Earth work excavation and depositing on bank
With an initial lead of 15 mts and lift of 1.5 mts
For hard gravely soils for foundation including
Cost of lab our, materials equipment etc.,
QTY
4672.00
Rate/
Unit
6.00 Cft
Amount
28032.00
530.00
60.00 Cft
31800.00
2240.00
55.00 Cft
123200.00
448.00
10.00 Cft
4480.00
1368.38
574.10
574.10
300.00 Cft
300.00 Cft
300.00 Cft
410512.50
172230.75
172230.75
1061.13
1973.16
1973.16
40.00 sft
40.00 sft
40.00 sft
42445.00
78926.40
78926.40
130.25
225.00
225.00
500.00 sft
500.00 sft
500.00 sft
65125.00
112500.00
112500.00
10
11
12
3768.05
4274.30
4584.30
40.00 sft
40.00 sft
40.00 sft
150722.00
170972.00
183372.00
365.60
608.00
608.00
100.00 sft
100.00 sft
100.00 sft
36560.00
60800.00
60800.00
2072.00
2828.00
2828.00
20.00 sft
20.00 sft
20.00 sft
41440.00
56560.00
56560.00
1454.30
1454.30
1454.30
10.00 sft
10.00 sft
10.00 sft
14543.00
14543.00
14543.00
804.00
804.00
804.00
15.00 sft
15.00 sft
15.00 sft
12060.00
12060.00
12060.00
..
L.Sum
..
25000.00
13
..
L.Sum
..
30000.00
14
248.00
248.00
240.00
60.00 sft
60.00 sft
60.00 sft
14880.00
14880.00
14400.00
15
..
L.Sum
..
40000.00
16
..
..
Total.
..
17
..
..
18
L. Sum
19
50000.00
20
40000.00
21
50000.00
296359.66
100000.00
Total
(Ruppes Thirty Three lakhs only
Date :
Place ; Sec'bad
Or Say Rs
2469663.80
296359.66
3302383.11
33,00,000/-
Detail Estimate
I
GROUND FLOOR:
SNO
DESCRIPTION
1
QTY
NOS.
12
3
3
2
3
L
Feet
6.00
12.00
18.00
31.00
24.00
B
Feet
6.00
2.00
2.00
2.00
2.00
16
4.00
4.00
1
1
18.00
12.00
24.00
31.00
3
3
2
3
12.00
18.00
31.00
24.00
2.00
2.00
2.00
2.00
3
3
2
3
12.00
18.00
31.00
24.00
2.00
2.00
2.00
2.00
Vertical
Slab beams
Vertical
Horizontal
Slab
Lintels
8.00
4.00
4.00
4.00
4.00
Total..
0.50
0.50
0.50
Total..
5.00
5.00
5.00
5.00
Total..
VALUE Unit
Cft/Sft
3456.00
288.00
432.00
496.00
576.00
4672.00 CFT
128.00
Total..
216.00
186.00
530.00 CFT
360.00
540.00
620.00
720.00
2240.00 CFT
72.00
108.00
124.00
144.00
448.00 SFT
525.00
191.25
27.00
40.50
46.50
54.00
27.00
40.50
46.50
54.00
162.00
139.50
6.00
7.50
1.13
1368.38 CFT
12
12
3
3
2
3
3
3
2
3
1
1
4
4
1
5.00
1.25
12.00
18.00
31.00
24.00
12.00
18.00
31.00
24.00
18.00
12.00
4.00
5.00
3.00
5.00
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
24.00
31.00
0.75
0.75
0.75
1.75
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.38
0.38
0.50
0.50
0.50
Total..
0
0
2
3
0.00
0.00
31.00
24.00
0.00
0.00
0.75
0.75
0.00
0.00
9.00
9.00
H
Feet
1
1
1
1
164.00
145.43
18.00
12.00
0.00
0.00
558.00
648.00
1206.00
(-ded)
(-ded)
Total..
130.25
14.63
1061.13 SFT
10.00
10.00
1640.00
1454.30
432.00
372.00
3898.30
130.25
3768.05 SFT
24.00
31.00
(-ded)
Total..
Wood work
D
D1
D2
windows
W
W1
W2
V
1
1
2
4.00
3.00
2.50
7.00
7.00
7.00
2
1
1
1
4.00
3.00
3.00
1.50
4.00
4.00
2.50
1.50
Total..
28.00
21.00
35.00
32.00
12.00
7.50
2.25
130.25 SFT
9
a
b
c
d
d
f
Flooring
Hall
Kitchen
Bed room
Room
Room
Scarting
10
Tiles dadoing.
Flooring
11
II
FIRST FLOOR:
SNO
1
1
1
1
0
0
DESCRIPTION
Vertical
Horizontal
Slab
Lintels
12.00
6.00
10.00
0.00
0.00
164
10.00
10.00
12.00
0.00
0.00
0.40
1
1
7.00
22.00
4.00
1
1
18.00
12.00
24.00
31.00
QTY
NOS.
L
Feet
12
3
3
2
3
1
1
8
5
3
1.00
12.00
18.00
31.00
24.00
18.00
12.00
4.00
5.00
3.00
3
3
2
3
12.00
18.00
31.00
24.00
B
Feet
0.75
0.75
0.75
0.75
0.75
24.00
31.00
0.75
0.75
0.75
5
a
b
c
d
e
f
1
1
1
--------------
164.00
145
33.00
--------------
10
Total..
28.00
220.00
248.00 SFT
Total..
432.00
372.00
804.00 SFT
H
Feet
VALUE Unit
Cft/Sft
9.00
1.00
1.00
1.00
1.00
0.38
0.38
0.50
0.50
0.33
Total..
9.00
9.00
9.00
9.00
Total..
120.00
60.00
120.00
0.00
0.00
65.60
365.60 SFT
324.00
486.00
558.00
648.00
2016.00
(-ded)
(-ded)
Total..
8.00 SFT
34.84 SFT
1973.16 SFT
10.00
10.00
1640.00
1454.30
1188.00
4282.30 CFT
8.00 CFT
4274.30 CFT
36.0
--------------
81.00
27.00
40.50
46.50
54.00
162.00
139.50
12.00
9.38
2.23
574.10 CFT
(-ded)
Total..
3
2
2
4.00
3.00
2.50
7.00
7.00
7.00
2
2
2
2
4.00
3.00
3.00
2.00
4.00
4.00
4.00
2.00
Total..
32.00
24.00
24.00
8.00
225.00 SFT
1
1
1
1
1
12.00
6.00
10.00
10.00
10.00
195
Total..
120.00
60.00
120.00
110.00
120.00
78.00
608.00 SFT
10.00
10.00
12.00
11.00
12.00
0.40
84.00
42.00
35.00
Tiles dadoing.
Flooring
II
SECOND FLOOR:
SNO
DESCRIPTION
1
Vertical
Horizontal
Slab
Lintels
1
1
5.00
22.00
4.00
1
1
18.00
12.00
24.00
31.00
QTY
NOS.
L
Feet
12
3
3
2
3
1
1
8
5
3
1.00
12.00
18.00
31.00
24.00
18.00
12.00
4.00
5.00
3.00
3
3
2
3
12.00
18.00
31.00
24.00
B
Feet
0.75
0.75
0.75
0.75
0.75
24.00
31.00
0.75
0.75
0.75
5
a
b
c
d
e
f
Tiles dadoing.
Flooring
1
1
1
--------------
195.00
145
33.00
--------------
20.00
220.00
240.00 SFT
Total..
432.00
372.00
432.00 SFT
H
Feet
VALUE Unit
Cft/Sft
9.00
1.00
1.00
1.00
1.00
0.38
0.38
0.50
0.50
0.33
Total..
9.00
9.00
9.00
9.00
10
Total..
324.00
486.00
558.00
648.00
2016.00
(-ded)
(-ded)
Total..
8.00 SFT
34.84 SFT
1973.16 SFT
10.00
10.00
1950.00
1454.30
1188.00
4592.30 CFT
8.00 CFT
4584.30 CFT
36.0
--------------
81.00
27.00
40.50
46.50
54.00
162.00
139.50
12.00
9.38
2.23
574.10 CFT
(-ded)
Total..
3
2
2
4.00
3.00
2.50
7.00
7.00
7.00
2
2
2
2
4.00
3.00
3.00
2.00
4.00
4.00
4.00
2.00
Total..
32.00
24.00
24.00
8.00
225.00 SFT
1
1
1
1
1
12.00
6.00
10.00
10.00
10.00
195
Total..
120.00
60.00
120.00
110.00
120.00
78.00
608.00 SFT
10
Total..
20.00
220.00
240.00 SFT
Total..
432.00
372.00
804.00 SFT
10.00
10.00
12.00
11.00
12.00
0.40
1
1
5.00
22.00
4.00
1
1
18.00
12.00
24.00
31.00
84.00
42.00
35.00