Vous êtes sur la page 1sur 6

Quality Management System

Document

Doc. No.: PCD-SF187


Page: 1 of
Rev.: 1
11

Procedure for
Preparation of Water Hose Reel Data
Sheet

1
0
Rev
.

24 May
14
15 Mar
07
Date

Change of Format
Issued for implementation
Description

H.Hosseini

I.Zamani

A. Fallahi

Prepared by

Reviewed
by

A.Zamani
E.
Behbahani
Approved
by

Sections changed in the last revision are identified by


This document is the property of Tehran Raymand Consulting Engineers and should not be disclosed or reproduced without a
prior written permission.

Procedure For
Preparation of Water Hose
Reel Data Sheet

Doc. No.: PCD-SF187


Rev.: 1

Page: 2 of
11

1. Preface
The present document is intended to outline the procedure for
Development of Data
Sheets for Water Hose Reel.
This document, as a part of the quality management system, is under
control and its latest revision will be issued to Tehran Raymand and its
relevant organizational units.
2. Applicable Documents
The following documents have to be obtained by the Project Lead
Engineer and referred to by the Engineer, prior to filling the data sheets:
Design Basis

Relevant Appendices of the Contract (if applicable)

Vendor Data

Blank Data Sheet in Project Format

Design Criteria for Fire Fighting System


A sample copy of the Data Sheets is attached in Attachment of the
present document.
3. Definitions
Project Lead Engineer is the Lead Engineer directly responsible for the
performance of activities of the project, set forth by the Project Manager
and/or Head of the department.
Engineer is the engineer responsible to fill out the Data Sheets under the
direct supervision of the Project Lead engineer.
4. Overview
In order to assist the engineer, a set of step-wise instructions for filling
the appropriate data into the Data Sheets are pointed out in the table in
clause 6 of the present document. This table shows the relevant
documents, which shall be referred by Engineer to prepare the Data
Sheet.
The data sheet is enclosed in Attachment of the present document.
5. General Requirements
For filling the Data Sheet, all documents which are listed in item No. 2
shall be available.

Procedure For
Preparation of Water Hose
Reel Data Sheet

Doc. No.: PCD-SF187


Rev.: 1

Page: 3 of
11

The project Lead Engineer is responsible to obtain and ensure that the
latest revision/edition of the mentioned documents are used by the
Engineer.
After filling the Data Sheet by Engineer, the Project Lead Engineer is
responsible to thoroughly check and confirm the Data Sheet. This Data
Sheet has to be final approved by Project Manager and/or Head of
Department. Then the Data Sheet will be issued to relevant department.
In case of any change in the data, Data Sheet has to be revised and
reissued to the concerned department with a change request.

6. Procedure
The following instructions shall be used to fill in the Data Sheets:
For project name and client name refer to Design Basis.
For Doc. No. refer to Doc. Numbering procedure.
Item No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Data & Reference Document


Recessed / non recessed and with
cabinet or not as designer
selection
By vendor
MTO for fire fighting & drawings
Fire fighting
Auto / manual with designer
selection
Fire fighting equipment layout &
drawings
NFPA-14. BS or others code & Std.
in contract
Painting spec. or Mfrr std.
NFPA, BS or applicable std. in
contract
ITP document
Whereas there is no freezing the
wet standpipe to be considered
Refer to fire fighting equipment
layout
Hydraulic calculation for pumps &

Procedure For
Preparation of Water Hose
Reel Data Sheet
Item No.
17
18

19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Doc. No.: PCD-SF187


Rev.: 1

Data & Reference Document


piping
NFPA-14, class I 2 , II 1, 1 ,
III 2 & 1 , fire fighting
design criteria & designer
judgment
F/F equipment layout drawing
By vendor
By vendor
C/S or S/S regarding to ambient
corrosion
1.5 mm for C/S and 1 mm for S/S
Swinging or fixed by designer
judgment
90 or 180 Deg. For swinging and
zero for fixed type
C/S or S/S regarding to ambient
corrosion
Equal or more then item 19
Thread type
Manufacturer std.
Manual or motorized, designer
selection on providing and cost
Will be used for fixed hose reel
Stand alone or wall mounted
C/S, S/S, GRP regarding to
atmosphere corrosion
C/S, S/S, GRP regarding to
atmosphere corrosion
1.5 m for C/S and 1 mm for S/S
Designer selection
4 Stands, one column, wall bracket
see item 37
C/S, S/S or GRP
Is applicable for hose reels with
cabinet
Designer selection
Flexible or non collapsible depends

Page: 4 of
11

Procedure For
Preparation of Water Hose
Reel Data Sheet
Item No.
46
47
48

49

50
51
52
53
54
55
56
57
58
59
60
61

62
63
64
65
66
67
68
69
70
71
72

Doc. No.: PCD-SF187


Rev.: 1

Data & Reference Document


on designer decision
By vendor
MTO for F/F equipment, F/F
drawings
Water
Synthetic woven textile, internal
lining & external coating for
ambient contamination
Usually 25 MT or based on owner
regulations but not more than 30
m
1, 1 , 1 , 2 as item 19
Shall be selected above Nor./Max.
Pressure of fire water network
By vendor
By vendor
Instantaneous BS-336, storz thread
or as owner regulation
Bronze alloy
Water nozzle, constant/variable
flow as designer decision
By vendor
One per each
Water
Depends on hose diameter, for 1
App.200 LPM. 1 & 1
App.450, 2 App.950 LPM
Shall be above network pressure
By vendor
By vendor
By vendor
Alum., bronze, plastic & light alloy
as designer selection
Same & mate to item 56
Yes unless be used for live Elec.
Appliances
Manual or motorized, designer
selection on providing and cost
Yes
Yes, unless nozzle have separate

Page: 5 of
11

Procedure For
Preparation of Water Hose
Reel Data Sheet
Item No.

73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92

Rev.: 1

Data & Reference Document


isolating valve
Is special provision with designer
judgment
By vendor
By vendor
Gate, globe or ball valve but
usually globe to be used
Matching to item 52
Bronze alloy unless exist special
requirement for corrosion
Thread or flanged and size same as
item 28
Mate to item 56
By vendor
By vendor
By vendor
By vendor
Special requirement shall be given
Simple sketch including said
components shall be given
-

7. Attachments

Doc. No.: PCD-SF187

Water Hose Reel Data Sheet

Page: 6 of
11

Vous aimerez peut-être aussi