Suatupekerjaaantanahuntukmembuatjalantoldiperkirakanakanmembutuhkanpekerjaandarimulaipekerjaangaliah

hinggapekerjaantimbunan.Alatalatyangdigunakanadalahsepertiyangdiberikanpadatabelbesertaspesifikasi
pekerjaannya.Kitadimintamengestimasihargaperm3pekerjaantanah(daricuttingtanahpadalokasiborrowedpit,
mengangkutkelokasitimbunandanhinggamemadatkannya.Faktorkembangtanah(swellingfactor)darikondisibank
measurediambil1.2sedangkanfaktorpemadatan(compactionfactor)darikondisibankmeasurediambil0.85.

Backhoe
capacity
digging
swing
loading
return
workingeffective
efficiency
Ownershipcost(rp/yr)
Operationcost(rp/hr)
cycle
productivity

ownershipcost
operationcost
totalcost
Productioncost

cycleuntukisitruk

truck
1
12
2
5
2
2500
1

m3
seconds
seconds
seconds
seconds
hr/yr

capacity
dumping
travelling
returning
positioning
workingeffective
efficiency

200,000,000.00
100,000.00
21
0.35
2.86
171.43

m3
minutes
minutes
minutes
minutes
hr/yr

bucket
pushing
positioning
returning
workingeffective
efficiency

60,000,000.00
15,000.00
seconds
cycle
minutes
l.m3/minutes productivity
l.m3/hr

80,000.00 rp/hr
100,000.00 rp/hr
180,000.00 rp/hr
1,050.00 rp/l.m3

4.20 minutes

cost(1backhoedan8truck)
cost(1backhoedan9truck)
1backhoe,8truck,2dozer
1backhoe,9truck,2dozer

dozer
12
1
15
12
1
2500
1

2,835.83
3,097.50
492,000.00
531,000.00
627,000.00
666,000.00

ownershipcost
operationcost
totalcost
Productioncost

jumlahtruck

8truck
9truck
Rp
Rp
Rp
Rp

m3
seconds
seconds
seconds

2500 hr/yr
1

lebar
cylce
lift
redo
efficiency
workingeffective

150,000,000.00
75,000.00

33.2 minutes

cycle

0.36 l.m3/minutes productivity


21.69 l.m3/hr
24000.00 rp/hr
15,000.00 rp/hr
39,000.00 rp/hr
1,798.33 rp/l.m3

8.9 equipment
8 trucks
9 trucks
173.49
171.43
2835.833333
3097.5
3,613.96
3,885.00

compactor
1
20
5
15

lm3/hr
lm3/hr
rp/lm3
rp/lm3
rp/lm3
rp/lm3

ownershipcost
operationcost
totalcost
Productioncost

jumlahdozer

40
0.666666667
1.50
90.00

2
10
30
3
0.833333333
2500

m
km/hr
cm
times
hr/yr

220,000,000.00
120,000.00
seconds
minutes
l.m3/minutes
l.m3/hr

60000.00 rp/hr
75,000.00 rp/hr
135,000.00 rp/hr
1,500.00 rp/l.m3

1.9 equipment
2 dozers

1.9 equipment
2 dozers
180 lm3/hr

cycle
productivity

ownershipcost
operationcost
totalcost
Productioncost

jumlahcompactor

6000.00
8470.59
171.43
88000.00
120,000.00
208,000.00

c.m3/hr
l.m3/hr
l.m3/hr
rp/hr
rp/hr
rp/hr

34.67 rp/c.m3

49.4 equipment
1 compactor