Vous êtes sur la page 1sur 16

SCI ROW 60

Subang City of Industry

Partner for Contact:


Order No.:
Company:
Customer No.:

Date: 27.09.2016
Operator: Beny Indrawan S

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

Table of contents
SCI ROW 60
Project Cover
Table of contents
Luminaire parts list
PHILIPS BGP323 T35 1xECO162-3S/830 DW
Luminaire Data Sheet
ROW 60 SCI
Planning data
Luminaire parts list
Photometric Results
3D Rendering
False Color Rendering
Valuation Fields
Valuation Field Roadway 1
Results overview
Isolines (E)
Greyscale (E)
Observer
Observer 1
Isolines (L)
Observer 2
Isolines (L)
Observer 3
Isolines (L)
Observer 4
Isolines (L)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Page 2

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

SCI ROW 60 / Luminaire parts list


12 Pieces

PHILIPS BGP323 T35 1xECO162-3S/830 DW


Article No.:
Luminous flux (Luminaire): 15824 lm
Luminous flux (Lamps): 17200 lm
Luminaire Wattage: 160.0 W
Luminaire classification according to CIE: 100
CIE flux code: 39 75 97 100 92
Fitting: 1 x ECO162-3S/830 (Correction Factor
1.000).

Page 3

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

PHILIPS BGP323 T35 1xECO162-3S/830 DW / Luminaire Data Sheet


Luminous emittance 1:

Luminaire classification according to CIE: 100


CIE flux code: 39 75 97 100 92

Due to missing symmetry properties, no UGR table


can be displayed for this luminaire.

SpeedStar LEDs ensure a safe


journey home
Municipalities are under pressure
to meet energy conservation goals by reducing their energy consumption
and
carbon footprint while complying with lighting norms and standards
Our SpeedStar LED luminaire
addresses these fundamental issues and provides a solution to reduce the
impact
on our environment. SpeedStar is an energy-efficient luminaire requiring
minimal
maintenance and incorporating the easy-to-upgrade LEDGINE, which can be
connected to lighting regulation systems for further energy savings. This
carbon-neutral luminaire is the ideal solution for functional road and street
lighting

Page 4

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Planning data


Street Profile
Grass Strip 2
Roadway 1

(Width: 3.500 m)
(Width: 15.050 m, Number of lanes: 4, tarmac: R3, q0: 0.070)

Grass Strip 1

(Width: 3.500 m)

Light loss factor: 0.67


Luminaire Arrangements

Luminaire:
Luminous flux (Luminaire):
Luminous flux (Lamps):
Luminaire Wattage:
Arrangement:
Pole Distance:
Mounting Height (1):
Height:
Overhang (2):
Boom Angle (3):
Boom Length (4):

PHILIPS BGP323 T35 1xECO162-3S/830 DW


15824 lm
Maximum luminous intensities
at 70:
668 cd/klm
17200 lm
at 80:
69 cd/klm
160.0 W
at 90:
1.53 cd/klm
Double row, opposing
Any direction forming the specified angle from the downward vertical, with
37.000 m
the luminaire installed for use.
10.921 m
No luminous intensities above 95.
11.000 m
Arrangement complies with luminous intensity class
1.596 m
G3.
5.0
Arrangement complies with glare index class D.4.
2.500 m
Glare Restriction Class (DIN 5044): KB 2

Page 5

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Luminaire parts list


PHILIPS BGP323 T35 1xECO162-3S/830 DW
Article No.:
Luminous flux (Luminaire): 15824 lm
Luminous flux (Lamps): 17200 lm
Luminaire Wattage: 160.0 W
Luminaire classification according to CIE: 100
CIE flux code: 39 75 97 100 92
Fitting: 1 x ECO162-3S/830 (Correction Factor
1.000).

Page 6

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Photometric Results

Light loss factor: 0.67

Scale 1:308

Calculation Field List


1

Valuation Field Roadway 1


Length: 37.000 m, Width: 15.050 m
Grid: 13 x 12 Points
Accompanying Street Elements: Roadway 1.
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200
Selected Lighting Class: MEW2
(All lighting performance requirements are met.)
Calculated values:
Required values according to class:
Fulfilled/Not fulfilled:

Lav [cd/m]
1.57
1.50

U0
0.59
0.40

Ul
0.89
0.60

TI [%]
10
10

SR
0.52
0.50

U0 (wet)
0.22
0.15

Page 7

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / 3D Rendering

Page 8

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / False Color Rendering

Page 9

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Results overview

Light loss factor: 0.67

Scale 1:308

Grid: 13 x 12 Points
Accompanying Street Elements: Roadway 1.
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200
Selected Lighting Class: MEW2
(All lighting performance requirements are met.)
Calculated values:
Required values according to class:
Fulfilled/Not fulfilled:

Lav [cd/m]
1.57
1.50

U0
0.59
0.40

Ul
0.89
0.60

TI [%]
10
10

SR
0.52
0.50

U0 (wet)
0.22
0.15

Assigned observer (4 Pieces):


No.
1
2
3
4

Observer

Position [m]

Observer 1
Observer 2
Observer 3
Observer 4

(-60.000, 1.881, 1.500)


(-60.000, 5.644, 1.500)
(-60.000, 9.406, 1.500)
(-60.000, 13.169, 1.500)

Lav [cd/m]

U0

Ul

TI [%]

U0 (wet)

1.57
1.58
1.58
1.57

0.59
0.65
0.65
0.59

0.95
0.89
0.89
0.95

8
10
10
8

0.22
0.28
0.28
0.22

Page 10

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Isolines (E)

Values in Lux, Scale 1 : 308


Grid: 13 x 12 Points
Eav [lx]
25

Emin [lx]
15

Emax [lx]
38

u0
0.589

Emin / Emax
0.393

Page 11

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Greyscale (E)

Scale 1 : 308
Grid: 13 x 12 Points
Eav [lx]
25

Emin [lx]
15

Emax [lx]
38

u0
0.589

Emin / Emax
0.393

Page 12

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Observer 1 / Isolines (L)

Values in Candela/m, Scale 1 : 308


Grid: 13 x 12 Points
Observer Position: (-60.000 m, 1.881 m, 1.500 m)
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200

Calculated values:
Required values according to class
MEW2:

Lav
[cd/m]
1.57
1.50

U0

Ul

0.59

0.95

0.40

0.60

TI
[%]
8

U0
(wet)
0.22

10

0.15

Fulfilled/Not fulfilled:

Page 13

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Observer 2 / Isolines (L)

Values in Candela/m, Scale 1 : 308


Grid: 13 x 12 Points
Observer Position: (-60.000 m, 5.644 m, 1.500 m)
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200

Calculated values:
Required values according to class
MEW2:

Lav
[cd/m]
1.58
1.50

U0

Ul

0.65

0.89

0.40

0.60

TI
[%]
10

U0
(wet)
0.28

10

0.15

Fulfilled/Not fulfilled:

Page 14

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Observer 3 / Isolines (L)

Values in Candela/m, Scale 1 : 308


Grid: 13 x 12 Points
Observer Position: (-60.000 m, 9.406 m, 1.500 m)
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200

Calculated values:
Required values according to class
MEW2:

Lav
[cd/m]
1.58
1.50

U0

Ul

0.65

0.89

0.40

0.60

TI
[%]
10

U0
(wet)
0.28

10

0.15

Fulfilled/Not fulfilled:

Page 15

SCI ROW 60
27.09.2016

PT. AECOM INDONESIA


Recapital Building, 1st Floor
Jl. Adityawarman Kav. 55 Blok M - Kebayoran Baru, Jakarta Selatan
12160

Operator
Telephone
Fax
e-Mail

Beny Indrawan S
+6285624298165
+62217392001
benyindrawan.saputra@aecom.com

ROW 60 SCI / Valuation Field Roadway 1 / Observer 4 / Isolines (L)

Values in Candela/m, Scale 1 : 308


Grid: 13 x 12 Points
Observer Position: (-60.000 m, 13.169 m, 1.500 m)
tarmac: R3, q0: 0.070, tarmac (wet): W3, q0 (wet): 0.200

Calculated values:
Required values according to class
MEW2:

Lav
[cd/m]
1.57
1.50

U0

Ul

0.59

0.95

0.40

0.60

TI
[%]
8

U0
(wet)
0.22

10

0.15

Fulfilled/Not fulfilled:

Page 16

Vous aimerez peut-être aussi