PROYECTO:
### PICHANAQUI.
OBRA
: PICHANAQUI.
N
DESCRIPCION
N
DIAMETRO/PESO
N de
de
Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
piezas
0.25 0.56 0.99 1.55 2.24 3.97
veces
Parcial
(m)
Parcial
(kg)
TOTAL
(Kg)
0.25m
7.00m
5/8" 99.00
99.00
7.50
1.55
0.00 0.00
73507.50
113936.63
113936.63
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
1/2"
1.00
20.00
344.00
340.56
340.56
### 5/8"
1.00
20.00
0.00 0.00
496.00
768.80
768.80
1/4"
1.00
200.00
2.56
512.00
128.00
128.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
0.25m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION X-X
###
###
###
###
### ###
###
### ###
###
###
1.55
### ###
###
### ###
###
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
METRADOS ACERO
PROYECTO:
### PICHANAQUI.
OBRA
: PICHANAQUI.
N
DESCRIPCION
N
DIAMETRO/PESO
N de
de
Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
piezas
0.25 0.56 0.99 1.55 2.24 3.97
veces
Parcial
(m)
Parcial
(kg)
TOTAL
(Kg)
VIGAS
DIRECCION Y-Y
8.00m
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
METRADOS ACERO
PROYECTO:
### PICHANAQUI.
OBRA
: PICHANAQUI.
N
DESCRIPCION
N
DIAMETRO/PESO
N de
de
Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
piezas
0.25 0.56 0.99 1.55 2.24 3.97
veces
Parcial
(m)
Parcial
(kg)
TOTAL
(Kg)
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
8.00m
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
8.00m
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
8.00m
VIGAS
DIRECCION Y-Y
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
METRADOS ACERO
PROYECTO:
### PICHANAQUI.
OBRA
: PICHANAQUI.
N
DESCRIPCION
N
DIAMETRO/PESO
N de
de
Long. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
piezas
0.25 0.56 0.99 1.55 2.24 3.97
veces
Parcial
(m)
Parcial
(kg)
TOTAL
(Kg)
VIGAS
DIRECCION Y-Y
8.00m
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
5/8"
1.00
20.00
8.00
1.55
0.00 0.00
160.00
248.00
248.00
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
VIGAS
DIRECCION Y-Y
8.00m
.
"ACONDICIONAMIENTO COMERCIO BANCARIO
TIENDA INTERBANK DOS DE MAYO"
Proyecto
Cliente
Especialidad :
Base de datos
0.30m
An=
0.30m
Al=
0.15m
V=
0.10m
c=
C=1/(L*(A+V))
8.33 Pza/m2
0.20m
0.20m3
0.0875m3/m2
0.25
Factor de consolidacion
0.80
72.51m3
13.49m3
69.56m3
Doble
1/4"
0.15
3/8"
0.25
1/2"
0.25
5/8"
0.35
3/4"
0.45
1"
0.55
Le(m)
1/4"
0.30
3/8"
0.35
1/2"
0.40
5/8"
0.50
3/4"
0.70
1"
1.00
Ganc
1/4"
0.15
3/8"
0.18
1/2"
0.2
5/8"
0.275
3/4"
0.375
1"
0.5
:
:
:
Proyecto de Tesis
Metrado general
SEMIPER cm
PULGADAS
Proyecto
Cliente
Especialidad
AISLAMIENTO
26
24
22
20
18
1 PULGADA
2 PULGADAS
KG/M
KG/M
KG/M
KG/M
KG/M
M2/M
M2/M
20.32
3.60
4.50
0.50
0.60
22.86
3.85
4.80
0.55
0.65
10
25.4
4.10
5.10
0.60
0.70
11
27.94
4.35
5.40
0.65
0.75
12
30.48
4.55
5.70
0.70
0.80
13
33.02
4.80
6.00
0.75
0.85
14
35.56
5.05
6.30
0.80
0.90
15
38.1
5.30
6.60
0.85
0.95
16
40.64
5.50
6.90
0.90
1.00
17
43.18
5.80
7.20
0.95
1.05
18
45.72
6.00
7.50
1.00
1.10
19
48.26
6.25
7.80
1.05
1.15
20
50.8
6.50
8.10
1.10
1.20
21
53.34
6.75
8.40
1.15
1.25
22
55.88
6.95
8.70
1.20
1.30
23
58.42
7.20
9.00
1.25
1.35
24
60.96
7.70
9.30
1.30
1.40
25
63.5
9.60
1.35
1.45
26
66.04
9.90
1.40
1.50
27
68.58
10.20
1.45
1.55
28
71.12
10.50
1.50
1.60
29
73.66
10.60
1.55
1.65
30
76.2
11.25
1.60
1.70
31
78.74
11.55
1.65
1.75
32
81.28
11.85
1.70
1.80
33
83.82
12.15
1.75
1.85
34
86.36
12.45
1.80
1.90
35
88.9
12.75
15.40
1.85
1.95
36
91.44
13.05
15.80
1.90
2.00
37
93.98
13.35
16.30
1.95
2.05
38
96.52
13.65
16.70
2.00
2.10
39
99.06
13.95
17.10
2.05
2.15
40
101.6
14.25
17.80
2.10
2.20
41
104.14
14.55
18.10
2.15
2.25
42
106.68
14.85
18.40
2.20
2.30
43
109.22
15.15
18.70
2.25
2.35
44
111.76
15.60
18.95
2.30
2.40
45
114.3
15.90
19.20
2.35
2.45
46
116.84
16.20
19.45
2.40
2.50
47
119.38
16.50
19.80
2.45
2.55
48
121.92
16.80
20.50
2.50
2.60
49
124.46
17.10
20.70
2.55
2.65
50
127
17.40
21.00
2.60
2.70
51
129.54
17.70
21.30
2.65
2.75
52
132.08
18.00
21.75
2.70
2.80
53
134.62
18.30
22.20
2.75
2.85
54
137.16
18.60
22.50
2.80
2.90
55
139.7
18.90
22.80
2.85
2.95
56
142.24
19.25
23.25
2.90
3.00
57
144.78
19.65
23.70
2.95
3.05
58
147.32
19.95
24.00
3.00
3.10
59
149.86
20.25
24.30
3.05
3.15
60
152.4
20.55
24.75
3.10
3.20
61
154.94
20.85
25.20
3.15
3.25
62
157.48
21.15
25.50
3.20
3.30
63
160.02
21.45
25.80
3.25
3.35
64
162.56
21.75
26.25
3.30
3.40
65
165.1
22.05
26.70
3.35
3.45
66
167.64
22.35
27.00
3.40
3.50
67
170.18
22.65
27.30
3.45
3.55
68
172.72
22.95
27.75
3.50
3.60
69
175.26
23.25
28.20
38.70
3.55
3.65
70
177.8
23.55
28.50
39.30
3.60
3.70
71
180.34
28.80
39.75
3.65
3.75
72
182.88
29.25
40.20
3.70
3.80
73
185.42
29.70
40.80
3.75
3.85
74
187.96
30.00
41.25
3.80
3.90
75
190.5
30.30
41.70
3.85
3.95
76
193.04
30.70
42.40
3.90
4.00
77
195.58
31.30
42.70
3.95
4.05
78
198.12
31.50
43.20
4.00
4.10
79
200.66
31.80
43.80
4.05
4.15
80
203.2
32.25
44.25
4.10
4.20
81
205.74
32.70
44.85
4.15
4.25
82
208.28
33.00
45.30
4.20
4.30
83
210.82
33.30
45.75
4.25
4.35
84
213.36
33.75
46.35
4.30
4.40
85
215.9
34.20
46.80
4.35
4.45
86
218.44
34.50
47.25
4.40
4.50
87
220.98
34.80
47.85
4.45
4.55
88
223.52
35.25
48.30
4.50
4.60
89
226.06
35.70
48.75
4.55
4.65
90
228.6
36.00
49.35
4.60
4.70
91
231.14
36.30
49.80
4.65
4.75
92
233.68
36.75
50.40
4.70
4.80
93
236.22
37.20
50.85
4.75
4.85
94
238.76
37.50
51.35
4.80
4.90
95
241.3
37.80
51.90
4.85
4.95
96
243.84
38.25
52.35
4.90
5.00
97
246.38
52.80
4.95
5.05
98
248.92
53.40
68.25
5.00
5.10
99
251.46
53.85
68.55
5.05
5.15
100
254
54.30
5.10
5.20
101
256.54
54.75
70.00
5.15
5.25
102
259.08
55.20
70.10
5.20
5.30
69.45
2. Tabla No 2
Construccion de ductos de baja presion
Lado mayor del ducto
No 26
No 24
No 22
No 20
Mayores de 215 cm
No 18
HOJA DE METRADOS
I
01.01.00
01.02.00
DESCRIPCION
01.04.00
03.03.00
03.03.01
14.96
1.00
14.96
14.96
522.15
1.00
1.00
1.00
190.75
1.00
190.75
190.75
31.06
1.00
10.60
2.93
31.06
157.49
1.00
35.68
2.93
104.54
1.00
21.70
2.44
52.95
39.43
1.00
4.89
2.20
10.76
1.00
5.40
2.50
13.50
1.00
5.40
0.31
1.67
1.00
5.40
2.50
13.50
15.33
4.00
0.90
2.10
7.56
3.00
1.00
2.10
6.30
1.00
0.70
2.10
1.47
Eliminacion de desmonte
50.00
1.00
0.05
190.75
9.54
1.00
0.15
31.06
4.66
1.00
0.12
157.49
18.90
Eliminacion de mamparas
1.00
0.10
39.43
3.94
1.00
0.10
15.33
1.00
03.02.01
45.00
212.51
03.02.00
45.00
309.64
03.01.01
7.00
60.00
212.51
03.01.00
1.00
309.64
###
7.00
1.00
DEMOLICIONES
02.06.00
4.00
1.00
###
02.05.00
Total
Segundo piso
OBRAS DE ESTRUCTURAS
02.04.00
Parcial
II
02.03.00
Alto(m)
Instalaciones de materiales
02.02.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
02.01.00
METRADO
01.06.00
Nro.
Vec.
OBRAS PRELIMINARES
01.03.00
01.05.00
1.53
11.43
CONCRETO ARMADO
Columnas - Concreto f'c=210 Kg/cm2
Primer piso - Zona 24 (C1)
0.67
3.00
0.50
0.15
2.93
0.64
10.27
1.00
3.34
2.93
9.78
415.82
1.00
396.02
396.02
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
0.43
03.04.01
1.00
1.32
0.20
0.50
0.13
03.04.02
1.00
1.32
0.15
0.50
0.10
03.04.03
1.00
4.10
0.15
0.30
0.18
03.05.00
5.85
03.05.01
1.00
1.32
0.20
0.50
1.59
03.05.02
1.00
1.32
0.15
0.50
1.52
03.05.03
1.00
4.10
03.06.00
0.30
2.46
#REF!
03.06.01
1.00
#REF!
03.06.02
1.00
#REF!
#REF!
03.06.03
1.00
200.80
200.80
03.07.00
03.07.01
1.00
1.10
0.15
2.93
03.07.02
1.00
11.48
0.20
2.93
03.08.00
#REF!
7.57
0.48
6.73
79.53
03.08.01
2.00
1.10
0.15
2.93
7.30
03.08.02
2.00
11.48
0.20
2.93
68.45
03.09.00
#REF!
03.09.01
1.00
#REF!
#REF!
03.09.02
1.00
#REF!
#REF!
03.10.00
03.10.01
03.11.00
03.11.01
03.12.00
03.12.01
###
1.69
1.00
0.20
8.07
8.47
1.00
8.07
1.61
8.07
#REF!
1.00
#REF!
#REF!
ESTRUCTURA METLICA
Estructura de parapetos frontal, acabado base zincromato
mas 2 manos de esmalte negro
04.01.00
04.02.00
1.00
17.42
3.00
52.25
1.00
71.31
0.40
28.53
III
OBRAS DE ARQUITECTURA
###
TABIQUES DE ALBAILERA
05.01.00
84.82
4.00
18.00
18.00
8.00
8.00
50.00
50.00
19.87
###
06.01.00
6.78
2.93
19.87
1.00
12.76
2.45
31.26
1.00
9.44
2.93
27.66
1.00
0.50
2.44
TABIQUES DRYWALL
Tabique de drywall con planchas de yeso (un lado)
Pirmer piso - Plataformas (Eje A-A)
Pirmer piso - Zona de tableros
electricos,Recuento,Escalera
Segundo piso - Detras del mueble locker
06.02.00
80.00
4.00
60.14
1.22
74.52
1.00
12.61
2.93
36.95
1.00
1.00
0.83
0.83
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
1.00
1.64
2.44
1.00
0.70
0.34
0.24
1.00
13.32
2.44
32.50
4.00
32.50
1.00
13.32
2.44
32.50
7.83
2.93
1.00
0.90
0.83
1.00
8.03
2.93
23.53
1.00
0.60
0.83
0.50
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
08.02.00
08.03.00
###
09.01.00
21.34
1.00
21.34
Friso en drywall.
21.34
48.09
1.00
10.33
10.33
1.00
16.75
16.75
1.00
21.01
21.01
1.00
17.46
2.95
1.00
2.39
2.95
7.05
1.00
6.78
2.95
20.01
Otros
1.00
13.56
2.95
40.00
1.00
3.34
2.93
1.00
1.32
0.20
0.50
1.59
1.00
1.32
0.15
0.50
1.52
1.00
4.10
REVOQUES Y ENLUCIDOS
Tarrajeo de muros interiores mezcla c:a,1:5;e=1.5cm
118.57
51.51
08.03.00
138.51
08.01.00
0.75
24.03
###
22.94
07.01.00
07.03.00
23.69
###
07.02.00
Total
06.05.00
Parcial
9.79
9.79
5.57
0.30
2.46
15.43
PISOS Y CONTRAPISOS
Instalacin de Piso porcelanato modelo por definir de
medidas 0.40mx0.40m (porcelanato suministrado por
Interbank).
157.96
1.00
99.82
99.82
1.00
42.06
42.06
1.00
16.08
16.08
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
09.04.00
###
10.01.00
4.10
1.00
4.10
8.30
1.00
2.41
2.41
1.00
2.22
2.22
1.00
1.26
1.26
1.00
2.41
2.41
10.03.00
31.72
1.00
31.72
1.00
26.49
50.36
1.00
50.36
50.36
CARPINTERIA DE MADERA
Puertas contraplacadas de MDF 6mm con marco cajn de
1" x 5" en madera cedro y pintado al color tecnogloss,
segn el plano.
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
11.03.00
26.49
11.02.00
31.72
26.49
11.01.00
4.10
ZCALOS Y CONTRAZOCALOS
###
27.76
10.02.00
10.06.00
Total
27.76
Parcial
3.00
1.00
1.00
2.00
2.00
###
CARPINTERIA METALICA
12.01.00
6.00
6.00
6.00
1.00
1.00
1.00
HOJA DE METRADOS
Nro.
Vec.
DESCRIPCION
Parcial
Total
2.00
2.00
1.00
1.00
1.00
1.00
1.00
10.09
10.09
###
Alto(m)
2.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
Puerta Metlica P6
Primer piso - Boveda
12.04.00
METRADO
12.03.00
2.00
2.00
2.00
DRYWALL REFORZADO
Estructura de drywall reforzado para zona de 24 horas
13.01.00
13.02.00
W=7.08Kg/m
W=9.62Kg/m
150.67
293.46
0.99
290.53
17.02
1.00
16.21
16.21
2.00
1.00
1.00
1.00
1.00
4.00
Primer piso - P1
1.00
1.00
Primer piso - P2
1.00
1.00
Segundo piso - P5
2.00
2.00
1.00
1.00
1.00
1.00
1.00
14.08.00
9.62
14.07.00
15.66
14.06.00
1.00
CERRAJERIA
14.05.00
346.75
1.00
14.01.00
14.04.00
6.45
W=0.99Kg/m
###
14.03.00
53.76
305.06
14.02.00
1.00
13.03.00
522.29
1.00
1.00
1.00
1.00
3.00
1.00
1.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00
1.00
24.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
HOJA DE METRADOS
Nro.
Vec.
DESCRIPCION
Segundo piso - Area nueva y rack de
comunicaciones. (P5-0.80MX2.20M)
14.09.00
Alto(m)
8.00
8.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
PINTURA
Empastado de superficie tarrajeada y drywall.
1055.40
101
1.00
29.16
2.69
78.29
102
1.00
53.48
2.69
143.59
103
1.00
13.89
2.69
37.29
105
1.00
11.06
2.69
29.70
107
1.00
13.63
2.69
36.60
109
1.00
172.54
2.69
463.27
110
1.00
18.91
2.69
50.77
113
1.00
3.90
2.69
10.47
114
1.00
6.20
2.69
16.65
1.00
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
145.44
1.00
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
747.15
102
1.00
53.48
2.69
103
1.00
13.89
2.69
37.29
109
1.00
172.54
2.69
463.27
110
1.00
18.91
2.69
50.77
114
1.00
6.20
2.69
16.65
143.59
INDECI
suministro e instalacion de sealtica adhesiva de
47.00
16.01.00 seguridad.
Primer piso - Zona 24 horas
8.00
8.00
1.00
1.00
9.00
9.00
18.00
18.00
1.00
1.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
16.02.00
Total
###
Parcial
1.00
15.01.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
1.00
###
METRADO
14.10.00
HOJA DE METRADOS
16.03.00
DESCRIPCION
17.06.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
INSTALACIONES SANITARIAS
###
1.00
1.00
1.00
IV
18.03.00
3.00
18.02.00
6.00
18.01.00
Total
Parcial
1.00
Alto(m)
1.00
17.05.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
1.00
APARATOS SANITARIOS
17.04.00
METRADO
17.01.00
17.03.00
Nro.
Vec.
###
17.02.00
1.00
17.00
13.00
13.00
4.00
4.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
3.00
3.00
1.00
HOJA DE METRADOS
DESCRIPCION
Primer piso - Tanque cisterna
18.04.00
18.05.00
18.06.00
18.07.00
###
19.01.00
00.01.00
19.02.00
Largo(m) Ancho(m)
1.00
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
36.93
1.00
16.87
16.87
1.00
20.06
20.06
1.00
7.00
7.00
1.00
7.00
7.00
14.00
4.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
71.93
1.00
36.93
1.00
14.00
1.00
21.00
INSTALACIONES DE DESAGE
Salida de PVC SAL para desage de =4"
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
7.00
19.04.00
METRADO
Nro.
Vec.
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
Primer piso - SH.Discapacitados.
19.05.00
19.06.00
19.07.00
19.09.00
Nro.
Vec.
METRADO
Largo(m) Ancho(m)
1.00
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
19.08.00
1.00
1.00
1.00
10.00
10.00
10.00
10.00
10.00
10.00
50.00
1.00
32.72
32.72
1.00
17.28
17.28
INSTALACIONES ELCTRICAS
###
1.00
1.00
1.00
20.01.01
20.02.00
20.02.01
20.02.02
20.02.03
20.92
1.00
15.42
15.42
1.00
1.50
1.50
1.00
3.00
3.00
1.00
3.77
3.77
1.00
1.50
1.50
1.00
3.00
8.68
3.00
32.42
1.00
15.42
15.42
1.00
1.50
1.50
1.00
3.00
3.00
1.00
3.77
3.77
1.00
1.50
1.50
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.50
1.50
1.00
1.50
1.50
20.03.01
5.25
5.75
1.00
2.00
2.00
1.00
1.50
1.50
1.00
1.50
1.50
1.00
5.50
5.50
1.00
5.50
5.50
1.00
1.50
20.04.00
DESDE EL TG HASTA EL TF
20.04.01
20.04.02
1.00
20.03.00
20.03.02
1.00
1.00
13.13
1.50
14.38
1.00
5.50
5.50
1.00
5.50
5.50
1.00
1.50
1.50
1.00
3.45
3.45
1.00
1.50
1.50
20.05.00
20.05.01
20.84
HOJA DE METRADOS
20.05.02
###
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
3.50
3.50
1.00
7.40
7.40
1.00
1.50
1.50
1.00
2.50
2.50
22.83
1.00
3.45
3.45
1.00
1.50
1.50
1.00
3.50
3.50
1.00
7.40
7.40
1.00
1.50
1.50
1.00
2.50
2.50
TABLEROS ELECTRICOS
Suministro e instalacin de los siguientes tableros elctricos
de acuerdo a especificaciones tcnicas y planos:
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
21.04.00
Azotea.
21.05.00
22.01.00
1.00
1.00
1.00
22.02.00
1.00
###
1.00
3.00
3.00
3.00
34.55
1.00
3.00
3.00
1.00
1.50
1.50
1.00
3.50
3.50
1.00
3.50
3.50
1.00
1.50
1.50
1.00
3.50
3.50
1.00
7.40
7.40
1.00
7.00
7.00
1.00
2.00
22.03.00
2.00
57.70
1.00
14.63
14.63
1.00
1.50
1.50
1.00
3.50
3.50
1.00
30.32
30.32
1.00
1.50
1.50
1.00
3.50
3.50
1.00
8.50
22.04.00
22.05.00
22.06.00
22.07.00
8.93
8.50
17.22
1.00
16.40
1.00
19.63
1.00
8.00
8.00
1.00
35.32
35.32
1.00
9.02
9.02
1.00
1.50
1.50
1.00
3.50
3.50
66.10
###
CIRCUITOS DERIVADOS
23.01.00
16.40
19.63
14.72
HOJA DE METRADOS
DESCRIPCION
Parcial
Total
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
29.00
7.00
1.00
1.00
6.00
6.00
10.00
10.00
4.00
4.00
1.00
1.00
21.00
1.00
1.00
1.00
1.00
4.00
4.00
3.00
3.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
4.00
23.05.00
Alto(m)
7.00
23.04.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
99.00
METRADO
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
11.00
11.00
11.00
23.07.00
Salida para tomacorriente bipolar doble con toma de tierra
en mostrador matix bticino, incluye caja de FoGo Pes, cable
NH-80 4mm2, c/tub de 20mm y accesorios del tipo PVC-P.
Primer piso - Zona counter
6.00
6.00
6.00
23.08.00
Salida para tomacorriente bipolar doble con toma de tierra
en el mueble matix bticino, incluye caja de FoGo Pes, cable
NH-80 4mm2, c/tub de 20mm y accesorios del tipo PVC-P.
Primer piso / Segundo piso - Todos los ambientes
23.09.00
7.00
18.00
24.00
23.14.00
23.15.00
4.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
23.17.00
4.00
1.00
23.16.00
24.00
4.00
18.00
24.00
7.00
18.00
23.12.00
12.00
7.00
23.11.00
12.00
23.10.00
12.00
1.00
1.00
1.00
1.00
2.00
HOJA DE METRADOS
DESCRIPCION
Primer piso - Zona Verde/Counters
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
2.00
2.00
23.18.00
Primer piso - Zona 24 horas
1.00
1.00
1.00
1.00
1.00
23.19.00
Primer piso - Zona Verde/Counters
1.00
1.00
2.00
23.20.00
Segundo piso - Embozadora (Area existente sin
intervenir)
Segundo piso - Racks de comunicaciones
23.21.00
23.25.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
23.26.00
1.00
23.24.00
1.00
23.23.00
1.00
23.22.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
23.32.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
2.00
2.00
1.00
1.00
Salida para fonoactivo, incluye caja de FoGo Pes, cable 31x4mm2 NH-80, c/tub de 20mm y accesorios del tipo PVC-P.
2.00
1.00
1.00
1.00
1.00
###
Total
23.31.00
Parcial
2.00
23.30.00
Alto(m)
SUMA
Area Vol
O Und
1.00
1.00
1.00
SISTEMA DE COMUNICACIONES
Suministro e instalacin de los siguientes materiales :
24.01.00
24.02.00
24.03.00
13.80
13.80
1.00
3.00
3.00
1.00
7.00
7.00
15.19
1.00
5.19
5.19
1.00
3.00
3.00
1.00
7.00
7.00
###
23.80
6.00
6.00
1.00
6.00
SISTEMA DE COMPUTO
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas (solo incluye entubado y caja
rectangular)
1.00
1.00
25.03.00
1.00
1.00
1.00
1.00
6.00
6.00
6.00
8.00
2.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
Parcial
Total
3.00
3.00
5.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
7.00
7.00
2.00
2.00
###
Alto(m)
###
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
11.00
###
METRADO
7.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
ARTEFACTOS DE ALUMBRADO
Instalacin de los siguientes artefactos de alumbrado :
26.01.00
80.00
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
10.00
7.00
7.00
1.00
1.00
6.00
6.00
10.00
10.00
4.00
4.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
82.00
20.00
1.00
11.00
2.00
13.00
5.00
20.00
2.00
8.00
99.00
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
29.00
7.00
7.00
1.00
1.00
6.00
6.00
10.00
10.00
HOJA DE METRADOS
DESCRIPCION
Pirmer piso - Plataformas / Sistema de tiras LED de
14ml de tiras led 1 fuente de alimentacin.
Segundo piso - Entrada a doble altura. / OD-5200 DE
60 CM CON TUBO T 5 DE 18W O ALTERNATIVA EN
MITAD DE UNIDADES DE 120 CM CON TUBO T8 DE 36
###
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
4.00
4.00
1.00
1.00
SISTEMA DE ALARMA
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas (solo incluye entubado y caja
rectangular):
27.01.00
1.00
1.00
27.03.00
1.00
1.00
1.00
20.00
5.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Salida para detector del tipo PIR, incluye caja de FoGo Pes,
27.05.00 c/tub de 20mm y accesorios del tipo conduit liviano EMT.
27.06.00
1.00
1.00
11.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
11.00
5.00
5.00
6.00
6.00
13.00
1.00
1.00
2.00
2.00
HOJA DE METRADOS
DESCRIPCION
Alto(m)
Parcial
Total
2.00
2.00
5.00
5.00
1.00
1.00
2.00
2.00
5.00
5.00
5.00
4.00
1.00
1.00
1.00
1.00
2.00
2.00
###
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
27.12.00
METRADO
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
2.00
2.00
1.00
1.00
CIRCUITO CERRADO DE TV
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas :
28.01.00
28.02.00
6.00
6.00
6.00
6.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
3.00
3.00
Salida para monitor de TV, incluye caja de FoGo Pes, cable 31x4mm2 NH-80, c/tub de 20mm y accesorios del tipo conduit
liviano EMT.
No figura en planos pero consideramos el minimo
28.03.00
2.00
2.00
###
20.00
2.00
8.00
8.00
8.00
VARIOS
Suministro e instalacin de los siguientes materiales :
29.01.00
1.00
Comunicaciones (IC-01).
Segundo piso - Racks de comunicaciones.
29.02.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
Comunicaciones (IC-01).
Segundo piso - Racks de comunicaciones.
29.03.00
8.00
1.00
1.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
29.04.00
1.00
21.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
4.00
1.00
1.00
2.00
2.00
2.00
Seguridad (Seg-01)
29.05.00
2.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Comunicaciones (IC-01).
Seguridad (Seg-01)
Primer piso - Zona de comunidad.
29.06.00
1.00
1.00
10.00
10.00
10.00
23.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
Comunicaciones (IC-01).
Segundo piso - Mueble de embozadora
Alarmas contraincendio (PI-01).
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
Seguridad (Seg-01)
29.08.00
2.00
49.92
Comunicaciones (IC-01).
29.09.00
1.00
7.73
7.73
1.00
2.60
2.60
1.00
1.58
1.58
2.00
14.07
28.14
2.00
3.36
6.72
2.00
1.58
3.15
46.89
2.00
15.68
31.35
2.00
3.36
6.72
2.00
1.58
3.15
1.00
1.49
1.49
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
29.10.00
1.58
26.91
29.11.00
1.00
4.48
4.48
1.00
2.60
2.60
1.00
1.58
1.58
1.00
14.07
14.07
1.00
2.60
2.60
1.00
1.58
1.58
14.07
Comunicaciones (IC-01).
29.12.00
1.00
9.89
9.89
1.00
2.60
2.60
1.00
1.58
1.58
67.71
Comunicaciones (IC-01).
Primer piso - Longuitudinal 1.
2.00
2.71
5.43
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.05
4.09
2.00
2.60
5.20
2.00
1.58
3.15
3.00
1.30
3.89
3.00
3.36
10.08
3.00
1.58
4.73
2.00
2.48
4.97
2.00
3.36
6.72
2.00
1.58
3.15
1.00
3.01
3.01
Seguridad (Seg-01)
HOJA DE METRADOS
29.13.00
DESCRIPCION
METRADO
Largo(m) Ancho(m)
1.00
3.36
1.00
1.58
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
3.36
1.58
133.35
1.00
3.16
3.16
Azotea /Longuitudinal.
1.00
0.68
0.68
1.00
5.50
5.50
1.00
3.50
3.50
2.00
4.30
8.61
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.11
4.22
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.73
5.47
2.00
2.60
5.20
2.00
1.58
3.15
1.00
6.48
6.48
1.00
2.60
2.60
1.00
1.58
1.58
1.00
2.63
2.63
1.00
2.60
2.60
1.00
1.58
1.58
2.00
2.13
4.25
2.00
2.60
5.20
2.00
1.58
3.15
1.00
1.23
1.23
1.00
2.60
2.60
1.00
1.58
1.58
2.00
5.59
11.17
2.00
2.60
5.20
2.00
1.58
3.15
2.00
3.60
7.19
2.00
2.60
5.20
2.00
1.58
3.15
1.00
2.44
2.44
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
Seguridad (Seg-01)
29.14.00
1.58
32.08
1.00
19.24
19.24
1.00
3.94
3.94
1.00
2.60
2.60
1.00
1.58
1.58
1.00
0.54
0.54
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
29.15.00
1.58
64.02
Seguridad (Seg-01)
Primer piso - Longuitudinal 1.
1.00
6.49
6.49
1.00
2.60
2.60
1.00
1.58
1.58
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
4.96
4.96
1.00
2.60
2.60
1.00
1.58
1.58
1.00
8.65
8.65
1.00
2.60
2.60
1.00
1.58
1.58
1.00
7.07
7.07
1.00
2.60
2.60
1.00
1.58
1.58
1.00
8.36
8.36
1.00
2.60
2.60
1.00
1.58
1.58
1.00
3.41
3.41
1.00
2.60
2.60
1.00
1.58
29.16.00
29.17.00
29.23.00
###
100.00
1.00
100.00
1.00
100.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
1.00
1.00
29.22.00
VI
1.00
29.21.00
100.00
29.20.00
1.00
1.58
25.00
1.00
1.00
4.00
4.00
4.00
3.00
3.00
3.00
AIRE ACONDICIONADO
SUMINISTRO DE EQUIPO DE AIRE
ACONDICIONADO TIPO SPLIT PARA DUCTO.
Unidades Fan Coil evaporadoras y unidades condensadoras
30.01.00
30.02.00
1.00
1.00
1.00
1.00
1.00
1.00
30.04.00
1.00
30.03.00
1.00
1.00
1.00
1.00
1.00
HOJA DE METRADOS
###
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
31.01.00
31.02.00
1.00
1.00
1.00
1.00
###
1.00
31.03.00
1.00
1.00
1.00
1.00
32.01.00
32.02.00
Cdigo: EC-02; Extractor centrifugo en gabinete 740CFM1000RPM (MOTOR 250W-220/3/60 ; MODELO CSP-A700)
32.03.00
###
33.01.00
33.02.00
###
34.01.00
34.02.00
34.04.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
912.09
1.00
912.09
1.00
78.86
912.09
78.86
Difusores de aire
78.86
2403.00
5.00
9.00
9.00
405.00
2.00
9.00
9.00
162.00
9.00
12.00
12.00
1296.00
3.00
15.00
12.00
540.00
3424.00
12.00
12.00
12.00
1728.00
3.00
16.00
16.00
768.00
HOJA DE METRADOS
34.05.00
34.06.00
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
16.00
16.00
256.00
1.00
12.00
12.00
144.00
1.00
12.00
10.00
120.00
1.00
12.00
10.00
120.00
2.00
12.00
12.00
288.00
Termostato de ambiente
4.00
1.00
1.00
2.00
2.00
1.00
1.00
10.41
43.00
0.24
10.41
VII
VIDRIOS Y CRISTALES
###
35.01.00
35.02.00
35.03.00
35.04.00
1.00
2.01
2.50
5.03
1.00
2.01
0.30
0.60
1.00
2.01
2.50
5.03
0.80
2.20
3.52
1.00
2.00
0.49
0.98
1.00
2.00
2.50
5.00
5.91
1.00
0.85
2.50
2.13
1.00
1.35
0.30
0.41
1.00
1.35
2.50
3.38
6.43
1.00
2.81
2.29
35.06.00
9.50
10.66
6.43
6.13
2.00
1.35
2.27
6.13
5.59
HOJA DE METRADOS
DESCRIPCION
Primer piso - Gerente de tienda / Mampara M7
(2.57mx2.17m)
35.07.00
VIII
MOBILIARIO
###
36.10.00
1.00
5.59
2.26
4.35
1.30
1.30
2.35
2.35
1.60
1.00
1.60
1.60
1.00
1.00
1.00
3.00
3.00
3.00
1.20
1.00
1.20
1.20
3.05
1.00
3.05
3.05
1.00
1.00
1.00
2.00
2.00
2.00
1.00
2.00
Total
2.35
36.11.00
1.00
36.09.00
2.17
Parcial
1.30
36.08.00
1.92
36.07.00
1.00
36.06.00
Alto(m)
SUMA
Area Vol
O Und
4.35
36.05.00
2.57
36.04.00
Largo(m) Ancho(m)
36.03.00
1.00
METRADO
36.02.00
Nro.
Vec.
36.01.00
1.00
5.00
5.00
5.00
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
1.00
1.00
4.00
2.23
0.95
0.99
5.48
2.40
0.55
Parcial
Total
12.22
2.28
2.18
7.44
1.00
2.86
2.60
SUMA
Area Vol
O Und
16.68
36.14.00
Nro.
Vec.
36.13.00
7.44
69.17
1.00
1.00
16.62
2.30
38.23
30.94
HOJA DE METRADOS
I
01.01.00
01.02.00
DESCRIPCION
01.06.00
03.02.01
03.03.00
03.03.01
45.00
14.96
1.00
DIAS
45.00
14.96
ML
14.96
522.15
212.51
212.51
1.00
1.00
M2
GB
1.00
190.75
1.00
190.75
M2
190.75
31.06
1.00
10.60
2.93
1.00
35.68
2.93
104.54
1.00
21.70
2.44
52.95
M2
31.06
157.49
39.43
1.00
4.89
2.20
10.76
1.00
5.40
2.50
13.50
1.00
5.40
0.31
1.67
1.00
5.40
2.50
13.50
15.33
4.00
0.90
2.10
7.56
3.00
1.00
2.10
6.30
1.00
0.70
2.10
1.47
Eliminacion de desmonte
50.00
1.00
0.05
190.75
9.54
1.00
0.15
31.06
4.66
1.00
0.12
157.49
18.90
Eliminacion de mamparas
1.00
0.10
39.43
3.94
1.00
0.10
15.33
1.00
03.02.00
7.00
1.00
03.01.01
DIAS
Segundo piso
03.01.00
7.00
309.64
###
UND
309.64
02.06.00
UND.
4.00
1.00
DEMOLICIONES
02.05.00
Total
###
02.04.00
Parcial
60.00
OBRAS DE ESTRUCTURAS
02.03.00
1.00
II
02.02.00
Alto(m)
Instalaciones de materiales
02.01.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
METRADO
Nro.
Vec.
OBRAS PRELIMINARES
M2
M2
M2
M3
1.53
11.43
CONCRETO ARMADO
Columnas - Concreto f'c=210 Kg/cm2
Primer piso - Zona 24 (C1)
0.67
3.00
0.50
1.00
3.34
0.15
2.93
10.27
2.93
415.82
1.00
M2
9.78
M3
0.64
396.02
396.02
KG
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
0.43
03.04.01
1.00
1.32
0.20
0.50
0.13
03.04.02
1.00
1.32
0.15
0.50
0.10
03.04.03
1.00
4.10
0.15
0.30
0.18
03.05.00
5.85
03.05.01
1.00
1.32
0.20
0.50
1.59
03.05.02
1.00
1.32
0.15
0.50
1.52
03.05.03
1.00
4.10
03.06.00
0.30
#REF!
03.06.01
1.00
#REF!
03.06.02
1.00
#REF!
#REF!
03.06.03
1.00
200.80
200.80
03.07.01
1.00
1.10
0.15
2.93
1.00
11.48
0.20
2.93
03.07.02
03.08.00
03.08.01
03.08.02
03.09.00
03.09.01
03.09.02
03.10.00
03.10.01
03.11.00
03.11.01
03.12.00
03.12.01
###
0.15
2.93
2.00
11.48
0.20
2.93
68.45
#REF!
1.00
#REF!
#REF!
1.00
#REF!
#REF!
1.69
1.00
0.20
8.07
8.07
1.00
#REF!
KG
M3
1.61
8.47
1.00
M2
7.30
M3
6.73
79.53
1.10
KG
0.48
M2
#REF!
7.57
M3
2.46
03.07.00
UND.
M2
8.07
#REF!
KG
#REF!
ESTRUCTURA METLICA
Estructura de parapetos frontal, acabado base zincromato
mas 2 manos de esmalte negro
04.01.00
04.02.00
1.00
17.42
3.00
52.25
1.00
71.31
0.40
28.53
4.00
18.00
18.00
8.00
8.00
50.00
50.00
III
OBRAS DE ARQUITECTURA
###
TABIQUES DE ALBAILERA
Muros de ladrillo KK 18 huecos de soga, c:a; 1:4 de 1.5cm
19.87
###
06.01.00
6.78
2.93
1.00
12.76
2.45
31.26
1.00
9.44
2.93
27.66
1.00
0.50
2.44
KG
UND
M2
19.87
TABIQUES DRYWALL
Tabique de drywall con planchas de yeso (un lado)
Pirmer piso - Plataformas (Eje A-A)
Pirmer piso - Zona de tableros
electricos,Recuento,Escalera
Segundo piso - Detras del mueble locker
06.02.00
80.00
4.00
05.01.00
84.82
60.14
M2
1.22
74.52
1.00
12.61
2.93
36.95
1.00
1.00
0.83
0.83
M2
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
1.00
1.64
2.44
1.00
0.70
0.34
0.24
1.00
13.32
2.44
32.50
32.50
1.00
13.32
2.44
1.00
7.83
2.93
1.00
0.90
0.83
1.00
8.03
2.93
23.53
1.00
0.60
0.83
0.50
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
###
08.01.00
08.02.00
08.03.00
###
09.01.00
21.34
1.00
21.34
Friso en drywall.
M2
M2
M2
21.34
48.09
1.00
10.33
10.33
1.00
16.75
16.75
1.00
21.01
21.01
1.00
17.46
2.95
1.00
2.39
2.95
7.05
1.00
6.78
2.95
20.01
Otros
1.00
13.56
2.95
40.00
1.00
3.34
2.93
1.00
1.32
0.20
0.50
1.59
1.00
1.32
0.15
0.50
1.52
1.00
4.10
ML
REVOQUES Y ENLUCIDOS
Tarrajeo de muros interiores mezcla c:a,1:5;e=1.5cm
118.57
M2
51.51
08.03.00
138.51
07.03.00
0.75
24.03
07.01.00
M2
22.94
###
M2
32.50
23.69
UND.
4.00
07.02.00
Total
06.05.00
Parcial
9.79
M2
9.79
5.57
0.30
M2
2.46
15.43
ML
157.96
M2
PISOS Y CONTRAPISOS
Instalacin de Piso porcelanato modelo por definir de
medidas 0.40mx0.40m (porcelanato suministrado por
Interbank).
Primer piso - Patio de espera,Zona de tableros
electricos,Back office, Recuento,pasadizos, boveda.
(PG3 Piso Porcelanato mate gris por definir)
1.00
99.82
99.82
1.00
42.06
42.06
1.00
16.08
16.08
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
09.04.00
###
10.01.00
4.10
1.00
4.10
8.30
1.00
2.41
2.41
1.00
2.22
2.22
1.00
1.26
1.26
1.00
2.41
2.41
31.72
1.00
31.72
1.00
26.49
50.36
ML
26.49
50.36
1.00
ML
31.72
26.49
M2
ML
ML
50.36
ML
CARPINTERIA DE MADERA
Puertas contraplacadas de MDF 6mm con marco cajn de
1" x 5" en madera cedro y pintado al color tecnogloss,
segn el plano.
Primer piso - Ingreso a zona de servicio. (P11.00MX2.10M)
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
11.03.00
4.10
11.02.00
M2
M2
10.03.00
11.01.00
M2
ZCALOS Y CONTRAZOCALOS
###
UND.
27.76
10.02.00
10.06.00
Total
27.76
Parcial
3.00
1.00
1.00
2.00
2.00
###
CARPINTERIA METALICA
12.01.00
6.00
6.00
UND
UND
6.00
1.00
1.00
UND
1.00
UN
HOJA DE METRADOS
Nro.
Vec.
DESCRIPCION
Parcial
Total
2.00
1.00
UN
UN
1.00
1.00
1.00
UND.
2.00
1.00
10.09
UN
10.09
###
Alto(m)
2.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
Puerta Metlica P6
Primer piso - Boveda
12.04.00
METRADO
12.03.00
2.00
2.00
UN
2.00
DRYWALL REFORZADO
Estructura de drywall reforzado para zona de 24 horas
13.01.00
13.02.00
W=7.08Kg/m
W=9.62Kg/m
150.67
293.46
0.99
17.02
1.00
16.21
2.00
1.00
1.00
4.00
Primer piso - P1
1.00
1.00
Primer piso - P2
1.00
1.00
Segundo piso - P5
2.00
2.00
1.00
1.00
3.00
1.00
1.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00
1.00
UND
UND
UND
1.00
UND
1.00
1.00
1.00
UND
1.00
1.00
1.00
M2
16.21
1.00
24.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Kg
290.53
1.00
14.08.00
9.62
14.07.00
15.66
14.06.00
1.00
CERRAJERIA
14.05.00
346.75
1.00
14.01.00
14.04.00
6.45
Kg
W=0.99Kg/m
###
14.03.00
53.76
305.06
14.02.00
1.00
13.03.00
522.29
UND
UND
UND
HOJA DE METRADOS
Nro.
Vec.
DESCRIPCION
Segundo piso - Area nueva y rack de
comunicaciones. (P5-0.80MX2.20M)
14.09.00
Alto(m)
8.00
UND.
8.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
UND
UND
PINTURA
Empastado de superficie tarrajeada y drywall.
1055.40
101
1.00
29.16
2.69
78.29
102
1.00
53.48
2.69
143.59
103
1.00
13.89
2.69
37.29
105
1.00
11.06
2.69
29.70
107
1.00
13.63
2.69
36.60
109
1.00
172.54
2.69
463.27
110
1.00
18.91
2.69
50.77
113
1.00
3.90
2.69
10.47
114
1.00
6.20
2.69
16.65
1.00
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
145.44
1.00
46.59
46.59
1.00
58.96
58.96
1.00
32.96
32.96
747.15
102
1.00
53.48
2.69
103
1.00
13.89
2.69
37.29
109
1.00
172.54
2.69
463.27
110
1.00
18.91
2.69
50.77
114
1.00
6.20
2.69
16.65
M2
M2
M2
143.59
INDECI
suministro e instalacion de sealtica adhesiva de
47.00
16.01.00 seguridad.
Primer piso - Zona 24 horas
8.00
8.00
1.00
1.00
9.00
9.00
18.00
18.00
1.00
1.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
16.02.00
Total
###
Parcial
1.00
15.01.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
1.00
###
METRADO
14.10.00
UN
UN
HOJA DE METRADOS
16.03.00
DESCRIPCION
17.06.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
INSTALACIONES SANITARIAS
###
13.00
13.00
4.00
4.00
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
3.00
3.00
UN
UND
UND
UND
UND
UND
UND
UND
1.00
17.00
UND.
1.00
1.00
1.00
IV
18.03.00
3.00
18.02.00
6.00
18.01.00
Total
Parcial
1.00
Alto(m)
1.00
17.05.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
1.00
APARATOS SANITARIOS
17.04.00
METRADO
17.01.00
17.03.00
Nro.
Vec.
###
17.02.00
1.00
UND
PT
UN
UN
HOJA DE METRADOS
DESCRIPCION
Primer piso - Tanque cisterna
18.04.00
18.05.00
18.06.00
18.07.00
###
19.01.00
00.01.00
19.02.00
Largo(m) Ancho(m)
1.00
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
16.87
16.87
1.00
20.06
20.06
1.00
7.00
7.00
1.00
7.00
7.00
14.00
4.00
1.00
1.00
3.00
3.00
1.00
1.00
UND.
1.00
36.93
ML
ML
UN
ML
1.00
71.93
1.00
36.93
1.00
14.00
1.00
21.00
ML
INSTALACIONES DE DESAGE
Salida de PVC SAL para desage de =4"
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
UND
1.00
PT
1.00
PT
1.00
PT
1.00
7.00
19.04.00
METRADO
Nro.
Vec.
1.00
1.00
1.00
1.00
1.00
UND
HOJA DE METRADOS
DESCRIPCION
Primer piso - SH.Discapacitados.
19.05.00
19.09.00
Largo(m) Ancho(m)
1.00
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
1.00
10.00
10.00
10.00
10.00
50.00
32.72
32.72
1.00
17.28
17.28
###
ML
10.00
1.00
INSTALACIONES ELCTRICAS
ML
10.00
UND
1.00
UND.
1.00
19.08.00
METRADO
19.07.00
Nro.
Vec.
19.06.00
1.00
1.00
ML
ML
1.00
20.01.01
20.02.00
20.02.01
20.02.02
20.02.03
15.42
15.42
1.00
1.50
1.50
1.00
3.00
3.00
1.00
3.77
3.77
1.00
1.50
1.50
1.00
3.00
8.68
15.42
15.42
1.00
1.50
1.50
1.00
3.00
3.00
1.00
3.77
3.77
1.00
1.50
1.50
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.50
1.50
1.00
1.50
1.50
5.25
5.75
1.00
2.00
2.00
1.00
1.50
1.50
1.00
1.50
1.50
1.00
5.50
5.50
1.00
5.50
5.50
1.00
1.50
20.04.00
DESDE EL TG HASTA EL TF
20.04.01
13.13
5.50
5.50
1.00
5.50
5.50
1.00
1.50
1.50
1.00
3.45
3.45
1.00
1.50
1.50
20.05.01
ML
ML
ML
ML
ML
1.50
14.38
20.05.00
ML
3.00
32.42
20.03.01
20.04.02
20.92
1.00
GBL
1.00
20.03.00
20.03.02
1.00
1.00
20.84
ML
ML
HOJA DE METRADOS
20.05.02
###
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
3.50
3.50
1.00
7.40
7.40
1.00
1.50
1.50
1.00
2.50
UND.
2.50
22.83
1.00
3.45
3.45
1.00
1.50
1.50
1.00
3.50
3.50
1.00
7.40
7.40
1.00
1.50
1.50
1.00
2.50
2.50
ML
TABLEROS ELECTRICOS
Suministro e instalacin de los siguientes tableros elctricos
de acuerdo a especificaciones tcnicas y planos:
1.00
1.00
1.00
1.00
1.00
UN
1.00
1.00
1.00
UN
1.00
UN
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
UND.
UN
21.04.00
Azotea.
21.05.00
22.01.00
1.00
1.00
UN
1.00
22.02.00
1.00
###
1.00
3.00
3.00
UND
3.00
34.55
ML
1.00
3.00
3.00
1.00
1.50
1.50
1.00
3.50
3.50
1.00
3.50
3.50
1.00
1.50
1.50
1.00
3.50
3.50
1.00
7.40
7.40
1.00
7.00
7.00
1.00
2.00
22.03.00
2.00
57.70
ML
1.00
14.63
14.63
1.00
1.50
1.50
1.00
3.50
3.50
1.00
30.32
30.32
1.00
1.50
1.50
1.00
3.50
3.50
1.00
8.50
22.04.00
22.05.00
22.06.00
22.07.00
8.93
17.22
1.00
16.40
1.00
19.63
1.00
8.00
8.00
1.00
35.32
35.32
1.00
9.02
9.02
1.00
1.50
1.50
1.00
3.50
3.50
###
CIRCUITOS DERIVADOS
23.01.00
ML
16.40
66.10
ML
8.50
ML
19.63
14.72
ML
HOJA DE METRADOS
DESCRIPCION
Parcial
Total
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
1.00
1.00
6.00
6.00
10.00
10.00
4.00
4.00
1.00
1.00
21.00
1.00
1.00
1.00
1.00
4.00
4.00
3.00
3.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
4.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
UND.
PTO
29.00
7.00
23.05.00
Alto(m)
7.00
23.04.00
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
99.00
METRADO
1.00
PTO
PTO
PTO
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
11.00
11.00
UND.
PTO
11.00
23.07.00
Salida para tomacorriente bipolar doble con toma de tierra
en mostrador matix bticino, incluye caja de FoGo Pes, cable
NH-80 4mm2, c/tub de 20mm y accesorios del tipo PVC-P.
Primer piso - Zona counter
6.00
6.00
PTO
6.00
23.08.00
Salida para tomacorriente bipolar doble con toma de tierra
en el mueble matix bticino, incluye caja de FoGo Pes, cable
NH-80 4mm2, c/tub de 20mm y accesorios del tipo PVC-P.
Primer piso / Segundo piso - Todos los ambientes
23.09.00
18.00
23.14.00
23.15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
23.16.00
1.00
1.00
PTO
PTO
1.00
1.00
1.00
PTO
1.00
6.00
PTO
4.00
1.00
1.00
PTO
24.00
4.00
4.00
PTO
18.00
24.00
24.00
PTO
7.00
18.00
23.12.00
7.00
PTO
12.00
7.00
23.11.00
12.00
23.10.00
12.00
PTO
1.00
2.00
PTO
HOJA DE METRADOS
DESCRIPCION
Primer piso - Zona Verde/Counters
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
UND.
2.00
2.00
PTO
23.18.00
Primer piso - Zona 24 horas
1.00
1.00
1.00
1.00
1.00
PTO
23.19.00
Primer piso - Zona Verde/Counters
1.00
1.00
2.00
PTO
23.20.00
Segundo piso - Embozadora (Area existente sin
intervenir)
Segundo piso - Racks de comunicaciones
23.21.00
23.25.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
PTO
PTO
PTO
1.00
2.00
PTO
2.00
2.00
PTO
2.00
2.00
23.26.00
1.00
23.24.00
1.00
23.23.00
1.00
23.22.00
1.00
1.00
PTO
PTO
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
23.32.00
1.00
1.00
1.00
1.00
1.00
1.00
UND.
PTO
PTO
1.00
3.00
2.00
2.00
1.00
1.00
Salida para fonoactivo, incluye caja de FoGo Pes, cable 31x4mm2 NH-80, c/tub de 20mm y accesorios del tipo PVC-P.
2.00
1.00
1.00
1.00
1.00
###
Total
23.31.00
Parcial
2.00
23.30.00
Alto(m)
SUMA
Area Vol
O Und
1.00
1.00
PTO
PTO
PTO
1.00
SISTEMA DE COMUNICACIONES
Suministro e instalacin de los siguientes materiales :
24.01.00
24.02.00
24.03.00
13.80
13.80
1.00
3.00
3.00
1.00
7.00
5.19
5.19
1.00
3.00
3.00
1.00
7.00
7.00
6.00
6.00
1.00
ML
7.00
15.19
###
23.80
ML
UN
6.00
SISTEMA DE COMPUTO
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas (solo incluye entubado y caja
rectangular)
1.00
1.00
25.03.00
1.00
1.00
1.00
PTO
1.00
6.00
6.00
PTO
PTO
6.00
8.00
2.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
PTO
HOJA DE METRADOS
DESCRIPCION
Parcial
Total
3.00
3.00
5.00
5.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
7.00
###
Alto(m)
###
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
11.00
###
METRADO
PTO
PTO
2.00
2.00
PTO
2.00
PTO
7.00
PTO
7.00
2.00
2.00
UND.
PTO
2.00
2.00
1.00
1.00
1.00
1.00
PTO
ARTEFACTOS DE ALUMBRADO
Instalacin de los siguientes artefactos de alumbrado :
26.01.00
80.00
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
10.00
7.00
7.00
1.00
1.00
6.00
6.00
10.00
10.00
4.00
4.00
1.00
1.00
UND
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
82.00
1.00
11.00
2.00
13.00
5.00
20.00
2.00
8.00
99.00
6.00
6.00
7.00
7.00
10.00
10.00
4.00
4.00
10.00
10.00
4.00
4.00
29.00
7.00
7.00
1.00
1.00
6.00
6.00
10.00
10.00
UND
20.00
UND.
UND
HOJA DE METRADOS
DESCRIPCION
Pirmer piso - Plataformas / Sistema de tiras LED de
14ml de tiras led 1 fuente de alimentacin.
Segundo piso - Entrada a doble altura. / OD-5200 DE
60 CM CON TUBO T 5 DE 18W O ALTERNATIVA EN
MITAD DE UNIDADES DE 120 CM CON TUBO T8 DE 36
###
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
4.00
4.00
1.00
1.00
UND.
SISTEMA DE ALARMA
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas (solo incluye entubado y caja
rectangular):
27.01.00
1.00
1.00
27.03.00
5.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Salida para detector del tipo PIR, incluye caja de FoGo Pes,
27.05.00 c/tub de 20mm y accesorios del tipo conduit liviano EMT.
Primer piso - Zona de servicio (Pasadizos)
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
PTO
PTO
PTO
2.00
11.00
5.00
5.00
6.00
6.00
PTO
1.00
11.00
PTO
1.00
20.00
27.06.00
1.00
1.00
1.00
PTO
13.00
1.00
1.00
2.00
2.00
PTO
PTO
HOJA DE METRADOS
DESCRIPCION
Alto(m)
Parcial
Total
2.00
2.00
5.00
5.00
1.00
1.00
2.00
2.00
5.00
5.00
1.00
1.00
1.00
1.00
2.00
2.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
UND.
PTO.
5.00
4.00
###
Largo(m) Ancho(m)
SUMA
Area Vol
O Und
27.12.00
METRADO
3.00
2.00
2.00
1.00
1.00
PTO.
PTO.
PTO.
CIRCUITO CERRADO DE TV
Suministro e instalacin de materiales para la ejecucin de
las siguientes salidas :
28.01.00
28.02.00
6.00
6.00
6.00
6.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
3.00
3.00
Salida para monitor de TV, incluye caja de FoGo Pes, cable 31x4mm2 NH-80, c/tub de 20mm y accesorios del tipo conduit
liviano EMT.
No figura en planos pero consideramos el minimo
28.03.00
2.00
2.00
###
20.00
PTO
2.00
8.00
8.00
PTO
PTO
8.00
VARIOS
Suministro e instalacin de los siguientes materiales :
29.01.00
1.00
UND
Comunicaciones (IC-01).
Segundo piso - Racks de comunicaciones.
29.02.00
1.00
1.00
2.00
UND
1.00
1.00
1.00
1.00
Comunicaciones (IC-01).
Segundo piso - Racks de comunicaciones.
29.03.00
8.00
1.00
1.00
UND
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
UND.
29.04.00
1.00
21.00
UND
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
4.00
1.00
1.00
2.00
2.00
2.00
Seguridad (Seg-01)
29.05.00
2.00
15.00
UND
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
Comunicaciones (IC-01).
Seguridad (Seg-01)
Primer piso - Zona de comunidad.
29.06.00
1.00
1.00
10.00
UND
10.00
10.00
23.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
Comunicaciones (IC-01).
Segundo piso - Mueble de embozadora
Alarmas contraincendio (PI-01).
UND
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
UND.
Seguridad (Seg-01)
29.08.00
2.00
49.92
ML
Comunicaciones (IC-01).
29.09.00
1.00
7.73
7.73
1.00
2.60
2.60
1.00
1.58
1.58
2.00
14.07
28.14
2.00
3.36
6.72
2.00
1.58
3.15
46.89
ML
2.00
15.68
31.35
2.00
3.36
6.72
2.00
1.58
3.15
1.00
1.49
1.49
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
29.10.00
1.58
26.91
ML
29.11.00
1.00
4.48
4.48
1.00
2.60
2.60
1.00
1.58
1.58
1.00
14.07
14.07
1.00
2.60
2.60
1.00
1.58
1.58
14.07
ML
Comunicaciones (IC-01).
29.12.00
1.00
9.89
9.89
1.00
2.60
2.60
1.00
1.58
1.58
67.71
Comunicaciones (IC-01).
Primer piso - Longuitudinal 1.
2.00
2.71
5.43
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.05
4.09
2.00
2.60
5.20
2.00
1.58
3.15
3.00
1.30
3.89
3.00
3.36
10.08
3.00
1.58
4.73
2.00
2.48
4.97
2.00
3.36
6.72
2.00
1.58
3.15
1.00
3.01
3.01
Seguridad (Seg-01)
ML
HOJA DE METRADOS
29.13.00
DESCRIPCION
METRADO
Largo(m) Ancho(m)
1.00
3.36
1.00
1.58
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
UND.
3.36
1.58
133.35
ML
1.00
3.16
3.16
Azotea /Longuitudinal.
1.00
0.68
0.68
1.00
5.50
5.50
1.00
3.50
3.50
2.00
4.30
8.61
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.11
4.22
2.00
2.60
5.20
2.00
1.58
3.15
2.00
2.73
5.47
2.00
2.60
5.20
2.00
1.58
3.15
1.00
6.48
6.48
1.00
2.60
2.60
1.00
1.58
1.58
1.00
2.63
2.63
1.00
2.60
2.60
1.00
1.58
1.58
2.00
2.13
4.25
2.00
2.60
5.20
2.00
1.58
3.15
1.00
1.23
1.23
1.00
2.60
2.60
1.00
1.58
1.58
2.00
5.59
11.17
2.00
2.60
5.20
2.00
1.58
3.15
2.00
3.60
7.19
2.00
2.60
5.20
2.00
1.58
3.15
1.00
2.44
2.44
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
Seguridad (Seg-01)
29.14.00
1.58
32.08
ML
1.00
19.24
19.24
1.00
3.94
3.94
1.00
2.60
2.60
1.00
1.58
1.58
1.00
0.54
0.54
1.00
2.60
2.60
1.00
1.58
Comunicaciones (IC-01).
29.15.00
1.58
64.02
Seguridad (Seg-01)
Primer piso - Longuitudinal 1.
1.00
6.49
6.49
1.00
2.60
2.60
1.00
1.58
1.58
ML
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
UND.
29.16.00
1.00
4.96
4.96
1.00
2.60
2.60
1.00
1.58
1.58
1.00
8.65
8.65
1.00
2.60
2.60
1.00
1.58
1.58
1.00
7.07
7.07
1.00
2.60
2.60
1.00
1.58
1.58
1.00
8.36
8.36
1.00
2.60
2.60
1.00
1.58
1.58
1.00
3.41
3.41
1.00
2.60
2.60
1.00
1.58
29.17.00
29.18.00
29.23.00
###
1.00
100.00
1.00
100.00
UND
25.00
1.00
PTO
1.00
1.00
GLB
4.00
UND
4.00
3.00
3.00
UND
25.00
25.00
4.00
UND
25.00
25.00
1.00
UND
25.00
25.00
29.22.00
VI
100.00
29.21.00
1.00
29.20.00
100.00
29.19.00
1.00
1.58
25.00
UND
3.00
AIRE ACONDICIONADO
SUMINISTRO DE EQUIPO DE AIRE
ACONDICIONADO TIPO SPLIT PARA DUCTO.
Unidades Fan Coil evaporadoras y unidades condensadoras
30.01.00
30.02.00
1.00
UND
1.00
1.00
1.00
UND
1.00
1.00
1.00
UND
1.00
1.00
30.04.00
1.00
30.03.00
1.00
1.00
UND
HOJA DE METRADOS
###
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
UND.
31.01.00
31.02.00
UND
1.00
1.00
1.00
UND
1.00
###
1.00
31.03.00
1.00
1.00
1.00
UND
1.00
32.01.00
32.02.00
Cdigo: EC-02; Extractor centrifugo en gabinete 740CFM1000RPM (MOTOR 250W-220/3/60 ; MODELO CSP-A700)
32.03.00
###
33.01.00
33.02.00
###
34.01.00
34.02.00
34.04.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
UND
1.00
1.00
1.00
UND
1.00
1.00
1.00
UND
1.00
912.09
1.00
912.09
1.00
78.86
78.86
M2
78.86
2403.00
5.00
9.00
9.00
405.00
2.00
9.00
9.00
162.00
9.00
12.00
12.00
1296.00
3.00
15.00
12.00
540.00
KG
912.09
UND
1.00
Difusores de aire
UND
3424.00
12.00
12.00
12.00
1728.00
3.00
16.00
16.00
768.00
PLG2
PLG2
HOJA DE METRADOS
34.05.00
34.06.00
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
SUMA
Area Vol
O Und
Parcial
Total
1.00
16.00
16.00
256.00
1.00
12.00
12.00
144.00
1.00
12.00
10.00
120.00
1.00
12.00
10.00
120.00
2.00
12.00
12.00
288.00
Termostato de ambiente
4.00
1.00
1.00
2.00
2.00
1.00
10.41
43.00
UND
1.00
UND.
0.24
ML
10.41
VII
VIDRIOS Y CRISTALES
###
35.01.00
35.02.00
35.03.00
35.04.00
1.00
2.01
2.50
5.03
1.00
2.01
0.30
0.60
1.00
2.01
2.50
5.03
0.80
2.20
3.52
1.00
2.00
0.49
0.98
1.00
2.00
2.50
5.00
5.91
1.00
0.85
2.50
2.13
1.00
1.35
0.30
0.41
1.00
1.35
2.50
3.38
6.43
1.00
2.81
2.29
35.06.00
9.50
10.66
1.35
2.27
M2
M2
M2
6.43
6.13
2.00
M2
M2
6.13
5.59
M2
HOJA DE METRADOS
DESCRIPCION
Primer piso - Gerente de tienda / Mampara M7
(2.57mx2.17m)
35.07.00
VIII
MOBILIARIO
###
36.10.00
1.00
2.26
1.30
2.35
1.00
1.60
2.35
1.20
3.05
ML
ML
3.05
UND
1.00
2.00
UND
2.00
1.00
UND
1.00
5.00
5.00
UND
1.20
1.00
2.00
UND
3.00
3.05
2.00
ML
1.60
1.20
1.00
ML
1.00
3.00
1.00
ML
1.30
3.00
1.00
M2
4.35
1.00
1.00
UND.
5.59
1.60
Total
2.35
36.11.00
1.00
36.09.00
2.17
Parcial
1.30
36.08.00
1.92
36.07.00
1.00
36.06.00
Alto(m)
SUMA
Area Vol
O Und
4.35
36.05.00
2.57
36.04.00
Largo(m) Ancho(m)
36.03.00
1.00
METRADO
36.02.00
Nro.
Vec.
36.01.00
5.00
UND
HOJA DE METRADOS
DESCRIPCION
METRADO
Largo(m) Ancho(m)
Alto(m)
1.00
1.00
4.00
2.23
0.95
0.99
5.48
2.40
0.55
Parcial
Total
1.00
2.86
2.60
16.62
2.30
M2
M2
7.44
69.17
1.00
1.00
UND.
12.22
2.28
2.18
7.44
SUMA
Area Vol
O Und
16.68
36.14.00
Nro.
Vec.
36.13.00
38.23
30.94
M2
N
03.00.00
03.01.00
03.01.01
DESCRIPCION
N de
veces
Proyecto
Tipo de analisis :
Especialidad
:
N de
piezas
Long.
1/4"
0.25
Metrados.
Metrado de acero
Fecha:
DIAMETRO/PESO
3/8"
0.56
1/2"
0.99
5/8" 3/4"
1.55 2.24
1"
3.97
Parcial
(m)
9/11/2016
0.45m
4.85m
0.45m
3/4" 8.00
7.00
5.75
5/8" 8.00
7.00
5.55
3/8" 8.00
21.00
4.05
2.24
322.00
721.28
721.28
310.80
481.74
481.74
680.40
381.02
381.02
Acero Longitudinal
0.35m
4.85m
0.35m
1.55
Estribos
###
###
###
###
###
###
0.56
1288.060
4.85m
0.35m
5/8" 8.00
14.00
5.55
3/8" 8.00
21.00
3.45
5/8" 8.00
14.00
5.55
3/8" 8.00
21.00
3.45
1.55
621.60
963.48
963.48
579.60
324.58
324.58
621.60
963.48
963.48
579.60
324.58
324.58
Estribos
###
###
###
###
###
###
0.56
Acero Longitudinal
0.35m
4.85m
0.35m
1.55
Estribos
###
###
###
###
###
###
0.56
803.170
3.22m
0.25m
3/8" 12.00
12.00
3.72
0.56
535.68
299.98
299.98
3/8" 12.00
16.00
4.68
0.56
898.56
503.19
503.19
Acero Longitudinal
0.25m
4.18m
0.25m
3258.760
4.10m
0.35m
4.10m
0.25m
5/8"
8.00
4.00
4.80
1/2"
8.00
6.00
4.60
3/8"
8.00
21.00
2.45
1/2"
8.00
4.00
21.10
1/2"
8.00
4.00
21.10
3/8"
8.00
106.00
1.75
1.55
153.60
238.08
238.08
220.80
218.59
218.59
411.60
230.50
230.50
0.99
675.20
668.45
668.45
0.99
675.20
668.45
668.45
1484.00
831.04
831.04
Acero Longitudinal
0.25m
Estribos
0.99
###
###
###
### ###
###
0.56
Viga X-X
###
###
###
### ###
###
Viga X-X
###
###
###
### ###
Estribos
###
###
###
###
### ###
###
0.56
DESCRIPCION
Proyecto
Tipo de analisis :
Especialidad
:
N de
veces
N de
piezas
Long.
3/8"
8.00
106.00
0.85
1/4"
0.25
Metrados.
Metrado de acero
Fecha:
DIAMETRO/PESO
3/8"
0.56
1/2"
0.99
5/8" 3/4"
1.55 2.24
1"
3.97
Parcial
(m)
9/11/2016
Acero Longitudinal
0.30m
0.35m
0.20m
0.56
720.80
403.65
5018.640
0.25m
5.14m
0.25m
403.65
1/2" 6.00
15.00
5.64
3/4" 6.00
2.00
6.04
1/2" 6.00
21.00
3.22
3/4" 6.00
2.00
3.62
1/2"
6.00
20.00
1.40
1/2"
6.00
20.00
1/2"
6.00
1/2"
0.99
507.60
502.52
502.52
72.48
162.36
162.36
405.72
401.66
401.66
43.44
97.31
97.31
0.99
168.00
166.32
166.32
1.80
0.99
216.00
213.84
213.84
24.00
1.70
0.99
244.80
242.35
242.35
6.00
24.00
1.40
0.99
201.60
199.58
199.58
3/4" 6.00
19.00
6.04
2.24
688.56
1542.37
1542.37
3/4" 6.00
13.00
4.15
2.24
323.70
725.09
725.09
5/8" 6.00
21.00
3.42
430.92
667.93
667.93
3/4" 6.00
2.00
3.62
43.44
97.31
97.31
0.45m
5.14m
0.45m
2.24
0.25m
2.72m
0.25m
0.99
0.45m
2.72m
Estribos
0.45m
2.24
###
###
Estribos
###
### ###
###
###
###
Estribos
###
### ###
###
###
###
Estribos
###
### ###
###
###
###
###
### ###
###
0.45m
5.14m
0.45m
0.45m
3.25m
0.45m
0.35m
2.72m
0.35m
1.55
0.45m
2.72m
0.45m
2.24
N
03.00.00
03.01.00
03.01.01
DESCRIPCION
N de
veces
Proyecto
Tipo de analisis :
Especialidad
:
N de
piezas
Long.
1/4"
0.25
Metrados.
Metrado de acero
Fecha:
DIAMETRO/PESO
3/8"
0.56
1/2"
0.99
5/8" 3/4"
1.55 2.24
1"
3.97
Parcial
(m)
9/11/2016
0.45m
4.85m
0.45m
3/4" 2.00
7.00
5.75
5/8" 2.00
7.00
5.55
3/8" 2.00
21.00
4.05
2.24
80.50
180.32
180.32
77.70
120.44
120.44
170.10
95.26
95.26
Acero Longitudinal
0.35m
4.85m
0.35m
1.55
Estribos
###
###
###
###
###
###
0.56
322.010
0.35m
4.85m
0.35m
5/8" 2.00
14.00
5.55
3/8" 2.00
21.00
3.45
1.55
155.40
240.87
240.87
144.90
81.14
81.14
Estribos
###
###
###
###
###
###
0.56
200.800
0.25m
3.22m
0.25m
3/8" 3.00
12.00
3.72
0.56
133.92
75.00
75.00
3/8" 3.00
16.00
4.68
0.56
224.64
125.80
125.80
Acero Longitudinal
0.25m
4.18m
0.25m
814.680
4.10m
0.35m
4.10m
0.25m
5/8"
2.00
4.00
4.80
1/2"
2.00
6.00
4.60
3/8"
2.00
21.00
2.45
1/2"
2.00
4.00
21.10
1/2"
2.00
4.00
21.10
3/8"
2.00
106.00
1.75
3/8"
2.00
106.00
0.85
1.55
38.40
59.52
59.52
55.20
54.65
54.65
102.90
57.62
57.62
0.99
168.80
167.11
167.11
0.99
168.80
167.11
167.11
0.56
371.00
207.76
207.76
0.56
180.20
100.91
100.91
Acero Longitudinal
0.25m
Estribos
0.99
###
###
###
### ###
###
0.56
Viga X-X
###
###
###
### ###
###
Viga X-X
###
###
###
### ###
###
Estribos
###
###
###
### ###
###
Acero Longitudinal
0.30m
0.35m
0.20m
2509.310
5.14m
0.25m
1/2" 3.00
15.00
5.64
0.99
253.80
251.26
251.26
DESCRIPCION
0.25m
5.14m
Tipo de analisis :
Especialidad
:
N de
piezas
Long.
3/4" 3.00
2.00
6.04
1/2" 3.00
21.00
3.22
3/4" 3.00
2.00
3.62
1/2"
3.00
20.00
1.40
1/2"
3.00
20.00
1/2"
3.00
1/2"
N de
veces
Proyecto
1/4"
0.25
Metrados.
Metrado de acero
Fecha:
DIAMETRO/PESO
3/8"
0.56
1/2"
0.99
5/8" 3/4"
1.55 2.24
1"
3.97
Parcial
(m)
9/11/2016
0.25m
5.14m
0.45m
2.24
36.24
81.18
81.18
202.86
200.83
200.83
21.72
48.65
48.65
0.99
84.00
83.16
83.16
1.80
0.99
108.00
106.92
106.92
24.00
1.70
0.99
122.40
121.18
121.18
3.00
24.00
1.40
0.99
100.80
99.79
99.79
3/4" 3.00
19.00
6.04
2.24
344.28
771.19
771.19
3/4" 3.00
13.00
4.15
2.24
161.85
362.54
362.54
5/8" 3.00
21.00
3.42
215.46
333.96
333.96
3/4" 3.00
2.00
3.62
21.72
48.65
48.65
2.72m
0.25m
0.99
2.72m
Estribos
0.45m
2.24
###
###
Estribos
###
### ###
###
###
###
Estribos
###
### ###
###
###
###
Estribos
###
### ###
###
###
###
###
### ###
###
5.14m
0.45m
3.25m
0.45m
2.72m
0.35m
1.55
2.72m
0.45m
2.24
Proyecto
Especialidad
:
:
Plazo de ejecucion
1.50Meses
Cantidad de personal ::
6 Personas
CANTIDAD DE DUCTOS
DIMENSION
DUCTO
ANCHO
ALTO
LONG
DUCTO
DOBLE
DUCTO
(m)
(mm) +
(mm) -
(m)
229
229
229
254
305
305
305
305
305
305
330
330
356
381
406
406
457
508
559
686
102
152
203
152
102
127
152
203
254
305
152
203
254
203
127
203
203
203
203
203
2.35
1.61
1.64
4.15
2.12
18.96
1.77
10.60
4.85
3.75
2.87
1.79
5.01
6.10
5.00
5.62
2.75
2.54
5.97
5.86
DIMENSION
SEMIP
(cal)
PESO
(Kg/m.l
)
26
26
26
26
26
26
26
26
26
26
24
24
24
24
24
24
24
24
24
24
4.80
5.30
5.80
5.50
5.50
5.80
6.00
6.50
6.95
7.70
7.80
8.40
9.30
9.00
8.40
9.30
9.90
10.50
11.25
12.75
11.28
8.51
9.52
22.85
11.65
109.99
10.59
68.92
33.70
28.91
TOTALES =
5%
Kg
NOTA:
Kg
Kg
Kg
Kg
78.86
m2
315.91
ANCHO ALTO
(pulg)
(pulg)
9''
9''
9''
10''
12''
12''
12''
12''
12''
12''
13''
13''
14''
15''
16''
16''
18''
20''
22''
27''
4''
6''
8''
6''
4''
5''
6''
8''
10''
12''
6''
8''
10''
8''
5''
8''
8''
8''
8''
8''
(pulg)
CAL
###
CAL.26
CAL.24
CAL.22
CAL.20
CAL.18
(kg)
(kg)
(kg)
(kg)
(kg)
AISLAMIENTO 1"
(m2/m.l.)
Longuitudes (Horizontales)
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Longuitud
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
Ducto
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
de
9''x
9''x
9''x
10''x
12''x
12''x
12''x
12''x
12''x
12''x
13''x
13''x
14''x
15''x
16''x
16''x
18''x
20''x
22''x
27''x
4''
6''
8''
6''
4''
5''
6''
8''
10''
12''
6''
8''
10''
8''
5''
8''
8''
8''
8''
8''
FS:
331.71
450.29
315.91 Kg
428.85 Kg
Kg
Kg
Kg
m2
13''
15''
17''
16''
16''
17''
18''
20''
22''
24''
19''
21''
24''
23''
21''
24''
26''
28''
30''
35''
Proyecto
Especialidad
:
:
Plazo de ejecucion
22.37
15.04
46.57
54.86
41.98
52.30
27.24
26.67
67.11
74.72
428.85
0.00
0.00
0.00
0.75
0.85
0.95
1.76
1.37
1.56
0.95
18.02
1.10
11.66
1.05
1.15
3.01
2.06
1.25
7.62
1.40
1.50
1.60
1.85
3.85
3.81
9.54
10.84
14.40
75.10
Proyecto de Tesis
Aire Acondicionado
1.00Meses
Tipo de Analisis
::
Cantidad de personal ::
0.00
CANTIDAD DE DUCTOS
DIMENSION
DUCTO
ANCHO
ALTO
LONG
DUCTO
DOBLE
DUCTO
(m)
(mm) +
(mm) -
(m)
229
228.6
1.75
229
305
406
305
305
356
305
228.6
304.8
406.4
304.8
304.8
254
304.8
0.70
2.10
0.35
0.35
1.05
5.50
3.50
DIMENSION
SEMIP
(cal)
PESO
(Kg/m.l
)
18''
18''
26
26
6.00
6.00
10.50
4.20
24''
32''
24''
24''
24''
24''
26
24
26
26
24
26
7.70
11.85
7.70
7.70
9.30
7.70
16.17
TOTALES =
5%
Kg
NOTA:
Kg
Kg
Kg
Kg
m2
68.60
ANCHO ALTO
(pulg)
(pulg)
9''
9''
9''
9''
12''
16''
12''
12''
14''
12''
12''
16''
12''
12''
10''
12''
(pulg)
CAL
###
CAL.26
CAL.24
CAL.22
CAL.20
CAL.18
(kg)
(kg)
(kg)
(kg)
(kg)
AISLAMIENTO 1"
(m2/m.l.)
9''x 9''
9''x
12''x
16''x
12''x
12''x
14''x
12''x
9''
12''
16''
12''
12''
10''
12''
68.60 Kg
55.30 Kg
Kg
Kg
Kg
m2
FS:
72.03
58.06
4.15
2.70
8.09
51.15
26.95
55.30
Anexo 1
01.00.00
anexo
PRIMER PISO.
08.03.01
10.33
ML
08.03.02
16.75
ML
08.03.03
21.01
ML
12.03.00
6.00
UND