Contents:
1.
Start Up Process
2.
Pre
2.1
2.2
2.3
2.4
3.
Tertiary Process
Commissioning Process
Raw Sewage Transfer Pump
Start Of Aeration Process
Recirculation Process
Disinfection Process
4. Start the blower from the ECP after checking oil level and open the valve so that the air flows to the
aeration tank.
5. Check the aeration in the aeration tank to confirm that the diffusers are working fine. In case if the
water is not getting agitated, kindly check the valve of the blower again.
6. Maintain this level till for about 12 to 15hrs time and then again fill the aeration tank to 75% of the
volume by switching on the raw sewage transfer pump from ECP.
7. Maintain this level for about 12 hrs to 15 hrs time and again after that, fill the aeration tank to free
board level.
8. Keep the water maintained in the aeration tank for another 24 hrs.
9. Take a beaker/Jar and collect the water sample from aeration tank and check the solid sludge
settling time. Usually it should be less than 45 mins.
10.
If the settlement time of the sludge comes down to less than 30 mins and with good clarity of
water, then switch on the raw sewage transfer pump and overflow the aeration tank. If the
settlement time is more, kindly maintain the retention time for next 12 hrs in aeration tank and
check the sample again till, we get the result.
The overflow from the aeration tank is then transferred to tube settler where the heavy sludge
particles would settle down. When the level of tube settler reaches about 30 % 50%. Open the
valve
11.
12.
13.
should be atleast 1500 mg/l by this time period. If the sample quality is good then proceed ahead
otherwise, increase the level of tube settler by switching on the raw sewage transfer pump to 75%
and keep recirculation pump on to the aeration tank for next 12 hrs. Repeat the procedure till
desired quality is achieved.
14.
Keep checking the level of the settled sludge in the aeration tank. It is better to maintain it in
between 25% to 45% by doing the jar test.
Tube settler is used to settle the Sludge and to flow the clarified water to the later process
Start the raw sewage transfer pump and keep it running till the overflow from Tube settler to
After Overflowing the tube settler, the water is transferred into the Holding Tank. The Chlorine
is used for disinfection. We have to dose 2-3 kg per day so have to Set the dosing Pump at certain
level 0 5 LPH.
22.
Start the disinfection system from ECP (if provided) by dosing the chemicals in the chlorine
contact tank/holding tank.
FIG: 1.1
FIG: 1.2
7. Now switch off Filter Feed pump, close backwash valve & open service inlet by setting valve on
service mode & open air vent valve.
8. Again Start Filter Feed pump / backwash pump & remove air from the vessel.
9. Set the valve into rinse mode & close air vent valve after water flow comes out from air vent pipe in
full flow.
10.
Now set the valve into service mode and the system would be ready to be used.
11.
Ensure water quality at inlet & output from outlet & take unit in Service cycle.
12.
Record Input & Output quality of the unit.
13.
If the Quality is good and within the desired parameters then water is transferred to the
Treated Water tank.
FIG: 1.3
CYCLE
Service
Air Vent
Rinse
Cycle
Service
Backwa
sh With
air Vent
Backwas
h
SER
.
I/L
SER
.
O/L
BACKWAS
H I/L
BACKWAS
H O/L
AIR
BLOWE
R I/L *
Open
Open
Open Open
RINS
E
O/L
AIR
VEN
T
Open
ON
OFF
10 to 15
ON
OFF
10 to 15
ON
OFF
1200*
Open
FEED BACKWAS
PUMP
H
PUMP
TIME
(Min)
Open
Open
OFF
ON
2 to 5
Open
Open
OFF
ON
5 to 15
Please note: The backwash should be done whenever the inlet and outlet pressure of the PFS or ACF is more
than 0.7 bar pressure irrespective of the service time. The backwash should be done till the differential
pressure reduces to regular pressure.