PROYECTO
R2
DATOS
0.80
1.70
5.00
17.00
7.50
25.00
0.50
1.56
2.40
100.00
7.50
0.30
0.60
1.00
0.50
0.00
0.00
0.50
2.40
1.8
h'
R1
R3
H
h
NIVEL AGUA
C
M
G
B
7.50 m
0.50 m
0.41 adim
E= 0,5*W*h (h+2h')*C=
Ev=E*Sen (o/2)=
Eh=E*Cos (o/2)=
20.387 Tn
4.413 Tn
19.904 Tn
2.65 m
1.5
1.25
0.67
1.00
0.97 m
2.35 m
2.13 m
Mi(Tn-m)
0.000
11.250
6.030
4.413
21.693
Esfuerzo a compresin del concreto F`c= 0,4(Fc)
F`c=
400
Tn/m2
P =Fv(1+6e/b)/(ab)
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
0.41 >2
RECALCULAR
0.79 >1.5
RECALCULAR
Chequeo al Deslizamiento
FSD=Pi*f/Eh
0.00 Tn
Xi(m)
0.000
0.000
22.413
22.413
Xv=Mt/Pi
1.25
1.25
0.97
Mi(Tn-m)
0.000
0.000
21.741
21.741
0.970 m
yi(m)
19.904
0.123
20.027
2.65
9.30
0.123 Tn/m
Mi(Tn-m)
52.746
1.144
53.890
Yh=Mi/Pi
Z=
e=
2.691
2.404
2.184
VERIFICACIONES
1-Verificacion de compresion y traccin
145.48 <F`c
P =Fv(1+6e/b)/(ab)
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
0.40 >2
RECALCULAR
0.78 >1.5
RECALCULAR
Chequeo al Deslizamiento
FSD=Pi*f/Eh
m
m
m
adimensional
24.685 kg
5.343 kg
24.100 kg
2.92 m
Xi(m)
0.000
9.000
9.000
4.608
7.020
5.343
34.971
1.595 m
2.012 m
1.617 m
1.8
1.55
0.97
1.2
2.10
2.40
Mi(Tn-m)
0.000
13.950
8.730
5.530
14.742
12.823
55.775
>b/6
e<b/6,
b/6= 0.400
RECALCULAR
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
73.48 <
RECALCULAR
Chequeo al volteo
FSV=Mi/(Eh*Dh)
0.79 >2
RECALCULAR
Chequeo al Deslizamiento
FSD=Pi*f/Eh
1.02 >1.5
RECALCULAR
Xi(m)
0.000
0.000
34.971
34.971
1.600 m
1.55
1.55
1.60
Mi(Tn-m)
0.000
0.000
55.954
55.954
yi(m)
24.100
0.123
24.223
2.96 m
2.92
10.10
Mi(Tn-m)
70.372
1.242
71.614
2.05 m
1.65 <b/6
RECALCULAR
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
74.68 <
RECALCULAR
Chequeo al volteo
FSV=Mi/(Eh*Dh)
0.78 >2
RECALCULAR
Chequeo al Deslizamiento
FSD=Pi*f/Eh
1.01 >2
RECALCULAR
7.50
=H
1.13 m
3.75 m, adoptamos
3.00 m
20.00 m
20.00 m
0.50
3.00
0.80
0.30
1.00
0.50
0.60
2.40
24.00
1-Empuje de terreno,
h
m
h
=
3.00
C = (Cos)*(Cos-raiz(Cos-cos)/(Cos+raiz(Cos-cos) =
0.71
E= 0,5*W*h2*C
Ev=E*Sen (/2)=
Eh=E*Cos (/2)=
Ld
4.984 TN
4.9842
1.036
4.875
Li
i
i
Punto de aplicacin de empuje Eh
Dv=h/3
1.00
a
P1
P2
Ev
Total
Xv=Mt/Pi
Z=Eh*Dv/Pi
e=b/2-(Xv-Z)
Pi(tn)
3.600
7.200
1.036
11.836
0.919 m
0.412 m
0.243 m
Xi(m)
Mi(Tn-m)
1.25
4.500
0.67
4.824
1.50
1.554
10.878
h
<b/6
e<b/6,
b/6= 0.250
CONFORME
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
19.51 <Fc
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
2.23 >2
CONFORME
1.70 >1.5
CONFORME
1-Empuje de terreno,
E= 0,5*W*h2*C
0.71
7.997 TN
Ev=E*Sen (/2)=
Eh=E*Cos (/2)=
1.663
7.822
1.27
P1
P2
P3
P4
Ev
Total
Pi(tn)
3.600
7.200
4.608
2.808
1.663
19.879
Xv=Mt/Pi
Z=Eh*Dv/Pi
e=b/2-(Xv-Z)
Xi(m)
1.55
0.97
1.20
2.10
2.40
1.408 m
0.500 m
0.292 m
Mi(Tn-m)
5.580
6.984
5.530
5.897
3.991
27.982
<b/6
e<b/6,
b/6=
CONFORME
VERIFICACIONES
1-Verificacion de compresion y traccin
P =Fv(1+6e/b)/(ab)
14.33 <
CONFORME
2.82 >2
CONFORME
1.78 >1.5
CONFORME
Chequeo al volteo
FSV=Mi/(Eh*Dh)
Chequeo al Deslizamiento
FSD=Pi*f/Eh
B
E
G
B
h
=
3.80
C = (Cos)*(Cos-raiz(Cos-cos)/(Cos+raiz(Cos-cos) =
Chequeo al Deslizamiento
FSD=Pi*f/Eh
0.40
DISEO DE ESTRIBO
CREACION PUENTE VEHICULAR EN EL CASERIO DE LLARAY
D
DATOS
E
c
ALTURA DE ZAPATA
CAPACIDAD PORT. TERRENO
(m)
d =
(Kg/cm)
s =
ANCHO DE PUENTE
(m)
LUZ DE PUENTE
(m)
A =
L =
ALTURA DE ESTRIBO
(m)
H =
()
(m)
(Tn/m)
h' =
g1 =
g2 =
M =
N =
G =
a =
b =
c =
e
0.50
1.00
5.60
20.00
4.80
35.00
1.00
1.60
2.40
1.20
1.50
1.00
1.60
0.30
0.50
0.50
3.70
2.70
a
e
H
h
NIVEL DE AGUA
B
d
C
M
53.57 Tn
P (Tn)
39.90 Tn
9.566 Tn/m
0.122 Tn/m
55.148 Tn/m
h
h'
C
E
Ev
Eh
=
=
=
=
=
=
TAN(45-/2)
0.5*w*h*(h+2h')*C
E*Sen(/2)
E*Cos(/2)
Punto de aplicacin
Dh
=
h*(h+3*h')/(h+2*h')/3
5.30
1.00
0.27
8.357
2.513
7.970
2.01
Xi (m)
1.152
0.108
0.96
6.48
4.44
-0.040
-0.944
13.056
2.513
27.725
2.39 m
Mi (tn-m)
1.85
1.80
1.60
1.70
1.85
2.07
2.10
3.05
2.20
2.131
0.194
1.536
11.016
8.214
-0.083
-1.982
39.821
5.529
66.376
Pi(tn)
3.327
7.970
Xi(m)
2.40
2.01
Mi(tn-m)
7.985
16.020
7.970
2.01
24.005
Esismo
Eh
Sum(Eh)
VERIFICACIONES
Chequeo al volteo
Clculo del coeficiente de volteo:
Cv
Miv/Mih
>=
2.77 BIEN !
Chequeo al deslizamiento:
Clculo del coeficiente de deslizamiento:
Cd
0.7*Fiv/Fih
>=2
2.44 BIEN !
0.32 m
e = B/2-(Miv-Mih)/Fv =
Clculo de las presiones mximas y mnimas
0.45
s
s
mx = Fiv*(1+6*e/B)/(aB) =
mx <=
s terreno
BIEN !
s
s
mx = Fiv*(1-6*e/B)/(aB) =
mx <=
s terreno
BIEN !
0.23
9.566
55.148
27.725
92.439
Xi (m)
1.45
1.45
2.39
Mi (tn-m)
13.871
79.965
66.263
160.099
0.122
11.093
7.970
19.185
Xi(m)
7.10
2.40
2.01
Mi(tn-m)
0.866
26.623
16.020
43.509
VERIFICACIONES
Chequeo al volteo
Clculo del coeficiente de volteo:
Cv
Miv/Mih
>=
3.68 BIEN !
Chequeo al deslizamiento:
Clculo del coeficiente de deslizamiento:
Cd
0.7*Fiv/Fih
>=2
3.37 BIEN !
0.59 m
e = B/2-(Miv-Mih)/Fv =
COMO
e < B/6
BIEN !
mx = Fiv*(1+6*e/B)/(aB) =
mx <=
s terreno
1.47
s
s
mn = Fiv*(1-6*e/B)/(aB)=
mn <=
s terreno
0.07
1.60 m
1.00 m
0.271
1.249 Tn
1.191 Tn
0.68 m
Eh
Pi (tn)
Xi (m)
1.191
0.68
Mi (tn-m)
0.810
= ?
= ?
= 0.4*fy
= 0.4*f'c
= Fy/Fc
= 2100000/(15000*(RAIZ(f'c))
= n/(n+r)
= 1 - k/3
=
0.810 Tn-m
4200 Kg/cm
210 Kg/cm
1680 Kg/cm
84 Kg/cm
20
10
0.33
0.89
30.00 cm
d<H
RAIZ(2*M*100000/(f'c*k*j*100))
5.13
BIEN !
1.053 Tn-m
Mu
= 1.3*Md
d
=
As
=
As mn = 14*b*d/fy
22.50
1.25 cm2
7.50 cm2
COMO
As mn > As
Entonces consideraremos,
VARILLA No
= 5/8''
26
4.80 m
1.00 m
0.271
7.076 Tn
Eh =E*cos(/2)
6.748 Tn
1.84 m
Xi (m)
1.152
0.108
0.96
6.48
9.566
55.148
73.414
0.50
0.65
0.60
0.40
0.50
0.50
0.50
Mi (tn-m)
0.749
0.065
0.384
3.240
4.783
27.574
36.80
Eh
Pi (tn)
Xi (m)
6.748
1.84
Mi (tn-m)
12.416 Tn-m
=
90.00 cm
d<H
RAIZ(2*M*100000/(f'c*k*j*100))
20.07
BIEN !
12.416
cm
0.17 m
Excentricidad : e = B/2-(Miv-Mih)/Fv =
Excentricidad de referencia:
Como
B/6
>
B/6
0.17 m
e ; la resultante cae dentro del tercio medio de la seccin, por lo tanto el estribo se disear a compresin
Acero vertical :
16.141 Tn-m
Mu
= 1.3*Md
d
=
90.00
As
=
As mn = 0,0015*b*d = para varillas de dimetro mayor que 5/8=
COMO
As mn > As
Entonces consideraremos,
VARILLA No
= 3/4''
Acero horizontal:
As mn = 0,0025*b*d =
VARILLA No
= 1''
Acero de reparticin:
vertical
As mn = 0,0015*b*d =
= 3/4''
horizontal
As mn = 0,0025*b*d =
21
cm
23
cm
21
cm
23
cm
22.50 cm2
13.50 cm2
@
=
VARILLA No
VARILLA No
22.50 cm2
= 1''
Xi(m)
Mi(tn-m)
0.840
14.076
14.916
0.60
0.64
0.504
9.009
9.513
9.513 Tn-m
=
40.00 cm
d<H
4.77 cm2
13.50 cm2
RAIZ(2*M*100000/(f'c*k*j*100))
17.56
BIEN !
12.367 Tn-m
Mu
= 1.3*Md
d
=
As
=
As mn = 14*b*d/fy
40.00
8.39 cm2
13.33 cm2
COMO
As mn > As
Entonces consideraremos,
VARILLA No
= 3/4''
21
cm
Ps1
Ps2
Ps3
Pz
TOTAL
Pi(tn)
-0.040
-0.944
13.056
1.800
12.112
Xi(m)
-0.13
-0.10
0.65
0.75
Mi(tn-m)
0.005
0.094
8.486
1.350
9.935
9.935 Tn-m
=
40.00 cm
RAIZ(2*M*100000/(f'c*k*j*100))
17.95
d<H
BIEN !
12.916 Tn-m
40.00
8.77 cm2
13.33 cm2
COMO
As mn > As
Entonces consideraremos,
VARILLA No
= 3/4''
21
cm
16
cm
25
cm
ACERO DE REPARTICION
As = 0.002*b*d >= 2.64 cm2
Para estribo
As =
VARILLA No
18 cm2
Para zapata
As =
VARILLA No
= 3/4''
8 cm2
= 5/8''
h'
C
N
o se disear a compresin
ANALISIS SISMICO
La Norma establece la frmula de clculo para la fuerza cortante basal, la
misma que ser empleada como empuje horizontal aplicada en el centro de gravedad de la estructura; la frmula es la siguiente:
V = (ZUSC)/ R * P =
0.12
Donde:
V : Fuerza cortante en la base
Z : Factor de Zona (zona 2, Sierra)
U : Factor de Uso (construccin importante)
S : Parmetro de Suelo ( suelo intermedio)
C : Factor de amplificacin ssmica
R : Factor de Reduccin (Muros de concreto armado)
P : Peso total de la estructura (a nivel de fondo de cimentacin)
0.3
1.3
1.2
2
7.5
Variable
Tn
C <= 2.5
Donde:
TP : Periodo que define plataforma del espectro en cada tipo de suelo
(suelo intermedio)
T : Periodo fundamental de la estructura
Adems, T es definido como:
T = hn / CT
Donde:
hn : Altura total de la edificacin en metros
CT : Coefic. de estimacin de periodo predominante de la estructura
( para elementos resistentes constituidos por muros de corte).
31.03
2
0.6 segundos
0.080 segundos
4.80 m
60
Esta aceleracin ser empleada para el calculo de los esfuerzos a los que se someteran elementos
de la estructura en caso de sismo.
Variable
Croquis
6.00
15.06
20.92
20.92
20.00
2.40
20.00
14.52
45
14.52
45
0.30
1.70
13.82
1.00
0.50
13.82
19.22
2.40
1.70
19.22
0.60
1.70
13.36
6.00
13.36
1.70
i = 0.7853981634 rad.
d = 0.7853981634 rad.
0.50
5.00
0.50
0.05
4.50
7.50
3.00
0.80
15.06
6.00
Pgina 21
15.06
Metrado
PLANILLA DE METRADO
PROYECTO
ENTIDAD
DEPARTAMENTO
: LA LIBERTAD
PROVINCIA
: SANCHEZ CARRION
DISTRITO
: SANAGORAN
LOCALIDAD
: SANAGORAN
FECHA
: ABRIL, 2008
DESCRIPCION
PARTIDA
UND
N VECES
1.00
TRABAJOS PRELIMINARES
1.01
M2
1.00
1.02
M2
1.00
1.03
ALMACEN
M2
1.00
2.00
MOVIMIENTO DE TIERRAS
2.01
M3
2.00
2.00
2.02
M3
1.00
2.03
M3
2.00
3.00
CONCRETO SIMPLE
M3
2.00
2.00
M3
2.00
2.00
2.00
3.01
3.02
ZAPATAS
CIMIENTOS CORRIDOS (1:10+30%PG)
Aletas
MUROS
SOBRECIMIENTOS (1:8+25%PM) A=.15 m.
Cajuela
Talud estribos
Pgina 22
Metrado
Aletas
2.00
3.03
4.00
CONCRETO ARMADO
4.01
VIGAS
CONCRETO (f'c = 210 Kg/cm2)
Diafragmas
sardinel
M2
2.00
2.00
2.00
2.00
M3
2.00
#REF!
2.00
4.02
ENCOFRADO Y DESENCOFRADO
Diafragmas
sardinel
M2
4.00
#REF!
4.00
4.03
KG
3873.48
412.56
M3
1.00
2.00
2.00
4.04
LOSA Y VEREDAS
CONCRETO (f'c = 210 Kg/cm2)
Veredas
Losa de aproximacin
4.05
ENCOFRADO Y DESENCOFRADO
Veredas
Falso Puente
M2
2.00
2.00
1.00
4.06
KG
2265.83
5.00
DRENAJE
UN
ML
16.00
20.00
UN
UN
2.00
1.00
5.01
5.02
6.00
6.01
6.02
BARANDA METALICA
APOYO FIJO INCLUYE JUNTA DILAT.
Pgina 23
Metrado
6.03
6.04
6.05
UN
UN
UN
1.00
1.00
1.00
GLB
1.00
7.00
7.01
FLETE TERRESTRE
8.00
8.01
8.02
8.03
8.04
FLETE TERRESTRE
Pgina 24
Metrado
METRADOS
OBRA:
DESCRIPCION
Unid.
1
1.01
1.02
1.03
TRABAJOS PRELIMINARES
Caseta y Almacn
Limpieza permanente de obra
Trazo y Replanteo con topgrafo
2
2.01
MOVIMIENTO DE TIERRAS
Excavacin manual
Corte en Estribo Derecho (L=6).
Corte en Estribo Izuierdo (L=6m).
Corte en Aleta Derecha Aguas Arriba (L=6m).
Corte en Aleta Derecha Aguas Abajo (L=3m).
Corte en Aleta Izuierda Aguas Abajo (L=6m).
Corte en Aleta Izquierda Aguas Arriba (L=3m).
Corte en muro de encausamiento (L=14m).
Relleno con material propio
En acceso Derecho
En acceso Izquierdo
En Aletas Margen Derecho
En Alet. Marg. Izquier.
2.01.01
2.01.02
2.01.03
2.01.04
2.01.05
2.01.06
2.01.07
2.02
2.02.01
2.02.02
2.02.03
2.02.04
2.03
3
3.01
3.01.01
3.01.01.01
3.01.02.02
3.01.02
3.01.02.01
3.01.02.02
3.01.02.03
3.01.02.04
3.01.02.05
3.02
3.02.01
Limpieza y encauzamiento de ro
OBRAS DE CONCRETO SIMPLE
Solado para zapatas
Estribos (Zapatas):
Zapata de Estribos de margen derecho
Zapata de Estribos de margen izquierdo
Aletas (Zapatas):
Zapatas de Aleta margen derecha aguas arriba
Zapatas de Aleta margen izquierda aguas arriba
Zapatas de Aleta margen derecha aguas abajo
Zapatas de Aleta margen izquierda aguas abajo
Zapata de Muro de encausam. Marg. Dere. aguas ar
Concreto f'c=140kg/cm2+30% piedra grande
Vigas principales
Pgina 25
Alto
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
4.40
4.40
4.45
4.45
4.45
4.45
4.50
m3
m3
m3
m3
5.40
5.40
4.95
4.95
m3
4.50
m2
m2
0.80
0.80
m2
m2
m2
m2
m2
0.80
0.80
0.80
0.80
0.80
m2
0.40
Metrado
3.02.02
3.03
3.02.04
3.02.05
3.04
3.02.06
3.02.07
3.02.07.01
3.02.07.02
3.02.08
3.02.08.01
3.02.08.02
3.02.08.03
3.02.08.04
3.02.08.05
4
4.01
4.01.01
4.01.02
4.01.03
Diafragmas
Concreto f'c=140kg/cm2+30% piedra mediana
Fondo losa
Sardinel:
Encofrado y desencofrado de estribos
Veredas:
Estribos (cuerpo):
Estribos de margen derecho
Estribo de margen izquierdo
Aletas (cuerpo):
Aleta margen derecha aguas arriba
Aleta margen izuierda aguas arriba
Aleta margen derecha aguas abajo
Aleta margen Izuierdo aguas abajo
Muro de Encuas. margen derecho aguas arriba
OBRA FALSA
Falso Puente (Madera de Eucalipto)
Madera Rolliza :
De 6" =3.15 ml
De 4" =1.025 ml
De 4" =4.25 ml
De 4" =6.50 ml
De 3" =3.40 ml
De 3" =3.50 ml
De 3" =6.80 ml
De 3" =1.025 ml
Listones:
De 4"X12"X6.50 ml
Tablas:
De 1"X8"X4ml
De 1"X8"X1ml
Clavos:
De 2" y 3"
De 4" y 5"
OBRAS DE CONCRETO ARMADO
5.01 Encofrado y desencofrado de superestructura
5.02 Concreto f'c=210 kg/cm2
Sardinel
5.03 Acero
Sardinel
6
6.01
VARIOS
Barandas metlicas
Pgina 26
m2
0.00
m2
m2
0.25
m2
m2
0.20
0.20
m2
m2
9.33
9.33
m2
m2
m2
m2
m2
8.38
8.38
8.38
8.38
7.42
ml
ml
ml
ml
ml
ml
ml
ml
pie2
4.00
pie2
pie2
1.00
1.00
kg
kg
0
0.68
0.15
m2
m2
m2
m2
0.20
0.25
0.25
Metrado
6.02
6.03
6.04
6.05
Apoyos de Neopreno:
Pruebas de laboratorio
Tubera de drenaje con canastilla PVC D=2" , Cada
Junta de Dilatacin de acera (Platinas)
7
7.01
TRANSPORTE DE MATERIALES
Flete Terrestre
Pgina 27
unid
unid
ml
ml
Metrado
METRADO
MEDIDAS
LARGO
#REF!
ANCHO
ALTURA
36.12
#REF!
5.00
5.00
6.00
40.00
2.40
2.40
2.40
2.40
635.90
PARCIAL
TOTAL
#REF!
#REF!
#REF!
#REF!
25.00
25.00
69.12
460.80
529.92
635.90
635.90
6.00
0.60
7.50
54.00
54.00
6.00
40.00
2.40
2.40
0.80
0.80
23.04
153.60
176.64
6.00
6.00
6.00
0.50
0.00
0.40
7.50
0.00
7.50
45.00
0.00
36.00
471.40
Pgina 28
Metrado
40.00
4.88
6.00
6.00
6.00
40.00
#REF!
#REF!
#REF!
#REF!
#REF!
0.15
#REF!
#REF!
#REF!
#REF!
#REF!
1.00
#REF!
#REF!
#REF!
2.00
#REF!
#REF!
#REF!
#REF!
390.40
7.50
0.00
7.50
5.25
90.00
0.00
90.00
420.00
600.00
#REF!
#REF!
0.30
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.30
#REF!
#REF!
#REF!
#REF!
3873.48
412.56
4286.04
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2265.83
2265.83
16.00
40.00
16.00
40.00
2.00
1.00
2.00
1.00
Pgina 29
Metrado
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
#REF!
1.00
1.00
1.00
#REF!
1.00
Pgina 30
Metrado
RADOS
Largo
No. veces
No. Elem.
Metrado
Parcial
4.00
7.00
7.00
6.00
15.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
24.00
105.00
105.00
24.00
105.00
105.00
2.60
2.60
2.00
2.00
2.00
2.00
2.00
6.00
6.00
6.00
3.00
6.00
3.00
14.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
68.64
68.64
53.40
26.70
53.40
26.70
126.00
1.00
1.00
1.00
1.00
6.00
6.00
9.00
9.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16.20
16.20
22.28
22.28
1.00
14.00
1.00
1.00
63.00
423.48
139.96
59.20
6.00
6.00
1.00
1.00
2.00
2.00
9.60
9.60
6.00
6.00
3.00
3.00
14.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
9.60
9.60
4.80
4.80
11.20
5.00
1.00
2.00
4.00
661.74
Pgina 31
Metrado
0.00
0.00
0.00
0.00
5.00
6.00
1.00
2.00
1.00
2.00
25.00
6.00
6.00
0.68
2.00
2.00
2.00
2.00
4.80
0.54
6.00
6.00
1.00
1.00
1.00
1.00
55.98
55.98
6.00
6.00
3.00
3.00
14.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
100.56
100.56
50.28
50.28
207.76
3.15
1.03
4.25
6.50
3.40
3.50
6.80
1.03
25.00
25.00
5.00
5.00
24.00
20.00
5.00
32.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
78.75
25.75
21.25
32.50
81.60
70.00
34.00
32.96
12.00
6.50
0.27
3.00
252.72
8.00
8.00
4.00
1.00
0.27
0.27
35.00
35.00
8.64
75.60
5.00
376.81
15.00
15.00
0.20
6.00
1.00
2.00
1.63
0.25
6.00
1.00
2.00
0.45
1.10
0.68
6.00
1.00
2.00
1.00
2.00
2.00
2.00
2.00
2.00
13.20
0.54
3.00
0.15
336.96
15.00
15.00
16.89
6.00
0.15
0.00
Pgina 32
Metrado
9.38
6.00
1.00
1.00
1.00
2.00
4.00
4.00
2.00
2.00
4.00
4.00
18.76
24.00
Pgina 33
4.00
4.00
18.76
24.00
Met. acero
TIPO
DIAMET.
LONGIT.
No PIEZAS
No ELEM.
PARCIAL
P.E.
PARCIAL
pulgadas
unid.
unid.
kg/m
kg
8/8
0.00
4.05
0.00
5/8
0.00
1.61
0.00
8/8
0.00
4.05
0.00
3/8
0.00
0.59
0.00
5/8
0.00
1.61
0.00
8/8
0.00
4.05
0.00
6/8
0.00
2.28
0.00
3/8
0.00
0.59
0.00
TIPO
DIAMET.
LONGIT.
No PIEZAS
No ELEM.
PARCIAL
P.E.
PARCIAL
pulgadas
unid.
unid.
kg/m
kg
Pgina 34
Met. acero
8/8
0.00
4.05
0.00
5/8
0.00
1.61
0.00
8/8
0.00
4.05
0.00
3/8
0.00
0.59
0.00
5/8
0.00
1.61
0.00
8/8
0.00
4.05
0.00
6/8
0.00
2.28
0.00
3/8
0.00
0.59
0.00
TIPO
DIAMET.
LONGIT.
No PIEZAS
No ELEM.
PARCIAL
PARCIAL
pulgadas
unid.
unid.
kg
VIGAS
20.3
162.40
658.32
VIGAS
1/2
15.65
187.80
190.32
VIGAS
19.9
278.60
1129.35
Pgina 35
Met. acero
VIGAS
19.9
278.60
1129.35
VIGAS
1/2
3.78
100
756.00
766.14
LOSA
5/8
5.2
85
442.00
645.02
LOSA
3/8
15.4
21
323.40
209.75
LOSA
5/8
4.5
95
427.50
623.86
LOSA
3/8
15.4
21
323.40
209.75
VEREDA
5/8
1.25
109
272.50
397.66
VEREDA
3/8
15.4
277.20
179.79
DIAFRAGMA
5/8
64.00
93.40
DIAFRAGMA
3/8
2.7
43.20
28.02
DIAFRAGMA
5/8
48.00
70.05
DIAFRAGMA
3/8
2.4
15
144.00
93.40
DIAFRAGMA
1/2
14
84.00
85.13
DIAFRAGMA
1/2
1.5
14
42.00
42.56
TOTAL=
6551.87
Pgina 36
3873.48
2265.83
412.56
1
2
3
4
DATOS
Peralte de vigas:
Borde libre terico (Ymx. 2.50, mn. 1.50 m):
Borde libre topogrfico :
Borde libre adoptado :
Tirante de Mxima Avenida Extraordinaria:
Profundidad de Socavacin:
Peralte de zapata=Df=
Cota de fondo de cauce:
H=
Bl=
Bl=
Bl=
Ymx=
Ysoc=
d=
RESULTADOS
Altura de los estribos
Cota de Cimentacin
Nivel de aguas mximas extraordinarias (NAME)
Nivel de rasante
1.00
1.98
0.00
1.98
0.52
1.80
0.60
2762.00
m
m
m
m
m
m
m
m.s.n.m.
5.90
2759.60
2762.52
2765.50
m.s.n.m.
m.s.n.m.
m.s.n.m.
m.s.n.m.
ESTUDIOS
(diseo de superestructura)
(Reglamento de puentes)
(estudio topogrfico)
(estudio hidrolgico e hidrulico)
(estudio hidrulico y de suelos)
(estudio topogrfico)
HOJA DE METRADOS
EXPEDIENTE No
PROYECTO
HECHO POR
:
:
:
PART.
01
01.01
DESCRIPCION
No
MEDIDAS
CANT.
SUBESTRUCTURA
TRABAJOS PRELIMINARES
Movilizacin y desm. de maquinaria
01.02
MOVIMIENTO DE TIERRAS
Corte en roca fija con explosivo
Excav. En suelo con gran boloneria
Corte en material suelto
Relleno con material propio
01.03
01.04
02
SUPERESTRUCTURA
02.01
VIGAS PRINCIPALES
Concreto f'c=210 kg/cm2
Encofrado y desencofrado
Acero
VIGAS DIAFRAGMA
Concreto f'c=210 kg/cm2
#REF!
Encofrado y desencofrado
#REF!
Acero
LOSA + VEREDA
Concreto f'c=210 kg/cm2
Encofrado y desencofrado
02.01
Acero
VARIOS
Tubera pvc
Apoyos de neopreno
Junta asfltica
LARGO
ANCHO
Baranda metlica
Acabado veredas
TRADOS
MEDIDAS
PARCIAL
TOTAL
UND
ALTO
und
m3
m2
m3
m2
m3
m2
und
ml
ml
m2
222