Narrative Report
Submitted by:
Mercado, Crissa Janella F.
Bachelor of Science in Electronics Engineering
I.
Introduction
Supervised Industrial Training Program is a partial requirement of the graduating
students that will help them face the real world. It is the time for us trainees and
students to learn new things, put theories and principles learned in school into practice
in order for us to enhance our skills and abilities, widen our knowledge about our
course. This will also help us to determine what track we wish to specialized with.
II.
our test phone and will give us a site ID to be tested and their activity in the site. We will
get their necessary details in our Client Device Driver. Ericsson has a project called
Project UNO and MEOW. Project UNO has a Swap/Rehoming activity that is the
Smart cell site will be swapped in to a Sun cell site. It also has a TRX Expansion activity
that will add a Transceiver in the cell site in order to maximize the capacity of the
subscriber. A Band Expansion, that is usually a Dual-Band site, expands the capacity of
2G into 3G. Project MEOW is a 4G project needed to be FT. Refarming is also an
activity in a site. It is mostly in SNCR. A cell site should be first integrated before
enrolling it. Our integrators are from our own company, Ericsson, and they are the one
logically installing the cell sites using the application WinFiol.
Citrix Application
Citrix contains the application, Alarm List Viewer that is used in order for us to
check the alarms of the sites. Usual alarms are BTS Internal, BTS External and Cell
Logical. BTS Internal is an alarm that will be fixed by out integrators. BTS External is
an alarm that will be fixed by the site engineers. We cannot test a certain site as long as
it has alarms on it. The Citrix will also show us if the site has a defined neighbors or if it
has only its sector as its neighbor.
Functionality Test for 2G and 3G/LTE (Voice Call, Video Call, SMS and MMS)
First, we should checked if the LAC/SAC/CGI/TAC/ENODEB of the RBS is
defined in all the MSC core. This is because the MSC is the one who will give a signal
to the site engineers cellular telephone when it is locked in a cells BCCH number.
Functionality Testing have its Functionality Testing form. In this form, we should fill up all
the necessary information like the Cell ID of each sector and its BCCH number, its
equipment type, RBS, BSC and its phone number. For 2G, it has 3 sectors. For 3G, it
has 3 sectors with 2 cells in each. We need to test the Voice Calls, SMS and MMS for
2G, and Voice Calls, Video Calls, SMS and MMS for 3G. I and the site engineer will
exchange voice calls and it is monitored by the SMART BIS using the application TANG.
The TANG shows the time and the Cell ID of the sector/cell tested. The SMART BIS will
first track the cell phone number of the site engineer and the site engineer needs to lock
to a certain sector/cell using the sector/cell BCCH number in order for him/her not to
transfer to another site. For example if I have received a call from the site engineer, the
SMART BIS will type a command for SMS/MMS or Video Call/Voice Call, and if the time
does not update, or the site engineer is not in the correct sector/cell we should repeat it.
For LTE, it is the same for 3G but the only difference is that the drive test is live being
watched by the SMART BIS.
Smart Rollout Support
SRS is an Ericsson application that will let you see all the sites in your location. It
is like a google map or google earth that contains all the cell sites in a certain location.
This is the new way of functionality testing. I just registered my IMSI number and my
cellphone number in the date base. SRS will automatically locked yourself in a certain
Cell ID and will start the FT if you are located in the same Cell ID. It will measure the
ping, the Voice Call and SMS. It is just a 1-minute test and will upload the measurement
directly in the SRS data base. This application works on all android phones but it
recommends high accuracy smartphones like Samsung S5, S6 or S7. My phone is
Samsung Galaxy Duos 2 and its accuracy is less than 100m. I have encountered an
or the site engineer. After 15 minutes then the alarm doesnt come back, the
functionality test should resume. Another problem is when the cell site is
congested. The MMS is mostly affected here, sometimes because of this
problem, the functionality test lasts for a maximum of 4 hours depending on the
cell site. Another problem encountered is that the time in the TANG application
doesnt update. Me and the site engineer should restart our phone and resend
the SMS/MMS. Another problem is when another site catches the site engineers
Call/SMS/MMS and is detected in TANG.
I have also experienced problems like our postpaid line is cut off and we
have no load and there is no engineer present. Our immediate supervisor should
lend money in order for us to continue our functionality test.
V.
Documents / Requirements
VII.
Photos
Checking if the
site is
integrated
using WinFiol
Checking the
alarms using
Alarm List Viewer