Binary Output 23BA20
Application, characteristics and technical data have
to be taken from the hardware data sheet:
23BA20

1 KGT 150 403

Operation
The 23BA20 board has sixteen output relays. Two
groups of eight contacts have the same common return. This allows to split the output channels only to
two different process voltage sources.

Processing function
The I/O micro controller (EAP Ein- Ausgabe-Prozessor / Input- output processor) activates any output
forced by the VAP of CMU (CMU = communication
unit) by a command output request. The EAP controls the time duration of a pulse output by the loaded
pulse length time value.

Output monitoring and supervision


Any output is checked and monitored by the EAP by
different tests and supervision functions:
- the output pattern is read back before the output
is activated
- the 24 V DC from backplane bus to switch the
output relays is supervised during an active output
- the pulse duration is controlled by the EAP
- any detected error is indicated by LEDs.

One or two pole outputs


Fig. 2: to Fig. 4: show the different principle wirings for one or two pole output channels.
See the 23BA22 Connections and Settings for the
wiring if (1 out of n) check is requested.

Doc.No.: 1KGT 150 436 V000 1

Settings
There are no settings required and possible on the
23BA20 board.

Signalling
The board monitors and checks its functionality as
well as the dialog via the peripheral bus. Detected errors are indicated and/or transmitted by the board:
- by the red LED ST on the front plate
- by the red LED PST on the front plate
- by diagnostic messages

LED ST
The ST LED indicates board errors or peripheral
bus errors.
The ST-LED indicates:
- board runs initialization procedure
- board is doing a cold- or warm start
- board has detected a memory error (RAM or
EPROM)
- micro controller faulty
- no dialog via the peripheral bus for at least 2
minutes. The board is not polled by the PBP of
CMU.

LED PST
The LED indicates an error at command output:
- 24 V DC for the output relays failed during command output
- Time out PBP during active output. Any active
output is stopped (switched off).

LED CO
At least one output relay is switched on. The CO
LED is direct connected to the 24 V DC. CO is ON for
the time an output is active (pulse or persistent).

17

ABB Utilities GmbH


Connections and Settings 23BA20

RTU560

ST

Micro
controller

RTU Peripheral Bus

W 01

output
relay: K01

K08
RAM

k01

A 01

k02

A 02

k03

A 03

k04

A 04

k05

A 05

k06

A 06

k07

A 07

k08

A 08
W 02

K09
EPROM

EAP
CO
K1
K16

A 09

k10

A 10

k11

A 11

k12

A 12

k13

A 13

k14

A 14

k15

A 15

k16

A 16

z32
b32
d32
z30
b30
d30
z28
b28
d22
d28
z26
b26
d26
z24
b24
d24
z22

PST
+ 24 V DC

k09

b22

k1

Fig. 1: Logic block diagram and front plate

18

Doc.No.: 1KGT 150 436 V000 1

ABB Utilities GmbH


Connections and Settings 23BA20

RTU560
23TP21
R0031

R0011

10

10

11

11

12

12

13

13

14

14

15

15

16

16

17

19

18

17

19

18

23ET23
Sub-connector
z32
b32
d32
z30
b30
d30
z28
b28
d28
z26
b26
d26
z24
b24
d24
A (Faston

Signal identification
Meaning

Identification
A 01

binary output 01

A 02

binary output 02

A 03

binary output 03

A 04

binary output 04

A 05

binary output 05

A 06

binary output 06

A 07

binary output 07

A 08

binary output 08

A 09

binary output 09

A 10

binary output 10

A 11

binary output 11

A 12

binary output 12

A 13

binary output 13

A 14

binary output 14

A 15

binary output 15

z22

A 16

binary output 16

6,3)

b22
d22

ReRe
mark

cable shield

W 01

common return output 1 to 8

W 02

common return output 9 to 16

The pin configuration of 23ET23 subrack corresponds to the direct pin configuration of the board connector

Subrack terminal connection:

TP21

ET23

Placement of signal terminal connectors on subracks

Doc.No.: 1KGT 150 436 V000 1

19

ABB Utilities GmbH


Connections and Settings 23BA20

RTU560
23TP21
R 0031

23BA20
k 01

k 02

A 03

k 03
3

A 04

k 04
4
k 05

A 05

5
k 06

A 06

A 07

k 08

A 08

8
k 09

A 09

9
k 10

A 10

10
k 11

A 11

11
k 12

A 12

12
k 13

A 13

13

k 14

A 14

14

k15

A 15

15
k16

A 16

16
17
b22
d22

18
19

Process

A 02

k 07

Signalidentific.
A 01

W 01

W 02

+ UP
- UP
UP = process voltage ( 24 / 48 / 60 V DC)
Fig. 2: Binary output 1 pole same process voltage circuit on both halfs.
* Pin assignment 23TP21
Board

23TP21
R0031

23TP21
R0011

17

19

b22

18

17

d22

19

18

Connection diagram 23TP21 subrack

20

Doc.No.: 1KGT 150 436 V000 1

ABB Utilities GmbH


Connections and Settings 23BA20

RTU560
23BA20

23TP21
R 0031

k 01

1
k 02

A 03

k 03
3

A 04

k 04
4
k 05

A 05

5
k 06

A 06

A 07

k 08

A 08

8
k 09

A 09

9
k 10

A 10

10
k 11

A 11

11
k 12

A 12

12
k 13

A 13

13

k 14

A 14

14

k15

A 15

15
k16

A 16

16
17
b22
d22

18
19

Process

A 02

k 07

Signalidentific.
A 01

W 01

W 02

+ UP
- UP + Pn
- PN
UP = process voltage ( 24 / 48 / 60 V DC) e.g. 23BA22 test circuit
Fig. 3: Binary output 1 pole. Different process voltage sources on k 01-k 08 and k 09-k 16
* Pin assignment 23TP21
Board

23TP21
R0031

23TP21
R0011

17

19

b22

18

17

d22

19

18

Connection diagram 23TP21 subrack

Doc.No.: 1KGT 150 436 V000 1

21

ABB Utilities GmbH


Connections and Settings 23BA20

RTU560
23TP21
R 0031

23BA20
k 01

Signalidentific.
A 01

k 02

A 02

A 03

k 03
3

A 04

k 04
4
k 05

A 05

5
k 06

A 06

6
k 07

A 07

k 08

A 08

8
k 09

A 09

9
k 10

A 10

10
k 11

A 11

11
k 12

A 12

12
k 13

A 13

13

k 14

A 14

14

k15

A 15

15
k16

A 16

16
17
b22
d22

18
19

Process

W 01

W 02

(- PN) - UP

+ UP (+ Pn)

UP = process voltage ( 24 / 48 / 60 V DC) or 23BA22 test circuit


Fig. 4: Binary output 2 pole. Either direct or by 1 out of n check
* Pin assignment 23TP21
Board

23TP21
R0031

23TP21
R0011

17

19

b22

18

17

d22

19

18

Connection diagram 23TP21 subrack

22

Doc.No.: 1KGT 150 436 V000 1

ABB Utilities GmbH


RTU560

Doc.No.: 1KGT 150 436 V000 1

Connections and Settings 23BA20

23

ABB Utilities GmbH


Connections and Settings 23BA20

ABB Utilities GmbH


68309
Mannheim (Germany)
Telephone +49 (0) 621 381-7592
Telefax
+49 (0) 621 381-7622

24

RTU560

03/2001

Subject to alteration

Doc.No.: 1KGT 150 436 V000 1

Vous aimerez peut-être aussi