Scope of work for Survey Consultant

Particulars
S. No.

A
1

Activity

Type

Survey work:
Mobilization & demobilization:
Field work

1.1

Field work

1.2

Field work

1.3
Field work

1.4
Field work

1.5

Field work

1.6
Field work

1.7
Desk top

1.8

Field work

1.9
A1
B

Sub Total
Installation of equipments & measurement work
Field work

1.1

Field work

1.2

Field work

1.3

Field work

1.4

Field work

1.5

Field work

1.6

Field work

1.7

B1

Sub Total

C
1

Daily and weekly reports :


Daily & weekly reports:
Desk top

1.1
2

Final report & corelation:


Desk top

2.1

Desk top

2.2

C1

Sub Total

Grand Total A1, B1, & C1

Kesulitan :
1. Menentukan lokasi yang dangkal dan perkiraan panjang yang harus di bathimetri.
2. Lokasi pemasangan alat AWLR dan penentuan apakah alat tersebut di tinggal atau d
3. Apakah laporan harian dan mingguan dikirim tiap minggu.

ey Consultant
Details

Nos

Days

Units

ilization:
Responsibility of taking care of social issue related to work

ls

like installation of wooden post & tidal guage etc. complete


Kick off meeting with site supervisors & survey team

1
60

times
2 person-time

Mobilization of Tidal Gauge & Water level Gauge

12

1 Units

Supply, transport & installation of painted woodden post

10
51

Mobilization of Manpower Skilled and Un skilled

Transport for work

Implementation of Safety Plan

Communication and daily weekly reporting


Demobilization of Equipments, Tools and Manpower

20

1
1

1 Units
120 person-time
1 units

120 ls
1 ls

ents & measurement work


Transfer of BM to the required location
Installation of tide gauge & calibration wrt to BM level

Measurement of water tide gauge

Installation of water level gauge on given location


Measurement of water level gauge on given location

Re- Installation of water level gauge on bridge location


Measurement of Air draft on the Bridges
Installation of Rainfall measurement equipments
Measurement of rainfall

Measurement of river along 60 km


Shallow area measurement as per given Bend drawings

17
2

Units
120 Units

120 mandays

10
30

1 Units
120 mandays

5
15
4
12
60

units
120 units
120 Units
120 units
km

30

19 bendweeks

reports :

s:
Submit the daily and weekly report to authorized person

120

unit

5
1

unit
ls

on:
Submit the final report to authorized person
Establish the corelation in the above determine parameters

ang dangkal dan perkiraan panjang yang harus di bathimetri.


alat AWLR dan penentuan apakah alat tersebut di tinggal atau di bongkar
an dan mingguan dikirim tiap minggu.

Rates

Amount

In IDR

In IDR

50,000,000.0

Remark

50,000,000

15,000,000.0
1,500,000

15,000,000
180,000,000 Transport, meal, dsa

1,500,000

18,000,000 Exceed bagage, land


transport, porters
10,000,000
612,000,000

1,000,000
100,000
1,500,000

100,000
198,000,000

5,000,000
500,000
150,000

30,000,000 Jas hujan, sepatu,


pelampung, topi, P3k, baterai
12,000,000
198,000,000
1,075,000,000
85,000,000
120,000,000 Isntalasi, kalibrasi dan sewa
alat
108,000,000

150,000

10,000,000
540,000,000

1,000,000
150,000
100,000
150,000
2,000,000

5,000,000
270,000,000
48,000,000
216,000,000
120,000,000

2,000,000

1,140,000,000

1,000,000

2,662,000,000

Pengukuran sungai tiap interval 50 m


Pengukuran tiap minggu sebanyak 30
lokasi

200,000

24,000,000

300,000
50,000,000

1,500,000
50,000,000
51,500,000
3,812,500,000