Document Number:
Revision Level:
SOP-006
NC
Page:
DCN Number:
1 of 5
DCN-001
PURPOSE
1.1 The purpose of this procedure is to define the Calibration and Verification
process.
2.0
SCOPE
2.1 This procedure applies to those areas within EON INSTRUMENTATION, INC.s
Quality Management System.
3.0
RESPONSIBILITIES
3.1 The President has assigned the President with the responsibility of
maintaining the Calibration and Verification Process.
3.2 EON INSTRUMENTATION, INC. has determined the monitoring and
measurement to be undertaken and the monitoring and measuring
equipment needed to provide evidence of conformity of product to
determined requirements.
3.3 Employee equipment, tools, or measuring devices are not allowed to be
used within EON INSTRUMENTATION, INC., unless they are placed within the
Calibration and Verification Process.
4.0
DEFINITIONS
Calibration - requirements: The process of validating specific monitoring
and measuring devices to measurement standards traceable to international
or national measurement standards.
Verification - requirements: The process of validating specific monitoring
and measuring devices to documented instructions and when applicable
traceable to international or national measurement standards.
Reference
Only
requirements:
Equipment owned by EON
which does not require Calibration or Verification.
Reference Only - can be defined as No Calibration Required/Necessary.
INSTRUMENTATION, INC.
Document Number:
Revision Level:
SOP-006
NC
Page:
DCN Number:
2 of 5
DCN-001
PROCEDURE
5.1
Document Number:
Revision Level:
SOP-006
NC
Page:
DCN Number:
3 of 5
DCN-001
Document Number:
Revision Level:
SOP-006
NC
Page:
DCN Number:
4 of 5
DCN-001
5.1.5 The President is responsible for ensuring that computer software used to
monitor or measure deliverable product requirements be confirmed prior
to initial use and reconfirmed as necessary.
Such computer software shall also be recorded into the Calibration and
Verification Log, F_004.
5.2
Calibration/Verification Alert
5.2.1 The President is responsible for taking the appropriate action (both on
equipment and product affected) when equipment is found not to conform
to requirements.
5.3
Document Number:
Revision Level:
SOP-006
NC
Page:
DCN Number:
5 of 5
DCN-001
REFERENCES
Procedures / Policies:
Instructions:
None
Forms: