Datos:
Contrapaso
17 cm
Paso
30 cm
fc=
210 kg/cm2
fy=
4200 kg/cm2
r=
3 cm
L. tramo mayor
4.20 m
S/C
400 kg/m2
Piso terminado=
120 kg/m2
concreto =
2.4 tn/m3
1). PREDIMENSIONAMIENTO
t=
L/20
21.00cm
t=
L/25 =
16.80cm
Tomaremos t=
18.00cm
COS =
0.876
Carga Muerta
P. losa =
1ML*1ML*;*0.18M*2,4T/M3
0.43 tn/m2
0.49 tn/m2
P. pasos =
0.165M*0.3M*/2*1M*4PASOS*2,4TM3
0.24 tn/m2
P. piso terminado =
1ML*1ML*0.12TM2
0.12 tn/m2
CM=
0.85 tn/m2
CV=
0.40 tn/m2
WU=
1.87 tn/m2
Sobrecarga
Carga Amplificada
2.45 m
3.48
1.35 m
DIAGRAMA DE CORTANTES
+
DIAGRAMA DE MOMENTOS
3.23
+
2.3) DISEO
CALCULO DE As
MU=
323143 kg-cm
fy=
4200 kg/cm2
f'c=
210 kg/cm2
b=
100 cm
t=
18.00cm
Recubrimien.
3.00cm
d=
14.37cm
var. Long.=
1.27 cm
Mu
As
0.9 fy (d
a
)
2
primer tanteo
d
5
a=
Mu
0.9 fy ( d
a
)
2
AS= 6.27cm2
As * fy
0.85 * b * f ' c
a=
A sm i n 0.7 0
f 'c
fy
bd
= 3.47cm2
Tomamos el mayor:
Luego As= 6.27cm2
Asmin=
A s m in
4.79cm2
14
bd
=
fy
As * fy
0.85 * b * f ' c
1/2"
tendremos
varillas
23.5cm
2.3.2) AS DE TEMPERATURA =
0,0018bd =
2.59cm2
AS ( )
As ( )
AStemp.
2
usaremos
3/8"
espaciadas a
27.5cm
= 3.14cm2
tendremos
varillas
1ML*1ML*;*0.18M*2,4T/M3
0.43 tn/m2
P. PISO TERMINADO=
1ML*1ML*0.12TM2
0.12 tn/m2
CM=
0.55 tn/m2
CV=
0.40 tn/m2
WU=
1.55 tn/m2
Sobrecarga
Carga Amplificada
1.58 m
1.58 m
2.4381
DIAGRAMA DE CORTANTES
+
1.92000375
+
DIAGRAMA DE MOMENTOS
3.3) DISEO
CALCULO DE As
MU=
192000 kg-cm
fy=
4200 kg/cm2
f'c=
210 kg/cm2
b=
100 cm
t=
18.00cm
var. Long.=
1.27cm
Recubrimien.
3.00cm
d=
14.37 cm
As
Mu
a
0.9 fy(d )
2
As * fy
0.85 * b * f ' c
primer tanteo
d
5
a=
Mu
AS= 3.64cm2
a
0.9 fy ( d
)
2
As * fy
0.85 * b * f ' c
a=
A sm i n 0.7 0
f 'c
fy
bd
= 3.47cm2
26.52cm
SE TOMA EL MENOR DE :
usaremos de
4.79cm2
4.79cm2
SEPARACION
3t
1/2"
A s m in
3t =54.00 cm
26.00cm
14
bd
fy
3.3.1) AS DE TEMPERATURA =
0,0018bd =
2.59cm2
AS ( )
As ( )
AStemp.
2
3/8"
SEPARACION
2.59cm2
0.71cm2
27.46cm
SE TOMA EL MENOR DE :
usaremos de
3t =54.00 cm
3/8"
27.46cm
0.80m
TRAMO 2 :
(DESCANSO)
0.65m
As * fy
0.85 * b * f ' c
45.00cm
3t =54.00 cm
2.87cm
1.48cm
4.79cm2
AS
6.61
1.56
6.29
1.48
6.27
1.48
6.27
1.48
6.27
1.48
As * fy
0.85 * b * f ' c
2.87cm
0.86cm
4.79cm2
AS
3.93
0.92
3.65
0.86
3.65
0.86
3.64
0.86
3.64
0.86
DIAMETRO
3/8"
1/2"
5/8"
AREA (cm2)
0.71
1.27
1.98
3/4"
2.85