PUNCH ITEM AND REMAINING WORKS OF 2ND FLOOR TRAINING

CENTER (NMCHC)
AS OF 15 JULY 2016
Location

Date of
Completion

General

Comment
Door Stopper Fixation

Picture

General

Floor Sealant

05 SEP 2016

General

Door Sealant (Inside


and Outside)

25 AUG 2016

215 Deputy
Director
Room 4

Sealant beside door


frame

25 AUG 2016

General

Sealant around the


glass block

18 JUL 2016

General

Curtain Box and Ceiling


Termination
Adjustment

18 JULY 2016

18 JUL 2016

213 Common
Meeting
Room 2,
210 Store 2
Fire Hose
Cabinet
and EPS
Floor

Replace of Door panel

15 AUG 2016

Dust Proof paint

18 JUL 2016

Corridor

Jalouse Glass

15 AUG 2016

Corridor

Remaining Ceiling
Louver
Up-stand under the
aluminum louver

20 JUL 2016

Corridor

Application of Paint on
the ceiling

18 JUL 2016

204Director
Room

Damage Bottom
Window Frame

18 JUL 2016

Corridor

18 JUL 2016