Académique Documents
Professionnel Documents
Culture Documents
Discipline
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
INSPECTIO
N
METHOD
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
VERIFIED
DOCUMENT
SWG
INSPECTION
xx LEVEL x x x
TPI
Approved Procedure
P&R
R/A
R&A
N/A
b.
1. Equipment Receiving
2
1. Foundation / Anchor Bolt
3
a.
Location and Projection
Review
- IDBU-ED-MSPDS-000059
Machinery
Installation and Installation
Design
- IDBU-ED-KSPDS-000001
Specification for Transport,
Rigging & Erection of Equipment
- IDBU-ED-KSPDS-000002
Specification for Onshore
Construction Lift
-IDBC-TX-MPZZZ-NG0012
Erection shcedule reference for
HRSG
- IDBC-TS-KPZZZC03050
Review
Approved Procedure
P&R
R/A
R&A
N/A
P&W1
V&W2
SW
N/A
-IDBC-TX-MDEQL-NG0089
-IDBC-TX-MDEQL-NG0089
Loading
Loading
Data, Pedestal Drawing for HRSG Data, Pedestal Drawing for
HRSG
-IDBC-TX-MDLAY-NG0006
P&W1
V&W2
SW
N/A
Inspect
Inspect
- IDBU-ED-MSPDS-000059
Machinery
Installation and Installation
Design
- IDBU-ED-KSPDS-000001
Specification for Transport,
Rigging & Erection of
Equipment
- IDBU-ED-KSPDS-000002
Specification for Onshore
Construction Lift
-IDBC-TX-MPZZZ-NG0012
Erection shcedule reference
for HRSG
-IDBC-TS-KPZZZ-C03050
-IDBC-TX-MDLAY-NG0006
Loading Data Pedestal Drawing
for Main Boiler and Main Stack
-IDBC-TS-LDLAY-C00001_1
Banyu Urip Central Procesing
Facility Overall Plot Plan
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
Chipping and Padding
INSPECTIO
N
METHOD
Inspect
-IDBC-TX-MDEQL-NG0089
Loading
Data, Pedestal Drawing for HRSG
'-IDBC-TX-MDLAY-NG0006
Loading Data Pedestal Drawing
for Main Boiler and Main Stack
- IDBC-TS-KPZZZ-C01023
Chipping and Padding Work
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
VERIFIED
DOCUMENT
544 0001 2002
M
P
xxx
P&W1
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
INSPECTION
xx LEVEL xxx
V&W2
SW
TPI
N/A
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
1. Installation
4
a.
Alignment and Leveling
b.
c.
1. Grouting
5
INSPECTIO
N
METHOD
Inspect
Inspect
Inspect
Inspect
Inspect
1. Perservation
6
1. Final Inspection
7
a.
Hydrostatic Test
2. Procedure
1
a Piping Fabrication and Erection
-IDBC-TX-MPZZZ-NG0026
Hydrostatic
Procedure
Review
-IDBC-TS-KPZZZ-C02003 Piping
Fabrication Procedure
Review
-IDBC-TX-MDLAY-NG0001 GA of
35
TPH for HRSG
-IDBC-TX-MDZZZ-NG0105
Pressure
-IDBC-TX-MPZZZ-NG0012
Erection
Schedule for Reference for
HRSG
-IDBC-TX-MPZZZ-NG0012
-IDBC-TX-MPZZZ-NG0012
Erection
Erection
Schedule for Reference for HRSG Schedule for Reference for
HRSG
-IDBC-TX-MDEQL-NGOO89
-IDBV-ED-CSPDS-00083
Loading
Specification for Grouting for
Data, Pedestal Drawing for HRSG Machinery
-IDBC-TX-MDLAY-NG0006
Loading
Data, Pedestal Drawing(for Main
Boiler and Main Stack) for HRSG
-IDBC-TX-QPZZZ-NG0064 Rust
-IDBU-ED-QSPDS-000001
Prevention Procedure for HRGS Preservation
& Protection During Shipping
and
-IDBC-TS-KPZZZ-C02010
Execution
Procedure For Piping Erection
-IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-TS-QPQAC-000001
Project
Specific Quality Plan
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
-IDBC-TX-MDLAY-NG0001 GA of
35 TPH
for HRSG
-IDBC-TX-MDZZZ-NG0105
Pressure Part
-IDBC-TX-MPZZZ-NG0012
Erection
Schedule for Reference for HRSG
Inspect
2 Piping
A
R
V
VERIFIED
DOCUMENT
xxx
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
INSPECTION
xxx LEVEL x x x
xxx
P&W1
V&W2
SW
N/A
P&W1
V&W2
SW
N/A
P&W1
V&W2
SW
N/A
P&W1
V&W2
SW
N/A
P&W1
V&W2
SW
N/A
P&W1
W2
R/W2
W2
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
M
P
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
INSPECTIO
N
METHOD IDBU-ED-QSPDS-000006
Upstream Project Quality
Assurance
General
Requirements
Review
IDBU-ED-RSPDS-000022
Upstream
Material Identification and
Traceability
Review
IDBC-TS-KPZZZ-C02001
Execution Procedure For
Qualification test of Welders
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
VERIFIED
DOCUMENT
M
P
xxx
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
INSPECTION
xx LEVEL xxx
TPI
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
IDBC-TS-KPZZZ-C02002
Execution procedure For Site
Welding Qualification test and
Production Test
Review
Review
Review
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-ED-QPQAC-C00002
Quality Audit and Surveillance
Schedule
IDBC-TS-KPZZZ-C03012
Execution
Procedure for PWHT
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
Review
Review
IDBC-TS-KPZZZ-C02011
Execution
Procedure for NDE
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-TS-KPZZZ-C03012
Execution
Procedure for PWHT
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
Hardness Test ( if any)
k Hydrostatic Test
INSPECTIO
N
METHOD
Review
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
Review
IDBC-TS-KPZZZ-C02016
Execution
Procedure For Piping Hydrostatic
Test
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
Comply with Project
Specification and
Procedure
Comply with Project
Specification and
Procedure
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
VERIFIED
DOCUMENT
Approved Procedure
xxx
P&R
INSPECTION
xx LEVEL x x x
R&A
R&A
TPI
N/A
Approved Procedure
P&R
R&A
R&A
N/A
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
2. Material Inspection
2
a Material Receiving
Inspect
IDBC-TS-BPFDP-000001 Field
Material
Management and Warehousing
Plan
P&W1
V&A
N/A
P&W1
V&A
N/A
P&W1
SW
SW
N/A
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
b Equipment Receiving
Inspect
IDBU-ED-QSPDS-000001 Rev 1
Preservation & Protection During
IDBC-TS-BPFDP-000001 Field
Material
Management and Warehousing
Plan
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
2. Field Installation
3
a Spool Identification
IDBU-ED-QSPDS-000001 Rev 1
Preservation & Protection During
Inspect
IDBC-TS-KPZZZ-C02003 Piping
Fabrication Procedure
AFC Drawing
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
INSPECTIO
N
METHOD IDBC-TS-KPZZZ-C02010
Execution
Procedure For Piping Erection
Inspect
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
IDBC-TS-KPZZZ-C02003 Piping
Fabrication Procedure
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
VERIFIED
DOCUMENT
AFC Drawing
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
xxx
INSPECTION
xx LEVEL xxx
TPI
P&W1
SW
SW
N/A
P&W1
R&A
R&A
N/A
P&W1
M/SW
M/SW
N/A
IDBC-TS-KPZZZ-C02010
Execution
Procedure For Piping Erection
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
c Welder List & ID Card
d Welding Process
1 Carbon Steel
2 Stainless Steel
Review
IDBC-TS-KPZZZ-C02001
Execution Procedure For
Qualification test of Welders
Inspect
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-TS-KPZZZ-C02006
Execution
Procedure for Welding
Review
Inspect
Inspect
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-TS-KPZZZ-C02006
Execution
Procedure for Welding
Approved Welder
List
Approved WPS/PQR
P&W1
M/SW
M/SW
N/A
P&W1
M/SW
M/SW
N/A
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
INSPECTIO
N
METHOD IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
VERIFIED
DOCUMENT
546 0001 2003
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
xxx
INSPECTION
xx LEVEL xxx
TPI
e Visual Inspection
Inspect
P&W1
SW
SW
N/A
Inspect
IDBC-TS-KPZZZ-C02003 Piping
Fabrication Procedure
P&W1
R&A
R&A
N/A
P&W1
R&A
V/A
N/A
P&W1
SW
SW
N/A
P&W1
SW
SW
N/A
P&W1
W2
R/W2
W2
IDBC-TS-KPZZZ-C02010
Execution
Procedure For Piping Erection
g NDE Request
2. Final Inspection
4
a.
Hydrostatic Test
Review
Inspect
Review
Inspect
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
IDBC-TS-KPZZZ-C02011
Execution
Procedure for NDE
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBC-TS-KPZZZ-C03012
Execution
Procedure for PWHT
IDBU-CW-LSPDS-000030
Upstream
Process Piping Welding and
Inspection
IDBU-CW-LSPDS-000035 Shop
and Field Fabrication, Handling,
Erection, Inspection Testing and
Cleaning of Process and Utility
Piping
-IDBC-TX-MPZZZ-NG0026
Hydrostatic
Procedure
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
INSPECTIO
N
METHOD
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
M
P
VERIFIED
DOCUMENT
xxx
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
INSPECTION
xx LEVEL xxx
TPI
3 Steel Structure
3. Procedure
1
a.
Welding Procedure Specification /
Procedure
Qualification Record ( WPS/PQR )
Review
b.
Review
c.
Review
d.
Review
e.
Grouting Work
Review
Inspect
3. Material Inspection
2
IDBC-TS-KPZZZ-C02001
Execution Procedure For
Qualification test of Welders
IDBU-ED-RSPDS-000028
Onshore
Structural Welding and
Inspection
IDBC-TS-KPZZZ-C01021 General
Fabrication Work
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
IDBC-TS-KPZZZ-C01022
Execution Procedure General
Structural Erection Work
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
IDBC-TS-KPZZZ-C01023 Chipping
and
Padding Work
IDBC-TS-KPZZZ-C01019
Execution
Procedure for Grouting
Work
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
IDBU-ED-RSPDS-000017 Painting
General Requirements - Onshore
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
Approved Procedure
P&R
R&A
R&A
N/A
P&W1
V&W2
V&SW
N/A
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
a.
DESCRIPTI
ON
WPS/PQR Qualification Test
b.
c.
Dimensional, Welding, NDT and Coating
Inspection
INSPECTIO
N
METHOD
Inspect
Inspect
Inspect
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
Approved WPS/PQR
VERIFIED
DOCUMENT
540 0001 2012
IDBU-ED-RSPDS-000028
Onshore
Structural Welding and
Inspection
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
IDBU-ED-RSPDS-000017 Painting
General Requirements - Onshore
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
xxx
P&W1
INSPECTION
xx LEVEL xxx
R&A
R&A
P&W1
W2
TPI
N/A
W2
N/A
P&W1
W2
SW
N/A
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
3. Installation
4
a.
Chipping and Padding check
INSPECTIO
N
METHOD
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
ACCEPTANCE CRITERIA
VERIFIED
DOCUMENT
M
P
xxx
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
INSPECTION
xxx LEVEL xxx
TPI
Inspect
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
P&W1
SW
SW
N/A
P&W1
W2
SW
N/A
b.
Plumbness check
Inspect
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
c.
Inspect
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
IDBU-ED-RSPDS-000017 Painting
General Requirements - Onshore
P&W1
SW
SW
N/A
d.
Bolt Tightening
Inspect
IDBU-ED-NSPDS-000105
Specification for Steel
Structural Fabrication &
Erection
P&W1
SW
SW
N/A
1. Material Inspection
Inspect
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
P&W1
W2
W2
N/A
2. Mixing proportion
Inspect
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
P&W1
SW
SW
N/A
3. Form-work
Inspect
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
P&W1
SW
SW
N/A
Inspect
IDBU-ED-CSPDS-000082
Specification for Reinforced
Concrete Foundations, Anchor
Bolts and Grout
P&W1
SW
SW
N/A
e.
Grouting Work
Legend
H
: Hold Point
W1 : 100% Witness
W2 : Witness based on RFI
MIGAS/Depnaker
SW : Spot/Random Witness
REFERENCE DOCUMENT
V948500
: CPF
DESCRIPTI
ON
5. Cleaning prior to placing
INSPECTIO
N
METHOD
Inspect
IDBU-ED-CSPDS-000082
Specification
for Reinforced Concrete
Foundations, Anchor Bolts and
Grout
A
R
V
:
:
Document Approval
Document Review
: Document / Data Verification
M
P
:
:
TPI
Monitoring
Perform / Prepare
Third Party Inspection /
VERIFIED
DOCUMENT
547 0001 2019
xxx
P&W1
INSPECTION
xxx LEVEL xxx
SW
SW
TPI
N/A
ACCEPTANCE CRITERIA
Inspect
IDBU-ED-CSPDS-000082
Specification
for Reinforced Concrete
Foundations, Anchor Bolts and
Grout
P&W1
W2
W2
N/A
f.
Inspect
IDBU-ED-NSPDS-000105
Specification
for Steel Structural
Fabrication & Erection
IDBU-ED-RSPDS-000017 Painting
General Requirements - Onshore
P&W1
W2
R&A
N/A
g.
Fire Proofing
Inspect
IDBU-CW-FSPDS-000003
Upstream Fire
Proofing
P&W1
W2
R&A
N/A
PT.XXXXXXXXX
xxxxxxxxxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx