Vous êtes sur la page 1sur 8

GOVERNMENT OF RAJASTHAN

DEPARTMENT OF SCIENCE & TECHNOLOGY


STUDENTPROJECTPROGRAMME
2 0 13-2014
Department of Science & Technology invites the project proposal for Student Project
Programme 2013-14.
ELIGIBILITY CRITERIA:
Students of S&T Institutions namely:
a)Engineering Colleges (Final Year B.E./ M.Tech Student-only previous),Polytechnic
Colleges/ Pharmacy
b) Medical Colleges / Dental Colleges, etc.
c) P.G. Students of Science Colleges/ Agriculture Colleges/Veterinary Colleges etc.
d) Ph.D. Scholars,
SUGGESTED BROAD AREAS: The project should be relevant to the basic needs and social priorities of the State
such as food, shelter, clothing, health, & Hygiene, Agriculture, Transport,
Communication, Environment and Pollution, Water, Biotechnology, Mining,
Engineering, etc.
Duration of the Student Project:
Up to One Year
Extent of Financial Assistance:
Max. Rs. 15000.00
Project Proposals:
1. A Student can be member of one team submitting one Project only.
2. One Teacher can be a guide teacher for maximum 5 Projects who should be permanent
faculty of the Institute.
3. The proposals in two copies should be submitted (by Registered Post) in prescribed format
through Head of the Department to: The Director, Department of Science & Technology, 506,
4th Floor, Mini Secretariat, Bani Park, Jaipur-302016.
4. One Institution can submit maximum 50 Projects in one discipline.
5. Project report must be submitted in maximum of 30 pages.
Last Date for Submission: 30 August, 2013
Application format: down loaded from website www.dst.rajasthan.gov.in
Submit proposal in: Hard copy (2 nos), soft copy of application is to be sent on E-mail ID
studentprojectsdst@gmail.com as attachment.

Form A
Form No
(for official use only)
1.

Title of the Project :


Automatic municipal water supply and saving of

water using microcontroller.

2. Discipline/ Subject Area (Engineering/ Medical/ Computer/ Life Science/ Biotechnology/


Textile/ Home Science Veterinary, Botany etc.)

Engineering
3. Region (Regional Office area of jurisdiction: - Ajmer /Kota /Jodhpur /Bikaner /Udaipur),
tick the relevant

Udaipur
4.

Designation & Address of the Person, in whose name, Demand Draft/Bankers Cheque of
grant is to be sent. (Head of Institution/Director/Registrar/ Controller/ Principal/Dean)
Tick the relevant)
Dr.K.K. Chhabra

Name & Class/Year of the Students (indicate clearly the semester in case of
system):
Name
Abhijeet
Sharma

Course
B.Tech.

semester

Semester
VII

6.

Whether belongs to SC/ST.(attach certified for Group Leader)


7. Address of the Students (Institutional & Correspondence Address with E-mail ID & Fax, Mobile
No.):

Name
Abhijeet
Sharma

8.

Course
B.Tech

Semester
VII

Address

127,nr.Hanuman
mandir,tekri,u
daipur

Bank Account No. of one of the students of the Group.


Abhijeet Sharma 694101500061 (ICICI)

9. a) Name & Designation of the Supervisor/Guide:

Mr. Jaitesh Upadhyay

E-mail ID
Abhijeet.sharma0910@gmail.co
m

HOD, Deptt . Of ECE


e-mail:jaitesh.u@gmail.com
Phone: 08947861435
b) Institutional & Correspondence Address of the Guide with Telephone No.:

Pacific College Of Engineering


Debari,
10. Whether certified from Plan Department (attach document).*
E-mail ID & Fax, Mobile No.

E-mail ID:abhijeet.sharma0910@gmail.com
Mobile: 08384963773

Name & Signature of the Students


Abhijeet sharma

Signature of Guide of the Project

C E R T I F I C AT E

It is hereby certified that


(i) Institution takes the responsibility of implementing the Student Project within stipulated
period.
(ii)
(iii)

The Institution shall provide the Infrastructural & other facilities required for the
project.
The amount sanctioned by Department of Science & Technology, Rajasthan, Jaipur
shall be provided to the concerned Student/Guide timely and funds be utilized for the
purpose for which it has been sanctioned.

Signature of the Head of Institution


Name and Designation with seal
Date :
Place:
-------------

The Bank Details of the Institution/College prescribe are mentioned as below :1. Name of the Bank: UCO Bank
2. A/C No:01260110003589
3. IFSC Code:UCBA0000126
4. Mobile number of Guide Teacher: 08947861435
Signature of the Head of Institution
Name and Designation with seal:

From 1.4.2013 it is mandatory that all NGO/Voluntary Organizations to be certified from


Plan Department. Further information available on Website ww:planning.rajasthan.gov.in.

In light of circular uploaded on Departmental Website for receiving Government


Department.
Form B
(Do not write name of PI, students and Institute any where in this form)
Form No

(for official use only)

Title of the Project :


Automatic municipal water supply and saving
of water using microcontroller.

Project Summary:
As Water is very important resource therefore
there is a way to conserve it. this project the water supply will
be very efficient.There will not be any problem occur like wasting of water.There is a
way to avoid the problem of wasting of water.
The controller control the opening and closening of valve. Timer circuit will follow the
time given by user.The supply to particular area will be according to the timer and
display of LCD.The main advantage of this to remain active and inactive according
to the user choice.It will be fully automatic.There will not be chance of wasting of
water.Due to controller and LCD display there will be very easy to manage this
system. By municipal man work there is lot of water wastage.Full area depends on
one man for water supply and if that person delay the supply there is to chance of
facing all people.So the main problem is man work of munciplity and wasting of
water.sThe problem of excessive supply and some times very less suplly of water by
worker will be removed. So here it is a project which will remove all of these problems and
in addition with it, this project will remove need of manual work. All the functions will be
operated by microcontroller.

Technical details of the Projects


Origin of the Proposal:
Generally it is seen that water from walls and main water tank of municipal
water tank is being wasted, either due to loose shunting of valves or being
over flow of water tank. So here it is a project which will remove all of these
problems and in addition with it, this project will remove need of manual work.
All the functions will be operated by microcontroller.

o Definition of the problem: As there is scarcity of water.water is


very useful resource and available in very less quantity.So there is
necessary way to conserve it.By municipal man work there is lot of
water wastage.Full area depends on one man for water supply and if
that person delay the supply there is to chance of facing all people.So
the main problem is man work of munciplity and wasting of water.

Objectives: The main objective of this project is saving of water and to


implement automation of municipal water supply. We can see that large
amount of water is wasted during the municipal water supply because of the
carelessness of the authorities.
With the help of this project we can overcome from this
problem. In this project with the help of microcontroller valve of water
supply tank will automatically open and close at predefined time.

Work Plan: I am working in this project.


Abhijeet Sharma

First I collected the data required for the automatic municipal


Water supply using microcontroller and timer. Then I
studied my project deeply. After doing deep study I will make
flow chart of project it is called design of project. According to this design
and need of the project I made a circuit design. Now I will collect the
required component of circuit and then will fabricate on PCB.

o Methodology:
Block Diagram

WORKING:
Required timing of switching of the valve is set on timer. Programming of the
microcontroller is done in such a way the time in the LCD digital clock matches with
the preset time valves of the water tank will automatically opened. And it remains
open until again the preset time matches with time in LCD digital clock. As this time
again matches with preset time valves will become off.
Preset times are defined on ports of microcontroller. Flow of the
whole working is that firstly time in LCD digital clock is compared with preset time
and when these two becomes equal, a pin of get activated. Thus microcontroller get to
know that it is time to switch the valve. Then microcontroller gives signal to relay and
relay switches the valve.

Organization of work element: I will purchase required component


from Udaipur. And the component which are not available here for that I will
go to Ahmedabad.

Time schedule: I started thinking about this project in the month of July
during our summer training. I completed my summer training on 15th July. Up
to 18th July I collected required data and made flow chart.
Now college has been started so I have less time for project. I decided to work
1 hour daily on it. Up to 7th August I made circuit diagram. Now I will stop it
for few days due to assignment work and preparation of midterm examination.
I will start it in September last. That time I will fabricate this circuit on PCB
and like this I will complete this project in the month of January.

o Proposed outcome/ findings: By this project the problem


related to water supply will be solved. There will be systematic supply
of water to particular area in very schedule manner. By timer every
area timing will can be managed efficiently. There will not be any
chance of wastening of water. There will not be the chance of facing
the problem due to less supply of water or non unifoem water supply by
municipal worker .So this project will be very useful for every kind of
supply by pipelines and valve.

Details of facilities to be provided by the Institute:


Led,Capacitor,Resistors,Technical help

Budget Estimates (with details)


Minor Equipment:
S.no.

1
2
3
4
5
6
7
8

Components used

Quantity

Atmel Ic 8051
2
IC 555 TIMER (8
3
pin)
Transistor
4
Zener diode
4
Battery
2
LED
Capacitors
S.no.
Consumable Component
Resistors

Price Per
Unit
400
200

Total

15
10
300

60
40
600

800
600

C
o
ns
u
m
ab
le:
Total Price

1.
2.
3.
4.
5.
7.

Flux
Desoldered Wire
Circuit Layout Printing
Fecl3
PCB Fabrication
Cyber caf

100/200/600/500/1400/800/-

Total

3600/-

Report Writing

1000 /-

Report writing:
Contingency & other costs:
Contingency & Other Costs

2000

Various utilization of project:


There will be no any problem of wasting of water will occur. Supply will be
done in efficient manner. The whole supply will be done automatically. This
decrease the problem of wasting of water. Many area has problem of water
supply time so by this problem this problem also removed. All area will get
water at particular fix time. So by this project This problem Will be removed
.This project will be very useful to municipal corporationLarge amount of
water is saved by this project.

Vous aimerez peut-être aussi