Vous êtes sur la page 1sur 5

GOVERNMENT OF MAHARASHTRA

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS REGION, PUNE


(Pune, Kolhapur, Sangli, Satara, Solapur)
SCHEDULE OF RATES
2016-2017

Rights of publications, translations and copying are reserved with P.W. Region Pune

Contents
GENERAL NOTES .................................................................................................................................... 4
Bd-A : Excavation .............................................................................................................................. 12
Bd-B : Pile Foundation....................................................................................................................... 18
Bd-C : Structural Steel Work ............................................................................................................. 23
Bd-E : Plain Cement Concrete .......................................................................................................... 25
Bd-F : Reinforcement Cement concrete ........................................................................................... 28
Bd-G : Brick Work .............................................................................................................................. 73
Bd-H : Stone Masonry ....................................................................................................................... 76
Bd-I : Cement Concrete Block Masonry ........................................................................................... 79
Bd-J : Water Proofing ........................................................................................................................ 80
Bd-K : Expansion Joint ....................................................................................................................... 84
Bd-L : Plastering and Pointing ........................................................................................................... 86
Bd-M : Paving,Flooring and Dado ..................................................................................................... 91
Bd-N : Wood finish .......................................................................................................................... 104
Bd-O : Oil Painting ........................................................................................................................... 106
Bd-P : Colour,white washing,distempering..................................................................................... 110
Bd-Q : Wood work........................................................................................................................... 112
Bd-R : Roofing and ceiling ............................................................................................................... 115
Bd-T : Doors and windows .............................................................................................................. 129
Bd-U : Iron Work ............................................................................................................................. 149
Bd-V : Water supply and sanitory fittings ....................................................................................... 150
Bd-W : Miscellaneous ..................................................................................................................... 178
CD

: Cross Drainage Works .......................................................................................................... 189

MORT & H Bituminous Construction .............................................................................................. 194


Rd: Road Furniture .......................................................................................................................... 229
BR

: Bridge Works ........................................................................................................................ 249

MORTH

: Bridge Works................................................................................................................ 301

Road & Bridge Maintenance ............................................................................................................... 310


SUR: Survey ......................................................................................................................................... 313
MATERIAL RATES ............................................................................................................................... 327
MACHINERY RATES ............................................................................................................................ 383
LABOUR RATES ................................................................................................................................... 390
Vigilance & Quality Control Circle ....................................................................................................... 394
2

BuildingTesting Frequency .................................................................................................................. 403


Bridge -Testing frequency ................................................................................................................. 408
STATEMENT C-1 (2016-2017).............................................................................................................. 409
Transportation Of Material ................................................................................................................. 411
STATEMENT -C-2 ................................................................................................................................. 417
CEMENT CONSUMPTION .................................................................................................................... 418
MATERIAL REQUIREMENTS FOR U.C.R. MASONARY ................................................................... 419
MATERIAL REQUIREMENTS FOR CEMENT PLASTERING & POINTING ....................................... 420
ASPHALT CONSUMPTION.................................................................................................................... 421
Modern Machinery............................................................................................................................. 440
BLOCK ESTIMATE RATES.................................................................................................................... 445

GENERAL NOTES
1

Schedule of Rates
prepared for the year 2016-17 is
Operative from 1st July 2016 and
applicable for Pune,
Solapur, Kolhapur, Sangli, and Satara District.

For the rates in Corporation area, Notified Tribal area,


Hilly inaccessible areas, & Central Jail premises, Mental
Hospital
premises an increase of percentages over the
normal schedule of rates (Basic completed item Rates)
prescribed for the year 2016-17 are as follows:
1

Corporation Areas

5%

Sugarcane factory area (within 10 Km. radius )

5%

Notified Tribal Areas

10%

Notified Hilly / Inaccessible areas

10%

Inside Premises of Central


Hospital,Raj

Bhavan ,

Jail,

Yerawada

Mental

15%

Prison ,

Yerawada Printing press..

Issue rates of Schedule A materials for above notified area


shall be increased by respective percentage. The above
percentage should be applied on the cost of items after
deducting the cost of Specified materials, if issued on Schedule
'A'.
The Superintending Engineers should Specify the sugar factory
areas under their circles after ascertaining working condition of
the Sugar factory.
The Hilly / inaccessible areas in Western Ghat Region for
Public Works Region, Pune are identified as below:
Sr.No.

District

Pune

Solapur

Sangli

Satara

Kolhapur

Hilly/ Inaccessible areas

Government Resolution, Planning


Department No.DVK/1089/P-66/Y-19
Dated 23-11-1990 & 13-06-2003

The works which are pertaining to inside premises of central jail,


Mental Hospital, Raj Bhavan , Yerawada Prison , Yerawada
4

Printing press as well as in corporation area, an increase of


percentage over normal scheduled rates shall be considered
both simultaneously e.g. If central jail is situated in corporation
area an increase of 5% for corporation area and 15% for jail
premises total 20% shall be considered.
For other works the increase in rates as above shall be
applicable one time only.
3.

Schedule of rates is based on the following basic rates of materials:


Sr.No Material

Basic rate for 2016-17

Cement

Rs.5,400 / M.T.

Mild Steel

Rs.35,000 / M.T.

Tor Steel(H.Y.S.D)

Rs. 35,500 / M.T.

Structural Steel

Rs.39,000 / M.T.

TMT-FE-500

Rs.37,000 / M.T.

Tubular Steel

Rs.43,000 / M.T.

High Tensile Steel

Rs.65,500 / M.T.

Bitumen VG-30 (Packed)

Rs.36,717 / M.T. Ex. Refinery Mumbai

Bitumen VG-10 (Packed)

Rs.35,691/ M.T. Ex. Refinery Mumbai

Bitumen VG-40 (Bulk)

Rs.32,764 / M.T. Ex. Refinery Mumbai

Bitumen VG-30 (Bulk)

Rs.31,715 / M.T. Ex. Refinery Mumbai

Bitumen VG-10 (Bulk)

Rs.30,689/ M.T. Ex. Refinery Mumbai

Bitumen Emulsion

Rs.26,455/ M.T. Ex. Refinery Mumbai

TAXES AND GOVT. CIRCULARS

4.1

VAT, LBT & SALES TAX f o r m a t e r i a l s are not considered


separately in the rate abstract as market rate includes VAT, LBT. AND
SALES TAX.

4.2

Turn over tax is not considered in the Rate Abstract.

4.3

i) As per Govt. circular No. DSR- 1090/ CR-6453/ PLN-3 Dt.14-7-1993,


5

Vous aimerez peut-être aussi