Vous êtes sur la page 1sur 10

SolutionReportForEngg.

Mechanics&ConstructionMaterialsandManagement:
AdvanceLevel
Representwholetestsolutionwithcorrectandincorrectanswers.
ViewYourTestAnalysis

Q.No
Q.1

QuestionStatus
WhichofthefollowingstatementisnotCORRECT?
a.

Totalfloatisthesumofthefree,interferingandindependentfloats.

b.Foreachcriticalactivitytotal,freeandindependentfloatsareequaltozero.
c.Anactivitywithsomefreefloatcannotbeacriticalactivity.
d.Interferingfloatistheexcessofthetotalfloatoverthefreefloat.

Attempt

Q.2

Correct

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

FAQ?

Haveanydoubt?

Solution

FAQ?

Haveanydoubt?

Solution

Thecriticalpathofthenetworkshownbelowis

a.12479
b.

13579

c.

13689

d.135689

Attempt

Q.3

Incorrect

YourAns.

CorrectAns.
VideoSolution

Totalprojectcostversustimecurveisa
a.Sshapedcurve
b.Parabola
c.

Ushapedcurve

d.Straightline

Attempt

Correct

CorrectAns.

VideoSolution

Q.4

MatchListI (Ingredient of cement) with ListII (Related effect on cement) and select the correct answer
usingthecodesgivenbelowthelists:
ListI

ListII

A.Silica

1.Quicksetting

B.Alumina

2.Unsoundness

C.Calciumsulphate

3.Strength

D.Sulphur

4.Retarder

Codes:

(a)

(b)

(c)

(d)

a.a
b.b
c.c
d.

Attempt

Q.5

Correct

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

FAQ?

Haveanydoubt?

Solution

FAQ?

Haveanydoubt?

Solution

WhichstatementamongthefollowingisCORRECT?
a.Calciumchlorideshouldnotbeusedinprestressedconcrete.
b.

Strengthofconcreteincreasesbelowfreezingpointofwater.

c.

Hardeningofconcretetakesplacerapidlyinhotwater.

d.Theingredientsofconcreteshouldbemixedwithinthreeminutes.

Attempt

Q.6

Incorrect

YourAns.

CorrectAns.
VideoSolution

Intimber,sectionsofmaximumstrengthareobservedin
a.Ordinarysawing
b.Quartersawing
c.Tangentialsawing
d.

Radialsawing

NotAttempt

Q.7

CorrectAns.

VideoSolution

Aeratedcementisproducedbytheadditionof
a.

Powderedaluminium

b.Sodiumnitrate
c.Zincsulphateandpowderedaluminium
d.Magnesiumsulphateandpowderedaluminium

NotAttempt

Q.8

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

If the optimistic time, most likely time and pessimistic time for an activity A are 4, 6 and 8 days
respectivelyandforanactivityBare5,5.5and9daysrespectively,then
a.expectedtimeofanactivityAisgreaterthantheexpectedtimeofanactivityB.
b.expectedtimeofactivityBisgreaterthantheexpectedtimeofanactivityA.
c.

expectedtimeofbothactivitiesAandBarethesame.

d.noneoftheabove

Attempt

Q.9

Correct

CorrectAns.

VideoSolution

FAQ?

Attempt

Correct

=____________.

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

Ifthecompletiontimeforaparticularprojectis20weeksanditsearliestexpectedtimeis22weeks,then
theslacktimefortheprojectis_____________weeks.

Attempt

Q.11

Solution

Considerthefollowingactivityijofacertainnetwork:

Thenthevalueof

Q.10

Haveanydoubt?

Incorrect

YourAns.

CorrectAns.
VideoSolution

FAQ?

Haveanydoubt?

Solution

Asteelwheelof600mmdiameteronahorizontalsteelrailcarriesaloadof500N.Ifthecoefficientof
rollingresistanceis0.3thentheminimumforcenecessarytorollthewheelalongtherailis_________N.

Attempt

Q.12

Incorrect

YourAns.

0.25
CorrectAns.
VideoSolution

0.5

FAQ?

Haveanydoubt?

Solution

Acarmovingwithuniformaccelerationcovers450mina5secondinterval,andcovers700minthenext
5secondinterval.Theaccelerationofthecaris____________m/s2 .

Attempt

Q.13

Correct

CorrectAns.

10

VideoSolution

FAQ?

Haveanydoubt?

Solution

Awheelrotateswithaconstantaccelerationof2rads2 .Ifitstartsfromrest,thenumberofrevolutionsit
willmakeinfirst10sis_____________.

Attempt

Correct

CorrectAns.

15.92(15.916.1)
VideoSolution

FAQ?

Haveanydoubt?

Solution

Q.14

Theratiooftheelasticmodulusofstructuraltimberinlongitudinaldirectiontothatinthetransverse
directionis____________.

Attempt

Q.15

Incorrect

0.5

CorrectAns.
VideoSolution

1.5(12)

FAQ?

Haveanydoubt?

Solution

Ifaggregatesizeof5040mmistobetestedfordeterminingtheproportionofelongatedaggregates,the
slotlengthofthegaugeshouldbe_______________mm.

Attempt

Q.16

YourAns.

Correct

CorrectAns.

81

VideoSolution

FAQ?

Haveanydoubt?

Solution

FiguregivenbelowshowsawheelrotatingaboutO.TwopointsAandBlocatedalongtheradiusofwheel
havespeedsof80m/sand140m/srespectively.ThedistancebetweenthepointsAandBis300mm.The
diameterofthewheelis__________mm.

Attempt

Q.17

Correct

CorrectAns.

1400
VideoSolution

FAQ?

Haveanydoubt?

Solution

FAQ?

Haveanydoubt?

Solution

PERTispreferredforplanningbecause
I.Projectsareofnonrepetitivetype.
II.Timerequirementneednottobeknown.
III.Timerequiredisknownprecisely.
IV.Eventshavebeenestablishedforplanning.
V.Emphasisgiventoactivitiesofproject.
a.

I,IIandIV

b.III,IVandV
c.I,IIIandIV
d.

I,IIandV

Attempt

Q.18

Incorrect

YourAns.

CorrectAns.
VideoSolution

AuniformrigidrodofmassMandlengthLishingedatoneendasshowninthefigure.AforcePisapplied
atadistanceof2L/3fromthehingesothattherodswingstotheright.Thehorizontalreactiondevelopedat
thehingeis

a.P
b.

c.

P/3

d.2P/3

Attempt

Q.19

Incorrect

YourAns.

CorrectAns.
VideoSolution

FAQ?

Haveanydoubt?

Solution

Usetheweightedunitcosttodeterminetheconceptualcostestimateforaproposedprojectofparkinglot
thatisexpectedtocontain135parkedcars.Previousdataofsimilarprojectisgivenbelow.

a.

Rs540000

b.Rs480000
c.Rs360000
d.Rs280000

NotAttempt

Q.20

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

Abulletafterfiringfromagungoesthroughaplankofthicknesshandchangesitsvelocityfromutov.
The resisting force is proportional to square of velocity. The time of motion of the bullet in the plank is
proportionalto
a.(uv)u2
b.(uv)v2
c.

(uv)(uv)1

d.(u2 v2 )(uv)2

NotAttempt

Q.21

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Thefunctionoffineaggregateis
a.toassistinproducingworkabilityanduniformityinthemixture.
b.toassistthecementpastetoholdthecoarseaggregateparticlesinsuspension.

Solution

c.topromoteplasticityinthemixtureandpreventpossiblesegregationofpasteandcoarseaggregate.
d.

alloftheabove

Attempt

Q.22

Correct

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

Anautomobiletravellingat25m/screstsahillofradius625mjustasthedriverslamsonthebrakesand
skidstoashop.Ifthecoefficientoffrictionbetweenthecarandtheroadis0.7.Findthecarsdeceleration
(inm/s2 )attheinstantthebrakesareapplied.
[Takeg=10m/s2 ]

a.3.3
b.4.5
c.5.4
d.

6.3

Attempt

Q.23

Correct

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

AflatcarofweightWrollwithoutresistancealongahorizontaltrackasshowninthefigure.Initially,thecar
togetherwithamanofweightwismovingtotherightwithspeedv0 .Whatincrementofvelocityvwillthe
carobtainifthemanrunswithspeedurelativetothefloorofthecarandjumpsoffattheleft?

a.

b.

c.

d.

NotAttempt

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

Q.24

Therawmaterialusedtopreparesulphateresistingcement,whencomparedwithOPC,willhave
a.morequantityofAl2 O3 andFe2 O3
b.samequantityofFe2 O3 andmoreofAl2 O3
c.

samequantityofAl2 O3 andmoreofFe2 O3

d.samequantityofAl2 O3 andFe2 O3

NotAttempt

Q.25

CorrectAns.

VideoSolution

FAQ?

Haveanydoubt?

Solution

Consideratechniquewheretheactivitytimesfollowsbetadistributionandtheprojecttimefollowsnormal
distribution.Thevarianceofthecriticalpathintheprojectis9units.Thetotaldurationofthecriticalpathis
17units.Thedifferenceinprobabilitiesthattheprojectwillbecompletedin22unitsandthattheprojectwill
becompletedin20unitsis________%.

Attempt

Q.26

Correct

CorrectAns.

11.07(10.811.2)
VideoSolution

FAQ?

Haveanydoubt?

Solution

Considerthefollowingarrowdiagramwithactivitytimesgivenindays:

Thenormalandcrashdataforthisprojectareasfollows:

Ifwewanttocompletetheprojectin22days,theprojectcostisRs_______.

Attempt

Q.27

Incorrect

YourAns.

800

CorrectAns.
VideoSolution

880

FAQ?

Haveanydoubt?

Solution

Auniformdiscofmass1.5kgandradius0.5misinitiallyatrestonahorizontalfrictionlesssurface.Three
forces of equal magnitude F = 0.5 N are applied simultaneously along the three sides of an equilateral
triangle XYZ with its vertices on the perimeter of the disc. The angular speed of the disc after 1s of
applicationofforceswillbe____________rads1 .

NotAttempt

Q.28

CorrectAns.

2(1.82.2)
VideoSolution

FAQ?

Haveanydoubt?

Solution

AnejectormechanismconsistsofahelicalcompressionspringhavingaspringconstantofK=981103
N/m.Itisprecompressedby100mmfromitsfreestate.Ifitisusedtoejectamassof100kgheldonit,
themasswillmoveupthroughadistanceof________mm.

Attempt

Q.29

Incorrect

YourAns.

150

CorrectAns.
VideoSolution

5000(49905010)

FAQ?

Haveanydoubt?

Solution

Asquareholeisremovedfromathincircularlamina,thediagonalofthesquarebeingequaltotheradius
ofthecircleasshowninthefigurebelow.Theabscissaofcentroidoftheremaininglaminais_________
102 R.

Attempt

Q.30

Incorrect

YourAns.

90.536
CorrectAns.
VideoSolution

9.5(9.29.8)

FAQ?

Haveanydoubt?

Solution

TwoprismaticbarsABandBCoflengthsLand2LrespectivelyarerigidlyjoinedatBandsuspendedbya
stringADasshownbelow.IfthebarisassumedundertheactionoftheirweightsWand2W then in the
positionofequilibriumasshownbelow,theangleis_________degrees.

NotAttempt

Q.31

CorrectAns.

19.11(19.019.4)
VideoSolution

FAQ?

Haveanydoubt?

Solution

BlockAofweight900NrestsonahorizontalsurfaceandsupportsontopofitanotherblockBofweight
225N.TheblockBisattachedtoaverticalwallbyaninclinedstringPQ.Themagnitudeofthehorizontal
forceFappliedtothelowerblockasshownbelow,thatwillbenecessarytocauseslippingtoimpend,is
_________N.
[Takecoefficientofstaticfrictionforallthesurfaces=0.3]

Attempt

Q.32

Correct

CorrectAns.

380.2(375385)
VideoSolution

FAQ?

Haveanydoubt?

Solution

ConsideranellipticalshapedrailPQintheverticalplaneasshown.Ablockofmass1kgispulledalong
therailfromPtoQwithaforceof18NwhichisalwaysparalleltolinePQ.Theincreaseinkineticenergyof
theblockwhenitreachesQwillbe__________Joules.
[Assumenofrictionandg=10m/s2 ]

NotAttempt

CorrectAns.

50

VideoSolution

FAQ?

Haveanydoubt?

Solution

Q.33

ThefixedcostforacottageindustryisRs400000.ThetotalsaleisofRs1000000.Thevariablecostper
unitisRs20.ThesellingpriceofeachproductisRs30.Themarginofsafetyforthesalesatbreakeven
pointis_____________%.

NotAttempt

CorrectAns.

10

VideoSolution

FAQ?

Haveanydoubt?

Solution