that occurred before after Substantial Completion but before Final Completion was
agreed upon by Lawrence in 2005.
1) A Sprinkler Head Break
2) Miscellaneous Leaks and other Issues
At the Same Time in August 2004 timeframe there were Outstanding Demands for
Direct Payment because certain subcontractors had not been paid by Peabody.
Maroney was one of the Subcontractors that had an outstanding Demand for Direct
Payment.
We dont need the Isensee Affidavit the documents speak for themselves.
ALL CLEAR FROM REGAN ROBBINS ON AUGUST 30, 2004
Before we get into the Issues of the Isensee Affidavit we need to say that if the
judge understands the facts the Items Identified, although repaired by Maroney,
they are unrelated to the issues in 2010.
Lets not get all wrapped up in the TMP Document. The Issues in 2010 are not the
same issues.
TMP Ids the water flowing back under the door in the C-wing.
The missing insulation is on Domestic Water Lines.
The Missing insulation is on the refrigeration line.
There is one location identified in the TMP Document that describes the insulation
on the Dual Temp system. It is clear that Insulation was delivered to Maroney for
the Guilmette School.
What you need to understand is that Maroney was both the Installer and the
Maintenance Company.
The Maroney Invoicing is self-evident even without the Isensee Affidavit.
There are more than 50+/- (put in correct number) Stated Material Facts
that Are in Dispute
The Issue that were identified by TMP were in the same timeframe as the work
being performed by ServPro (See Exhibit # __)