hinggapekerjaantimbunan.Alatalatyangdigunakanadalahsepertiyangdiberikanpadatabelbesertaspesifikasi
pekerjaannya.Kitadimintamengestimasihargaperm3pekerjaantanah(daricuttingtanahpadalokasiborrowedpit,
mengangkutkelokasitimbunandanhinggamemadatkannya.Faktorkembangtanah(swellingfactor)darikondisibank
measurediambil1.2sedangkanfaktorpemadatan(compactionfactor)darikondisibankmeasurediambil0.85.
Backhoe
capacity
digging
swing
loading
return
workingeffective
efficiency
Ownershipcost(rp/yr)
Operationcost(rp/hr)
cycle
productivity
ownershipcost
operationcost
totalcost
Productioncost
cycleuntukisitruk
truck
1
12
2
5
2
2500
1
m3
seconds
seconds
seconds
seconds
hr/yr
capacity
dumping
travelling
returning
positioning
workingeffective
efficiency
200,000,000.00
100,000.00
21
0.35
2.86
171.43
m3
minutes
minutes
minutes
minutes
hr/yr
bucket
pushing
positioning
returning
workingeffective
efficiency
60,000,000.00
15,000.00
seconds
cycle
minutes
l.m3/minutes productivity
l.m3/hr
80,000.00 rp/hr
100,000.00 rp/hr
180,000.00 rp/hr
1,050.00 rp/l.m3
4.20 minutes
cost(1backhoedan8truck)
cost(1backhoedan9truck)
1backhoe,8truck,2dozer
1backhoe,9truck,2dozer
dozer
12
1
15
12
1
2500
1
2,835.83
3,097.50
492,000.00
531,000.00
627,000.00
666,000.00
ownershipcost
operationcost
totalcost
Productioncost
jumlahtruck
8truck
9truck
Rp
Rp
Rp
Rp
m3
seconds
seconds
seconds
2500 hr/yr
1
lebar
cylce
lift
redo
efficiency
workingeffective
150,000,000.00
75,000.00
33.2 minutes
cycle
8.9 equipment
8 trucks
9 trucks
173.49
171.43
2835.833333
3097.5
3,613.96
3,885.00
compactor
1
20
5
15
lm3/hr
lm3/hr
rp/lm3
rp/lm3
rp/lm3
rp/lm3
ownershipcost
operationcost
totalcost
Productioncost
jumlahdozer
40
0.666666667
1.50
90.00
2
10
30
3
0.833333333
2500
m
km/hr
cm
times
hr/yr
220,000,000.00
120,000.00
seconds
minutes
l.m3/minutes
l.m3/hr
60000.00 rp/hr
75,000.00 rp/hr
135,000.00 rp/hr
1,500.00 rp/l.m3
1.9 equipment
2 dozers
1.9 equipment
2 dozers
180 lm3/hr
cycle
productivity
ownershipcost
operationcost
totalcost
Productioncost
jumlahcompactor
6000.00
8470.59
171.43
88000.00
120,000.00
208,000.00
c.m3/hr
l.m3/hr
l.m3/hr
rp/hr
rp/hr
rp/hr
34.67 rp/c.m3
49.4 equipment
1 compactor