ADDENDUM /BID BULLETIN NO. 16-010 This Addendum/Bid Bulletin No. 16-010 is issued in response to the queries raised during the pre-bid conference conducted on 08 September 2016 for the project Construction of UPOU Teaching and Learning Hub. Bidders should note the following: 1. On the project requirements as indicated in the checklist of technical proposal, the Contractor's All Risk Insurance (CARI) coverage for the duration of the project, copy of the bidding documents, and copy of the application of the building permit duly received by the Office of the Building Official shall not be included in the submission of the technical documents. 2. The Project Architect shall perform the same function of a CADD Operator. Personnel with multiple expertise and qualifications with at most three different positions mentioned under GCC Clause 6.5 are allowed as long as he/she can provide the necessary documentation in support of his/her qualifications, such as an appropriate license, certificate of training, accreditation, and the like should be submitted separately for each position. 3. The eligibility documents and technical bid shall be opened on 20 September 2016 and the technical bid will be inspected and evaluated by the Technical Working Group (TWG)). Only the financial bids of those whose technical proposals will receive a Pass rating would be opened on 27 September 2016. The financial bid of those whose technical and/or eligibility documents are not compliant with the requirements will be returned to the bidders unopened. 4. The stand-by generator set for the building is not included in the contractors scope of work. It shall be provided by UPOU and shall be purchased separately. The specifications was included to serve as a reference for future purchase. 5. Bidders will be provided with formatted soft copy of the Summary of Breakdown of the Detailed Cost Estimate Worksheet (DCEW). This shall only be the acceptable format for submission. 6. The unit price shall be based on the specified brand. The list of brand names and manufacturers/suppliers specified in the technical specifications is an indicator of the preferred performance quality of the materials to be used in the construction and should be
used as a guide in costing. Other brands and/or suppliers/manufacturers of materials of the
same quality are allowed. 7. The Annual Income Tax Return to be submitted should be for 2015. Only tax returns filed through the Electronic Filing Payment System shall be accepted, as per GPPB Resolution No. 11-2013 and Revenue Memorandum Circular No. 30-2013. The latest audited financial statements to be submitted should cover two years i.e. calendar years 2014 and 2015. 8. On page 98 of the Bid Forms, as regard to the authority of signatory, particularly the secretarys certificate, the Project Reference Number should be 16-08-001. This bid bulletin shall form an integral part of the bid documents for the project for inclusion in the submission of technical and financial proposal. For the guidance and information of all concerned bidders.
Dr. PRIMO G. GARCIA Chair, BAC Received by the Bidder: __________________________ Date:_____________________