Check list for inter UIC audit

Sr No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Check list for inter UIC audit of hei

Team Members:D.C.Toshniwal,Srinivasan kannan


UIC : 5
Name of area: Zinc Colony
Description of work & Name of agency: A type Exterior painting work, M/S Swaroop Const
Description/Observation
Whether proper work permit available
Whether tool box talk conducted & evidence available
Whether JSA done & evidence available
The persons engaged for height work are Certified
The platofrm used is properly decked
Hand rail , mid rail & toe guard available
Whether Proper access to platform( Ladder etc) available
If any opening made in the floor & same is barricaded
Persons are aware of theree point contact & use of hand rail & implementing the same
The safety belt in use are full body harness & with double lanyard
Is the safety belt properly hooked w.r.t to strength & location of anchor point
Is the width to height ration(minimum 1:4) maintained while ercting scaffold
The scaffold is erected on base plate/ Mud sill
Is the scaffolding in plumb & level
The scaffolding material is in good condition
Is the proper tag( Green/ red) provided on scaffold
If mobile scaffold is in use are the wheel movement locked
Is it ensurd that the ladder used with scaffold is proprely secured thorugh clamp etc.

Are persons aware of rescue requirement, escape route emergency phone no, assembly point etc
Any other point related to height work / scaffolding
Are Engineers / supervisors aware about Scaffolding standards and procedures ( if yes ask basic quest
Have Engineers and supervisors gone through the sacffolding training.

work & scaffolding - First Audit

Yes
Yes

No

NA

No
No
Yes
No
No
No
NA
Yes
yes
Yes
Yes
Yes
Yes
Yes
No
NA
NA
Yes
NA
No
Yes

First Audit
date : 08/12/15

Remarks
Tool box talk was not recorded
JSA was conducted but not record was available
person trained but passport not available
Opening was found at deck
toe guard not available.
Ladder was not fixed properly

Tags were not available


Staircase is available

Some persons were unable to answer properly

Check list for inter UIC audit of

Sr No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Check list for inter UIC audit of heig

Team Members:D.C.Toshniwal,Srinivasan kannan


UIC : 5
Name of area: Zinc Colony
Description of work & Name of agency: Eexecutive club Exterior painting work , M/S Swaro
Description/Observation
Whether proper work permit available
Whether tool box talk conducted & evidence available
Whether JSA done & evidence available
The persons engaged for height work are Certified
The platofrm used is properly decked
Hand rail , mid rail & toe guard available
Whether Proper access to platform( Ladder etc) available
If any opening made in the floor & same is barricaded
Persons are aware of theree point contact & use of hand rail & implementing the same
The safety belt in use are full body harness & with double lanyard
Is the safety belt properly hooked w.r.t to strength & location of anchor point
Is the width to height ration(minimum 1:4) maintained while ercting scaffold
The scaffold is erected on base plate/ Mud sill
Is the scaffolding in plumb & level
The scaffolding material is in good condition
Is the proper tag( Green/ red) provided on scaffold
If mobile scaffold is in use are the wheel movement locked
Is it ensurd that the ladder used with scaffold is proprely secured thorugh clamp etc.

Are persons aware of rescue requirement, escape route emergency phone no, assembly point etc
Any other point related to height work / scaffolding
Are Engineers / supervisors aware about Scaffolding standards and procedures ( if yes ask basic quest
Have Engineers and supervisors gone through the sacffolding training.

ork & scaffolding - Second Audit

struction
Yes
Yes
Yes
Yes
Yes
Yes

No

NA

No
Yes
NA
Yes
yes
No
Yes
Yes
Yes
Yes
No
NA
NA
Yes
NA
No
Yes

Second Audit
date :22/12/2015

Remarks

JSA was conducted.


person trained but passport not available
toe guard not available.
Proper staircase are available

Some workers were not using proper anchorage point

Hand made tags only available, standard tags under perparation


Staircase is available

Some persons were unable to answer properly

Check list for inter UIC audit of height work & scaffolding - Second Audit
Team Members:D.C.Toshniwal,Srinivasan kannan
UIC : 5
Name of area: Zinc Colony
Description of work & Name of agency: B type Exterior painting work , M/S Swaroop Construction
Sr No Description/Observation
1
Whether proper work permit available
2
Whether tool box talk conducted & evidence available
3
Whether JSA done & evidence available
4
The persons engaged for height work are Certified
5
The platofrm used is properly decked
6
Hand rail , mid rail & toe guard available
7
Whether Proper access to platform( Ladder etc) available
8
If any opening made in the floor & same is barricaded
9
Persons are aware of three point contact & use of hand rail & implementing the same
10 The safety belt in use are full body harness & with double lanyard
11 Is the safety belt properly hooked w.r.t to strength & location of anchor point
12 Is the width to height ration(minimum 1:4) maintained while ercting scaffold
13 The scaffold is erected on base plate/ Mud sill
14 Is the scaffolding in plumb & level
15 The scaffolding material is in good condition
16 Is the proper tag( Green/ red) provided on scaffold
17 If mobile scaffold is in use are the wheel movement locked
18 Is it ensurd that the ladder used with scaffold is proprely secured thorugh clamp etc.
19
20
21
22

Are persons aware of rescue requirement, escape route emergency phone no, assembly point etc
Any other point related to height work / scaffolding
Are Engineers / supervisors aware about Scaffolding standards and procedures ( if yes ask basic questions)
Have Engineers and supervisors gone through the sacffolding training.

date :14/01/16

Yes
Yes
Yes
Yes
Yes
Yes

No

NA

Remarks

JSA was conducted.


person trained but passport not available
No

mid rail not available.


Proper staircase are available

Yes
NA
Yes
yes
No

Some workers were not using proper anchorage point

Yes
Yes
Yes
Yes
No

Hand made tags only available, standard tags under perparation


NA
NA

Staircase is available

Yes
NA
No
Yes

Painting is not as per 2016 painting code, yellow to be painted


Some persons were unable to answer properly