Vous êtes sur la page 1sur 2

MEGHA ENGINEERING AND INFRASTRUCTURE LTD

COMPARATIVE STATEMENT OF PRICES QUOTED BY VENDORS FOR PROCUREMENT READY MIX CONCRETE

Name Of Work: DESIGN ENGINEERING, MANUFACTURE, SUPPLY, TRANSPORTATION TO SITE STORAGE, ERECTION, TESTING AND COMMISSIONING OF
ALL EQUIPMENTS INCLUDING ALL MECHANICAL, CIVIL, ELECTRICAL WORKS UNDER PHASE-III & IV FOR PUMPING STATION-1(PS-1) AT CHAINAGE
68.485KMS, PUMPING STATION -2 (PS-2) AT CHAINAGE 77.165 KMS AND PUMPING STATION -3 (PS-3) AT CHAINAGE 87.950 KMS SAURASHTRA BRANCH
CANAL.

A. Requirement as per site

Sr.
No
1

Description

Transit Mixers

3
4

5
6

Batching Plant
setup
Concrete
Pump

Quality
controlling
Land for
Batching plant
Setup
Power Supply

Statuary
Compliance

Quoted Agencies

Specification of
Requirement
CP30/CP60 Mainly
required 150-200cum
per day costing
Minimum 4 Nos of 6
cum each
Max concrete Output
per hour 35-45 Cum

M/s Ultratech Cement Ltd

M/s Sharad Infra

M/s Vishwa Constructions

5 Nos of 6 Cum Each

3 Nos of 6 Cum Each

3 Nos of 6 Cum Each

Establishing the quality team with


required Lab equipments to be
maintained daily QC Checks

Not providing - The


daily QC Tests to be
carryout by MEIL

Not Providing- The daily QC


Tests to be carryout by MEIL

We provide Land within


boundary, Leveling
development is under
Quoted agencies scope
We are not giving any
assurance for the
Supply, but as per the
availability we will
provide
All statuary
requirement is under
Quoted agencies scope

UTCL asking some support like setup


of weighbridge, water tanks, initial
setups

Ready to do as per
Specification

Ready to do as per Specification

UTCL Asking Power supply on


chargeable from MEIL, Additional they
are Considering DG for Spare

It self-Providing DG

DG Providing 105KV

UTCL Agreed & they pursue

Agreed by agency

Agreed by agency

Deployment of Two to
Three qualified QC
Engineers with required
Lab equipments

CP60

Providing Concrete pump of SP1400


SCHWING STETTER along with crew

CP30

Not providing

Remarks

CP25/ Mobile

Not Providing

Rs 90 Rupees
extra cost for
Pumping/Cum
Rs 35 rupees
extra cost for
Lab
Establishment/C
um

Rs 38 Rupees
for diesel cost
for DG/Cum

MEGHA ENGINEERING AND INFRASTRUCTURE LTD


A. Requirement as per site

Sr.
No
8

Description

Escalation of
Price

10

11

Specification of
Requirement
No escalation will be
applicable Up to one
year from the date of
Work order issue

M/s Ultratech Cement Ltd

PS-2
PS-1&PS-3
Rs. 1816
Rs 1923
Concrete per Cum
including Mixing and
supply to site with all
raw material excluding
cement For M30
(Excluding VAT)

PS-2
PS-1&PS-3
Rs. 1832
Rs 1935
Concrete per Cum including
Mixing and supply to site with all
raw material excluding cement
For M30 (Excluding VAT)

PS-2
PS-1&PS-3
Rs. 1900
Rs 1925
Concrete per Cum including
Mixing and supply to site
with all raw material
excluding cement For M30
(Excluding VAT)

PS-2
PS-1&PS-3
Rs. 2065 Rs.2100
Concrete per Cum including
Mixing and supply to site with
all raw material excluding
cement For M20 (Excluding
VAT)

PS-2

PS-2

PS-2

PS-2

Concrete per Cum


including Mixing and
supply to site with all
raw material excluding
cement For M15
(Excluding VAT)
Price

Payment and
advance

Quoted Agencies

Rs. 1789

PS-1&PS-3
Rs 1896

No Advance will be paid


monthly billing will be
done every month after
certification of Site In
charge

During the discussion agreed that


they shall try to remove
escalation & and they are
discussing with higher officials on
written confirmation
Concrete per Cum including
Mixing and supply to site with all
raw material excluding cement
For M20 (Excluding VAT)

Rs. 1832

PS-1&PS-3
Rs 1935

Asking BG for 1.15 Cr and 50Lck


mobilization Adv. ( But it will be
negotiation)

M/s Sharad Infra

Not excepting the same


whenever diesel cost
increase/decreased
additional charge @
Rs.5.5/Cum
Concrete per Cum including
Mixing and supply to site
with all raw material
excluding cement For M20
(Including all tax)

Rs. 1900

PS-1&PS-3
Rs 1925

No Advance & No BG

M/s Vishwa Constructions

Agreed and No Escalation will


be billed up to one year
Concrete per Cum including
Mixing and supply to site with
all raw material excluding
cement For M20 (Including all
Tax)

Rs. 2065

PS-1&PS-3
Rs.2100

No Advance & No BG

Remarks

Vous aimerez peut-être aussi