Current SSIP Status

Entity Name

On Demand Identifier

Entity Status

AKRON CSD

$1,255,318.00

$252,328.00

Akron SSIP #2 - Devices

Approved

AKRON CSD

$1,255,318.00

$144,018.00

Wireless Infrastructure

Approved

ALBANY CITY SD

$7,946,807.00

$2,400,618.00

Phase One 2016-2017

Approved

ALTMAR-PARISH-WILLIAMSTOWN CSD

$2,067,182.00

$1,592,032.00

APW SSIP 1

Expenditure Review

AMAGANSETT UFSD
AMSTERDAM CITY SD
ARDSLEY UFSD

SSBA Allocation

Total Budgeted

$31,800.00

$31,800.00

$3,170,930.00

$2,932,279.00

Smart 1

Approved

GASD SMART 1

Expenditure Review

$577,595.00

$511,650.00

Final Plan-Fifth Submission Revised 4-7

Approved

$5,218,541.00

$4,576,250.00

ACSDSSIP#1

Expenditure Review

AUBURN CITY SD

$3,526,117.00

$3,526,117.00

050100010000V1

Expenditure Review

AUSABLE VALLEY CSD

$1,296,170.00

$614,042.00

AVCS1

Expenditure Review

AVERILL PARK CSD

$2,160,806.00

$1,205,127.00

$836,086.00

$239,481.00

ARLINGTON CSD

BABYLON UFSD
BARKER CSD

$596,160.00

$119,700.00

$1,826,167.00

$1,615,281.00

BEAVER RIVER CSD

$876,507.00

BEDFORD CSD

$624,371.00

BELLEVILLE-HENDERSON CSD

Averill Park CSD 121615

Approved

Babylon-Project 1-Wireless

Expenditure Review

Approved

57030206000

Review Board

$875,448.00

BRCSD1

Expenditure Review

$620,202.00

03-2016

Approved

$378,728.00

$378,728.00

FINAL PLAN

Expenditure Review

$2,195,440.00

$2,058,269.00

Bellmore-Merrick CHSD SSIP Plan

Approved

$37,842.00

$37,842.00

BUFSD Amended submission 1

Expenditure Review

$1,128,764.00

$412,032.00

BethpageSchools091515

Approved

$195,893.00

$195,800.00

blindbrook

Approved

$1,607,265.00

$1,426,847.00

School Connectivity & Classroom Technology

Expenditure Review

BRIARCLIFF MANOR UFSD

$326,239.00

$326,239.00

BriarcliffPlan.a

Review Board

BRONXVILLE UFSD

$172,631.00

$172,631.00

201601BXV

SSBA Initial Review

BATH CSD

BELLMORE-MERRICK CENTRAL HS DISTRICT


BERKSHIRE UFSD
BETHPAGE UFSD
BLIND BROOK-RYE UFSD
BREWSTER CSD

BURNT HILLS-BALLSTON LAKE CSD

$1,900,404.00

$617,798.00

SSIP BHBL 1-16

Expenditure Review

BYRAM HILLS CSD

$333,850.00

$333,850.00

Byram 2016 SSBA App

SSBA Initial Review

CALEDONIA-MUMFORD CSD

$837,412.00

$793,252.00

March 29

Approved

CAMBRIDGE CSD

$914,980.00

$914,980.00

SSIP1

Expenditure Review

CAMDEN CSD

$2,834,336.00

$375,624.00

Expenditure Review

CAMPBELL-SAVONA CSD

$1,268,792.00

$919,826.00

Expenditure Review

CANANDAIGUA CITY SD

$2,256,756.00

$2,200,296.00

07-28-16

Expenditure Review

$424,135.00

$374,275.00

$2,434,123.00

$1,305,933.00

CARLE PLACE UFSD


CARMEL CSD
CAZENOVIA CSD
CENTER MORICHES UFSD
CHAPPAQUA CSD
CHAZY UFSD

$813,516.00

$316,650.00

$1,034,558.00

$1,034,558.00

$686,946.00

Greenberg1

Approved

CCSD 1

Expenditure Review

Caz First Submission (Revised)

Expenditure Review

rsoto123

Review Board

$500,306.00

Chappaqua5-12-16

Expenditure Review

$378,806.00

$100,000.00

Chazy SSIP #1

SSBA Initial Review

CHENANGO FORKS CSD

$1,662,216.00

$1,662,216.00

04/14/2016

Review Board

CHENANGO VALLEY CSD

$1,295,686.00

$1,295,686.00

Fall2015SSIP1

Approved

$618,522.00

$618,522.00

CVS Smart Schools investment

Expenditure Review

CHERRY VALLEY-SPRINGFIELD CSD


CHESTER UFSD

$565,011.00

$565,011.00

091815_Chester_UFSD

Program Area Review

CHITTENANGO CSD

$1,653,971.00

$997,864.00

1732Fyler

Expenditure Review

CHURCHVILLE-CHILI CSD

$3,099,982.00

$1,994,498.00

2016 Submission

Approved

$871,926.00

$820,728.00

Preliminary SSIP

Approved

CLARENCE CSD

$1,965,009.00

$1,964,925.00

CCSDSSIP1

Approved

CLARKSTOWN CSD

$2,806,902.00

$2,806,902.00

CCSDDRAFT1

Approved

CLIFTON-FINE CSD

$428,090.00

$424,032.00

510401040000

Expenditure Review

$1,181,056.00

$1,181,056.00

Final

Expenditure Review

$306,709.00

$306,709.00

COMMACK UFSD

$3,504,794.00

$2,208,844.00

CONNETQUOT CSD

$4,206,087.00

CORNING CITY SD

$3,812,892.00

CORNWALL CSD

CINCINNATUS CSD

CLYDE-SAVANNAH CSD
COLD SPRING HARBOR CSD

CROTON-HARMON UFSD

CSH WiFi and Switching

Approved

SSIP #1 FINAL

Expenditure Review

$1,213,034.00

June 2016

Expenditure Review

$3,652,854.00

Final Submission

Approved

$1,579,027.00

$1,178,376.00

44-03-01-06-7-999-003

Expenditure Review
Expenditure Review

$346,133.00

$346,118.00

Croton-Harmon2

DANSVILLE CSD

$1,803,760.00

$115,638.00

SSIP - #1 Submission - Doc Cams / Primary

Approved

DANSVILLE CSD

$1,803,760.00

$284,069.00

Second Submission

Expenditure Review

DEER PARK UFSD

$2,636,151.00

$61,976.00

DP SSBA 2.1.16

Expenditure Review

DEPEW UFSD

$1,622,349.00

$1,347,704.00

DepewSSIP1

Approved

DERUYTER CSD

$539,745.00

$29,431.00

DCS Chromebook Pilot

Approved

DERUYTER CSD

$539,745.00

$56,230.00

Security Upgrades

Approved

DOVER UFSD

$1,036,956.00

$700,000.00

Dover Submission #2

Expenditure Review

DRYDEN CSD

$1,679,854.00

$1,677,454.00

DUANESBURG CSD

$661,917.00

$590,918.00

First Submission

Review Board

02

SSBA Initial Review

DUNDEE CSD

$888,015.00

EAST BLOOMFIELD CSD

$802,089.00

$888,015.00

DCS #1

Approved

$451,192.00

Feb2016

EAST GREENBUSH CSD

Approved

$2,312,974.00

$210,088.00

490301060000

Expenditure Review

EAST GREENBUSH CSD

$2,312,974.00

$377,202.00

490301060000-1

SSBA Initial Review

EAST ISLIP UFSD

$3,332,894.00

$828,194.00

Spring 2016

Expenditure Review

EAST MORICHES UFSD

$558,853.00

$277,623.00

East Moriches Smart Schools 2016

Approved

EAST SYRACUSE MINOA CSD

$2,298,247.00

$800,000.00

SSIP #2

Expenditure Review

EAST SYRACUSE MINOA CSD

$2,298,247.00

$627,500.00

Spending Plan #1 (November 2015)

Approved

EDGEMONT UFSD

$302,038.00

$302,038.00

EdgemontSSIP1

Expenditure Review

EDWARDS-KNOX CSD

$906,104.00

$315,000.00

NKK6M-4JVTJ

Review Board

10/06/2016

Current SSIP Status


Entity Name

On Demand Identifier

Entity Status

ELDRED CSD

$499,431.00

$499,431.00

Eldred CSD 2

Approved

ELLICOTTVILLE CSD

$343,647.00

$200,000.00

SSIP Classroom Technology Plan

Approved

ELLICOTTVILLE CSD

$343,647.00

$113,223.00

SSIP Security Plan

Review Board

$7,090,526.00

$5,951,633.00

$936,641.00

$936,641.00

ELMONT UFSD

$2,267,378.00

ELWOOD UFSD

$1,178,161.00

EVANS-BRANT CSD (LAKE SHORE)


FAYETTEVILLE-MANLIUS CSD

ELMIRA CITY SD

SSBA Allocation

Total Budgeted

2016-03-02

Approved

Third Submission

Expenditure Review

$386,928.00

Third Draft

Review Board

$460,591.00

Security Plan

Approved

$2,715,167.00

$345,804.00

Evans-Brant Proposal 1 - February 2016

Approved

$1,727,955.00

$1,727,955.00

Instructional Technology Plan

Approved

$933,511.00

$544,000.00

Fillmore Central School SSIP

Expenditure Review

FONDA-FULTONVILLE CSD

$1,397,813.00

$1,170,178.00

Expenditure Review

FREEPORT UFSD

$5,944,521.00

$5,940,000.00

Freeport SSIP Submission 1

Expenditure Review

FULTON CITY SD

$3,971,619.00

$531,435.00

01132016

Approved

GALWAY CSD

$759,384.00

$733,174.00

April 2016 SSBAIP

Approved

GARDEN CITY UFSD

$561,721.00

$326,005.00

GCFirewall2016

Expenditure Review

GATES-CHILI CSD

$2,980,556.00

$2,980,550.00

Gates Chili November 2015

Approved

GENERAL BROWN CSD

$1,256,750.00

$1,251,906.00

SSIP 5-20-16

Expenditure Review

ELMIRA HEIGHTS CSD

FILLMORE CSD

$251,500.00 Phase One - Desktop Replacements, Chromebooks, iPads, and Upgraded


Security Camera System

GENESEO CSD

$626,846.00

GERMANTOWN CSD

$425,755.00

$96,753.00

SMART 2015

Review Board

GILBERTSVILLE-MOUNT UPTON CSD

$548,407.00

$548,407.00

GMU-CSD-2015-16

Approved

GLENS FALLS CITY SD

$1,604,375.00

$526,786.00

Submission 1

Approved

GORHAM-MIDDLESEX CSD (MARCUS WHITMAN

$1,300,467.00

$131,276.00

April 2016

Expenditure Review

GOUVERNEUR CSD

$2,291,848.00

$1,728,500.00

GSCD Submission 1

Expenditure Review

GRANVILLE CSD

$1,431,659.00

$35,140.00

Phase 2 Fibre Connection

SSBA Initial Review

GRANVILLE CSD

$1,431,659.00

$492,167.00

Phases 1 & 2

SSBA Initial Review

$851,730.00

$851,715.00

GNPS SSIP #1: 12/9/15

Approved

$79,785.00

$79,544.00

66-04-11-02-7-999-BA1

Expenditure Review

2016SmartSchools

Expenditure Review

GREAT NECK UFSD


GREENBURGH ELEVEN UFSD
GREENBURGH-GRAHAM UFSD

$94,806.00

$94,806.00

$1,058,561.00

$1,058,561.00

HADLEY-LUZERNE CSD

$742,502.00

HALDANE CSD

GREENVILLE CSD

Expenditure Review

SSIP_1

SSBA Initial Review

$648,728.00

hlcs

Expenditure Review

$248,055.00

$248,055.00

Haldane SSIP 2016 Sept 2016 resubmission

Expenditure Review

$86,845.00

$86,845.00

HALLEN SSIP

Expenditure Review

$325,979.00

$27,491.00

Smart Schools 1

SSBA Initial Review

$1,322,218.00

$452,422.00

Smart Investment Plan 1

Expenditure Review

HARRISON CSD

$430,913.00

$430,913.00

Harrison-1

Review Board

HARTFORD CSD

$591,447.00

$180,792.00

SmartSchool1

Expenditure Review

HASTINGS-ON-HUDSON UFSD

$449,874.00

$449,874.00

February1SSB

Approved

HAWTHORNE-CEDAR KNOLLS UFSD

$113,051.00

$113,051.00

001

Expenditure Review

HALLEN SCHOOL
HAMMOND CSD
HARBORFIELDS CSD

HENDRICK HUDSON CSD

$569,117.00

$569,117.00

Hendrick Hudson SSIP

Review Board

HERKIMER CSD

$953,082.00

$339,500.00

Smart Schools (1.0)

SSBA Initial Review

HEUVELTON CSD

$754,611.00

$46,744.00

$2,995,226.00

$2,540,056.00

Pilot Purchase BOE 12.16.15

Approved

HCSD Smart Schools Investment Plan

$686,346.00

$404,812.00

Approved

feb2016

HORSEHEADS CSD

$2,929,862.00

Approved

$2,929,862.00

Final Submission 3-23-16

HUDSON FALLS CSD

Approved

$2,189,224.00

$2,189,224.00

HFCSD SSIP v.1

Approved

HUNTINGTON UFSD

$1,407,121.00

$447,104.00

SSIP-2016-V1

Expenditure Review

IROQUOIS CSD

HILTON CSD
HONEOYE CSD

$1,305,424.00

$1,305,424.00

Irqouois CSD #2

Expenditure Review

IRVINGTON UFSD

$277,051.00

$185,845.00

20160919

SSBA Initial Review

ISLAND PARK UFSD

$236,888.00

$236,888.00

IslandParkUFSD1

Approved

ISLAND TREES UFSD

$1,536,993.00

$1,536,993.00

Infrastructure-Work-11-02-15

Approved

ITHACA CITY SD

$2,561,479.00

$2,089,607.00

Final Phase 1

Expenditure Review

JEFFERSON CSD

$284,092.00

$231,593.00

selmersax4821

Expenditure Review

$1,387,107.00

$870,019.00

JECSD SSIP v1

Expenditure Review

KATONAH-LEWISBORO UFSD

$707,779.00

$707,629.00

KLSDSSIP-1

Approved

KENDALL CSD

$967,959.00

$544,838.00

January 2016- 1st

Review Board

First Submission

Approved

KPCSD_2016

Expenditure Review

JORDAN-ELBRIDGE CSD

KINDERHOOK CSD

$1,309,134.00

$689,678.00

KINGS PARK CSD

$1,454,202.00

$1,454,202.00

$857,397.00

$556,670.00

08/18/2015

Approved

$57,292.00

$57,292.00

Submission1

Approved

LAKELAND CSD

$3,648,705.00

$3,648,139.00

Lakeland-Phase1-081915

Approved

LANCASTER CSD

$2,982,935.00

$2,982,935.00

Lancaster First Submission

Approved

LANSINGBURGH CSD

$2,263,155.00

$2,263,155.00

TES UPK Addition

SSBA Initial Review

SSBA Submission 2

Approved

LAFAYETTE CSD
LAKE PLEASANT CSD

LAURENS CSD

$489,555.00

$480,720.00

LEVITTOWN UFSD

$4,969,070.00

$1,384,922.00

LEWISTON-PORTER CSD

$1,354,745.00

$628,768.00

LINDENHURST UFSD

$5,047,538.00

LITTLE FALLS CITY SD

$1,059,936.00

LIVERPOOL CSD

$5,345,676.00

$2,346,402.00

SSIP1

Approved

LIVERPOOL CSD

$5,345,676.00

$1,417,495.00

Tech Plan II

Expenditure Review

LIVONIA CSD

$1,299,812.00

$1,246,700.00

Preliminary

Approved

LONG BEACH CITY SD

$1,997,095.00

$1,747,097.00

Long Beach Submission 4-4-16

Review Board

LONG LAKE CSD


LONGWOOD CSD

10/06/2016

First submission

Approved

First Attempt

Expenditure Review

$265,918.00

First Submission 2016

Review Board

$587,346.00

LFCSD 2nd Submission

Review Board

$50,879.00

$50,674.00

$7,772,337.00

$2,894,757.00

Long Lake SISP-1

Approved

Longwood SSIP

Expenditure Review

Current SSIP Status


Entity Name

SSBA Allocation

Total Budgeted

On Demand Identifier

Entity Status

LYNCOURT UFSD

$277,464.00

$40,350.00

Lyncourt 2015-16

Approved

LYNDONVILLE CSD

$733,151.00

$165,000.00

March 10 2016 - smartboards

Approved

MADISON CSD

$498,604.00

$175,000.00

1-27-16 part a

Approved

MADISON CSD

$498,604.00

$63,000.00

1-27-16 part b

Approved

MADRID-WADDINGTON CSD

$829,943.00

$360,000.00

MWCSNov2015

Approved

MAHOPAC CSD

$3,181,109.00

$186,538.00

SSIP2016001

Approved

MAHOPAC CSD

$3,181,109.00

$673,061.00

SSIP2016002

Approved

MAINE-ENDWELL CSD

$1,877,858.00

$659,100.00

Summer 2016

Expenditure Review

MALONE CSD

$2,822,926.00

$420,953.00

MALONE - Submission 1

Expenditure Review

MAMARONECK UFSD

$536,892.00

$536,892.00

RS1

Approved

MANHASSET UFSD

$432,581.00

$146,007.00

Feb2316

Approved

MARATHON CSD

$1,012,784.00

$270,622.00

SubmitFeb2016b

Approved

MARCELLUS CSD

$1,121,225.00

$163,574.00

Spring 2016 - Chromebooks

Approved

MARION CSD

$1,038,923.00

$776,838.00

Marion CSD - SSBA Investment Plan

Approved

MARLBORO CSD

$1,076,410.00

$1,075,960.00

SSIP_Alpha

SSBA Initial Review

MASSAPEQUA UFSD

$2,650,127.00

$2,085,677.00

MASSENA CSD

$2,415,023.00

$738,200.00

$273,511.00

$265,790.00

MUFSD1

Review Board

$8,318,342.00

$219,627.00

Initial Fiber

SSBA Initial Review

$499,549.00

$145,838.00

Milford SSIP Submission #1

Approved

$1,892,970.00

$1,892,673.00

2016A

Review Board

MATTITUCK-CUTCHOGUE UFSD
MIDDLE COUNTRY CSD
MILFORD CSD
MILLER PLACE UFSD
MINEOLA UFSD

SSIP (1)

Approved

Massena CSD SSIPv1

SSBA Initial Review

$576,879.00

$576,879.00

001

Expenditure Review

MONROE-WOODBURY CSD

$4,494,641.00

$4,494,641.00

MWCSD-SSID-1

Expenditure Review

MORAVIA CSD

$1,081,921.00

$1,081,921.00

Moravia Final SSIP

SSBA Initial Review

MORIAH CSD

$931,051.00

$317,000.00

Expenditure Review

MORIAH CSD

$931,051.00

$372,000.00

SSBA Initial Review

MORRISTOWN CSD

$469,501.00

$84,393.00

Morr92716SSIP

SSBA Initial Review

MT MORRIS CSD

$654,585.00

$276,229.00

MM SMART #1

Expenditure Review

MT PLEASANT-BLYTHEDALE UFSD

$32,314.00

$32,314.00

MT SINAI UFSD

$1,618,336.00

$1,617,432.00

NANUET UFSD

$670,759.00

$338,469.00

Nanuet93-01

Review Board

NAPLES CSD

$616,762.00

$383,600.00

Naples CSD SSIP

Expenditure Review

NEW HARTFORD CSD

$1,167,221.00

$1,051,155.00

NH_SSIP_7_16

Expenditure Review

NEW ROCHELLE CITY SD

$3,527,277.00

$3,426,511.00

1082015

Approved

NEWBURGH CITY SD

$12,831,056.00

$1,934,350.00

Network Refresh

SSBA Initial Review

NEWBURGH CITY SD

$12,831,056.00

$537,300.00

Network Refresh-NFA Main

SSBA Initial Review

$933,590.00

$642,277.00

NCSDssippV1

Expenditure Review

NIAGARA FALLS CITY SD

$8,865,240.00

$5,481,086.00

NFCSD 1

Approved

NORTH BELLMORE UFSD

$1,289,890.00

$1,019,435.00

step1

SSBA Initial Review

NORTH COLONIE CSD

$1,838,380.00

$865,841.00

NorthColonieJune2016-01

Expenditure Review

NORTH SYRACUSE CSD

$6,256,194.00

$1,759,923.00

100-Device

Approved

NORTH SYRACUSE CSD

$6,256,194.00

$2,640,500.00

101-Wireless

Approved

$297,646.00

$151,926.00

SchoolConnectivity1

Expenditure Review

NEWFIELD CSD

NORTH WARREN CSD


NY MILLS UFSD

482016

Approved

Mount Sinai 201608

SSBA Initial Review

$379,261.00

$141,860.00

Application 1

SSBA Initial Review

$1,147,390.00

$664,680.00

Submission-1

Approved

$893,825.00

$893,825.00

OMCSD2016

Approved

OPPENHEIM-EPHRATAH-ST. JOHNSVILLE CS

$1,194,883.00

$344,987.00

David Halloran 41

Expenditure Review

ORCHARD PARK CSD

$2,333,018.00

$684,133.00

OPSSIP-July2016

SSBA Initial Review

$659,180.00

$387,750.00

INNOVATION and MAKER

Review Board

OSSINING UFSD

$1,486,507.00

$1,486,507.00

ossining

SSBA Initial Review

OXFORD ACADEMY & CSD

$1,089,409.00

$1,072,279.00

version1

Approved

PATCHOGUE-MEDFORD UFSD

$6,047,604.00

$2,040,742.00

First Submission - Revised 6/2/16 - Response to Notes

Approved

$616,065.00

$616,065.00

SBA_V1

Expenditure Review

Pearl River UFSD 9-2015

Expenditure Review

Peekssip

Expenditure Review

OAKFIELD-ALABAMA CSD
ODESSA-MONTOUR CSD

ORISKANY CSD

PAWLING CSD
PEARL RIVER UFSD

$876,023.00

$876,023.00

PEEKSKILL CITY SD

$3,202,505.00

$2,718,298.00

PENN YAN CSD

$1,275,268.00

$351,456.00

PY Submission 2015-16

Approved

$913,171.00

$586,376.00

Submission 2

Expenditure Review

PERU CSD

$2,129,269.00

$1,263,996.00

Peru June 2016

Expenditure Review

PINE BUSH CSD

$5,050,017.00

$999,532.00

SS Phase 1

Expenditure Review

$690,008.00

$690,008.00

MG 7-5-16

Expenditure Review

$1,637,283.00

$1,637,283.00

POBCSD-SSIP-1

SSBA Initial Review

PLEASANTVILLE UFSD

$432,564.00

$432,564.00

PUFSD12

Approved

POCANTICO HILLS CSD

$101,145.00

$101,144.00

PCSD012016

Review Board

PERRY CSD

PINE PLAINS CSD


PLAINVIEW-OLD BETHPAGE CSD

PORT CHESTER-RYE UFSD

$1,736,663.00

$304,686.00

POTSDAM CSD

$1,315,137.00

$1,105,435.00

Feb162016

Review Board

Potsdam-SSBA-Investment-1

Expenditure Review

PULASKI CSD

$1,209,470.00
$915,998.00

$480,000.00

2016 Phase I

Expenditure Review

$595,151.00

PVCSD 8-8-16 001

Expenditure Review

$20,613.00

$20,613.00

082216

SSBA Initial Review

QUEENSBURY UFSD

$1,921,304.00

$547,675.00

SSIP Feb 2016

Approved

RAMAPO CSD (SUFFERN)

$1,646,123.00

$871,369.00

Ramapo CSD SSBA Project 16-17

Approved

$982,876.00

$860,353.00

RCSD 2015-16

Expenditure Review

$540,794.00

$20,620.00

SSIP #1 Chromebooks (July 2016)

Review Board

$47,234,577.00

$38,734,577.00

RCSD1

Expenditure Review

PUTNAM VALLEY CSD


QSAC

RENSSELAER CITY SD
RIPLEY CSD
ROCHESTER CITY SD

10/06/2016

Current SSIP Status


Entity Name
ROME CITY SD
ROMULUS CSD

SSBA Allocation
$6,016,740.00

Total Budgeted
$5,466,553.00

$484,398.00

$96,548.00

RONDOUT VALLEY CSD

$2,004,951.00

$1,400,000.00

ROOSEVELT UFSD

$4,305,702.00

$932,084.00

ROTTERDAM-MOHONASEN CSD

$1,737,958.00

$1,368,000.00

ROYALTON-HARTLAND CSD

$1,197,557.00

$179,550.00

RUSH-HENRIETTA CSD

$2,944,081.00

$2,944,081.00

RYE NECK UFSD

$174,995.00

SACKETS HARBOR CSD

On Demand Identifier

Entity Status

RCSD Phase 1

Expenditure Review

Replacement of RCS Network Switches and Core 01-2016

Expenditure Review

Technology Infrastructure

SSBA Initial Review

Phase1.01

Expenditure Review

1mohon

Approved

Approved

original submission

Approved

$174,995.00

2015 Smart School Investment Plan

Approved

$318,862.00

$39,394.00

SHCSD 15-16

Approved

SARATOGA SPRINGS CITY SD

$2,738,126.00

$2,738,126.00

6/27/2016

Expenditure Review

SAUQUOIT VALLEY CSD

$1,057,495.00

$285,895.00

20160517

Expenditure Review

SCHALMONT CSD

$1,058,978.00

$468,214.00

2016 Projects

Review Board

SCHENEVUS CSD

$429,031.00

$222,000.00

Smart Investment Plan 1

Approved

SCHODACK CSD

$673,090.00

$573,015.00

Schodack 1

Program Area Review

SCHOHARIE CSD

$942,067.00

$942,067.00

SchCen04212016

Review Board

SCHROON LAKE CSD

$101,915.00

$100,609.00

Approved

$1,152,629.00

$325,700.00

Aug 2016 SSIP

Expenditure Review

SENECA FALLS CSD


SHARON SPRINGS CSD

$448,289.00

$448,000.00

SSIP-0001

Approved

SHARON SPRINGS CSD

$448,289.00

($80,081.00)

SSIP-0001 - Amendment 1

Review Board

SI SCHOOL APP 1

Review Board

SHELTER ISLAND UFSD

$57,876.00

$57,876.00

SHERRILL CITY SD

$1,706,827.00

$1,706,067.00

vvssmart1

Review Board

SIDNEY CSD

$1,379,095.00

$1,092,000.00

2016-1

Expenditure Review

$534,585.00

$534,575.00

Skan SSIP 1

Review Board

$1,132,813.00

$322,700.00

2015-16 Wireless and Network Upgrade

Expenditure Review

SKANEATELES CSD
SOLVAY UFSD
SOMERS CSD

$713,823.00

$712,751.00

040216-FINAL

Approved

SOUTH COUNTRY CSD

$4,480,887.00

$3,613,250.00

Submission #1

Approved

SOUTH GLENS FALLS CSD

$2,230,126.00

$1,802,492.00

Final App 2016

Approved

SOUTH HUNTINGTON UFSD

$2,900,702.00

$300,907.00

South Huntington 1

Approved

SOUTH LEWIS CSD

$1,308,299.00

$931,441.00

Preliminary

Approved

SOUTH SENECA CSD

$1,019,853.00

$616,228.00

Version1

SSBA Initial Review

SOUTHAMPTON UFSD

$236,674.00

$124,340.00

Southampton-PhaseOne

Expenditure Review

SOUTHERN CAYUGA CSD

$795,165.00

$216,623.00

Smart School Investment Plan 1

Approved

SPACKENKILL UFSD

$752,800.00

$123,003.00

2015 First Submission - Chromebooks

Approved

SPACKENKILL UFSD

$752,800.00

$110,894.00

2nd Submission - Chromebooks (HS 2016-17)

Review Board

SPRINGS UFSD

$136,874.00

$136,874.00

Smart Schools Bond Act Submission 1

Approved

$32,940.00

$32,940.00

Smart School Budget #1

SSBA Initial Review

$1,591,338.00

$1,591,338.00

SSBA First Submission

Approved

$635,106.00

$35,450.00

Stockbridge-01 Teacher Laptops

Review Board
Expenditure Review

ST ANNE INSTITUTE
STARPOINT CSD
STOCKBRIDGE VALLEY CSD
STOCKBRIDGE VALLEY CSD

$635,106.00

$313,250.00

Stockbridge-02 Security Cameras

SWEET HOME CSD

$1,891,997.00

$496,160.00

SHCSD 03-2016

Approved

SYRACUSE CITY SD

$27,150,068.00

$1,370,404.00

SSIP1.1

Review Board

SYRACUSE CITY SD

$27,150,068.00

$350,000.00

THREE VILLAGE CSD

$3,395,850.00

$1,234,644.00

$597,733.00

TIOGA CSD
TIOGA CSD

TICONDEROGA CSD

TUCKAHOE COMN SD

SSIP2.1

Expenditure Review

TVCSD1.NetworkEquip

Expenditure Review

$73,503.00

Cameras and Doors Aug 2016

Expenditure Review

$1,080,145.00

$335,160.00

Final

Approved

$1,080,145.00

$744,985.00

Pre-K Final SSIP

SSBA Initial Review


Review Board

$96,818.00

$83,826.00

TCSD SB 3

TULLY CSD

$784,252.00

$319,900.00

data10-22-15

Approved

TUPPER LAKE CSD

$799,842.00

$602,000.00

Tupper Lake Central School District Application #1

Review Board

014-011-1a

Expenditure Review

UNADILLA VALLEY CSD

$1,296,682.00

$991,500.00

UNION-ENDICOTT CSD

$2,984,582.00

$2,984,582.00

VALLEY STREAM 13 UFSD

$1,042,753.00

$285,884.00

VALLEY STREAM 24 UFSD

$595,695.00

VALLEY STREAM 30 UFSD

$611,219.00
$1,954,631.00

$1,954,631.00

VALLEY STREAM CENTRAL HS DISTRICT


VAN HORNESVILLE-OWEN D YOUNG CSD

Union Endicott1

Approved

VS13Security

Expenditure Review

$405,676.00

First Submission

Expenditure Review

$611,059.00

SSIP_3-17-16_submission_1

SSBA Initial Review

VSCHSDSSIP1

Expenditure Review

$292,336.00

$190,000.00

ODY 316

Expenditure Review

VICTOR CSD

$1,613,312.00

$1,416,465.00

VCS Submission 1

Approved

WALLKILL CSD

$2,640,175.00

$2,639,701.00

May 2016

Approved

WALTON CSD

$1,168,536.00

$897,000.00

waltonsmart15

Expenditure Review

WAPPINGERS CSD

$5,327,266.00

$1,513,120.00

WARRENSBURG CSD

$1,062,079.00

$320,088.00

WARWICK VALLEY CSD

$2,213,192.00

$1,474,275.00

$581,040.00

$236,010.00

WATERVLIET CITY SD

$1,441,614.00

WATKINS GLEN CSD

$1,167,539.00

WAVERLY CSD

Wappingers SSBA #1

Approved

SSIP Phase I

Review Board

SSB Investment plan

Approved

WHUFSD_SSIP_5.12.16(edited)

Expenditure Review

$530,601.00

Smart Bond July 2016

Expenditure Review

$527,500.00

Smart Schools 0627162

Review Board

$1,626,225.00

$359,322.00

Preliminary

Review Board

WAYLAND-COHOCTON CSD

$1,873,238.00

$241,437.00

SSIP 1

Approved

WEBSTER CSD

$4,432,162.00

$50,884.00

Webster Amendment #1

SSBA Initial Review

WEBSTER CSD

$4,432,162.00

$3,974,251.00

Webster Form 1

Approved

$118,291.00

$118,291.00

WellsSMARTSchools1

Approved

WEST BABYLON UFSD

$3,059,663.00

$1,960,000.00

IWB

Approved

WEST GENESEE CSD

$2,847,843.00

$1,661,739.00

SSBA #1

Expenditure Review

WEST ISLIP UFSD

$2,973,629.00

$1,750,000.00

SSIP Phase 1

Expenditure Review

WATERFORD-HALFMOON UFSD

WELLS CSD

10/06/2016

Current SSIP Status


Entity Name

On Demand Identifier

Entity Status

$23,601.00

$23,601.00

WECSTechUpgrade1

Review Board

WHITE PLAINS CITY SD

$1,746,127.00

$1,746,127.00

WPCSD-SSIP-092415

Approved

WHITNEY POINT CSD

$1,961,303.00

$1,055,457.00

UPK Classrooms

Expenditure Review

WESTCHESTER EXCEPTIONAL CHLDRN CTR

WILDWOOD SCHOOL

SSBA Allocation

Total Budgeted

$60,355.00

$60,355.00

CM2325

Review Board

WILLIAMSON CSD

$1,027,801.00

$834,750.00

Williamson 1

Expenditure Review

WILLIAMSVILLE CSD

WCSD SBIP 1

Expenditure Review

$3,474,731.00

$3,474,731.00

WINDHAM-ASHLAND-JEWETT CSD

$147,823.00

$147,823.00

11162015

Approved

YORK CSD

$856,513.00

$499,579.00

2016 York CSD

Expenditure Review

$1,463,127.00

$700,025.00

YCSD preliminary v2

Approved

YORKTOWN CSD

10/06/2016