Académique Documents
Professionnel Documents
Culture Documents
Description
Mounting of part
1.1
Location
1.2
Routing of pipes
1.3
Impact of Temperature
1.4
Impact of Vibration
1.5
Impact of Dust
1.6
Impact of Humidity
1.7
Impact of Water
1.8
Electro-Magnetic Interference
Process
2.1
2.2
Impact of Current
2.3
Impact of Voltage
2.4
Storage Conditions
2.5
Material Handling
2.6
2.7
Fitment Procedure
3.1
3.2
3.3
4.1
4.2
Overall Observations
Sign Of
TML:
34 (Petrol)
120 (Diesel)
Specification
BIW tower & Knuckle bracket mounting
Brake Hose & sensor cable mounting
Not applicable
Supplier:
TML-PSC-SQ-034
found OK
found OK
Found Ok
Found Ok
able
able
Remarks
Found Ok
Refer overall
observations
Found Ok
Found Ok
Found Ok
Refer overall
observations
Found Ok
Refer overall
observations
To be checked @
service center for
avilability of tools
Refer overall
observations
Description
Mounting of part
1.1
Location
1.2
Routing of pipes
1.3
Impact of Temperature
1.4
Impact of Vibration
1.5
Impact of Dust
1.6
Impact of Humidity
1.7
Impact of Water
1.8
Electro-Magnetic Interference
Process
2.1
2.2
Impact of Current
2.3
Impact of Voltage
2.4
Storage Conditions
2.5
Material Handling
2.6
2.7
Fitment Procedure
3
3.1
3.2
3.3
4.1
4.2
Overall Observations
1
2
Sign Of
TML:
24200109
Date: 06-0
Specification
Chassis -engine mounting
NA
Operating tempreature range as per
drawing, should not exceed the same
No impact
No
No
Supplier:
TML-PSC-SQ-034
Remarks
Ok
NA
OK
Ok
1. Proper grade
washers & nuts to
be used along with
plate for mounting
on Chassis
2. Also while loading
engine it should not
hit the mount
Ok
NA
OK
Rust could be
observed on metal
parts due to
exposure to water
NA
OK
NA
NA
Ok
WI to be defined for
identification of heat
shield parts
ok
Ok
Ok
Mount orientation to
be taken care
plier:
1. Visual WI should be
there on assy line for
identification of heat
shield variant
2. Mount should not be
in stress while engine
fitment.
Ok
S. No.
Description
Mounting of part
1.1
Location
1.2
Routing of pipes
1.3
Impact of Temperature
1.4
Impact of Vibration
1.5
Impact of Dust
1.6
Impact of Humidity
1.7
Impact of Water
1.8
Electro-Magnetic Interference
Process
2.1
2.2
Impact of Current
2.3
Impact of Voltage
2.4
Storage Conditions
2.5
Material Handling
2.6
2.7
Fitment Procedure
3.1
3.2
3.3
4.1
4.2
Overall Observations
1
Sign Of
TML:
Supplier Nam
Date: 06-0
Specification
Chassis -Gear box mounting
NA
Operating tempreature range as per
drawing, should not exceed the same
No impact
No
No
TML-PSC-SQ-034
Supplier:
Remarks
Ok
NA
OK
Ok
1. Proper grade
washers & nuts to
be used for
mounting on Chassis
2. Also while loading
Gear box it should
not hit the mount
studs
Ok
NA
OK
Rust could be
observed on metal
parts due to
exposure to water
NA
Current defined
torque is 4.0 Kgm
which is not being
checked
NA
NA
ok
ok
ok
Currently torque is
not being checked
as defined
Currently there is no
space for torque
wrench to check the
required tightening
torque after fitment
of gear box mount
ok
ok
1. Visual WI should be
there on assy line for
identification of heat
shield variant
2. Mount should not be
in stress while Gear
box fitment.
plier: