PROYECTO:
CREACION DE PONTONES PARA EL SERVICIO VEHICULAR Y PEATONAL EN EL JR. LOS ALISOS, BARRIO ROMERAL, DISTRITO DE TARMA,
PROVINCIA DE TARMA - JUNIN
FECHA:
DESCRIPCION
PARTIDA
2.6.23.2
2.6.2 3. 2 4
PARCIAL
SUB-TOTAL
TOTAL
INFRAESTRUCTURA VIAL
46,617.20
UND.
CANT.
P.UNIT.
02 Operario
Das
90.00
41.00
02 Oficial
Das
90.00
38.00
6,840.00
05 Peones
Das
90.00
32.50
14,625.00
01 Almacenero
Das
90.00
30.00
2,700.00
7,380.00
3,716.00
2,839.05
S.C.TR 1.53%
482.64
Por riesgo
394.31
11,356.20
2.6.2 3. 2 5
3,154.50
4,731.75
3,469.95
124,567.69
3,805.00
CANT
P.UNIT
3.00
250.00
750.00
PAR
10.00
60.00
600.00
BOTAS DE JEBE
PAR
10.00
40.00
400.00
GUANTES DE JEBE
PAR
18.00
8.00
144.00
PAR
18.00
12.00
216.00
LENTES VISOR
PZA
10.00
8.00
80.00
UNIFORME (Mamelucos)
UND
10.00
80.00
800.00
CASCO (Protectores)
UND
13.00
15.00
195.00
UND
10.00
12.00
120.00
CHALECOS
UND
10.00
50.00
500.00
UND
CANT
P.UNIT
Kg.
76.00
5.00
380.00
Kg.
70.00
5.00
ALAMBRE NEGRO N8
Kg.
38.00
5.00
350.00
190.00
M
Kg.
VAR
UND
UND
UND
M3
M3
72.00
2,341.00
51.00
8.00
8.00
16.00
143.00
142.00
19.30
3.78
42.50
100.00
700.00
145.00
65.00
45.00
1,389.60
8,848.98
2,167.50
800.00
5,600.00
2,320.00
9,295.00
6,390.00
M3
M3
71.00
71.00
70.00
70.00
4,970.00
4,970.00
HORMIGON
ARENA FINA
M3
M3
87.00
0.04
65.00
80.00
5,655.00
3.20
BLS
BLS
UND
Kg.
P2
1,939.00
3.00
50.00
14.00
6.00
22.00
10.80
190.00
13.50
3.60
42,658.00
32.40
9,500.00
189.00
21.60
UND
116,229.87
P2
765.00
5.85
4,475.25
PINTURA ANTICORROSIVA
GLN
1.30
31.50
40.95
PINTURA ESMALTE
GLN
1.30
31.50
40.95
6.00
6.70
40.20
GLB
2.00
2600.00
5200.00
GLN
1.18
15.00
17.70
LIJA
UND
16.00
3.50
56.00
THINER
GLN
0.50
19.00
9.50
PINTURA DE TRAFICO
GLN
0.82
72.00
59.04
PLN
32.00
17.50
560.00
UND
2.00
30.00
60.00
689.00
UND
2.00
1.50
3.00
UND
1.00
5.00
5.00
UND
3.00
1.00
3.00
CJA
0.25
16.00
4.00
UND
3.00
20.00
60.00
CLASIFICADOR DE GASTOS
PROYECTO:
CREACION DE PONTONES PARA EL SERVICIO VEHICULAR Y PEATONAL EN EL JR. LOS ALISOS, BARRIO ROMERAL, DISTRITO DE TARMA,
PROVINCIA DE TARMA - JUNIN
FECHA:
DESCRIPCION
PARTIDA
PARCIAL
UND
2.00
250.00
500.00
PERFORADOR
UND
1.00
15.00
15.00
UND
1.00
18.00
18.00
TIJERA
UND
2.00
6.00
12.00
UND
1.00
9.00
9.00
WINCHA DE 50m
UND
1.00
58.82
58.82
UND
9.00
34.00
306.00
LAMPAS TRAMONTINA
UND
9.00
28.00
252.00
CARRETILLAS BUGUIE
UND
4.00
180.00
720.00
UND
1.00
90.00
90.00
PETROLEO
GLN
100.00
14.27
1,427.00
GASOLINA 90
GLN
58.00
15.00
870.00
LUBRICANTES
GLN
2.00
60.00
120.00
SERVICIOS
UND
CANT
P.UNIT
UND
1.00
350.00
UND
1.00
1,500.00
UND
2.00
30.00
60.00
ALQUILER
GLB
1.00
1,200.00
1,200.00
HM
118.00
20.00
2,360.00
HM
32.00
20.00
640.00
HM
8.00
100.00
800.00
HM
14.00
10.00
140.00
HM
20.00
15.00
300.00
HM
31.00
120.00
3,720.00
HM
51.00
5.00
255.00
HM
10.00
25.00
250.00
TEODOLITO
HM
12.00
20.00
240.00
NIVEL TOPOGRAFICO
HM
12.00
10.00
120.00
UND
CANT
P.UNIT
DISEO DE MEZCLA
UND
2.00
300.00
600.00
UND
12.00
25.00
300.00
SERVICIOS DE ASISTENTE
UND
CANT
P.UNIT
ASISTENTE DE OBRA
MES
3.00
1,000.00
2.4 HERRAMIENTAS
2,417.00
1,500.00
900.00
3,000.00
3,000.00
10,000.00
UND
CANT
P.UNIT
MES
3.00
3,000.00
9,000.00
LIQUIDACION DE OBRA
GLB
1.00
1,000.00
1,000.00
UND
CANT
P.UNIT
Glb.
1.00
8,500.00
8,500.00
Glb.
1.00
12,000.00
12,000.00
25,835.00
350.00
2.6.8
2.6.8.1.3
11,935.00
RESIDENTE DE OBRA
2.6.8.1
2.6.8.1.3.1
TOTAL
1,426.82
2.6.2 3. 2 6
SUB-TOTAL
20,500.00
8,500.00
2.6.81.4.3
2.6.81.43
SUPERVICION DE OBRA
12,000.00
217,519.89
PART.
DESCRIPCION
MONTO
2.6.2 3. 2 4
46,617.20
2.6.2 3. 2 5
124,567.69
2.6.2 3. 2 6
25,835.00
2.6.8
20,500.00
TOTAL S/.
SON
217,519.89