Installation

LG Electronics

Installation & SVC Equipment List

Cate.

Picture

Use

Name

Refrigerant charging equipment

Manifold gauge

-Measure high/low pressure


-Not used for vacuum test

-Supplement accurate volume of

Charging cylinder

refrigerant

-Eliminate substances and moisture in

Vacuum pump

Clamp meter

the pipe before charging refrigerant

-Measure current, voltage, resistance


frequency etc

Measurement Equipment

Ohmmeter

-Detect the leakage of electricity

Thermometer

-Measure temp. of in/out door


-Measure temp of return/supply air

Refrigerant

-Detect the leakage of refrigerant


at the joint of in/out door unit

detector

Installation & SVC Equipment List

Cate.

Picture

Use

Name

Measurement equipment

Noise detector

-Detect the noise of working of unit

-Detect the position of wire, water pipe

Metal detector

Range finder

reinforcing rod in the concrete


-Measure the accurate distance of
pipe to calculate the exact quantity of
additional refrigerant
- Eliminate substances on the fin of

Brush

heat exchanger

Cleansing equipment

- Clean substances / germ on the

Cleansing liquid

heat exchanger chemically

- Protect the heat exchanger by coating

Cleansing rinse

after cleaning

- Eliminate the cleansing liquid on the

Pump set for

HEX by spraying water with high

cleansing

pressure

Installation equip

- Required For installation or SVC

Lifter

Moves the I/U safely to the ceiling

#/#

Installation & SVC Equipment List

Cate.

Picture

Use

Name

Copper pipe cutter -Cut or enlarge copper pipe for


installation

and enlarger

-Bend the pipe for smooth

Copper pipe

refrigerant flow

bender

-Make hole on the ceiling or wall for

Core drill

pipes passage

Installation equipment

-Make anchor hole for inserting

Hand drill

anchor

- Use for installation of I/U or pipes

Ladder

Oxygen welding

- Use for welding of pipes

machine

Basic instrument for installation


-Hexagonal wrench, Screw driver,
tape measure, Horizontal measure, cutter
etc

Installation FLOW
Installation chart

Sleeve

Pipe Installation
Refrigerant pipe

Drain
CST / Duct
Electric wiring

Indoor unit
1-Way / 4-Way / Duct

Leakage test

Outdoor unit

Vacuum test

Charge Add ref.

Testing operation
Check

Check Point
Installation plan

Follow the installation plan

Pipe
Installation

Insulate pipe and fix


Insulation : Liquid 9T / Gas 13T

Drain

Indoor unit

No leakage at joints and insulation


Max high head to be less than 450mm from
drainage pipe
Refer to the table for Main pipe Size
Use anchor bolt
Height of Remote Controller should be 1.5M from
ground

Leakage test

Check the leakage by injecting nitrogen


gas to pipe (Check after 24hr, from the time of
completion of nitrogen gas injection)

Outdoor unit

Install the place where is no problem about


noise / safety etc (Roof)
Install tray for pipe
Install strong to prevent fall down by strong
wind

Vacuum/Charging

Test operation

Explain

Vacuum : Less than 0.05 Torr


(At least more than 1hr)
Charge the refrigerant accurately by using
a charging cylinder
Flow the testing operation check sheet

Explain to customer or operator the


manual etc

Installation Plan

Working
Plan

Working drawing

Progress Schedule

Select material & order


Installation equipment

Working
Drawing

Ex) 330 APT (Seoul)


PROJECT TITLE

1,400
900

200

()
W
H
D
(870 x 769 x 320 )
W
H
D
(900 x 1220 x 370 )
40

527-1234()

300

DRAWN BY

A'

LOUVER
()

370
1,250

CHECKED BY

SUBMITTED BY

APPROVED BY

600

LTC
1

1/30

400

DRAIN PVC 25A


(TYP)
400

1,250

LTC
1
600

NOTE

Neo Classic
(100PY)

PVC40A CAP

LTC
1

50

FRAME

UNITA-1

UNITA-1

1,650

400

40
0

LTC
1

1,300

LTC
1

3,080

320

40
0

LTC
2
2,5
25

769

1,4
50

40
0

60
0

70

370

80

()

(1,000 L x400W x80H )


()

(A-A')
1/30

4,1
00

LTC
3
3,4
40

* NOTE
DRAIN : PVC 25A
MAIN DRAIN : PVC 40A

PVC40A

DRAWING TITLE


-1(A)


(A-1 TYPE-2)

*
No. SYMBOL

Indoor unit

type

Model
LT-202C

name

Outdoor unit

Cooling capa Q'nt


(kcal/hr)

Model

(EA)

L/room

5,200

LT-202C

Kitchen

1WAY LM-080VTF

3,000

LM-450V6F

M/room

1WAY LM-080VTF

3,000

Room1

1WAY LM-060VTF

2,000

Room 2

1WAY LM-060VTF

2,000

Room 3

1WAY LM-060VTF

2,000

S/room

1WAY LM-060VTF

2,000

CUT()

1050 X 480

1000X 440

1-way

LTC-2

1050 X 480

1000 X 440

1-way

LTC-3

910 X 910

850 X 850

4-way

5200kcal

(W x H x D)
870 X 655 X 320


, 220V

2.05 kw

43 A

12000kcal

900 X 1220 X 370

, 380V

4.75 kw

10 A

DATE

2001.08

FILE NAME

DRAWING NO.

M A

Power

(EA)

1 1 9

SHEET NO.

Consumption R e m a r k s

(kW)

5,200

1x220Vx60Hz

1.84

12,000

3x380Vx60Hz

4.7

C/O

SCALE

1 / 50

Elec. Spec

Heating capa Q'nt


(kcal/hr)

4WAY

()

LTC-1

No.

: 1/50

Room

Typical
plan for-2(A1)
A/C (A-1)

100P.Y Product

Installation Plan

Ex-2) 211 APT (Seoul)


PROJECT TITLE

1,250
240

370

527-1234()

900
1,400

(870 x 769 x 320 )

DRAWN BY

CHECKED BY

SUBMITTED BY

APPROVED BY

240

40

()

5,000


1/30

600
2,160

LTC
1
1,250

400

NOTE

400

Neo Classic

600

LTC
4
PVC40A CAP

(64PY)

50

1,300

FRAME

UNIT F

3,080

769

LTC
1

UNIT F

70

370

80

400

600

(1,000 L x400 W x80 H )


()

()

LTC
1

(A-A')
400
750

1/30

LTC
1

DRAIN PVC 25A


(TYP)

* NOTE
DRAIN : PVC 25A
MAIN DRAIN : PVC 40A

DRAWING TITLE


-9(F)


(F TYPE-)

No. SYMBOL

: 1/50

Unit

Room

type

Indoor unit
Model

name

(kcal/hr)

Model

(EA)

L/room

4WAY LM-200VTF

5,200

M/room

1WAY LM-060VTF

2,000

Room 1

1WAY LM-060VTF

2,000

Room 2

1WAY LM-060VTF

2,000

Room 3

1WAY LM-060VTF

2,000

12,000

1050 X 480

1000X 440

1-way

LTC-4

670 X 670

620 X 620

4-way

No.

(W x H x D)

12000kcal

900 X 1220 X 370

4.75 kw

10 A

, 380V

DATE

2001.08

Power

(EA)
1

FILE NAME

DRAWING NO.

1 2 6

SHEET NO.

Consumption R e m a r k s

(kW)
3x380Vx60Hz

4.7

SCALE

1 / 50

M A

Elec. Spec.

Heating capa Q'nt


(kcal/hr)

LM-450V6F

CUT()

Outdoor unit

Cooling capa Q'nt

()

LTC-1

Typical
for A/C
(F-9)
plan

-9(F)

64P.Y

C/O

Installation Plan

Progress
Schedule

Make progress schedule (Weekly/Monthly/Total) base on building


construction schedule
Make detail working plan based up on progress schedule
Check the progress (Weekly/Monthly) then make balance
with total progress of building construction schedule

< Total Progress>


Category

Jan Feb Mar Apr

May Jun Jul

Sep Oct

Nov Dec

Name

1. Sleeve

000

2. Pipe/Wire

000

3. Drain

000

4. Indoor unit
5. Pressure Test
6. Leakage Test
7. Outdoor unit
8. Vacuum/Charge
9. Test operation
Total progress

30 %

Installation Plan

<Weekly Progress>
Item

Category

B'dg

Ref. Pipe

Last week result


Mon

Tue

Wed

Thu

Fri

This week plan


Sat

Sun

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Drain
Indoor unit
Ref. Pipe

Drain

A/C

Indoor unit
Ref. Pipe

Drain
Indoor unit
Ref. Pipe

Drain
Indoor unit

<Monthly Progress>
Item

Category

B'dg

Ref. Pipe

Last month result (Feb)

This month plan (Mar)

Drain
Indoor unit
Ref. Pipe

Drain

A/C

Indoor unit
Ref. Pipe

Drain
Indoor unit
Ref. Pipe

Drain
Indoor unit

Check progress of each flat to control total progress


Room No

403
402
401
303
302
301
203
202
201
103
102
101

Ref.
pipe

Drain

Indoor unit
1way

4way

Pressure

Drain

test

L e akage te s t

O utdoor
unit

Vacuum

Test

Addition

running

Sleeve

Progress

Select

Fix sleeve

Conceal
(Constructor)

Notice
Install the sleeve with right position and specification based
up on drawing
Pipe
Drain
Provide Slope for drain sleeve

Installation without sleeve would be


corroded or damaged like above picture

Sleeve
type

PVC

Steel

Steel with
wing

In case of bunch of pipes


use steel sleeve

Sleeve

Select

Size of Sleeve

Ex)
Liquid 9.52mm, Gas15.88mm
Insulation 10mm
Liquid A=9.52+102=29.52
Gas A=15.88+102=35.88
Size of sleeve=29.52+35.88+52
=75.4 80

LP/GP

LP : Liquid pipe
GP : Gas pipe

Sleeve

Detail
drawing

Insulation
(10T)
Gas pipe

Cable
ARC WELDING

PIPE SLEEVE

Liquid

pipe

INSULATION
PIPE

CAULKING COMPOUND
YARN OR INSULATION 64K

MIN. 30MM

WALL & FLOOR

4.5THK. STEEL PLATE

Detail drawing pipe sleeve

ARC WELDING

PIPE SLEEVE

PIPE

MIN. 30MM

CAULKING COMPOUND
YARN OR INSULATION 64K

4.5THK. STEEL PLATE


WALL & FLOOR

Detail drawing drain sleeve

TAPE

Installation Refrigerant pipe

Progress

Insulation

Taping/Piping

Supporting

Insulation

Insulate with seamless insulation and pipes

Taping/
Piping

Taping

Wire
Insulation

If pipes are in open space or


in ceiling, cover the pipes with
taping to prevent the infiltration of
water ( preferably bottom to top)
(Apply Ceiling concealed/
Exposed case)

Liquid

Gas

Piping with flexible tube


Use flexible tube instead
of taping
(Apply reclamation wall)

Flexible tube

Tape

Installation Refrigerant pipe

Supporting

Ceiling concealed
Clamp Hanger
Fix/suspend pipes to prevent the nose of vibration with
clamp hanger
Use set-anchor or pin-anchor to fix hanger.
Fix every 1.5 m

Pipes

Saddle
Use pin-anchor to fix saddle
Insert pin-anchor without damage to wire in the concrete
carefully

1.5 m

Installation Refrigerant pipe

Holding
Method

In case copper pipe bending ( L,U bending) radius is over R200,


support shall be provided within 600mm from bending point

Ref. Pipe

Drain

Wall And Floor Routing


In case the Piping are routed are through the walls and floor
(Concealed routes), Joint Box shall be provided for pipes protection,
easy installation ( for Ref. pipe & Drain pipe)
Joint box
installation
Joint box

Pipe insulation

Flexible tube

Installation Refrigerant pipe

Holding
Method

Joint box installation

Joint box

Connection cable
Pipe insulation

Flexible tube

Joint Box after Completion of


Concrete filling

Joint box

3
Caution

Installation Refrigerant pipe


use the sleeve & sealing work, when routing through concrete wall or floor.
After laying the copper piping, flush the cooper pipes with nitrogen to maintain
the dryness & cleanness.
flushing nitrogen pressure : more than 5kgf/
Copper pipes used, is seamless type, so, in case welding works required,
make sure to blow the nitrogen gas.
Seal the edge of the pipes to protect from inflow of debris

Check for bends, cracks etc. of pipes after installation


Flare process
Flare connection between Indoor and outdoor Units
Improper connection leads to leakage of refrigerant
- make sure to do the reamer work before flare connections
Piping work(Bending)
make sure to minimize the friction to refrigerant flow
increase in the friction, reduces the capacity
- careful use of the spring for bending work only
- dont use the hands for bending work
Welding
insert the nitrogen gas for protect the gas leakage
- if necessary, use the Thermal protector (clay)
at top and bottom 15~20 cm of welding point
outdoor pipe connection : Flare connection

Installation Refrigerant pipe

Pipe
Insulation

Flare connection
Flare Plate and copper pipe shall be connected linearly
apply the refrigeration oil at the flare surface and screw
tighten the spanner after tightening flare nut
use the double spanner to keep away the over pressure at pipe
connection point
Insulation of pipe joints
make sure insulation at pipe joints to prevent the permeation of
outside air.
Insulation shall overlap at the corners , and shall be tightened
and clamped together using clamp or tape.
in case air permeation at joint, condensation occurs, when running
in cooling mode, thus water seepage
Must insulate over
the insulator of pipe
Insulation tube

Insulation tube
Insulator of pipe

Insulator of pipe

Leakage water drop


Fixing band of
insulation tube

Fixing band of
insulation tube

Drain pipe work

Working
process
Insulation

Insulation

Combination

Holding & Head

Leaking Test

Usually, drain temperature is about 10.


Therefore, condensation takes place, when air comes in contact with drain pipe,
resulting in water seepage
-if air gap exist between drain pipe with insulation, condensation takes place,
water droplets are partially absorbed by insulation material, however, if more
condensation, water leakage takes place
( insulation material - FORM PE and thickness is more than 10mm )
- Insulate the Drain connection socket after sealing test
- Drain pipe Insulation shall be up to the unit including the flexible hose
- Flexible Hose shall be made tight using fixing band and shall be fixed without
bending
Fixing band

Insulator

Unit
Flexible tube
There should be no gap around this part

Standardized Material shall be use for Drain pipe (PVC PIPE more than
O.D 32, I.D. 25), maintain the slope gradient without any folds
Use the standardized connection tool and fixing material to prevent leakage at
drain connection point
Drain pipe Insulation is mandatory to prevent the condensation.

Drain pipe work

Combination

connect the main drain pipe line, must


use. Fixing glue to prevent leakage
Elbow, connection socket, T socket,
shall be used after leak test

In case, corrosive gas or bad smell exist at drain outlet, inflow of the
gas/smell is possible to the indoor. (use the trap at drain edge or indirect drain)

Bad example

Good example(1)

Good example(2)

Indirect
Odor trap

drainage

Odor

Leak test

Pour anti-freezing solution (for water) inside the drain pipe, concentrated on
connection point, to be kept stagnant for a period of more than 24hour,

Drain pipe work

1. Components for U-Trap installation

U-Trap

Connection socket

Connection Elbow

2. U-Trap Installation

Drain Pipe
Connection
socket

U-Trap

N.B. when U-Trap installation


1. Use the single drain pipe

Connection
Elbow
Indoor Unit

H1 : min. over 50mm


H2 : 1/2 * H1
H1

Cab for removal


dregs

H2

Drain pipe work


Slope Gradient for drain Shall be (1/50~1/100mm) and PVC pipes shall be used
support hanger shall be at 1.2 ~ 1.5m interval to prevent from loosing and
dropping
Supporting hanger

Indoor unit

Slope

Seamless insulator

[Table] The interval of the supporting hanger for drainage pipe


Diameter (mm) Less than 16
Interval (m)

20~40

Less than 0.75 Less than 1.0

40~50
Less than 1.2

65~125

More than 150

Less than 1.5

Less than 2.0

maximize the slope gradient for easy drain.


if exist the upward gradient, occurs the drain failure
if need to large gradient, use the elbow and install in the middle . 450 mm is
Maximum height for drain outlet from indoor unit, center line of outlet connection
(maximum height 700 mm for drain pump is from the base ceiling level, not the
vertical height from the center of the drain outlet connection)
In case of elbow connection is required, it is not possible to use the extension
pipe before elbow connection. Only direct connection is possible as shown in the
picture below
Down Slope
more than 3mm

Max. 450mm

Max. 450mm

450mm

Holding
And
Head

450mm

Elbow

Drain port

Indoor unit

Indoor unit
Impossible extension
of pipe into horizontally

Supporter of pipe

Drain pipe work

Common
drain
pipe

The standard of common drain pipe


- Refer to the table below
- The common drain pipe should be for A/C system only, if it should be shared
with another drainage pipe, like rainwater pipe etc.
- Avoid sharing the drain piping with other facilities like sewage, waste-water
pipes etc.
[Table] Standard Common drain pipe size
ID(OD) (mm)

25(32)

Sum of the
Capa of IU(hp)

32(40)

20

40(50)

50(60)

40

60

65(75)

100

note) Select the diameter of the rising pipe is bigger than the horizon pipes one

Installation Air vent


- The standards for installation

In case of common drain pipe Install air vent after intervals of 5 HP connected
indoor capacity
The diameter of air vent should be larger than the drainage pipe diameter
Install the net to block incoming substances or insects
To prevent a water leak through the air vent, install it more than 100mm higher
than highest level of drain pipe

Air Vent
slope 1/50 ~ 1/100

Vertically downward slope

Common drain

Drain pipe work

Common
drain
pipe

common drain pipe


when several Indoors drain are connected to common drain pipe, resistance
at drain outlet of each indoor, has a cumulative effect, which keeps on
increasing with no of indoors.
if the pipe diameter is small, backward flow occurs at the drain pan because of
friction and static pressure of indoor unit blower, thus resulting in to leakage
For the size of common drain pipe diameter, please refer to the table on pg. no. 24
Same
position/Height

Head (Elevation)
Air vent

Air vent

Refer to the
Table (Diameter)

Make a diameter of the main drain


pipe large for good air flow
Individual unit drain outlet shall be kept at higher elevation and connected at an
angle of 90 degrees to common drain pipe

Indoor Drain

Main Drain

Electrical Wiring

Caution
1) Use the standardized Electrical wires & Equipments
2) Refer to the wiring diagram of outdoor unit, for detail information
3) Permit only authorized person for electrical works
4) Joints in the wiring shall be avoided. Joint may lead to electrical noise other Hazards
5) For Long Distance, Keep separate signal line and power line.
6) Remote control line shall be kept separate from the power and signal line.
7) Use separate power supply, if heaters are used
8) Select of the size of heater cable and a circuit breaker and Electric switch, as per
power consumption and safety ratings
9) Heater and indoor unit control wiring shall be as per wiring diagram
10) Interconnecting cable between indoor & out door units shall be clamped with clamp
holder, & shall not be kept loose and sagging
11) Check the grounding of outdoor power socket, (3rd grounding work or special 3rd
grounding work at outdoor) to prevent the electrical accident
12) Use the NFB (No Fuse Breaker) when 3 phase 3 line and single phase
13) Use the ELB (Earth Leakage Circuit Breaker) when 3 phase 4 line

1. Remote Controller installation


Installation is based on drawing
Install where no source of heat / steam is nearby Remote Controller
Install Remote Controller 3m apart from an object which generate a strong electric /
magnetic field.
2. Installation of Communication cable
The specification of cable is based on drawing.
The communication cable shall be kept away from power cable
If the route of cable and refrigerant pipe are same, both should be taped together
In the case cable and ref. Pipe are installed separately, use flexible tube for cable

Electrical Wiring

5. Wired R/C Installation


Installation height shall be 1.5 meter from the floor level and shall be kept away
from the electrical/ magnetic sources
Installation location shall be accessible and easy to sense the room temperature
In the case of exposed the cable, use the cover for the cable
- In the ceiling : Use cable tube (PVC etc)
- Exposed : Use cover for the cable
Cable cover
Remote
Controller
Insulation pad

1500

After installing insulation


pad, install wired Remote
Controller

Floor
The standard height of installation of wired Remote controller is 1.5m from
the floor, but, if required by owner, its possible to change the height
(Confirm at the time of installation from the owner)

Electrical Wiring

4) Central controller installation


Must install sleeve for cable when install the central controllers wire
use separate sleeve for AC (for IU/OU connecting) / DC (for central con.
Connecting) to prevent the noise
In case of exposed cable route, use the cover for the cable
- In the ceiling : Use cable tube (PVC etc)
- Exposed : Use cover for the cable
Caution

No tube

Cable for
Central con. (DC)

Cable for
IU/OU(AC)

Series method

Bus method

Bus/Star method

unit
1

unit
2

unit
3

unit
4

unit
1

unit
2

unit
3

unit
4

unit
1

unit
2

unit
3

unit
4

unit
5

unit
6

unit
7

unit
8

unit
5

unit
6

unit
7

unit
8

unit
5

unit
6

unit
7

unit
8

unit
9

unit
10

unit
11

unit
12

unit
9

unit
10

unit
11

unit
12

unit
9

unit
10

unit
11

unit
12

unit
13

unit
14

unit
15

unit
16

unit
13

unit
14

unit
15

unit
16

unit
13

unit
14

unit
15

unit
16

red
TA Central
black
TB Controller
1
blue
CH1
CH2 TB

red
TA Central
black
TB Controller
blue
2
CH1
CH2 TB

red
TA Central
black
Controller
TB
3
blue
CH1
CH2 TB

Connecting method between Central controller and Sub PCB

Indoor unit installation (Cassette type)

1) Select the best location


There should not be no obstacle for preventing the air circulation
Location should be best suited for air circulation with in the room
Ensure the spaces indicated by arrows from the wall, ceiling, or other obstacles are available
The indoor unit must be accessible to maintenance
30

(unit : cm)
100

50

50

50

Less than 300

obstacle

floor

Location of unit shall be able to withstand up to the weight which is more than 4 times of the
weight of IU
Ceiling shall be plain ( Horizontal) at unit location
There should not be any heat source or steam source near the unit
Location, where drainage point can be easily obtained
Ensure the space above the ceiling to be more than 30cm
Unit shall be located, at least 3m away from obstacles (Big motor, monitor etc), which causes
the noise (Use a noise filter, where the noise is generated because of the power)
(Caution) : Thoroughly study the following installation locations :
In such places as restaurants and kitchens, considerable amount of oil steam and flour
adhere to the turbo fan, the fin of the HEX and the drain pump, resulting in poor heat
exchange, spraying, dispersing of water drops, drain pump malfunction, etc
In these cases, take the following actions :
- Make sure that the ventilation fan for smoke-collecting hood on a cooking table has
sufficient capacity to prevent the oily steam is sucked to the air conditioner
- Keep enough distance from a cooking room to install the air conditioner in such a place
where it may not suck in oily steam
A/C
Ensure the
Enough
distance
Cooking table

Use the ventilation fan


for smoke-collecting
hood with sufficient
capacity

Avoid installing A/C in such circumstances where cutting oil mist or iron powder is in
suspension in factories, etc
Avoid places where inflammable gas is generated, flows in, is stored or vented
Avoid places where sulfurous acid gas or corrosive gas is generated.
Avoid places near high frequency generators

Indoor unit installation (Cassette type)

1) Ceiling opening
- Make hole 750mm750mm on the ceiling
- Use the box jig for opening the ceiling
2) Make hole for set-anchor using box
jig by hand-drill.
- Make 4 holes 14.5mm, 40mm (depth) vertically
- Consider the direction of drain pipe while making
holes (The pitch for the drain is small)
- If the units are Installed with incorrect Pitch
occurs the leakage of refrigerant and water
3) Insert the 4 set-anchors to the hole then, fix it firmly by hitting lower part of Jig

Insert Set-anchor

Fix Set-anchor

Combine nut and washer

Fixing Jig
(Self-subsistence)

Nut

Washer

Plz use a fixing jig


to fix a set-anchor

4) Combine the accessories ; nut, washer etc to the


Nut
Spring washer
hanging bolt
flat
- Hanging bolt, Nut, Washer : M10
washer
The length of hanging bolt is 550mm
- Must use the standard accessories to prevent unscrew
condition (for safety)

Bracket for
Indoor unit
Flat washer
Spring washer
Nut

5) After combining nuts to the set-anchor, combine to the hanging bolt


- Combine connecting nuts and hanging bolt to the 4 set-anchors each.
- In the case of insufficient fixing, it cause vibration or noise of the unit
- Combine various hanging bolt to the ceiling according to material and type of ceiling
(In the case of H beam of material of the ceiling, should be attached by welding)

Concrete

Light framing pipe

Angle

Wood

Indoor unit installation (Cassette type)

6) Hang the unit to the hanging bolt and fix it


- While Hanging the unit to the hanging bolt, fasten the nuts and washers tightly with
double side where upper and lower part of bracket to prevent the vibration

Tighten the nut and bolt (washer)


for the safety

unit

7) Adjust the length of the hanging bolt


- Keep the length of the bolt from the bracket up to 40mm
Keep the distance about 100mm from the ceiling board to the bracket
- When the length of the bolt is too long, it is impossible to joint the front grill,
on the contrary, the length is too shot, it cause a gap and leakage of cold air
- Adjust the length of the bolt to install the unit and the ceiling board horizontally
by using a level gauge

Unit
40mm

100mm
Install the unit and the
ceiling horizontally

8) Make sure to Install the decorative panel with air gaps because cool air leakage causes
sweating
Cool
Air leakage

Decorative
panel

Air

Unit
Cool air leakage

Gab

Unit
Air

Louver
Decorative
panel

Indoor unit installation (Cassette type)


Front Panel
1. Loosen Indoor Front panel Hanging bolt (4unit) to Insert Front Grill and fasten
the bolt again.
2. Pay attention to assemble the machine because there is a direction of Front Panel
3. After attaching the front panel, connect the wire of Louver motor, piping thermo sensor
and close the cover of control box
4. Attach the filter into suction grill and hang the hook for finish.
Piping
Indoor

Front Panel Screw


Key Hall
Front Panel

5. If there is any clearance, cold and hot air can be leaked out. So, Thermostat is
operated earlier and frost is made by cold leakage
Cold
Leakage Air flow
Guide

Front Grill

Indoor unit
Cold leakage

clearance
Air flow
Guide

Front Grill

Indoor unit

Air flow direction


Control louver

Indoor unit installation (Cassette type)

Indoor
Unit
installation

Wrapping the machine by vinyl wrapper after installation

(picture) Wrapping 1-WAY cassette by a vinyl wrapper

Spring hanger for protecting vibration

Indoor unit installation (Cassette type)


secure some distance between indoor unit and fire alarm
- installing indoor unit apart 1m from fire alarm.
- if you dont secure some distance, fire alarm is operated

Indoor unit location (Ceiling Concealed duct)

location : hospital / Theater


Feature

Consideration

Hospital
sterilization and cleaning
- operating room, delivery room,
sick room
Air distribution in building
- doctor, staff room

using HEPA Filter


maintain the room at higher pressure for
protecting the inflow of germs and dust
each sick room is needed to control air pressure

Controlling humidity and temp.


- test room, experiment room

Theater

crowded

maintain high and low layer temperature equally

use intermittently

- each floor controlling

high ceiling and wide room

- using the nozzle or slot type Grill for high ceiling

there are many separate room

- make provision below the seat for ventilation

there is stage in the hall

- Prevent the cold draft on stage and wall


installation upside discharging duct behind
of stage for heating, or use the heater

Indoor unit location (Ceiling Concealed duct)

location : Hotel/Department/Market
Feature

Consideration

Hotel
Purpose
- Commercial hotel:convention room
- Business hotel:staying
- Resort hotel:tour
function
- lodging part:guest room, lobby
- public part:lobby, restaurant,
banquet hall
- admin. part

select VRF system for different using time,


different purpose
(especially, guest room)
- Prevent the Draft on the bed area
- allocate the machine to easy maintenance area
- keep the low noise level 35dB
keep the high pressure at lobby, lounge
preventing the ambient inflow
in case of banquet hall, keep the velocity of air
flow at 0.25m/s
for cradle

Department store
exists with station, theater, restaurant,
office
changeable interior
disaster prevention equipment

installation of air curtain


cooling also in winter season
- for special shop
lots of dust in the shop
- Filter selection

Market
Clothes, grocery, living product

Design the discharge air outlet locations,


considering the opened show case
Adopt the Circular Grille for discharge

Indoor unit location (Ceiling Concealed duct)

shall withstand the weight (4 times of indoor unit) and no vibration.


There should be no bar at suction and discharging part
Easy maintenance and safe from electric Noise
easy drain and easy connection between indoor and outdoor
low noise level, easy refrigerant piping and drain piping
secure the SVC space (Refer to the below table)
distance from discharging Grille at least 5m
available to attach the low noise chamber
take into the consideration the air flow and interior for selecting the Grill
take the indoors feature and height into consideration for grill Selection
Design the velocity of discharging - 2~3m/s
- secure the proper velocity for reducing noise level.
select silent chamber and branch chamber for silent area
select the branch chamber and adjust the length of F/Duct for regular air flow
(if you need, attach the Volume Damper)
suction Grill with Filter
( Table. SVC space )
Capa
(Cooling)

SIZE

932

450

1550(932+600+20)X450

18K Btu/h
21K Btu/h
23K Btu/h

28K Btu/h
1232

450

1292

680

1850(1232+600+20)X450

36K Btu/h
48K Btu/h

E
1900(1292+600+10)X450

Indoor unit location (Ceiling Concealed duct)

Suction and discharge diffuser installation notice


1)select the Suction and Discharge diffuser for least friction / noise
(Round diffuser,Nozzle diffuser)
2)select nozzle diffuser for heating mode
3)select the flexible duct for reducing the noise level of suction diffuser
4)attach suction and discharging diffuser to ceiling and fasten the hanging bolt for
preventing vibration.

Selecting and installation of Noise level reducer


1)noise chamber installation site
- suction and discharge all use: broadcasting room, church and so on
- suction and discharge selective use : small office, small theater, restaurant
(lower than 50dB)
-not using the noise chamber : gymnasium, large theater (over the 50dB)
2) Noise chamber attach sound attenuators
3) Noise chamber connection part fasten the bolt and insert the packing for reducing
vibration
4) Difficult to attach the noise chamber attach the flexible duct

Indoor unit location (Ceiling Concealed duct)

Hanging bolt and the machine fixing


1)use the hanger and hanging bolt to fix the machine.
2)insert the anti vibration rubber between hanger and hanging bolt for preventing the vibration
3) Check the balance before fixing.
Installation the flexible duct
1) Use the anti fire flexible duct.
2) Insert canvas duct between Suction duct and unit to prevent the vibration.
3) Insert the filter in suction part.
4) Attach the Hanger entirely to structure.
5) The distance between hangers max 3m, (normally 1~1.5m).
6) Hang down of duct when the distance between hangers is 1m, hang down of duct
is 50mm and when 1.5m, hang down of duct is 75mm.
7) hangers width when the distance between ducts core wires is 25mm, hangers
width is over the 25mm and when the distance between duct s core wires is 36mm,
hangers width is limited under the 36mm.
8) Hanger can cover the ducts skin (select the installation method according to hangers
Structure)
9) It is required to attach the Sub support panel under the duct.
10) Hangers size shall be larger than duct size
11) Sub materials that are connected with Duct shall be supported properly
12) If there is no hanger, you must install the something for support (under 0.9m)
13) Materials used shall be Anti electricity and anti fire
14) Dont vend the duct vent duct is not good for static pressure

Indoor unit installation (Ceiling Concealed duct)

Connecting the duct


1)if you want to connect the duct, insert the connection part over 25mm and fasten the
band
2) Angels for bend joints shall be gentle for securing the proper static pressure and
reducing the noise.
3) Duct shall not be kept loose or sagging, provide proper support to prevent duct damages
& Duct loses.
4) Duct bend part diameter must be over R = 2 * Duct width

Connecting the duct to structure


1)if you want to connect the duct, insert the connection part over 25mm and fasten the
band

2) pull the laggings and Wind tape twice

Connecting the duct to duct (spiral duct)


1) Length of the duct connection material(i.e. coupling) shall over 100mm.
2) Insert the duct into connectors both side and wind tape twice and fix with two bands.
3) pull the laggings and Wind tape twice

Standard of connection material


1) Insert the duct over 50mm into connection material
2) Total length of connection material shall be over 100mm

Indoor unit installation (Ceiling Concealed duct)

Ceiling concealed duct type/installation notice


Note
1. Flexible Duct and Duct installation
Flexible Ducts length limitation - Main Duct under 5m, branch Duct over 5m,
branch Flexible Duct must keep the proper static pressure, and maximum length allowed is 10m
and control the Flexible Ducts length for controlling the air volume.
if there is not enough Gap between structure beam and ceiling,
dont reduce the size of duct more than 20% (max) of original size
install the duct hanger after every 1m for Flexible Duct.
Duct equipment shall be fixed to ceiling by Anchor Bolt.
use the band when you connect Flexible Duct to other equipment ,
and insert the duct completely and wind Vapor Barrier Tape for
preventing the leakage of cold air
The number of bends shall be kept minimum while installing the F/Duct .
bends are the main reason for loss of static pressure.
2. Drain pipe installation
Use U-Trap, to prevent the condensing water overflow
(common drain 1 U-Trap per 1 indoor unit)
Cover the Drain piping by insulator (thickness : over 10t)
Drain pipings slope gradient - 1/100~1/50

Indoor unit installation (Ceiling Concealed duct)

Note
3. Check the equipment and F/Duct.
check the leakage of discharge Sound Chamber,
suction Sound Chamber,Diffuser and branch Sound Box
check the gaps and cracks in F/Duct manually
check the painting and fault of Diffuser manually
4. installation
Keep the slope for easy draining of condensing water, as shown in the picture.
Slope in opposite direction causes over-flow
5. Installation surroundings
use the Square,Round Diffuser for cooling only.
use the Nozzle,Grille,Line Diffuser for heating mode.
install the anti vibration spring hanger in case of using ceiling concealed duct type for
hotel, inn, complex tower application
normally, Filter is attached in suction Grill but, filter can be attached in main body.
unit access panel for maintenance for each unit is a must.

slope
3~5mm

Suction part
slope
3~5mm

Suction part

Indoor unit installation (Ceiling Concealed duct)


improvement
1. U-Trap for Drain Piping

Drain piping
socket

U-Trap

Drain piping
elbow

before

after

notice of installation
1. Dont have to purge the air on U-Trap

2. Air Filter change


- 1 step Mesh 2 step Mesh
- shape change : plane type wrinkle type

Leakage test

Leakage
Test

Procedure of test (Base on R-22)


connect the pressure gauge to liquid flare part.
connect the nitrogen inlet part to gas pipe flare part.
increase the pressure of nitrogen.
Step 1 : 3kgf/ to check the big leakage.
Step 2 : 15kgf/.
Step 3 : 28kgf/ to check the microscopic leakage.
28kgf/ for 24 hr.
24 hr later, check the microscopic leakage.
compensating the pressure (approximately 0.1kgf/ per 1)
Compensation value = (around temp. of increasing pressure time
- around temp. of Check time) 0.1

after checking, purge the nitrogen completely


disconnect the pressure gauge from gas pipe flare part.
Pressure Gauge

Nitrogen inlet

inlet the nitrogen to


both liquid and gas

liquid
indoor

V/v Close
outdoor

gas
Ball v/v Close

Nitrogen inlet
Close

using the manifold


gauge, ball valve

L H

Close
V/v Close

liquid
indoor
gas
Ball v/v Close

outdoor

Leakage test

Leakage
Test

Pressure
Gauge
Nipple for inlet of
Nitrogen
Progress of Test
Record the leakage test as per the following table

Management of leakage
No.
1
2
3
4
5
6
7
8
9
10

Date

Gage pressure(kg/)

Location:
Supervisor

Signature

Remarks

Outdoor room installation


In case of room installations, make the air guide duct for discharge air,
and enough space shall be provided for the air circulation with in the
room for suction air & maintenance, thus better heat exchange

(Ex)outdoor room for office


1370
150
300

870

350

320

1270

Louver
80~90
300

Duct

100

870

955

Top view

655

Outdoor
Room
Condition

100

300

Front view

Side view

O/D Space for Officetel

Outdoor unit installation

(ex) Apartment O/D space


1550

500

150
900

500

370

1450

Top view

200

655

200

2300

Louver(80~90)

1225

O/D Space
Condition

100

100

100

450

Front view

Side view

<O/D Space for Apartment>

Outdoor operating Space Limitations

2) Selection best location O/D


(1) The Front outlet type (Fig.27)
When the wall is in back of air inlet More than 1m above the unit

More than 10cm

More than 10cm

More than 50cm (S/V area)

When the wall is in front of air outlet More than 1m above the unit
More than 10cm

More than 50cm (S/V area)

More than 1m

When two O/D stand in a low

More than 30cm

More than 4m

Outlet air

Outlet air

More than 3m

Outlet air

Outlet air

Outlet air

Outlet air

More than 50cm

Outdoor operating Space Limitations

(2) The upside outlet type (4 Room Multi) (Fig. 25)

A
B
C
D

A Space between unit and wall


: More than 500mm
B inlet put opposite inlet side : More than 1000mm
C inlet put opposite outlet side : More than 500mm
D Outlet put opposite outlet side : More than 500mm
E Space between unit and wall
: More than 500mm

Outdoor operating Space Limitations

300

10

3) Out door foundation work


- When the units are installed on the roof or the floor, Vibration may
be transmitted to the installation section and noise and vibration may be
generated from the floor and walls, depending on the installation conditions.
Therefore, provide ample vibration proofing (cushion pads, cushion frame, etc.).
- Foundation works are required for out door units (Scope of Construction
Company)
- In case of Big project(More than 20 units, e.g. school project),
if foundation work is not provided, Noise claim will be there.
- an example of foundation work in shown below in the figure.
Provide the O/D unit base size to the construction company
- Prevent falling down of units from vibration or typhoon with foundation work
(Pad + Anchor bolt)

200

W +200

( )
Base
Top view

300


O/D
Front view

200

200

200

200

view

O/D Side

( )

Base Front view

Provide foundation work and fix the


unit by using anchor bolts
(U type, 4 spots)
Anchor bolt

Outdoor operating Space Limitations

Location

Make sure, to Have proper installation work in order to


protect against a strong wind and earthquake. Any
installation deficiency may cause unit to fall down,
resulting in a personal injury.

While making the foundation, provide drain water disposal.

Make sure to install unit at a place strong enough to withstand


its weight.

Enough Space shall be provided for air passage and service work.
- prevent vibration and noise.

Select space, easy to wire with main power source.

It is recommended to fence around the outdoor unit in order to


prevent any person or animal from accessing the outdoor unit.
- Do not install O/D outside the veranda and on outer wall, to preven
falling down and avoid difficulty for maintenance

Vacuuming & Gas charging

Vacuuming

Work vacuuming to remove nitrogen gas, air, and moisture after


connecting pipes.
Prepare vacuum pump, vacuum gauge, monkey wrench,
manifold gauge, and six angle wrench.
Connect the vacuum hose each to SVC valves of gas and liquid side.
Be sure to use vacuum pump and vacuum gauge.
* Except for Multi-V : Evacuation up to 0.05 Torr

check the degree of a vacuum by vacuum gauge

Additional
Charge

Calculate the additional charge of refrigerant on account of Piping length


additional charge :
-3.0hp : 70g/m, 5.5Hp : 100g/m.
-Make sure to use charging-cylinder for precise charging in inverter type

Vacuuming & Gas charging

Gas
Charging

Make sure to use scale or charging-cylinder to charge additional


refrigerant.
Can be charged in liquid state.
- Refer to the manual for using charging-cylinder and weight scale.

Vacuuming : More than 4hr per


unit

Additional charge: 70g /m


Make sure to use scale and cylinder

Check pressure : manifold gauge

Charging refrigerant

10 Initial test run


1. Refrigerant Leakage Test
To check gas leakage, use the soap bubble or leakage detector at joints, SVC
Valves etc.

2. Connection of power supply (Crankcase heater)


Crankcase heater is a critical control for most rooftop and pad-mounted units,
usually a strap-heater strip attached to the hermetic motor-compressor
unit. In the beginning of the cooling season, before starting the unit, the crankcase
heater must be energized. Verify this with a clamp-on ammeter. The crankcase
heater should be energized for at least six hours before running the compressor
and should be left energized for the rest of the season.
.

3. Check operating
Make sure to use remote controller when testing run.
- Check negative current.
- When negative current, it will be blinked the LED of relay in O/D and I/D and error
mark is displayed on remote controller display.
- Check wire connection between O/D and I/D.
- Signal line has polarity, so right connections shall be made, otherwise, error will
occur, like, I/D fan operating, O/D fan is not operating
Make sure to start test run from cooling mode to protect 4way valve and
compressor.
- Can not operate cooling mode in winter because of operating temp. range.
- Usually test run for 30minute. After finishing test run, normal operating starts
and test run signal will be disappeared.
- In case of heat pump, start on heating mode after finishing test run and
additional cooling mode for 10 minute.

App Installation Reference


1) Exposed Vertical pipes in the room
- Matching with interior. Refer to the below example.
MDF finishing (MDF thickness : 9t)
- Finish with MDF panel not to exposure pipe over matching with wall
color (Fig. 8)

MDF (9t)

MDF

(Fig. 8)

STS(Stainless Steel) finishing


- Use same finishing cover(STS). (Fig9)

Whole view

Detail view
Existing
Inner finishing

STS_cover

(Fig 9)

App Installation Reference


Extra finish
- When pipe pass over the beam, install the pipe below the beam
and finish with MDF. (Fig. 10)

Whole view

MDF_cover 9t
Detail view

(Fig .10)

Beam

App Installation Reference


2).Exposed pipe finishing on roof
- In case of exposed pipe on roof, put it in order like below fig.
- Avoid exposure of pipes to prevent damages
- Use cover
Bricking (Fig. 11)
- arrange exposed pipes and lay brick beside the pipes. Finally use top
cover.
- Be sure to pave the way for SVC.

Whole view

zinc galvanizing top cover

Detail view

Lay brick
(Fig. 11)

App Installation Reference


STS (stainless steel) cover finishing (fig 12)
- use a special STS cover in limited space.
- Easy to handle the cover.
Before

After(Side view)

After(Front view)

(Fig. 12)

App Installation Reference


TRAY finish (Fig. 13)
- Use TRAY for wiring.
- Select Tray size depending on Number of pipes.
- Separate tray from ground for drainage (More than 20cm).
- Use rustless materials for TRAY.

Before

After

(Fig. 13)

App Installation Reference


Details (Using Tray)

00
20

100

30
0

Tray
cover

(2.3t)

Cable
Tray

Ref.
pipe

200

Supporting angle

Fix to concrete

Keep to the size as over


Drawing to prevent pipe and
Wire with inundation
Limited height : over 200mm

App Installation Reference


Extra finish (near by roof rail)
- In case of the pipes over roof rail, use PVC elbow not to spoil
the beauty of building. (Fig. 14)

Before

After

PVC elbow

Flexible hose

After ( Detail )

(Fig. 14)