Project Plan
System Implementation
Anishe
Contents
1.1 Problem Description.......................................................................................................................... 2
Drawbacks of the Manual Restaurant Management....................................................................................3
1.2 Scope outline..................................................................................................................................... 3
2.0 Business Objective................................................................................................................................ 4
2.1 Assumptions and Limitations............................................................................................................. 4
2.2 Deliverables....................................................................................................................................... 5
2.3 Milestones.......................................................................................................................................... 5
2.4 Project Schedule and Budget............................................................................................................ 6
3.0 Organizational Structure...................................................................................................................... 7
3.1 Communication Plan.......................................................................................................................... 7
3.2 Project Accountability......................................................................................................................... 7
3.3 Management Plan.............................................................................................................................. 7
3.4 Monitoring and Control...................................................................................................................... 7
4.0 Risk Management.................................................................................................................................. 8
4.1 Risk Assessment............................................................................................................................... 8
4.2 Risk Control....................................................................................................................................... 8
4.3 Risk Identification............................................................................................................................... 8
4.4 Risk Analysis...................................................................................................................................... 9
4.5 Risk Prioritization............................................................................................................................... 9
5.0 Process Plan / Back up Plan................................................................................................................ 10
5.1 Quality Assurance............................................................................................................................ 10
5.2 Project Review................................................................................................................................. 10
5.3 Issue management.......................................................................................................................... 10
6.0 Conclusion........................................................................................................................................... 11
7.0 References.......................................................................................................................................... 12
Appendix 01 - Project Charter................................................................................................................... 13
Communication Plan.............................................................................................................................. 13
Appendix 02 Gantt chart............................................................................................................................ 14
Appendix 03 Network Diagram.................................................................................................................. 14
Appendix 04 Budget.................................................................................................................................. 15
Appendix 05 Project Status Report......................................................................................................... 16
Appendix 06- Organization Structure......................................................................................................... 18
Project Document
1.0 Introduction
Sri Lankas oldest and most respected, was established in 1942 Chinese dragon caf has
pioneered the Chinese cuisine in Sri Lanka by offering authentic food refined specifically to suit
the local palate. Customers are impressed by the delightfully charming atmosphere in the
restaurant combine with the delicious variety of Chinese cuisine, soups and hot spicy noodles
accompanied with perfect wines. Chinese dragon caf is the first class fine dining Chinese
cuisine restaurant that will get the most pleasurable experience and spend time will surely raise
the value
Operating under the new ownership and the management, its the perfect time the restaurant to
do a upgrade to uplift the service offering to the customers and will focus on three main service
areas quality, time, efficiency of employees and level of service which were found to be
lacking at the present and management has taken immediate steps to overcome this situations
by implementing a new restaurant management system to the business. This is a system which
is covering entire daily operation in the management with the intention of making the restaurant
to a high step by taking the brand closer to the people and what they love.
1.1 Problem Description
Chinese dragon caf is following a manual process in the restaurant operation. All the guest
reservations (guest details), sales details, transactions are recorded in a file and stored in a
different room. Sales transactions, calculation of bills and stock inventory is done manually.
This enables that following system is file or manual based and management or staff need make
more effort to maintain and secure data. They can be easily damaged by fire, insects or natural
disasters. Maintaining files consumes more time of employees and management cannot
guarantee the accuracy level of calculating sales details and bills.
Other main reason of slow service in dragon cafe is the outdated ordering process, where the
stewards have to get down the food orders from the guests and send the bar order ticket (BOT)
and kitchen order ticket (KOT) to Bar, kitchen and cashier. More time will be taken to get down
the food orders to the relevant stations, while this method can also missed or mixed up or lost
the order completely.
The reservations also need to be made making a phone call which is outdated method. All the
data files need to arrange by the year and staff making hard to find specific data within those
files. The front office needs maintain to places for guest reservations and for each and every
customer file is been maintained. For a repeat guest, details are copied the particular file. This
results more time, more files and more physical space. Cost charts or orders needs to be check
manually before prepared the guest bills.
The tablet device has tube proficient of two way communication with a central computer.
Will used to direct food orders to the kitchen, informs of orders, card payment approval
and other required information.
To improve the value level of the operation and the productivity of the business.
Easy access for employees in billing process and increase staff efficiency
All the food orders and the payments that a made during the operation needs to be
recorded to calculate the daily report and monthly sales report.
New restaurant management system will function efficiently without any issues
Finance controller will manage all the expenses according to the agreed budget.
All the employees will read and understand the new system rapidly
Constraints
Two IT persons will be hired for temporary basis to provide training for the management
regarding the new system (Fundamentals, importance and operation process)
Certain staff persons will find difficulty when implementing the new system
Management staff need to attend for new system training including stewards to top
management while doing daily operation
2.2 Deliverables
Operational issues will solved within 10days after implementing the new system to the
caf
Increase the level of positive feedbacks from the customers regarding performance after
implementing the system
2.3 Milestones
The project starts on 20th November 2014 and will be completed February 10th 2015. The
time period for the project would two and half months. Under authority of project
manager, new system implementation project operates under three phases.
Phase one
Feasibility study is done by the project team for the ERP - POS venders on November
20th to November 27th which is 6days of time period.
Receiving proposals from the POS venders and short listing the best four venders by
considering the following factors such as budget, Proactive time schedule, Technology,
user friendliness, efficiency level of POS system, current customer base strength of the
POS vender and fit for the purpose.
Selecting the best vender after all the demonstration are done by the venders. Time
period 28th November to 2nd December (4 days)
Phase Two
The new system implementation and initial data entering from the manual systems is
done on 3rd of December to 18th December (2 weeks)
The new system training is done for the front liners (Manager, supervisor, stewards,
cashier) on ordering process through tablet device including payments and for the back
area persons ( CEO, Accountant, store keeper) data analyzing, forecasting, ledger
transactions, inventory handling and advanced functions related to the system - time
period 19th December to January 20th (4 weeks)
gathering the system issues faced by the all staff during the training period and make
arrangement to solve the issues 27th December to January 20th (3 weeks)
Phase Three
Internal and external meetings with the management and the vender regarding the
performance and efficiency level of the new system before the live experience. January
21st to January 23rd ( 2 days)
Run the system in the daily operation (Live) and gather feedbacks from the customers
about the level of service to analyze further developments and changes needs to be
done for the processes related to the system implementation. Completing the project
-January 24th to February 10th (2 weeks)
Entire project is observed by the project manager and support the other one executives
during the project
Follow up work is done by executives and once the each tack is complete its been
confirm to the project manager.
Every Wednesday and Saturday discussions are made to discuss the progress of the
project, issues faced by the team as well as the management of the restaurant and what
needs to be done to prevent those issues and accomplish the targets,
All the expenses and cost related issues are monitored by the finance controller
Temporary hired IT persons will carry out the necessary training to the dragon cafe
management regarding the new system (method of using)
Client Risks - User find difficulty of using the new system due to subject matter or
strange (unknown) to the system
Organizational risks - issues rises in the management due the poor communication plan
Evaluation Risk the expenses will exceed when implementing the system compared to
the approved budget of the project.
Probability (High/Medium/Low)
Effects
Technological Risk
Medium
System Malfunction
Client Risk
Low
Organizational Risk
Low
Evaluation Risk
Medium
Tools Risk
Medium
6.0 Conclusion
The main intention of the project is to upgrade the standards (quality, efficiency, time) of the
restaurant operation by implementing new system to the environment. The project is done after
the result of discussions done by the management of the restaurant.
10
Compare with the financial statement, system implementation appears to be more profitable
project new system implementation will help to achieve the business objectives and taking the
operation to high level.
7.0 References
(http://www.chinesedragoncafe.com/)
(http://www.ijarcsse.com/docs/papers/Volume_3/2_February2013/V3I2-0232.pdf)
11
(http://www.ncr.com/hospitality/restaurant-solutions)
12
Project Title
Anishe Perera
Project Manager
Chathura Fernando
Project Executive
Sheehan Rajapaksha
Financial Controller
Communication
Plan
The communication is done via emails, daily, weekly meetings and phone calls regarding the all
project information within the restaurant management.
Information
Method
Information
Frequency
Participants
Project data
Meeting
Documentation
and reports
Every Friday
Milestone meeting
E-Mail/Meetings
Progress of the
project
Before
milestone
Project issues
Level of success
Once in
weeks
Final Project
Meeting
Covering
experiences
End of project
13
two
14
Appendix 04 Budget
Hardware Requirements
Quantity
Amount (LKR)
Server
01
150,000
Computer
04
180,000
Tablets
08
150,000
02
8,000
Wi-Fi Router
01
5,000
493,000
15
1,173,000
16
Contribution
Reporting
Period
17
Duration of
project
CEO
Restaurant Manager
Accountant
Executive Chef
Store Keeper
Store Assistant
Supervisor 01
Supervisor 2
Demi Chef
Steward
Steward
1 st commis
Steward
Steward
2 nd comimis
Steward
Steward
Cook
Cook