Académique Documents
Professionnel Documents
Culture Documents
GROUP
FICCI
Lessons Learned for India
Worldwide Presence
Consulting & IT
Studies organization and strategy consultancy privatizations
project management financial modeling infrastructure management
IT consultancy and services geo-solutions
109.5 m
23.4 m
29.0 m
33.7 m
195.6 m
68.9 m
32.7 m
27.5 m
27.1 m
7.2 m
32.2 m
195.6 m
Photovoltaic
Solarthermal power
Hydropower
Wind power
Geothermal power
Solid biomass
Sewage and landfill gas
Biogas
Present PV Highlights
About 20 PV projects ongoing at present, mostly due diligence services on behalf
of financing institutions and investors as well as owners engineering services,
among others:
3 projects in Spain
>10 projects and project pipelines in Italy
1 project pipeline in the Czech Republic
1 project in Qatar (test facility for solar equipment)
4 projects in Bulgaria
1 project pipeline in Canada
2 projects in Peru
1 project in United Kingdom
1 project in Chad
1 project in Ukraine
1 project in Turkey
1 project in Thailand
1 project in India
Developer
Insurance
company
Equity
Project
Rights
Policies
Solar Project
Special Purpose
Vehicle (SPV)
Power purchase
agreement
Operation
Contract
Management
O&M Contract
EPC Contract
Utility
Service
Company
EPC contractor(s)
Objectives:
8
Implementation of a long life power plants with high energy yield and availability
Proper and safe operation complying with the relevant requirements
Low cost, high return on investment
10
11
Construction
Monitoring
Verification of
Construction
Completion
Site Assessment
14
Thin film
20%
Change of LEC
Monocrystalline
15%
Polycrystalline
10%
Parabolic trough
5%
0%
-5%
-10%
1,254
1,463
1,671
1,881
2,089
2,299
DNI [kWh/a]
15
2,508
2,716
2,926
Assessment of Costs
Example: Johannesburg, South Africa
0.25
LEC [/kWh]
/kWh]
0.20
0.15
fixed
1-axis
2-axis
0.10
0.05
0.00
Thin film
16
Poly- crystalline
Monocrystalline
Parabolic
trough
Summary
Industry
No better technology but project specific technology selection
Size, topography, irradiation (global / direct), Accessibility, grid condition
Feed-in tariffs
Relevance of dispatchability / storage
Framework
Reliability of framework is key is basis for planning
Tariffs, PPAs
Permitting
Selected References:
19
21
22
Client:
Confidential
Period:
03.2010 05.2010
7489P01
Client:
Period:
03.2010 05.2010
7481S01
Client:
Confidential
Period:
03.2010 05.2010
7474S01
Client:
Confidential
Period:
03.2010 05.2010
7474S02
26
Client:
Confidential
Period:
01.2010 03.2010
7469P01
Client:
Confidential
Period:
01.2010 03.2010
7463P01
28
Client:
Commercial bank
Period:
01.2010 03.2011
6881P04
29
Client:
SunRay Management
Ltd., London, United
Kingdom
Period:
10.2009 03.2010
7422P03
Client:
Confidential
Period:
10.2009 07.2010
30
7422P02
Client:
Confidential
Period:
10.2009 05.2010
31
7422P03
Client:
Commercial bank
Period:
2008 ongoing
7421A01
Client:
Confidential
Period:
10.2009 11.2009
7423A01
Client:
Period:
09.2009 05.2010
7421A01
35
Client:
DEE Deutsche
Erneuerbare Energien
GmbH, Dsseldorf,
Germany
Period:
09.2009 10.2009
7420S01
Client:
Confidential
Period:
08.2009 11.2009
36
7404P01
Client:
Confidential
Period:
since 03.2009
37
F. Solar
Client:
Confidential
Period:
since 02.2009
38
F. Solar
Client:
Confidential
Period:
06.2008 09.2008
5442P09
40
Client:
Confidential
Period:
since 04.2008
41
Client:
Confidential
Period:
since 04.2008
Fixed orientation
Biaxial tracking
Photon 7/2004
42
Single axis
tracking
- vertical -
- tilted -
Client:
Confidential
Period:
since 04.2008
- horizontal -
43
Client:
Confidential
Period:
since 01.2008
Client:
Confidential
Period:
since 01.2008
Photovoltaic Plant
Lenders Engineering Services for two
5 MWp Photovoltaic Power Plants, Italy
45
Client:
Confidential
Period:
since 01.2008
Client:
Confidential
Period:
12.2007
47
Client:
Period:
08.2007 11.2007
6881S04
Client:
Confidential
Period:
08.2007 09.2007
7077P02
49
Client:
Confidential
Period:
07.2007
6881S02
50
Client:
Confidential
Period:
01.2007 02.2007
Client:
Period:
01.2007 10.2007
51
6881A01
Client:
Abastecimientos
Energeticos SL Madrid,
Spain
on behalf of
Deutsche Bank AG,
London, United Kingdom
Period:
05.2006 12.2008
52
7105S01
Standby Slides
Design Review
30 MWe Fresnel Solar Power Plant,
Puerto Errado II, Spain
The plant will have an installed capacity of 30 MWe.
A turnkey contractor has been appointed for detail
engineering, procurement, construction and
commissioning of the power plant. A design review
is conducted for all parts of the plant in order to
ensure a reliable and easily maintainable design.
Fichtner supports EBL during the design review in
the following areas:
Solar steam generation
Water-steam cycle including steam turbine
and generator
Client:
Electrical equipment
Period:
05.2010 - 12.2010
Project Data:
Grid connection
Civil works.
54
7505A01
Feasibility Study
Jaisalmer 50 MWe Solar Power Plant,
India
In close collaboration with Fichtner India Pvt
Ltd, Fichtner Germany supported the
elaboration of a Feasibility study for a
50 MWe parabolic trough power plant to be
located in Jaisalmer, India.
Fichtners support included:
Solar resource assessment
Preliminary solar field and HTF system
design, including layout
Preliminary plant performance analysis
(annual electricity production)
Costs estimated of solar field together
with the heat transfer fluid system
Client:
Period:
04.2010 06.2010
Project Data:
Client:
Period:
11.1997 05.1998
Project data:
56
4899S13
Feasibility Study
Solar Thermal Parabolic Through Power
Plant, Mathania, India
Client:
Rajasthan Energy
Development Agency, India
Period:
09.1995 03.1996
Project data:
57
4899P11
Feasibility Study
Solar Thermal Power Plant (SOLIN-1), India
Client:
Period:
08.1989 11.1990
Project Data:
30 80 MWe
Cost estimate
Determination of ecological benefits
Determination of organizational concepts
Devising a strategy to introduce solar energy
on a large scale into the Indian power scenario
58
4899P03
Selected References:
Linear-focusing
(single axis)
Linear
Fresnel
Parabolic
Trough
Photovoltaic
(PV)
Point-focusing (dual
axias)
Central
Receiver
Dish
Concentrating
(CPV)
NonConcentr.
DC-AC Inverter
Brayton Cycle
Stirling
Engine
60
Electric Power
Solar Irradiation
Direct
on
no
rm
al
pl a
ne
Diffuse
Direct
Direct
Global = Diffuse + Direct
on horizontal plane
Organisation Geschftsbereich G3
G3
Geschftsbereich
Geschftsbereich
G3 Geschftsbereich
Project Consultants
Sekretariat
Link
Seregly
Somdalen
G31
Projektbereich
G32
Projektbereich
Energiewirtschaft
Heinrich P.
(Dr. Stuible)
Bohlmann
Fey
Finker
Gomez Mejia
Jahraus
Kohberg
Plasa
Rehrl
Schlegel
Schller
Ulrichs
Wlbeck
Basteck
Benz
Eckert
Fricke
Dr. Langni
llbrunner
Preu
Stumpp
Ullrich
Wssner
G3
Controlling
Janetzko, Bauer-Bidell,
Becker, Kauderer,
Rada, Striffler, Tipling,
G33
Projektbereich
G34
Studien
konomie
Linder
(Dr. Hnig)
Planung und
Ausfhrung
Bauteil
Planung und
Ausfhrung
Elektromechanik
Dr. Palt
(Dr. Schfer)
Siemer
(Dr. Trifkovic)
Hegetschweiler
(von Bueren)
Dr. Ayros
Dr. Gurmessa
Haug
Heider
Dr. Hildebrand
Dr. Kammerer
Dr. Peissner
Pfizenmaier
Dr. Rosier
Shresta
Thapa
Thvenaz
Vuckovic
Blling
Brggemann
Croissant
Fahrenbach
Dr. Hnisch
Osan
Schtz
Stangl
Tedla
Fr. Vuckovic
Brunner U.
Gantenbein
Guimond
Mancal
Yungi
Bro Lima
Borel
Heimel
Kantsperger,
Girmendonk, Harder, Selei
Projektbereich
Wasserkraft
konomie
Linder
Becker
Dr. Belova
Clausen
Dr. Horn
Horstmann
Dr. Hnig
Johnson
Dr. Korn
Mahler
Dr. Pintz
Rischawy
Dr. Unger
Geschftsbereich
Project
Assessment
Dr. Butler
Abfallwirtschaft
Bickel
Mettler
sterle
Dr. Obid
Vancini
Fuchs
G35
Projektbereich
Photovoltaik /
Solar Technologies
Dr. Stickel
Baumgartner
Capdevila
Becerra Cruz
Gudat
John
Kuhn
Lecoufle
Lemaitre
Meyer, T.
Organisation Geschftsbereich G3
G3 Geschftsbereich
Erneuerbare Energien,
Umwelt
G3 Geschftsbereich
Project Consultants
G31
G32
Projektbereich
Energiesysteme
Energiemrkte
Frderung, Regulierung
Integrierte
Infrastrukturkonzept
Biomasse
Geothermie
Photovoltaik
Solarthermie
Windkraft
63
Projektbereich
G33
Energiewirtschaft
Energiewirtschaft
Umwelt- und Klimaschutz
Nachhaltige Entwicklung
Genehmigungsmanagement
Umweltmanagement
Umweltvertrglichkeitsstudien
Emissionshandel, CDM, JI
CO2-Speicherung
Standorte, Trassen
Immissionsberechnungen
Raumplanung
Geoinformatik
Projektbereich
Wasserkraft
Studien
Laufwasserkraftwerke
Speicherkraftwerke
Pumpspeicherkraftwerke
Hochdruckanlagen
Rehabiltierung, Modernisier
ung
Dmme, Talsperren
G3 Geschftsbereich
G3 Geschftsbereich
Sekretariat
Controlling
G34
Projektbereich
konomie
konomie
Tarife, Preismodelle
Restrukturierung/
Unbundling
Institutional Strengthening
Financial Modelling
Privatisierung, PPP
Abfallwirtschaft
Kommunalwirtschaft
Projektsteuerung
Risk Management
Projekt- und
Unternehmensbewertung,
Due Diligence
M&A
G35
Projektbereich
Photovoltaik /
Solar Technologies
Photovoltaik-Anlagen
PV-Zellen und PV-Modul
Technologien (kristallin,
Dnnschicht)
Freiflchen- / Aufdach- /
Gebudeintegrierte
Anlagen
Niedertemperatur
Solarthermie (Solares
Heizen und Khlen)
Due Diligence
Anlagenspezifikation / ausschreibung
Anlagenplanung
Ertragsprognosen
Anlagenabnahme (inkl.
Kennlinienmessung /
Verifizierung
Anlagenperformance)
Projektmanagement
Studien
64
5994
5000
4500
4000
2536
3500
3000
1815
2500
152
20
202
27
288
29.4
390
37.6
1998
1999
2000
2001
720
127
18.8
1997
179
89
11.45
1996
100
79
13.3
1995
50
69
15.6
1994
750
60
16.9
1993
30
58
15.6
1992
42.2
55
18.3
1991
500
47
15.6
1000
560
1500
430
1256
2000
2008
2007
2006
2005
2004
2003
2002
4297
5500
1990
6000
Recession
30000
Conservative
Accelerated
25000
MWp
20000
15000
10000
5000
66
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
Recession
675.3
1049.8
1407.7
1984.6
3073
5455.8
5214.1
5425.4
6207.7
11611
15569.5
Conservative
675.3
1049.8
1407.7
1984.6
3073
5455.8
5990.2
6808.1
8770.3
11731.9
15732.7
Accelerated
675.3
1049.8
1407.7
1984.6
3073
5455.8
6555.2
8507.2
12202.2
18718.2
28795.6
67
11.5%
17.4%
22.9%
29.8%
23.1%
29.6%
27.2%
34%
68
Bundesverband Solarwirtschaft
Site impressions
69
70
71
72
73
74
75