Job Safety Analysis (JSA)


Job
Tripping pipe in Hole
Date:
July 26, 2016
Description:
Work
Malampaya gas field
Completed
Location:
By:
Client:
Engr. Lexyber Manalo
JSA No.:
1
Sequence of Basic Steps
Potential Hazards
Hazard Control Measures
Traveling block moving up Swinging blocks hitting sides
Stabilize blocks and
derrick
of derrick. Tong
elevators. Do not put tongs
counterweight line getting
on pipe too soon.
hooked on blocks or
elevators.
Put make up tongs on and
Pinch points when latching
Keep hands and fingers on
wrap spinning chain
tongs to pipe.
designated handles. Keep
good tail on spinning chain.
Keep control of chain.
Latching pipe into
Pinch points of elevators and
Derrick man should tail out
elevators
pipe.
pipe and stabilize stand after
Dropping stand across
pick up. Floormen watch for
derrick. Swinging pipe.
snag or short stand.
Stabbing pipe
Slipping while tailing pipe.
Get firm hold. Give driller
Pinch points of pipe and
clear view. Place your hands
tongs. Missing box.
and legs properly.
Throwing chain, torqueing
Chain breaking, stuck by
Make sure tongs are latched
pipe, unlatching tongs
chain, pinch points getting
properly. Hold tongs out of
hang or fingers in chain.
way after unlatching. Stay
Tongs slipping
clear of chain and out of
swing of tongs.
Pulling Slips
Strains
Proper lifting techniques. Lift
together. Use moving pipe as
leverage.
Lowering pipe
Hitting bridge, line parting
Lower pipe at controlled
brake
speed. Watch weight
indicator.
Set slips and unlatch
Pinch points at slip handles
Slow down pipe and set slips.
elevators
elevator links, and elevator
All hands should work
latch.
together.
Job Safety Analysis Written By:
Engineer
Approve By:

Ragasa, Arvie M.

Job Title:
Job Title:

Drilling