Académique Documents
Professionnel Documents
Culture Documents
Executive Summary
A. Title of Project
CONSTRUCTION OF TWO STUDY SHED IN THE BOTANICAL GARDEN
B. Location
Botanical Garden (Engineering and Technology Department)
D. Priority Issue
The priority of this project is to ensure that students have a safe, convenient and comfortable
place to study.
E. Objectives
1. To provide a comfortable and convenient place to study.
A. Project Location
St. Anthony's College (Engineering and Technology Department)
B. Structures
1. The study shed is made of concrete materials and angle bars for the roofing. The shed has a
circular area of 50.27 sq.ft.
2. It can occupy 10 students per shed.
B. Organizational Structure
Project Manager:
Marco Alfeche
V. Financial Aspect
A. Itemized Budget (Cost)
MATERIALS
QUANTITY
COST
Cement
50 Bags/ P250
Php 13,750
24 cu.m/ P950
Php 22,800
RSB 12mm
20 Pcs./ P162
Php 3,240
RSB 10mm
20 Pcs./ P105
Php 2,100
RSB 8mm
30 Pcs./ P80
Hollow Blocks
Joyje Mae D. Esteban
Tying Wire
300 Pcs.
3 Kilos/ P65
Php 2,700
Celine V. Juanico
Php 195
20 Pcs.
Php 4,200
4 Pcs./ P800
Php 3,200
Coco Lumber(2210)
15 Pcs./ P90
Php 1,350
Common Nails(4")
3 Kilos/ P60
Php 180
Common Nails(2")
3 Kilos/ P60
Php 180
40 Pcs./ P300
Php 12,000
Welding Rod
4 Kilos/ P100
Php 400
Cutting Disc
6 Pcs./
P45Engineer:
Project
Php 270
Teaks Crew
200
Pcs. Percival Riego
ENGR.
Php 200
Ridge Roll
10 Pcs./ P150
Php 1,500
Paint
1 Gallon
Field Coordinator:
Project Leader:
Paint Brush(4")
Juan Carlos V. Pelingon
TOTAL COST:
B. Source of Financing
2 Pcs./ P40
Php 2,400
Field Coordinator:
Php 560
Project Consultant:
Php 80
Shara Mae D. Medes
Php 71,305
CES Funds
4.
Cyberian Funds