installation shall be removed and
replaced with accepted one at no extra cost to NESPAK.

1.4.3

Remedy of Defective Work and Maintenance of Concrete Pegs


The Contractor shall be responsible for all defective work and to replace Peg(s) if
required. The Contractor shall maintain his work for a period of one month from
the last date of handed over all the pegs are to PMUs Representative. At the
time of final handing over, any concrete peg if found missing shall again be
installed by the Contractor at his own cost.

1.5

Payment of Advance
No advance payment shall be made.

1.6

Mode of Payment
The following payments will be made for ROW concrete pegs installed and
accepted by the Employers Representative:-

1.7

On completion of work of any Package (may be


comprised 10 to 20 km each) i.e. No of concrete pegs fixed
at site and accepted / approved by the Consultant /
Client in accordance with agreed rate.

90%

On issuance of completion Certificate

10%

Performance Bond
The successful bidder shall have to submit performance bond from any
scheduled bank of Pakistan equivalent to 10% of the contract value.

1.8

Certificate of Site Visit


A statement in writing shall be submitted by the bidder certifying that he has
visited the site and familiarized himself with all conditions which may affect his
quotation / bid and that he has no query whatsoever such as access to site, etc.

1.9

Document to be Submitted with the Bid

1.

Registration Certificate of the company

2.

Details of available technical / non-technical staff

3.

List of similar Jobs completed and in-hands

4.

Rate analysis along with break up calculations

1.10

Bill of Quantities
Item

Description

Unit

Quantity

No.
1

Setting out of center line /

km

60

N0.

5,000

Rate

Amount

Rs.

Rs.

Row limits @ 25 m intervals


+ main points of curve.
2

Installation of concrete pegs


along ROW limits at 25 m
intervals as per attached
Sketch / Plate No.1

Note: Item No.1 is optional and it may or may not be awarded as part of the
Scope of Work.

Vous aimerez peut-être aussi