Académique Documents
Professionnel Documents
Culture Documents
A. JENIS PERMOHONAN
TYPE OF APPLICATION
1. Bukan Aktiviti Yang Ditetapkan (Bukan EIA)
Non Prescribed Activity (Non EIA)
Jenis pembangunan:
Type of development:
________________________________________________
________________________________________________
2. Aktiviti Yang Ditetapkan (EIA) di bawah Perintah
Kualiti Alam Sekeliling (Aktiviti Yang Ditetapkan)
(Penilaian Kesan Kepada Alam Sekeliling), 1987,
Akta Kualiti Alam Sekeliling, 1974.
Prescribed Activity (EIA) listed under the Environmental
Quality Order (Prescribed Activity)(Environmental
Impact Assessment), 1987, Environmental Quality Act,
1974
a. Jenis Aktiviti EIA (nyatakan Aktiviti Yang Ditetapkan)
Types of EIA Activity (state the Prescribed Activity)
_____________________________________________
_____________________________________________
_____________________________________________
1
Maklumat
Lengkap
Complete
Information
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Ulasan:
Comment:
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
B. PENGENALAN
INTRODUCTION
3. Tajuk Cadangan Projek/Aktiviti:
Project/Activity Title:
________________________________________________
________________________________________________
________________________________________________
Ulasan:
Comment:
____________________
Ulasan:
Comment:
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
____________________
Ulasan:
Comment:
6. Lokasi Tapak:
Site Location:
a. No. Lot/ PT: ___________________________________
Lot number/PT:
b. Mukim/Daerah/Negeri:___________________________
Territory/District/State:
c. Koordinat tapak:
Site coordinate:
Longitud
Latitud
Longitude
Latitude
Ulasan:
Comment:
Ulasan:
Comment:
Ulasan:
Comment:
Ulasan:
Comment:
______________________________________
______________________________________
Maklumat
Lengkap
Complete
Information
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
______________________________________
______________________________________
f.
Ulasan:
Comment:
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Ulasan:
Comment:
i.
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Ulasan:
Comment:
a. Teknologi Hijau
Green Technology
b. Best Available Technology (BAT)
Nota:
Note:
Sila teruskan ke Bahagian F, sekiranya projek pembangunan adalah berasaskan industri.
For industrial-based development projects, kindly proceed to Part F.
Sila teruskan ke Bahagian G sekiranya projek pembangunan tidak melibatkan pembangunan
industri.
For non industrial development projects, kindly proceed to Part G.
F. MAKLUMAT CADANGAN PROJEK BAGI INDUSTRI
INFORMATION ON PROPOSED INDUSTRIAL PROJECT
Maklumat
Lengkap
Complete
Information
Kuantiti/hari
Quantity/day
_____________
_____________
_____________
_____________
_____________
7
Ulasan:
Comment:
Kuantiti/hari
Quantity/day
_____________
_____________
_____________
_____________
_____________
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Kuantiti/hari
Quantity/day
_____________
_____________
_____________
_____________
_____________
Ulasan:
Comment:
Ulasan:
Comment:
Kuantiti/bulan
Quantity/month
_____________
_____________
_____________
_____________
_____________
a. Masa Operasi
Hours of Operation
Purata
Average
_________________
Maksimum
Maximum
_____________
Maksimum
Maximum
_____________
Maklumat
Lengkap
Complete
Information
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Ulasan:
Comment:
Bilangan
Quantity
(i) Dandang:
_________
Boiler
(ii) Dapur:
_________
Cooker/Oven
(iii) Janakuasa: _________
Generator
(iv) Insinerator:
_________
Incinerator
(v) Lain-lain:
_________
(nyatakan)
Others (specify)
Jenis
Kuantiti
Bahanapi
Kg/jam
Types of Fuel Quantity
Kg/hour
_________
__________
_________
__________
_________
__________
_________
__________
_________
__________
Ulasan:
Comment:
Jenis Pencemar
Kuantiti
Types of Pollutants Quantity
_______________
_______________
_______________
_______________
_______________
Maklumat
Lengkap
Complete
Information
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
___________
___________
___________
___________
___________
Ya
Yes
Ya
Yes
Ulasan:
Comment:
Tidak
No
Tidak
No
Tempat
Kaedah
Pelupusan
Pelupusan
Type of Disposal Location
sisa pepejal _________
________________
solid waste
buangan ___________
________________
terjadual
scheduled wastes
10
Ulasan:
Comment:
Maklumat Tidak
Lengkap
Incomplete
Information
Ulasan:
Comment:
Nama Pemohon:___________________________________
Name of Applicant:
Tandatangan:_____________________________________
Signature:
Jawatan: ________________________________________
Designation:
Tarikh : ____________________
Date:
Cop syarikat : _______________
Company stamp:
11
Ulasan:
Comment:
Maklumat
Lengkap
Complete
Information
Maklumat Tidak
Lengkap
Incomplete
Information
_____________________________________________
Ulasan:
Comment:
_____________________________________________
(if related to the Local Plan or Special Area Plan)
Ada
Yes
Lengkap
Complete
Tidak
Lengkap
Incomplete
Tiada
No
14