Académique Documents
Professionnel Documents
Culture Documents
IPER/SP
A.T. =
C.A. =
2,000.00 m
2.00 (bs.)
4,000.00 m
0.00 m
4,000.00 m
CATEGORIA DE USO:
PRODUTO:
R$ 3,000.00 /m A Util
4,000.00 m
VGV =
12,000,000.00
Mdia:
Corretagem:
CCM =
1% x VGV
4% x VGV
Alquota:
IMP =
10% x VGV
600,000.00
1,200,000.00
10,200,000.00
CC =
ML =
1000% x VT
R$ 6,707,490
Prazo:
taxa juros:
CFin =
0 meses
0% a.m.
0% x VT
CUB
Fator padro
custos adicionais
rea comput.
rea no comput.
fator correo rea comput.
BDI
REA EQUIVALENTE
RESULTADO DO EMPREENDIMENTO:
RECEITA:
CUSTOS:
VGV =
IMP =
CCM =
VGV Lq =
CC =
ML =
12,000,000.00 100.00%
1,200,000.00 10.00%
600,000.00 5.00%
10,200,000.00
2,821,756.00 23.51%
6,707,490.00 55.90%
VALOR DO TERRENO:
Custo do empreendimento:
5,292,505.00
Cfin =
VT =
0.00
670,749.00 5.59%
R$ 335.37 / por m
apolo.verissimo@hotmail.com
www.apoloverissimo.com.br
de 4 pavimentos
EVADOR"
Lucro lquido em %:
92.73