GRID SOLAR & ENERGY EFFICIENCY PROJECT

NEPAL ELECTRICITY AUTHORITY, NEPAL


CONTRACT NO.: GSEEP/ICB-071/72-01

CONSTRUCTION SCHEDULE

ID

Task Name

1
2
3
5

Project Schedule
Mobilization
Site Investigations
Survey, mapping, layout drawings & report submission: Three Groups/Gangs
shall conduct in parallel.
Soil investigtion, preparation of report and submission for approval: Three
groups shall conduct in parallel.
Approval of all above submitted reports from client
Design and approval.
Design of access road, drainage, boundry walls, control building, water
supply system, water tanks, guard house etc. all complete.

4
6
7
8
9
10
11
12
13
14
15
16
17
18

19
20
21
22
23
24
25
26
27
28
29
30
33
34

31
32
35
36

Duration

Design of all Solar modules, invertor, batteries, chargers, joint boxes etc.
complete: Respective Manufacturers shall conduct in parallel.
Design of transmission lines, power cables, control cables for both AC &
DC.: Respective manufacturers shall conduct in parallel.
Approval of all above submitted reports from client.
Design of equipment foundations, civil structures, cable trench, grounding
meshes, fence etc. and submission for approval.
Design and approval of Electro-Mechanical equipments by respective
manufacturers.
Approval of design submission from 11
Manufacturing, Inspection & Testing.
Manufacturing & inspection of solar modules, Invertors, batteries, battery
chargers, cables, joint boxes, complete: Respective manufacturers shall
manufacture in parallel in their factories in parallel..
Manufacturing & inspection of power transformer.
Manufacturing inspection and testing of switchgears, protection & metering,
SCADA system, Communication, control & relay panels etc. all complete:
Respective proposed manufacturer shall manufacture in parallel in their
respective factories in parallel..
Manufacturing & inspection of all Electro-Mechanical equipments: Proposed
manufacturers shall manufacture in their respective factories.
Transportation of all equipments to site
Transportation of all equipments from factories to site
Site construction work
Site preparation and grading work, construction of ware house & water
supply system: Five to Six separate gangs shall commence the respective
construction orks in parallel.
Construction of access road, drain, control building, boundary wall, water
tank & guard house etc: Six different gangs of respective construction works
shall be done in parallel.
Construction of cable trenches & drain, equipment foundations, & fences:
Three different Gangs shall execute in parallel.
Soil conservation & bio-engineering work, transmission line, internal lighting:
It shall be executed in parallel to other civil construction works after site
grading and levelling in three gangs.
Erection, installation, cabling, wiring, connections
Erection of all equipment supporting structures, grounding etc.: Six gangs
shall execute in parallel.
Installation of solar modules, invertors, joint boxes, batteries, chargers, wirng
& connections: Three separate gangs shall execute in required sections in
parallel.
Installation of power transformers, switchgears, CRP pannels & associated
accessories: Six gangs shall execute in parallel..
Preparation of as buit drawings, maintenance & operational manuals etc.
Preparation of as buit drawings, maintenance & operational manuals etc.:
This activity shall be done right from manufacturing process till
commissioning and testing by respective exeprts in paralled to other
installations, connections, commissioning and t
Commissioning and testing of all equipments.
Commissioning and testing of all equipments in Six groups
Charging, handling over and taking over of project.
Charging, handling over and taking over of project: Three separate gangs
having sufficient experts and equipments shall execute in parallel.

Project: Construction Schedule


Date: 30-08-15

Start

Finish

Submitted by: PINGGAO-HAREON J/V

15
Nov '15
Dec '15
Jan '16
Feb '16
Mar '16
Apr '16
May '16
Jun '16
Jul '16
Aug '16
Sep '16
Oct '16
11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09

365 days
10 days
51 days
30 days

15-10-15
15-10-15
25-10-15
25-10-15

13-10-16
24-10-15
14-12-15
23-11-15 25-10

21 days

01-11-15

22-11-15 un 01-11

21 days
101 days
30 days

24-11-15
11-12-15
11-12-15

14-12-15
20-03-16
09-01-16

30 days

15-12-15

13-01-16

30 days

19-12-15

17-01-16

21 days
21 days

18-01-16
08-02-16

07-02-16
28-02-16

30 days

08-02-16

08-03-16

21 days
120 days
60 days

29-02-16
08-02-16
08-02-16

20-03-16
06-06-16
07-04-16

Mon 08-02

Thu 07-04

60 days
120 days

08-02-16
08-02-16

07-04-16
06-06-16

Mon 08-02
Mon 08-02

Thu 07-04

60 days

29-02-16

28-04-16

75 days

07-06-16

20-08-16

75 days
195 days
45 days

07-06-16
08-02-16
08-02-16

20-08-16
20-08-16
23-03-16

Mon 08-02

150 days

08-02-16

06-07-16

Mon 08-02

120 days

21-03-16

18-07-16

150 days

24-03-16

20-08-16

73 days
40 days

19-07-16
19-07-16

29-09-16
27-08-16

40 days

21-08-16

29-09-16

Sun 21-08

35 days

21-08-16

24-09-16

Sun 21-08

Sat 24-09

45 days
45 days

21-08-16
21-08-16

04-10-16
04-10-16

Sun 21-08

Sun
Tue

7 days
7 days
7 days
7 days

30-09-16
30-09-16
07-10-16
07-10-16

06-10-16
06-10-16
13-10-16
13-10-16

Thu 15-10
Sun 25-10
Mon 23-11
Sun 22-11
Tue 24-11

Mon 14-12
Fri 11-12

Fri 11-12

Sat 09-01

Tue 15-12

Wed 13-01

Sat 19-12

Sun 17-01
Mon 18-01

Sun 07-02
Mon 08-02

Sun 28-02

Mon 08-02

Tue 08-03
Mon 29-02

Sun 20-03
Mon 08-02

Mon 06-06

Mon 29-02

Thu 28-04
Tue 07-06
Tue 07-06

Sat 20-08
Mon 08-02

Wed 23-03
Wed 06-07
Mon 21-03

Mon 18-07

Thu 24-03

Sat 20-08
Tue 1
Tue 19-07

Sat 27-08
Thu 29-

Fri 30-09

Fri
Thu

Fri 07-10

Task

Summary

Rolled Up Milestone

External Tasks

ProgrTask

Critical Task

Rolled Up Task

Rolled Up Progress

Project Summary

Critical Task

Milestone

Rolled Up Critical Task

Split

Group By Summary
Page 1

The total project execution time period shall be 365 days from the contract effective date.