Vous êtes sur la page 1sur 1

2

11

10

13

12

14

15

16

FROM PI-0700D
CP-3513NO-EF-001

8131.X.0701D

8131.V.0701D

AWT HEATER

AWT SEPARATOR

SHEET 4 OF 5

8131.P.0701D
AWT PUMP

PAL

0G

TI

0706D

FROM PT-0701D

PAH

CP-3513NO-EF-001

PIC

0701D

SHEET 4 OF 5

TAH

0701D

TT
0706D

TAL

0703D

0G

DESIGN PRESSURE AND TEMP. PROCESS SIDE

: 300 PSIG / 410 F

OPERATING PRESSURE AND TEMP. STEAM SIDE (IN/OUT)


OPERATING PRESSURE AND TEMP. PROCESS SIDE (IN/OUT)

ZSC

1703D

1703D

SOV

RATED CAPACITY

: 100 GPM

: 5 PSIG / 50 PSIG

DISCH. PRESS

: 201.58 PSIG

TEMPERATURE (OPERATING/DESIGN)

: 100 - 320 F / 400 F

TEMPERATURE (OPERATING/MAX.)

: 100 - 320 F / 400 F

: 141 PSIG / 339 F

BRAKE HORSE POWER

: HOLD 2

: 7 PSIG / 200 F

OPERATING DUTY

: INTERMITTENT

ZLO

ZSO

1703D

1703D

NOTE 3
PIC

" GAF-1/SE

0702D

0G

0703D

0G

2H3

IA

PY
0701D

3"GAF-30

TY
0702D

"GAF-1/SE

"GAF-1

NOTE 20
(TYP.6)

2"x1"

NC
"GAF-1

HOLD 1

"GAF-1

2"x1"

1" GAF-1

TV

"GAF-1

0G

NC

1"FC

CP-3513NO-EF-002

0702D

2" CKF-3
2" GAF-2

ZLC

ZSC
1704D

NC

NC

10D

" GAF-1/SE
NC

2"

SOV

8131.X.0701D

R
ZSO
1704D

ZLO
1704D

3"

HOLD 3

LO
3"

NOTE 8
2" GAF-2

8131-CL-075-2"-B3CS4F-G5H20

3" GAF-2

2"

CP-3513NO-EF-002

FUEL SUPPLY HEADER

TT

0702D

0705D

"GAF-1/SE

1" GAF-1

KILL WATER

NC

6"x4"

8131-CGC-078-6"-B3CS4F

4"FO

NC

" GAF-1/SE

LAHH

0G

6"

3"GAF-2

0702D

N8A
100

4"

0G
NC

108D

"GAF-1/SE

3"
"GAF-1/SE

PSLL

0704D

HOLDS :

0G

3"x2"

HHLL

13-6"

HLL

12-6"

LLL

1-6"

1. CONTROL VALVE SIZE


START
I

0701D

LLLL

0-10"

0701C

C3CS4F

B3CS4F

PI

0700D

- FLOWRATE OIL

ZLO

ZSO

0700D

0700D

XV
0700D

" GAF-1/SE

2" CKF-30HF

0G
0G
3"GAF-2
2" CKF-30HF

- FLOWRATE WATER
" GAF-1

2" GAF-30

HC

- TOTAL WATER IN EACH TEST

0G

0G

UTILITY STATION

2. PREFIX FOR INSTRUMENT TAG NO SHALL BE 8131

NC

NOTE 6

NC

2" GAF-30

N9B

"GAF-1/SE

3"GAF-2
"GAF-1/SE

2" GAF-30

N7

0G

2" GAF-2

3. DO NOT POCKET

N8B

0G
NC

16-0"

NC

2" GAF-30

- TOTAL OIL IN EACH TEST

"GAF-1/SE

- WATER CUT BY DENSITY METER FROM CORRIOLIS METER

" GAF-1/SE

N5
2"FC

8131-PF-674-3"-B3CS4F

N6

NC

108D

PAHH

RE-ISSUED FOR

0707D

DESIGN

PAH
PI

0707D

0707D

8"GAF-2

1" GAF-1

0G

NC

SP

8131-PF-707-8"-B3CS4F

OIL

0701D

COMPANY REVIEW

8131NO-16D

ABOVE GROUND LEVEL

FI

0G
8131-PF-675-3"-B3CS4F
NOTE 4
C3CS4F

LOCATE SAMPLE POINT IN VERTICAL MINIMUM DISTANCE

0G
FROM CORRIOLIS METER FOR DETAIL CONNECTION REFER

0G

TO PID GENERAL STANDARD SYMBOL & LEGEND FOR PIPING

PDT
0715D
MIN.

NC

8131-KW-171-"-C3CS4F

PCP-0513GN-EF-003.

ST

1"GAF-1

PDH

0715D
" GAF-1

NC
"GAF-1/SE

CODE 3 - NOT PROCEED

1 "GAF-1

FQI

PSV
0702D

1" GAF-1

13. LOW PRESSURE STEAM LINE IS FULL VACUUM.

NC

NOTE 19

NC

8131-OWS-431-1"-B3CS4F

8131-OWS-430-1"-B3CS4F

DETAIL CONNECTION
(WATER CUT CAPACITANCE)

8131-OWS-429-1"-B3CS4F

0G

" CON.

8131-OWS-428-1"-B3CS4F

17. CONNECTION FOR WATER CUT CAPACITANCE PROBE.

HS
0703D

B3CS4F

" GAF-1/SE

PT
0706D

108D

B3CS4F

x"x6"

XL

HS

XS

PULSATION
DAMPENER

0702D

0702D

0701D

NOTE 12

C3CS4F

PT
0707D

HOLD 3

NC

070ID

TT
0701D

FT
NOTE 1

PI
NOTE 9 0709D

3"x2"

NOTE 17

NOTE 7

x"x3"

3"GAF-2

CP-3513NO-EF-002

3"x2"

" GAF-1

8131.P.0701D

1"GAF-1

8131-PF-711

2" GAF-30

0G

0G
NC

NC

SAMPLE

0G

8131-KW-676-2"-C3CS4F
" GAF-1/SE

NC

2" CKF-30HF

0G

NC

NOTE 18

NC

NC

NOTE 18

1"GAF-1

8131-PF-076-3"-B3CS4F

0G

3" GAF-2

NC

0G

0G

C3CS4F

NC

3" GAF-2

0G

-3"-B3CS4F

0G

TO PRODUCTION HEADER

3" CKF-3

3"GAF-2

LO

0G

0G

1"

NOTE 11

"GAF-1/SE

DATE :

TW
0701D

0701D

8131-PF-715-2"-B3CS4F

NC

NAME :

0G

0G
2"x1"

NC
"GAF-1

TOTAL WATER

0702D

1"GAF-1

M
8131-PF-088-2"-B3CS4F
8131-OWS-432-"-B3CS4F

CODE 4 - RECEIPT NOTED

0G

TI

"
I

RUN/STOP

15. USE NON- FLAPPER CHECK VALVE TYPE.


C3CS4F

2" GAF-2

8"GAF-2

HOLD 3

14. DELETED

0G

XL
0703D
2"GAF-30

8131-KW-743-2"-C3CS4F

0G

TANGENT VESSEL HEIGHT

0705D

NOTE 19

NOTE 4

12. PULSATION DAMPENER TO BE DETERMINED BY EPC

16. N8A SHALL BE LOCATED OF MINIMUM 1 FEET FROM

HOA

"GAF-1/SE

HOA STATUS

2"GAF-2

11. FLEXIBLE HOSE. MIN 2-0"

2"GAF-30

"GAF-1/SE

0G

8131-PF-739-3"-B3CS4F

LO

FQI

PI
10. DELETED

TOTAL OIL

0701D

SET AT 225 PSIG

8131-PF-677-1"-B3CS4F

NC

9. FULL PORT VALVE.

CODE 2 - PROCEED WITH NOTE

% WATER CUT

0701D
NC

1.5F2
NOTE 19

0G

8. FLOAT TYPE.

CODE 1 - PROCEED

FP

B3CS4F

3"GAF-2

NC

NOTE 1

"GAF-1/SE

NC
1" GAF-1

3"GAF-2

6. OPERATOR ACCESSIBLE

WATER

0702D

3"GAF-2

3"GAF-2

5. DELETED

MIN.1M

0706D
108D

FI

THE END OF CONNECTION SHOULD BE MIN. 2-0"

7.

CATEGORY 1

PALL

NOTE 4

4. CONNECTION PROVIDED FOR SPOT CHECK METERING :

PAL
0706D

NOTE 3

0G

0G

0706D

MW
IA

8131-RF-719-2"-B3CS4F

0704D

1. INDICATION ON HMI INCLUDING

STOP

24"

SOV

0G

0701D

LI

PIT

0G

110D

LSL

0702C

8131.V.0701D

NOTES

ZSC

0700D

3. NOZZLE SIZE
109D
I

LT

LT

ZLC

2. BREAK HORSE POWER

110D

LSH

109D

0700D

0702D

N4

0701D
8131-OWS-427-1"-B3CS4F

LALL

8131-KW-695-2"-C3CS4F

PI

LI

NOTE-16

0G

0704D

0G

NOTE 6

N1 3"GAF-2

3" GAF-2

6" GAF-2

NOTE 15

HOLD 1

N2

3"x4"

B3CS4F

FLARE HEADER

6" CKF-3

6"x4"

8131-KW-073-2"-C3CS4F

CP-3513NO-EF-002

0G
6" GAF-2

TO NEAREST

0702D

N3

CP-3513NO-EF-002
2"FC

0G

0705D

C3CS4F

0G

3"

8131-CGC-723-3"-B3CS4F

TW

0G

8131-FG-964-2"-B3CS4F

C
PV
0702D

LC

N9A

2" CKF-30HF

8131NO-17D

ESDV
1704D

6"GAF-2

NC

"GAF-1/SE
NC

1" GAF-1

SP

FUEL GAS FROM

TT

8131-PF-662-3"-B3CS4F

2" GAF-30
NC

0702D

0G

IA

TUBING PROD. HEADER

TW

3" GAF-2

1704D

CONDENSATE TO

"GAF-1/SE

"GAF-1/SE

"GAF-1

0708D

NC

3" GAF-2
1"FC

0702D

0702D
PALL

"GAF-1/SE

2"x1" 2"GAF-2

HOLD 1

0708D

LO

8131-PF-666-3"-B3CS4F

NC

PY

PT

CP-3513NO-EF-002

3"GAF-2

2"GAF-2 2"x1"

" GAF-1/SE

NOTE 9

NC

PI
0710D

0G

" GAF-1/SE

PV
0703D

3" GAF-30

0G

3"x2"

0703D

0701D

8131-PF-658-3"-B3CS4F

NC

1704D

PV

3"x1"

PY

NC

B3CS4F

0G

15D

"GAF-1/SE

0G

3"x1"

HOLD 1

NC

NC

PIT
0708D

0G

NOTE 21

PAH

3"x6"

0701D

1"FC

8131-CGC-735-6"-B3CS4F

0708D

"GAF-1/SE

NC

"GLF-1HF

2"FC

NC
NC

TO VENT STACK

PAHH

" GAF-1SE

PSV

0705D

10D

0G

6" GAF-2

LO

SET AT 50 PSIG

TAHH

ESDV
1703D 2" GAF-2

C3CS4F

NC

8131-RF-077-6"-B3CS4F

1:500

NC

0G

TO VENT STACK

SLOPE

0G

0G

2" GAF-2

" GAF-1

0G

0G

CP-3513NO-EF-002

: 260 BFPD / 500 BFPD

PRESSURE (OPERATING/DESIGN)

" GAF-1
"GAF-1/SE

PT
R

DISTRIBUTION

LIQUID FLOWRATE (OPERATING/DESIGN)

CP-3513NO-EF-002

1703D

0G

: RECIPROCATING

10D,15D

ZLC

" GAF-1/SE

TYPE

" CKF-1

NC

NC

8131-SL-074-2"-B3CS4F-G5H20

: 300 PSIG / 410 F

: 4-6" ID x 18-0" T/T

0702D

1"

CP-3513NO-EF-002

STEAM FROM INFIELD

DESIGN PRESSURE AND TEMP. STEAM SIDE

DIMENSIONS

TIC

3" GAF-30

8131-PF-071-3"-C3CS4F

: TBD

0702D

MANIFOLD

: MULTITUBE HAIRPIN

DUTY

"GAF-1/SE

FROM PRODUCTION

TW
0706D

TYPE

0702D
PI

0G

0701D

NC

8131-OWS-433-1"-B3CS4F

8131-OWS-435-1"-B3CS4F

B3CS4F

8131-OWS-434-1"-B3CS4F

0G

0G

18. CONNECTION FOR PROVER.

8131-OWS-703-3"-B3CS4F

19. LOCATE VALVE AT MINIMUM DISTANCE TO THE HEADER.


20. DISCHARGE SHALL BE DIRECTED TO SAFE AREA.
21. INSTRUMENTATION SHALL BE LOCATED AS CLOSED
AS POSIBLE TO N2.

OWS

DRAWN

CHECKED

PT. CHEVRON PACIFIC INDONESIA


DESIGN ENGR.

DESIGN TEAM LEADER


20/11/12

RE-ISSUED FOR DESIGN

0F

02/03/11

ISSUED FOR DESIGN

REV.

DATE

DESCRIPTION

E/A1

GTO/RBH

RND/AGS SPD/LHN

RUJI

JT

BY

CHKD

RJ

DLM

T. LDR

CONTRACT NO.

DRAWING TITLE

C793162
:

SPD/LHN

JB/DS

PIPING & INSTRUMENT DIAGRAM

CAD
NEVER CHANGE THIS

NTS

DRAWING BY HAND

AREA-13 NORTH
DRAWING NO.

REV.

AUTOMATIC WELL TEST SYSTEM

JB/DS

DESIGN DESIGN
ENGR

RND/AGS
DRAWN WITH CAD

DURI - SUMATRA - INDONESIA

0G

GTO/RBH

SCALE

HEAVY OIL OPERATING UNIT

RJ

PROJ

OPRG

ENGR

DEPT.

WIKA - INWHA - SINGGAR

REFERENCE DRAWINGS

10

PROJECT ENGR.

OPRG DEPT.

11

CP-3513NO-EF-003 0G
SHEET 4 OF 4

12

13

14

15

16

FILE NAME : CP-3513NO-EF-003 SHT. 4 OF 4_0G.DGN

Vous aimerez peut-être aussi