PARTIDA
01
1.1
1.2
1.3
1.4
DESCRIPCION
VECES
# ELEMEN
1
1
1
1
LONG.
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
1.00
1.00
1.00
und
9.00
1.00
9.00
mes
9.00
1.00
9.00
mes
1.00
1.00
1.00
GLB
TRABAJOS PRELIMINARES
CARTEL DE OBRA
ALQUILER DE HABITACION PARA ALMACEN
TRAZO Y REPLANTEO DURANTE OBRA
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA
PLANILLA DE METRADOS
LUGAR
ITEM
DESCRIPCION
02.00.00
UND.
N VECES
CANTIDAD
LARGO
und
02,01,01
M2
1.00
1.00
3.50
02,01,02
M2
1.00
1.00
3.50
02,01,03
M3
ALEROS
1.00
2.00
1.50
BOBEDA DE CAPTACION
1.00
1.00
4.00
CAMARA DE CAPTACION
1.00
1.00
1.10
CAJA DE VALVULAS
1.00
1.00
0.55
1.00
1.00
1.30
CIMIENTOS
1.00
2.00
3.20
MURO
1.00
2.00
3.20
1.00
1.00
1.30
1.00
1.00
1.30
LARGO
1.00
2.00
1.30
ANCHO
1.00
2.00
1.00
CIMIENTOS
02,01,04
M3
ALEROS
CAMARA DE CAPTACION
CIMIENTOS
MUROS
PLANILLA DE METRADOS
LUGAR
ITEM
DESCRIPCION
UND.
N VECES
PISO
LOSA
CANTIDAD
LARGO
1.00
1.00
1.20
1.00
1.00
1.10
-1.00
1.00
0.60
LARGO
1.00
2.00
0.50
ANCHO
1.00
1.00
0.40
PISO
1.00
1.00
0.40
1.00
4.00
3.20
INTERIOR
1.00
1.00
4.00
EXTERIOR
1.00
1.00
5.20
INTERIOR
1.00
1.00
1.60
EXTERIOR
1.00
1.00
MENOS TAPA
CAJA DE VALVULAS
02,01,05
M2
ALEROS
CAMARA DE CAPTACION
CAJA DE VALVULAS
02,01,06
M3
2.20
varillas ml
N VECES
16.47
CANT
LARGO
MUROS ALEROS
2.00
21.33
1.50
MUROS
1.00
32.00
1.50
PLANILLA DE METRADOS
LUGAR
ITEM
02,01,07
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
1.00
12.00
4.80
PISO
2.00
9.00
1.30
LOSA
2.00
8.00
1.20
1.00
2.00
3.20
1.00
1.00
4.00
1.00
1.00
1.60
1.00
2.00
3.20
1.00
1.00
4.00
1.00
1.00
5.20
M2
ALEROS
CAMARA DE CAPTACION
INTERIOR
CAJA DE VALVULAS
INTERIOR
02,01,08
TARRAJEO EN EXTERIORES
M2
ALEROS
CAMARA DE CAPTACION
EXTERIOR
CAJA DE VALVULAS
EXTERIOR
02,01,09
ML
1.00
1.00
3.00
ML
1.00
1.00
5.00
UND
1.00
1.00
UND
1.00
2.00
PLANILLA DE METRADOS
LUGAR
ITEM
02,01,10
02,01,11
02,01,12
02,01,13
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
UND
1.00
2.00
UND
1.00
1.00
UND
1.00
2.00
UND
1.00
1.00
UND
1.00
1.00
UND
1.00
1.00
UND
1.00
1.00
UND
1.00
1.00
UND
1.00
1.00
FILTRO DE GRAVA
M3
1.00
2.20
1.00
2.10
1.00
16.00
1.00
20.00
FILTRO DE ARENA
M3
M2
LANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
3.50
12.25
12.25
3.50
12.25
12.25
12.32
0.20
1.20
0.72
2.00
1.20
9.60
1.30
1.20
1.72
0.70
0.50
0.19
0.20
0.35
0.09
3.24
0.20
0.50
0.64
0.15
1.20
1.15
0.20
0.50
0.13
0.15
0.20
0.04
0.15
1.20
0.47
0.15
1.20
0.36
2.00
LANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
1.20
0.15
0.22
1.20
0.15
0.20
0.60
0.15
-0.05
0.10
0.50
0.05
0.10
0.50
0.02
0.40
0.15
0.02
26.94
1.20
15.36
0.90
3.60
1.20
6.24
0.40
0.64
0.50
1.10
118.83
PESO KG/M
DIAM
PARCIAL
0.56 3/8"
35.84
0.56 3/8"
26.88
LANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
0.56 3/8"
32.26
0.56 3/8"
13.10
0.56 3/8"
10.75
11.92
1.20
7.68
0.90
3.60
0.40
0.64
1.20
7.68
1.20
4.80
0.50
2.60
15.08
3.00
3.00
5.00
5.00
1.00
1.00
2.00
2.00
LANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
2.00
2.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.20
2.20
2.10
2.10
16.00
16.00
20.00
20.00
PLANILLA DE METRADOS
PARTIDA
2.02
02.02.01
02.02.01.01
DESCRIPCION
VECES
# ELEMEN
02,02,02
2.03
3,748.50
1.00
3,748.50
1.00
3,748.50
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TERRENO COMPACTO
0.80
2,998.80
3,748.50
3,748.50
02,02,02,04
SUB-TOTAL
TRAZO Y REPLANTEO
ALTURA
TRABAJOS PRELIMINARES
ANCHO
LINEA DE ADUCCION
02,02,02,01
LONG.
3,748.50
1.25
374.85
1.00
0.70
2,623.95
468.56
INSTALACION DE TUBERIAS
02,03,01
3,748.50
02,03,02
3,748.50
3,748.50
PLANILLA DE METRADOS
TOTAL
UNID.
3,748.50
M2
2,998.80
M3
3,748.50
2,623.95
M3
468.56
M3
3,748.50
3,748.50
PLANILLA DE METRADOS
ITEM
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
M2
7.00
1.00
1.00
02,03,02
TRAZO Y REPLANTEO
M2
7.00
1.00
1.00
02,03,03
M3
CAMARA DE ALMACENAMIENTO
7.00
1.00
1.10
CAJA DE VALVULAS
7.00
1.00
0.50
DADO CONCRETO
7.00
1.00
0.30
LARGO
7.00
2.00
0.80
ANCHO
7.00
2.00
0.60
PISO
7.00
1.00
1.00
DADO
7.00
1.00
0.30
LARGO
7.00
2.00
0.50
ANCHO
7.00
1.00
0.40
PISO
7.00
1.00
0.50
02,03,05
M3
MUROS
CAJA DE VALCULAS
MUROS
02,03,06
M2
PLANILLA DE METRADOS
ITEM
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
CAMARA DE ALAMACENAMIENTO
INTERIOR
7.00
1.00
2.40
EXTERIOOR
7.00
1.00
3.20
INTERIOR
7.00
1.00
1.20
EXTERIOR
7.00
1.00
4.50
CAJA DE VALVULAS
PLANILLA DE METRADOS
ITEM
02,03,07
DESCRIPCION
ACERO F'Y=4200 KG/CM2
UND.
N VECES
M3
N VECES
MUROS
LARGO
23.26
CANT
LARGO
7.00
22.00
1.05
7.00
7.00
3.20
14.00
9.00
1.30
7.00
1.00
2.40
7.00
1.00
0.60
7.00
1.00
1.20
7.00
1.00
0.40
EXTERIOR
7.00
1.00
3.20
CAJA DE VALVULAS
7.00
1.00
1.50
PISO
02,03,08
CANTIDAD
varillas ml
M2
CAMARA DE ALMACENAMIENTO
INTERIOR
CAJA DE VALVULAS
INTERIOR
02,03,09
02,03,10
TARRAJEO EN EXTERIORES
M2
ML
7.00
1.00
2.00
ML
7.00
1.00
2.00
UND
7.00
1.00
UND
7.00
1.00
UND
7.00
1.00
UND
7.00
1.00
PLANILLA DE METRADOS
ITEM
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
UND
7.00
1.00
UND
7.00
1.00
UND
7.00
1.00
UND
7.00
1.00
7.00
28.84
TAPA 0.60X0.60
7.00
1.00
0.60
TAPA 0.40X0.40
7.00
1.00
0.40
BOYA
02,03,11
02,03,12
M2
M2
ANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
1.50
10.50
10.50
1.50
10.50
10.50
9.53
1.10
1.00
8.47
0.50
0.50
0.88
0.30
0.30
0.19
3.45
0.10
1.00
1.12
0.10
1.00
0.84
1.00
0.10
0.70
0.30
0.30
0.19
0.10
0.40
0.28
0.10
0.40
0.11
0.60
0.10
0.21
60.55
ANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
1.00
16.80
1.10
24.64
0.40
3.36
0.50
15.75
ANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
270.09
PESO KG/M
DIAM
PARCIAL
0.56 3/8"
90.55
0.56 3/8"
87.81
0.56 3/8"
91.73
25.48
1.10
0.60
18.48
2.52
0.40
0.40
3.36
1.12
28.84
1.10
24.64
0.40
4.20
14.00
14.00
14.00
14.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
ANILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
201.88
201.88
3.64
0.60
2.52
0.40
1.12
RESERVORIO
Pg 20 de 237
07
02,04,01
02,04,01,01
GRAFICO
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
02,04,02
MOVIMIENTO DE TIERRAS
PARTIDA
GRAFICO
N VECES
PARTIDA
GRAFICO
N VECES
RESERVORIO
Pg 21 de 237
PARTIDA
07.02.03
GRAFICO
N VECES
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1.30
02,04,03
CONCRETO SIMPLE
PARTIDA
GRAFICO
07.03.01
N VECES
1
1
RESERVORIO
Pg 22 de 237
PARTIDA
02,04,05
GRAFICO
N VECES
PARTIDA
GRAFICO
02,04,06
N VECES
02,04,07
02,04,07,01
GRAFICO
N VECES
1
1
PARTIDA
GRAFICO
02,04,07,01,02
ESPECIFICACIONES
N VECES
34
RESERVORIO
Pg 23 de 237
34
1
2
2
2
2
2
2
2
2
2
4
4
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
64.44
356.64
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
37.3752
363.77
TOTAL Kg
401.15
02,04,07,02
MUROS REFORZADOS
PARTIDA
GRAFICO
02,04,07,02,01
ESPECIFICACIONES
N VECES
1
1
2
1
RESERVORIO
Pg 24 de 237
PARTIDA
02,04,07,02,02
GRAFICO
ENCOFRADOS Y DESENCOFRADOS DE
ESPECIFICACIONES
N VECES
2
2
4
2
PARTIDA
02,04,07,02,03
GRAFICO
ESPECIFICACIONES
N VECES
27
27
27
27
9
8
30
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
217.55
443.34
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
126.179
452.21
TOTAL Kg
578.39
02,04,07,03
TECHO
PARTIDA
GRAFICO
02.04.07.03.01
ESPECIFICACIONES
N VECES
RESERVORIO
Pg 25 de 237
1
-1
PARTIDA
GRAFICO
02.04.07.03.02
ESPECIFICACIONES
N VECES
1
1
1
1
PARTIDA
GRAFICO
02.04.07.03.03
ESPECIFICACIONES
N VECES
2
2
1
1
1
1
2
2
2
1
1
2
2
2
RESERVORIO
Pg 26 de 237
1
1
1
1
2
2
2
1
1
2
2
1
1
1
1
1
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
146.19
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
84.7902
0.00
TOTAL Kg
84.79
02,04,08
02.04.08.01
GRAFICO
02.04.08.01.01
ESPECIFICACIONES
N VECES
PARTIDA
RESERVORIO
Pg 27 de 237
PARTIDA
02.04.08.01.02
GRAFICO
ESPECIFICACIONES
N VECES
10
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
12.50
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
7.25
0.00
TOTAL Kg
7.25
02.04.08.02
MUROS REFORZADOS
PARTIDA
GRAFICO
02.04.08.02.01
ESPECIFICACIONES
N VECES
1
2
1
1
PARTIDA
GRAFICO
02.04.08.02.02
ENCOFRADOS Y DESENCOFRADOS DE
ESPECIFICACIONES
N VECES
2
1
1
1
1
2
RESERVORIO
Pg 28 de 237
RESERVORIO
Pg 29 de 237
PARTIDA
02.04.08.02.03
GRAFICO
ESPECIFICACIONES
N VECES
6
8
6
6
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
29.86
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
17.3188
0.00
TOTAL Kg
17.32
02.04.08.03
TECHO
PARTIDA
GRAFICO
02.04.08.03.01
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
02.04.08.03.02
ESPECIFICACIONES
N VECES
1
2
RESERVORIO
Pg 30 de 237
PARTIDA
02.04.08.03.03
GRAFICO
ESPECIFICACIONES
N VECES
2
6
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
4.80
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
2.784
0.00
TOTAL Kg
2.78
02.04.09
02.04.09.01
ARQUITECTURA
ENLUCIDOS Y MOLDURAS
PARTIDA
GRAFICO
N VECES
1
1
1
2
2
2
2
RESERVORIO
Pg 31 de 237
PARTIDA
02.04.09.01.02TARRAJEO EN EXTERIORES
GRAFICO
ESPECIFICACIONES
N VECES
1
4
2
1
1
2
1
1
1
07.06.02
CIELORRASOS
PARTIDA
GRAFICO
02.04.09.01.03
ESPECIFICACIONES
N VECES
1
-1
1
02.04.09.02
PINTURA
PARTIDA
GRAFICO
N VECES
1
4
RESERVORIO
Pg 32 de 237
2
1
1
2
1
1
1
PARTIDA
GRAFICO
N VECES
1
1
02.04.09.03
02.04.09.03.
07.07.01.01
INSTALACIONES SANITARIAS
INSTALACION DE TUBERIAS VALVULAS Y ACCESORIOS
CAJA VALVULA - SALIDA
PARTIDA
GRAFICO
07.07.01.01.01
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
07.07.01.01.02
JUNTA DE DILATACION
ESPECIFICACIONES
N VECES
RESERVORIO
Pg 33 de 237
RESERVORIO
Pg 34 de 237
07.07.01.02
VARIOS
PARTIDA
GRAFICO
07.07.01.02.01
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
07.07.01.02.02
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
07.07.01.02.03
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
07.07.01.02.04
ESPECIFICACIONES
N VECES
02.04.09.04
CERCO PERIMETRICO
TRABAJOS PRELIMINARES
RESERVORIO
Pg 35 de 237
PARTIDA
GRAFICO
N VECES
RESERVORIO
Pg 36 de 237
ANCHO(m)
A=
40.06
LARGO(m)
ANCHO(m)
A=
40.06
ALTO(m)
ANCHO(m)
A=
62.72
m2
METRADO
PARCIAL
METRADO
TOTAL
40.06
ALTO(m)
ALTO(m)
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
1.58
0.60
0.60
40.06
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
62.72
40.06
UND
40.06
N TERRENO COMPACTO
LARGO(m)
UND
62.72
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
0.57
0.57
RESERVORIO
Pg 37 de 237
ANCHO(m)
A=
45.74
ALTO(m)
ANCHO(m)
m3
METRADO
PARCIAL
METRADO
TOTAL
45.74
UND
ALTO(m)
62.15
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
80.80
45.74
80.80
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
1.00
0.10
15.34
1.53
1.30
1.50
0.10
0.20
17.29
RESERVORIO
Pg 38 de 237
LARGO(m)
ANCHO(m)
25.30
1.00
ALTO(m)
ANCHO(m)
25.30
1.00
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
m2
METRADO
PARCIAL
METRADO
TOTAL
25.30
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
0.15
14.68
2.20
0.12
1.57
13.10
25.30
UND
25.30
m2
25.30
UND
3.77
4.67
1/4"
3/8"
1/2"
5/8"
158.78
RESERVORIO
Pg 39 de 237
5.69
193.46
4.00
4.00
3.98
7.96
3.92
7.84
3.81
7.62
3.66
7.32
3.46
6.92
3.19
6.38
2.84
5.68
2.38
4.76
1.78
3.56
0.60
2.40
1.10
4.40
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
12.50
0.15
3.80
7.13
0.80
0.10
0.60
0.05
0.60
0.10
0.60
0.07
0.80
0.15
0.60
0.07
7.32
RESERVORIO
Pg 40 de 237
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
12.50
3.80
95.00
0.80
0.60
0.96
0.60
0.60
1.44
0.40
0.60
0.48
97.88
1/4"
3/8"
1/2"
4.03
108.81
4.03
108.81
4.18
112.86
4.18
112.86
0.75
6.75
0.85
6.80
6.80
204.00
ANCHO(m)
ALTO(m)
5/8"
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
RESERVORIO
Pg 41 de 237
0.40
0.15
13.68
0.60
0.15
2.05
-0.04
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
2.02
10.59
10.59
1.28
1.28
13.10
0.15
1.97
2.00
0.15
0.30
14.14
1/4"
3/8"
1.98
3.96
2.63
5.26
3.08
3.08
3.42
3.42
3.68
3.68
3.88
3.88
4.02
8.04
4.12
8.24
4.18
8.36
4.20
4.20
3.03
3.03
2.70
5.40
2.08
4.16
2.73
5.46
1/2"
5/8"
RESERVORIO
Pg 42 de 237
3.18
3.18
3.52
3.52
3.78
3.78
3.98
3.98
4.12
8.24
4.22
8.44
4.28
8.56
4.30
4.30
3.13
3.13
2.80
5.60
2.65
5.30
3.47
3.47
3.92
3.92
4.00
4.00
3.36
3.36
3.24
3.24
ANCHO(m)
ALTO(m)
1.50
1.30
0.10
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
0.20
0.20
RESERVORIO
Pg 43 de 237
1/4"
1.25
3/8"
1/2"
5/8"
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
12.50
ANCHO(m)
ALTO(m)
1.50
0.10
0.90
0.14
1.35
0.10
0.90
0.24
1.50
0.15
0.60
0.14
1.50
0.05
0.20
0.02
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
1.35
1.00
3.60
1.50
0.70
1.05
1.50
0.30
0.45
1.50
0.10
0.53
9.35
0.15
1.30
0.90
1.17
1.05
0.90
1.89
RESERVORIO
Pg 44 de 237
1.30
0.80
1.04
RESERVORIO
Pg 45 de 237
1/4"
3/8"
0.97
5.82
0.98
7.84
1.25
7.50
1.45
8.70
ANCHO(m)
ALTO(m)
0.30
1.50
0.10
ANCHO(m)
1.30
0.30
ALTO(m)
1/2"
5/8"
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
0.05
0.05
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
0.10
0.13
0.10
0.06
0.19
RESERVORIO
Pg 46 de 237
1/4"
3/8"
1.44
2.88
0.32
1.92
LARGO(m)
ANCHO(m)
ALTO(m)
10.60
1/2"
5/8"
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
10.60
1.05
1.30
1.37
11.50
2.61
30.02
0.60
0.75
0.90
0.40
0.75
0.60
1.05
0.90
1.89
1.30
0.90
2.34
47.71
RESERVORIO
Pg 47 de 237
LARGO(m)
ANCHO(m)
12.50
ALTO(m)
2.61
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
32.63
0.80
0.60
1.92
1.35
1.00
2.70
1.50
1.00
1.50
3.00
0.10
0.30
13.10
1.28
2.56
0.15
1.97
0.80
0.80
0.64
0.30
1.50
0.45
ANCHO(m)
ALTO(m)
10.60
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
10.60
0.60
0.40
-0.24
0.15
1.30
0.20
ANCHO(m)
12.50
0.80
ALTO(m)
2.61
0.60
44.66
10.56
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
32.63
44.66
1.92
RESERVORIO
Pg 48 de 237
1.35
1.00
2.70
1.50
1.00
1.50
3.00
0.10
0.30
13.10
1.28
2.56
0.15
1.97
0.80
0.80
0.64
0.30
1.50
0.45
ANCHO(m)
1.30
0.60
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
0.70
0.91
0.60
ANCHO(m)
ALTO(m)
UND
glb
METRADO
PARCIAL
METRADO
TOTAL
1.00
LARGO(m)
1.50
ANCHO(m)
1.27
0.36
UND
ALTO(m)
1.00
UND
METRADO
PARCIAL
METRADO
TOTAL
1.50
1.50
RESERVORIO
Pg 49 de 237
RESERVORIO
Pg 50 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
ANCHO(m)
ALTO(m)
45.00
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
45.00
ANCHO(m)
ALTO(m)
1.00
0.60
0.60
1.00
45.00
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
0.36
0.36
RESERVORIO
Pg 51 de 237
ANCHO(m)
35.00
1.00
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
35.00
35.00
PLANILLA DE METRADOS
PARTIDA
02.05
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
ALTURA
SUB-TOTAL
6,372.54
TRAZO Y REPLANTEO
L=VIENE DE LA SUMA DE INSTALACIONES DE TUBERIAS
02.05.02
MOVIMIENTO DE TIERRAS
02.05.02.01
1.00
6,372.54
0.60
6,372.54
0.80
3,058.82
02.05.02.03
6,372.54
3,058.82
TOTAL
6,372.54
6,372.54
6,372.54
2,676.47
6,372.54
0.60
0.70
2,676.47
2,294.11
2,294.11
02.05.02.04
02.05.03
INSTALACION DE TUBERIAS
02.05.03.01
799.50
799.50
02.05.03.02
500.90
500.90
02.05.03.03
1,737.44
1,737.44
0.75
3,058.82
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
VECES
# ELEMEN
LONG.
02.05.03.04
3,334.70
02.05.03.05
6,372.54
ANCHO
ALTURA
SUB-TOTAL
TOTAL
3,334.70
6,372.54
6,372.54
ACCESORIOS
INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION
1.00
1.00
1.00
3.00
1.00
3.00
2.00
1.00
2.00
02.05.04.03
4.00
1.00
4.00
02.05.04.04
8.00
1.00
8.00
02.05.04.05
5.00
1.00
5.00
02.05.04.06
4.00
1.00
4.00
02.05.05
02.05.04
02.05.04.01
02.05.04.02
GLB
15.00
12.00
247.00
15.00
12.00
247.00
15.00
12.00
247.00
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
ALTURA
SUB-TOTAL
TOTAL
PLANILLA DE METRADOS
UNID.
M2
M3
M
M3
M3
M
M
M
PLANILLA DE METRADOS
UNID.
M
UND
UND
UND
UND
UND
PLANILLA DE METRADOS
UNID.
PLANILLA DE METRADOS
ITEM
07.00.00
07.01.00
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
CAMARA ROMPEPRESIONES
CAMARA ROMPEPRESIONES T-6 1" <1.2 LT/S
und
6.00
02.05.06.01
LIMPIEZA
M2
3.00
1.00
1.00
02.05.06.02
M2
3.00
1.00
1.00
02.05.06.03
EXCAVACION EN TIERRA
M3
CAMARA DE ALMACENAMIENTO
3.00
1.00
1.10
CAJA DE VALVULAS
3.00
1.00
0.50
DADO CONCRETO
3.00
1.00
0.30
LARGO
3.00
2.00
0.80
ANCHO
3.00
2.00
0.60
PISO
3.00
1.00
1.00
DADO
3.00
1.00
0.30
LARGO
3.00
2.00
0.50
ANCHO
3.00
1.00
0.40
PISO
3.00
1.00
0.50
02.05.06.05
M3
MUROS
CAJA DE VALCULAS
MUROS
PLANILLA DE METRADOS
ITEM
02.05.06.06
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
M2
CAMARA DE ALAMACENAMIENTO
INTERIOR
3.00
1.00
2.40
EXTERIOOR
3.00
1.00
3.20
INTERIOR
3.00
1.00
1.20
EXTERIOR
3.00
1.00
4.50
CAJA DE VALVULAS
02.05.06.07
M3
varillas ml
N VECES
MUROS
PISO
02.05.06.08
12.86
CANT
LARGO
3.00
22.00
1.05
3.00
7.00
3.20
6.00
9.00
1.30
3.00
1.00
2.40
3.00
1.00
0.60
3.00
1.00
1.20
M2
CAMARA DE ALMACENAMIENTO
INTERIOR
CAJA DE VALVULAS
INTERIOR
PLANILLA DE METRADOS
ITEM
02.05.06.09
02.05.06.10
DESCRIPCION
UND.
N VECES
CANTIDAD
LARGO
3.00
1.00
0.40
EXTERIOR
3.00
1.00
3.20
CAJA DE VALVULAS
3.00
1.00
1.50
TARRAJEO EN EXTERIORES
M2
ML
3.00
1.00
2.00
ML
3.00
1.00
2.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
UND
3.00
1.00
3.00
12.36
3.00
1.00
BOYA
02.05.06.11
02.05.06.12
M2
M2
0.60
PLANILLA DE METRADOS
ITEM
DESCRIPCION
TAPA 0.40X0.40
UND.
N VECES
CANTIDAD
3.00
LARGO
1.00
0.40
NILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
1.50
4.50
4.50
1.50
4.50
4.50
4.09
1.10
1.00
3.63
0.50
0.50
0.38
0.30
0.30
0.08
1.48
0.10
1.00
0.48
0.10
1.00
0.36
1.00
0.10
0.30
0.30
0.30
0.08
0.10
0.40
0.12
0.10
0.40
0.05
0.60
0.10
0.09
NILLA DE METRADOS
ANCHO
ALTO
PARCIAL
TOTAL
25.95
1.00
7.20
1.10
10.56
0.40
1.44
0.50
6.75
115.75
PESO KG/M
DIAM
PARCIAL
0.56 3/8"
38.81
0.56 3/8"
37.63
0.56 3/8"
39.31
10.92
1.10
0.60
7.92
1.08
0.40
1.44
NILLA DE METRADOS
ANCHO
ALTO
0.40
PARCIAL
TOTAL
0.48
12.36
1.10
10.56
0.40
1.80
6.00
6.00
6.00
6.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
37.08
37.08
1.56
0.60
1.08
NILLA DE METRADOS
ANCHO
ALTO
0.40
PARCIAL
TOTAL
0.48
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
3.00
03.01
03.01.01
VECES # ELEMEN
LONG.
ANCHO
TRAZO Y REPLANTEO
L=VIENE DE LA SUMA DE INSTALACIONES DE TUBERIAS
7,526.79
1.00
4,892.41
1.00
2,634.38
1.00
MOVIMIENTO DE TIERRAS
03.01.02
03.01.03
03.01.04
03.01.05
7,526.79
7,526.79
03.01.06
6,189.43
03.01.07
1,337.36
03.01.08
PRUEBA HIDRAULICA
7,526.79
03.01.09
03.02
03.02.01
1.00
8,140.22
274.00
1.00
PLANILLA DE METRADOS
FECHA:
ALTURA
SUB-TOTAL
TOTAL
UNID.
7,526.79
M2
6,849.38
M3
3,688.13
M3
7,526.79
5,268.75
M3
6,189.43
1,337.36
7,526.79
7,526.79
8,140.22
8,140.22
M3
110.00
110.00
7,526.79
1.40
6,849.38
1.40
3,688.13
7,526.79
0.70
5,268.75
UND
PLANILLA DE METRADOS
#REF!
PROYEC.:
PARTIDA
03.03
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
152.00 UND
TRABAJOS PRELIMINARES
03.03.01
TRAZO Y REPLANTEO
152.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.03.02
152.00
0.65
2.10
03.03.03
152.00
0.35
2.10
03.03.04
1.25
290.47
152.00
0.65
2.10
EN PISO
152.00
1.00
2.10
EN MURO
152.00
1.00
5.03
EN LOSA
152.00
1.00
2.10
EN MURO
152.00
1.00
5.03
EN LOSA
152.00
1.00
2.10
152.00
16.00
0.80
1.02
MURO HORIZONTAL
152.00
7.00
5.03
1.02
MURO VERTICAL
152.00
26.15
1.20
1.02
152.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.03.05
03.03.06
03.03.07
03.03.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.03.09
0.20
152.00
1.00
2.10
MURO INTERIOR
152.00
1.00
5.03
ACCESORIOS
03.03.10
152.00
1.00
ADOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
319.20
319.20
M3
1.40
290.47
290.47
M3
1.40
156.41
156.41
M3
363.09
363.09
M3
207.48
207.48
M2
311.17
M3
1,236.67
M2
1,984.51
KG
1,236.67
M2
0.20
1.20
0.20
1.20
63.84
183.49
63.84
917.47
319.20
1,984.51
5,458.96
4,865.16
1,984.51
319.20
1.20
917.47
152.00
152.00
UND
PLANILLA DE METRADOS
#REF!
PROYEC.:
03.04
DESCRIPCION
VECES
# ELEMEN
LONG.
8.00 UND
TRABAJOS PRELIMINARES
03.04.01
TRAZO Y REPLANTEO
8.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.04.02
8.00
0.65
2.10
03.04.03
8.00
0.35
2.10
03.04.04
1.25
17.47
8.00
0.65
2.10
EN PISO
8.00
1.00
2.10
EN MURO
8.00
1.00
5.03
EN LOSA
8.00
1.00
2.10
EN MURO
8.00
1.00
5.03
EN LOSA
8.00
1.00
2.10
8.00
16.00
0.80
MURO HORIZONTAL
8.00
8.00
5.03
MURO VERTICAL
8.00
26.15
1.40
8.00
16.00
0.80
OBRAS DE CONCRETO
03.04.05
03.04.06
03.04.07
03.04.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.04.09
8.00
1.00
2.10
MURO INTERIOR
8.00
1.00
5.03
ACCESORIOS
03.04.10
8.00
1.00
E METRADOS
REF!
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
16.80
16.80
M3
1.60
17.47
17.47
M3
1.60
9.41
9.41
M3
21.84
21.84
M3
10.92
10.92
M2
17.99
M3
73.14
M2
104.45
KG
73.14
M2
0.20
0.20
10/14/2016
1.40
0.20
1.40
3.36
11.27
3.36
56.34
16.80
104.45
328.36
298.74
104.45
1.02
1.02
1.02
1.02
16.80
1.40
56.34
8.00
8.00
UND
PLANILLA DE METRADOS
PARTIDA
03.05
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
1.00 UND
TRABAJOS PRELIMINARES
03.05.01
TRAZO Y REPLANTEO
1.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.05.02
1.00
0.65
2.10
03.05.03
1.00
0.35
2.10
03.05.04
1.25
2.46
1.00
0.65
2.10
EN PISO
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
1.00
16.00
0.80
1.02
MURO HORIZONTAL
1.00
9.00
5.03
1.02
MURO VERTICAL
1.00
26.15
1.60
1.02
1.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.05.05
03.05.06
03.05.07
03.05.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.05.09
0.20
1.00
1.00
2.10
MURO INTERIOR
1.00
1.00
5.03
ACCESORIOS
03.05.10
1.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
2.10
2.10
M3
1.80
2.46
2.46
M3
1.80
1.32
1.32
M3
3.07
3.07
M3
1.37
1.37
M2
2.45
M3
10.15
M2
13.06
KG
10.15
M2
0.20
1.60
0.20
1.60
0.42
1.61
0.42
8.05
2.10
13.06
46.18
42.68
13.06
2.10
1.60
8.05
1.00
1.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.06
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
4.00 UND
TRABAJOS PRELIMINARES
03.06.01
TRAZO Y REPLANTEO
4.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.06.02
4.00
0.65
2.10
03.06.03
4.00
0.35
2.10
03.06.04
1.25
10.92
4.00
0.65
2.10
EN PISO
4.00
1.00
2.10
EN MURO
4.00
1.00
5.03
EN LOSA
4.00
1.00
2.10
EN MURO
4.00
1.00
5.03
EN LOSA
4.00
1.00
2.10
4.00
16.00
0.80
1.02
MURO HORIZONTAL
4.00
10.00
5.03
1.02
MURO VERTICAL
4.00
26.15
1.80
1.02
4.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.06.05
03.06.06
03.06.07
03.06.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.06.09
0.20
4.00
1.00
2.10
MURO INTERIOR
4.00
1.00
5.03
ACCESORIOS
03.06.10
4.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
8.40
8.40
M3
2.00
10.92
10.92
M3
2.00
5.88
5.88
M3
13.65
13.65
M3
5.46
5.46
M2
10.60
M3
44.62
M2
52.22
KG
44.62
M2
0.20
1.80
0.20
1.80
1.68
7.24
1.68
36.22
8.40
52.22
205.22
192.05
52.22
8.40
1.80
36.22
4.00
4.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.07
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
6.00 UND
TRABAJOS PRELIMINARES
03.07.01
TRAZO Y REPLANTEO
6.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.07.02
6.00
0.65
2.10
03.07.03
6.00
0.35
2.10
03.07.04
1.25
18.02
6.00
0.65
2.10
EN PISO
6.00
1.00
2.10
EN MURO
6.00
1.00
5.03
EN LOSA
6.00
1.00
2.10
EN MURO
6.00
1.00
5.03
EN LOSA
6.00
1.00
2.10
6.00
16.00
0.80
1.02
MURO HORIZONTAL
6.00
11.00
5.03
1.02
MURO VERTICAL
6.00
26.15
2.00
1.02
6.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.07.05
03.07.06
03.07.07
03.07.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.07.09
0.20
6.00
1.00
2.10
MURO INTERIOR
6.00
1.00
5.03
ACCESORIOS
03.07.10
6.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
12.60
12.60
M3
2.20
18.02
18.02
M3
2.20
9.70
9.70
M3
22.52
22.52
M3
8.19
8.19
M2
17.11
M3
72.96
M2
78.34
KG
72.96
M2
0.20
2.00
0.20
2.00
2.52
12.07
2.52
60.36
12.60
78.34
338.62
320.08
78.34
12.60
2.00
60.36
6.00
6.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.08
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
5.00 UND
TRABAJOS PRELIMINARES
03.08.01
TRAZO Y REPLANTEO
5.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.08.02
5.00
0.65
2.10
03.08.03
5.00
0.35
2.10
03.08.04
1.25
16.38
5.00
0.65
2.10
EN PISO
5.00
1.00
2.10
EN MURO
5.00
1.00
5.03
EN LOSA
5.00
1.00
2.10
EN MURO
5.00
1.00
5.03
EN LOSA
5.00
1.00
2.10
5.00
16.00
0.80
1.02
MURO HORIZONTAL
5.00
12.00
5.03
1.02
MURO VERTICAL
5.00
26.15
2.20
1.02
5.00
16.00
0.80
1.02
OBRAS DE CONCRETO
5.00
03.08.06
03.08.07
03.08.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.08.09
0.20
5.00
1.00
2.10
MURO INTERIOR
5.00
1.00
5.03
ACCESORIOS
03.08.10
5.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
10.50
10.50
M3
2.40
16.38
16.38
M3
2.40
8.82
8.82
M3
20.48
20.48
M3
6.83
6.83
M2
15.27
M3
65.83
M2
65.28
KG
65.83
M2
0.20
2.20
0.20
2.20
2.10
11.07
2.10
55.33
10.50
65.28
307.84
293.40
65.28
10.50
2.20
55.33
5.00
5.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.09
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
1.00 UND
TRABAJOS PRELIMINARES
03.09.01
TRAZO Y REPLANTEO
1.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.09.02
1.00
0.65
2.10
03.09.03
1.00
0.35
2.10
03.09.04
1.25
3.28
1.00
0.65
2.10
EN PISO
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
1.00
16.00
0.80
1.02
MURO HORIZONTAL
1.00
12.00
5.03
1.02
MURO VERTICAL
1.00
26.15
2.20
1.02
1.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.09.05
03.09.06
03.09.07
03.09.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.09.09
0.20
1.00
1.00
2.10
MURO INTERIOR
1.00
1.00
5.03
ACCESORIOS
03.09.10
1.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
2.10
2.10
M3
2.40
3.28
3.28
M3
2.40
1.76
1.76
M3
4.10
4.10
M3
1.37
1.37
M2
3.05
M3
13.17
M2
13.06
KG
13.17
M2
0.20
2.20
0.20
2.20
0.42
2.21
0.42
11.07
2.10
13.06
61.57
58.68
13.06
2.10
2.20
11.07
1.00
1.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.10
DESCRIPCION
VECES
# ELEMEN
LONG.
ANCHO
5.00 UND
TRABAJOS PRELIMINARES
03.10.01
TRAZO Y REPLANTEO
5.00
1.00
2.10
MOVIMIENTO DE TIERRAS
203.10.02
5.00
0.65
2.10
03.10.03
5.00
0.35
2.10
03.10.04
1.25
19.11
5.00
0.65
2.10
EN PISO
5.00
1.00
2.10
EN MURO
5.00
1.00
5.03
EN LOSA
5.00
1.00
2.10
EN MURO
5.00
1.00
5.03
EN LOSA
5.00
1.00
2.10
5.00
16.00
0.80
1.02
MURO HORIZONTAL
5.00
14.00
5.03
1.02
MURO VERTICAL
5.00
26.15
2.60
1.02
5.00
16.00
0.80
1.02
OBRAS DE CONCRETO
03.10.05
03.10.06
03.10.07
03.10.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.10.09
0.20
5.00
1.00
2.10
MURO INTERIOR
5.00
1.00
5.03
ACCESORIOS
03.10.10
5.00
1.00
DOS
FECHA:
ALTURA
10/14/2016
SUB-TOTAL
TOTAL
UNID.
10.50
10.50
M3
2.80
19.11
19.11
M3
2.80
10.29
10.29
M3
23.89
23.89
M3
6.83
6.83
M2
17.28
M3
75.89
M2
65.28
KG
75.89
M2
0.20
2.60
0.20
2.60
2.10
13.08
2.10
65.39
10.50
65.28
359.14
346.75
65.28
10.50
2.60
65.39
5.00
5.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.11
DESCRIPCION
VECES
# ELEMEN
LONG.
3.00 UND
TRABAJOS PRELIMINARES
03.11.01
TRAZO Y REPLANTEO
3.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.11.02
3.00
0.65
2.10
03.11.03
3.00
0.35
2.10
03.11.04
1.25
12.29
3.00
0.65
2.10
EN PISO
3.00
1.00
2.10
EN MURO
3.00
1.00
5.03
EN LOSA
3.00
1.00
2.10
EN MURO
3.00
1.00
5.03
EN LOSA
3.00
1.00
2.10
3.00
16.00
0.80
MURO HORIZONTAL
3.00
15.00
5.03
MURO VERTICAL
3.00
26.15
2.80
3.00
16.00
0.80
OBRAS DE CONCRETO
03.11.05
03.11.06
03.11.07
03.11.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.11.09
3.00
1.00
2.10
MURO INTERIOR
3.00
1.00
5.03
ACCESORIOS
03.11.10
3.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
6.30
6.30
M3
3.00
12.29
12.29
M3
3.00
6.62
6.62
M3
15.36
15.36
M3
4.10
4.10
M2
10.97
M3
48.55
M2
39.17
KG
48.55
M2
0.20
0.20
10/14/2016
2.80
0.20
2.80
1.26
8.45
1.26
42.25
6.30
39.17
230.88
224.05
39.17
1.02
1.02
1.02
1.02
6.30
2.80
42.25
3.00
3.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.12
DESCRIPCION
VECES
# ELEMEN
LONG.
2.00 UND
TRABAJOS PRELIMINARES
03.12.01
TRAZO Y REPLANTEO
2.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.12.02
2.00
0.65
2.10
03.12.03
2.00
0.35
2.10
03.12.04
1.25
8.74
2.00
0.65
2.10
EN PISO
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
2.00
16.00
0.80
MURO HORIZONTAL
2.00
16.00
5.03
MURO VERTICAL
2.00
26.15
3.00
2.00
16.00
0.80
OBRAS DE CONCRETO
03.12.05
03.12.06
03.12.07
03.12.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.12.09
2.00
1.00
2.10
MURO INTERIOR
2.00
1.00
5.03
ACCESORIOS
03.12.10
2.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
4.20
4.20
M3
3.20
8.74
8.74
M3
3.20
4.70
4.70
M3
10.92
10.92
M3
2.73
2.73
M2
7.72
M3
34.38
M2
26.11
KG
34.38
M2
0.20
0.20
10/14/2016
3.00
0.20
3.00
0.84
6.04
0.84
30.18
4.20
26.11
164.18
160.04
26.11
1.02
1.02
1.02
1.02
4.20
3.00
30.18
2.00
2.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.13
DESCRIPCION
VECES
# ELEMEN
LONG.
2.00 UND
TRABAJOS PRELIMINARES
03.13.01
TRAZO Y REPLANTEO
2.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.13.02
2.00
0.65
2.10
03.13.03
2.00
0.35
2.10
03.13.04
1.25
9.28
2.00
0.65
2.10
EN PISO
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
2.00
16.00
0.80
MURO HORIZONTAL
2.00
17.00
5.03
MURO VERTICAL
2.00
26.15
3.20
2.00
16.00
0.80
OBRAS DE CONCRETO
03.13.05
03.13.06
03.13.07
03.13.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.13.09
2.00
1.00
2.10
MURO INTERIOR
2.00
1.00
5.03
ACCESORIOS
03.13.10
2.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
4.20
4.20
M3
3.40
9.28
9.28
M3
3.40
5.00
5.00
M3
11.60
11.60
M3
2.73
2.73
M2
8.12
M3
36.39
M2
26.11
KG
36.39
M2
0.20
0.20
10/14/2016
3.20
0.20
3.20
0.84
6.44
0.84
32.19
4.20
26.11
174.44
170.71
26.11
1.02
1.02
1.02
1.02
4.20
3.20
32.19
2.00
2.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.14
DESCRIPCION
VECES
# ELEMEN
LONG.
2.00 UND
TRABAJOS PRELIMINARES
03.14.01
TRAZO Y REPLANTEO
2.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.14.02
2.00
0.65
2.10
03.14.03
2.00
0.35
2.10
03.14.04
1.25
9.83
2.00
0.65
2.10
EN PISO
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
2.00
16.00
0.80
MURO HORIZONTAL
2.00
18.00
5.03
MURO VERTICAL
2.00
26.15
3.40
2.00
16.00
0.80
OBRAS DE CONCRETO
03.14.05
03.14.06
03.14.07
03.14.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.14.09
2.00
1.00
2.10
MURO INTERIOR
2.00
1.00
5.03
ACCESORIOS
03.14.10
2.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
4.20
4.20
M3
3.60
9.83
9.83
M3
3.60
5.29
5.29
M3
12.29
12.29
M3
2.73
2.73
M2
8.52
M3
38.40
M2
26.11
KG
38.40
M2
0.20
0.20
10/14/2016
3.40
0.20
3.40
0.84
6.84
0.84
34.20
4.20
26.11
184.70
181.38
26.11
1.02
1.02
1.02
1.02
4.20
3.40
34.20
2.00
2.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.15
DESCRIPCION
VECES
# ELEMEN
LONG.
1.00 UND
TRABAJOS PRELIMINARES
03.15.01
TRAZO Y REPLANTEO
1.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.15.02
1.00
0.65
2.10
03.15.03
1.00
0.35
2.10
03.15.04
1.25
5.19
1.00
0.65
2.10
EN PISO
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
EN MURO
1.00
1.00
5.03
EN LOSA
1.00
1.00
2.10
1.00
16.00
0.80
MURO HORIZONTAL
1.00
19.00
5.03
MURO VERTICAL
1.00
26.15
3.60
1.00
16.00
0.80
OBRAS DE CONCRETO
03.15.05
03.15.06
03.15.07
03.15.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.15.09
1.00
1.00
2.10
MURO INTERIOR
1.00
1.00
5.03
ACCESORIOS
03.15.10
1.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
2.10
2.10
M3
3.80
5.19
5.19
M3
3.80
2.79
2.79
M3
6.48
6.48
M3
1.37
1.37
M2
4.46
M3
20.21
M2
13.06
KG
20.21
M2
0.20
0.20
10/14/2016
3.60
0.20
3.60
0.42
3.62
0.42
18.11
2.10
13.06
97.48
96.02
13.06
1.02
1.02
1.02
1.02
2.10
3.60
18.11
1.00
1.00
UND
PLANILLA DE METRADOS
0
PARTIDA
03.16
DESCRIPCION
VECES
# ELEMEN
LONG.
2.00 UND
TRABAJOS PRELIMINARES
03.16.01
TRAZO Y REPLANTEO
2.00
1.00
2.10
MOVIMIENTO DE TIERRAS
03.16.02
2.00
0.65
2.10
03.16.03
2.00
0.35
2.10
03.16.04
1.25
10.92
2.00
0.65
2.10
EN PISO
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
EN MURO
2.00
1.00
5.03
EN LOSA
2.00
1.00
2.10
2.00
16.00
0.80
MURO HORIZONTAL
2.00
20.00
5.03
MURO VERTICAL
2.00
26.15
3.80
2.00
16.00
0.80
OBRAS DE CONCRETO
03.16.05
03.16.06
03.16.07
03.16.08
ENCOFRADO Y DESENCOFRADO
REVESTIDOS Y MOLDURAS
03.16.09
2.00
1.00
2.10
MURO INTERIOR
2.00
1.00
5.03
ACCESORIOS
03.16.10
2.00
1.00
E METRADOS
0
FECHA:
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
4.20
4.20
M3
4.00
10.92
10.92
M3
4.00
5.88
5.88
M3
13.65
13.65
M3
2.73
2.73
M2
9.33
M3
42.43
M2
26.11
KG
42.43
M2
0.20
0.20
10/14/2016
3.80
0.20
3.80
0.84
7.65
0.84
38.23
4.20
26.11
205.22
202.71
26.11
1.02
1.02
1.02
1.02
4.20
3.80
38.23
2.00
2.00
UND
CAM. REJ
Pg 124 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
04.01.01
TRATAMIENTO
CAMARA DE REJAS
TRABAJOS PRELIMINARES
PARTIDA
04.01.01.01
GRAFICO
N VECES
PARTIDA
04.01.01.02
GRAFICO
TRAZO Y REPLANTEO
ESPECIFICACIONES
N VECES
04.01.02
MOVIMIENTO DE TIERRAS
PARTIDA
04.01.02.01
GRAFICO
Area = 3.45
N VECES
Long.= 1.75
CAMARA DE REJAS
PARTIDA
PARTIDA
GRAFICO
04.01.02.02
N VECES
CAM. REJ
Pg 125 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
TRATAMIENTO
CAMARA DE REJAS
1.30
04.01.03
GRAFICO
04.01.03.01
N VECES
1
Area = 2.85m2
CAM. REJ
Pg 126 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
TRATAMIENTO
CAMARA DE REJAS
PARTIDA
04.01.03.02
GRAFICO
N VECES
Area = 0.30m2
h = 0.73m
1
1
1
Area = 0.4m2
h = 0.35m
1
1
1
1
1
-2
1
1
PARTIDA
GRAFICO
04.01.03.04
N VECES
1
1
Perimetro= 7.91m
-1
1
2
2
2
Perimetro=2.85m
h = 0.73m
2
2
2
Perimetro=5.31m
h = 0.35m
CAM. REJ
Pg 127 de 237
PLANILLA DE METRADOS
04.01
Perimetro=2.85m
4 PLANTA DE TRATAMIENTO
h = 0.73m
CAMARA DE REJAS
Perimetro=5.31m
h = 0.35m
2
-4
PARTIDA
04.01.03.03
GRAFICO
N VECES
2
17
3
3
3
3
3
17
32
8
4
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
158.60
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
91.988
0.00
TOTAL Kg
91.99
CAM. REJ
Pg 128 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
04.01.04
TRATAMIENTO
CAMARA DE REJAS
04.01.04.01
GRAFICO
N VECES
1
-1
1
Perimetro=2.85m
h = 0.73m
2
2
2
Perimetro=5.31m
h = 0.35m
2
2
2
2
-4
PARTIDA
DERRAMES E=0.15ML
GRAFICO
ESPECIFICACIONES
N VECES
1
1
1
04.01.05
ACCESORIOS
PARTIDA
04.01.05.01
CAM. REJ
Pg 129 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
TRATAMIENTO
CAMARA DE REJAS
GRAFICO
ESPECIFICACIONES
N VECES
PARTIDA
04.01.05.02
GRAFICO
N VECES
PARTIDA
GRAFICO
04.01.05.03
N VECES
CAM. REJ
Pg 130 de 237
PLANILLA DE METRADOS
4 PLANTA DE
04.01
TRATAMIENTO
CAMARA DE REJAS
PARTIDA
04.01.05.04
GRAFICO
N VECES
PARTIDA
GRAFICO
N VECES
1
1
CAM. REJ
Pg 131 de 237
LARGO(m)
ANCHO(m)
1.15
3.05
LARGO(m)
ANCHO(m)
1.15
3.05
ALTO(m)
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
3.51
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
3.51
3.51
ANCHO(m)
ALTO(m)
1.75
rea=
3.45
ANCHO(m)
m2
3.51
LARGO(m)
LARGO(m)
UND
ALTO(m)
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
6.04
6.04
UND
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
CAM. REJ
Pg 132 de 237
3.12
4.05
4.05
LARGO(m)
ANCHO(m)
ALTO(m)
rea=
2.85
1.00
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
2.85
2.85
CAM. REJ
Pg 133 de 237
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
0.90
0.15
0.61
0.08
1.24
0.15
0.73
0.14
0.45
0.15
0.83
0.06
0.45
0.15
0.59
0.04
rea=
0.30
0.73
0.22
rea=
0.40
0.35
0.14
0.91
0.15
0.57
0.08
0.45
0.15
0.83
0.06
0.45
0.15
0.59
0.04
0.30
0.15
0.20
-0.02
0.18
0.30
0.18
0.01
0.10
0.30
0.05
0.00
DESENCOFRADO NORMAL
0.84
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
Permetro=
7.91
0.15
1.19
Permetro=
2.85
0.73
2.08
Permetro=
1.61
0.38
-0.61
Permetro=
5.31
0.35
1.86
0.90
0.61
1.10
1.24
0.73
1.81
0.45
0.83
0.75
0.45
0.59
0.53
0.91
0.57
1.04
0.45
0.83
0.75
10.78
CAM. REJ
Pg 134 de 237
0.45
0.59
0.53
0.30
0.20
-0.24
LONGITUDES
LONG/PZA
5.20
0.70
5.20
5.20
0.70
0.70
4.70
2.40
1.00
0.85
1.80
1/4"
3/8"
1/2"
5/8"
10.40
11.90
15.60
15.60
2.10
2.10
14.10
40.80
32.00
6.80
7.20
CAM. REJ
Pg 135 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
Permetro=
2.85
0.73
2.08
Permetro=
1.61
0.38
-0.61
Permetro=
5.31
0.35
1.86
0.90
0.61
1.10
1.24
0.73
1.81
0.45
0.83
0.75
0.45
0.59
0.53
0.91
0.57
1.04
0.45
0.83
0.75
0.45
0.59
0.53
0.30
0.20
-0.24
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.13
5.13
3.17
3.17
1.00
1.00
18.89
UND
CAM. REJ
Pg 136 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
CAM. REJ
Pg 137 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.10
5.10
2.00
2.00
7.10
DESA
Pg 138 de 237
04.02
DESARENADOR
TRABAJOS PRELIMINARES
04.02.01
PARTIDA
04.02.01.01
GRAFICO
N VECES
PARTIDA
04.02.01.02
GRAFICO
N VECES
MOVIMIENTO DE TIERRAS
04.02.02
PARTIDA
04.02.02.01
GRAFICO
N VECES
1
Area = 2.77
PARTIDA
GRAFICO
04.02.02.02
N VECES
1.30
DESA
Pg 139 de 237
04.02
03.00
DESARENADOR
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
1
1
04.02.03
CONCRETO ARMADO
PARTIDA
GRAFICO
04.02.03.01
N VECES
DESA
Pg 140 de 237
04.02
DESARENADOR
PARTIDA
04.02.03.02
GRAFICO
ESPECIFICACIONES
N VECES
1
1
1
1
1
1
1
1
PARTIDA
04.02.03.03
GRAFICO
ESPECIFICACIONES
N VECES
1
1
1
1
10
6
10
10
20
8
10
6
4
4
DIAMETRO
1/4"
3/8"
1/2"
5/8"
DESA
Pg 141 de 237
04.02
DESARENADOR
LONG TOTAL
0.00
108.70
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
63.046
0.00
TOTAL Kg
63.05
PARTIDA
GRAFICO
04.02.03.04
N VECES
1
1
2
2
4
2
4
2
2
2
CORTE B-B
ESCALA 1/20
DESA
Pg 142 de 237
04.02
04.02.04
DESARENADOR
REVOQUES Y ENLUCIDOS
PARTIDA
GRAFICO
04.02.04.01
N VECES
1
1
2
2
4
2
4
2
2
2
2
PARTIDA
GRAFICO
DERRAMES E=0.15ML
ESPECIFICACIONES
N VECES
2
2
1
04.02.05
ACCESORIOS
PARTIDA
GRAFICO
N VECES
DESA
Pg 143 de 237
04.02
DESARENADOR
PARTIDA
04.02.05.02
GRAFICO
N VECES
07.00
INSTALACIONES HIDRAULICAS
PARTIDA
GRAFICO
N VECES
1
1
DESA
Pg 144 de 237
ANCHO(m)
3.60
0.96
ALTO(m)
ANCHO(m)
3.60
0.96
ALTO(m)
LARGO(m)
ANCHO(m)
ALTO(m)
1.56
rea=
2.77
3.42
ANCHO(m)
METRADO
PARCIAL
METRADO
TOTAL
3.46
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
3.46
3.46
LARGO(m)
m2
3.46
O DE NIVELES Y REPLANTEO
LARGO(m)
UND
ALTO(m)
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
4.32
4.32
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
4.44
4.44
DESA
Pg 145 de 237
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
1.10
5.30
1.00
5.83
rea=
0.42
2.77
1.17
ANCHO(m)
ALTO(m)
rea=
0.64
0.96
7.00
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
0.61
1.22
DESA
Pg 146 de 237
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
0.96
0.15
0.45
0.06
0.56
0.15
0.45
0.04
0.94
0.15
0.85
0.12
0.73
0.15
0.85
0.09
1.10
0.15
0.60
0.10
0.95
0.15
0.60
0.09
0.65
0.15
0.55
0.05
0.66
0.15
0.55
0.05
1/4"
3/8"
1.49
1.49
1.77
1.77
2.19
2.19
1.25
1.25
0.68
6.80
1.20
7.20
0.68
6.80
1.55
15.50
0.70
14.00
1.10
8.80
0.95
9.50
3.60
21.60
2.00
8.00
0.95
3.80
1/2"
5/8"
DESA
Pg 147 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
1.78
0.45
0.80
2.76
0.45
1.24
0.31
0.40
0.25
0.21
0.85
0.36
0.75
0.85
2.55
0.75
0.85
1.28
1.10
0.60
2.64
0.23
0.45
0.21
1.10
0.60
1.32
2.32
0.55
2.55
2.26
0.60
2.71
15.90
DESA
Pg 148 de 237
INT. CON MORTERO 1:5, ESP. 1,5CM ACABADO PULIDO CON IMPERMEAB.
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
1.78
0.45
0.80
2.76
0.45
1.24
0.31
0.40
0.25
0.21
0.85
0.36
0.75
0.85
2.55
0.75
0.85
1.28
1.10
0.60
2.64
0.23
0.45
0.21
1.10
0.60
1.32
2.32
0.55
2.55
2.26
0.60
2.71
LARGO(m)
ANCHO(m)
ALTO(m)
UND
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
3.40
6.80
0.66
1.32
1.68
1.68
ANCHO(m)
ALTO(m)
24.90
UND
METRADO
PARCIAL
METRADO
TOTAL
3.00
3.00
DESA
Pg 149 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
2.00
2.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.00
5.00
2.50
2.50
7.50
CAM DIST
Pg 150 de 237
02
04.03
04.03.01
PLANTA DE TRATAMIENTO
CAMARA DE DISTRIBUCION
TRABAJOS PRELIMINARES
PARTIDA
04.03.01.01
GRAFICO
N VECES
PARTIDA
04.03.01.02
GRAFICO
N VECES
04.03.02
MOVIMIENTO DE TIERRAS
PARTIDA
04.03.02.01
GRAFICO
N VECES
PARTIDA
04.03.02.02
GRAFICO
N VECES
CONCRETO SIMPLE
PARTIDA
CAM DIST
Pg 151 de 237
02
04.03
PLANTA DE TRATAMIENTO
CAMARA DE DISTRIBUCION
PARTIDA
GRAFICO
N VECES
04.03.03
CONCRETO ARMADO
PARTIDA
GRAFICO
04.03.03.02
N VECES
1
Area = 3.6800
1
2
1
1
CAM DIST
Pg 152 de 237
02
PLANTA DE TRATAMIENTO
CAMARA DE DISTRIBUCION
04.03
PARTIDA
04.03.03.03
GRAFICO
.66
N VECES
.3 2
.4 0
1 .2 0
1 .0 0
4
1
.66
.80
PARTIDA
04.03.03.04
GRAFICO
N VECES
1.50
3/8"@.15
1.50
1.30
3/8"@.10
0.93
1.06
1.20
ACERO PLANTA
1.25
1.37
1.46
0.85
3/8"@.15
3/8"@ .10
0.70
3/8"@ .15
Tub. 8"
3/8"@ .10
3/8"@ .15
0.59
Tub. 8"
0.45
ACERO CORTE A - A
CAM DIST
Pg 153 de 237
3/8"@.15
3/8"@ .10
02
PLANTA DE TRATAMIENTO
3/8"@ .15
3/8"@ .10
Tub. 8"
CAMARA DE DISTRIBUCION
04.03
3/8"@ .15
Tub. 8"
0.87
ACERO CORTE A - A
1.40
1.11
0.93
3/8"@.10
0.66
1.50
8.45
0.48
TECHO PLANTA
0.34
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
169.00
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
98.02
0.00
TOTAL Kg
98.02
CAM DIST
Pg 154 de 237
02
04.03
04.03.04
PLANTA DE TRATAMIENTO
CAMARA DE DISTRIBUCION
ENLUCIDOS Y MOLDURAS
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
1
1
4
1
1
04.03.05
ACCESORIOS
PARTIDA
04.03.05.01
GRAFICO
N VECES
07.00
INSTALACIONES HIDRAULICAS
PARTIDA
GRAFICO
N VECES
CAM DIST
Pg 155 de 237
ANCHO(m)
1.20
1.20
ALTO(m)
ANCHO(m)
1.20
1.20
ALTO(m)
LARGO(m)
ANCHO(m)
ALTO(m)
rea=
1.16
1.80
METRADO
PARCIAL
METRADO
TOTAL
1.44
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
1.44
1.44
LARGO(m)
m2
1.44
O DE NIVELES Y REPLANTEO
LARGO(m)
UND
ALTO(m)
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
5.59
2.09
UND
METRADO
PARCIAL
METRADO
TOTAL
3.50
3.50
3.50
UND
m2
CAM DIST
Pg 156 de 237
ANCHO(m)
ALTO(m)
rea=
5.12
1.00
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
5.12
5.12
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
rea=
5.12
0.10
0.51
rea=
2.93
1.20
3.52
0.27
0.10
0.30
0.02
rea=
3.68
0.10
0.37
0.75
0.75
0.05
0.03
4.44
CAM DIST
Pg 157 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
4.34
0.10
0.43
4.34
1.20
5.21
3.60
1.20
4.32
0.27
0.30
0.32
rea=
3.68
1.20
14.09
3.68
0.10
0.12
1/4"
3/8"
8.00
12.00
8.00
12.00
2.00
2.60
2.00
1.86
1.00
1.06
1.00
1.20
1.00
1.25
1.00
1.37
2.00
2.92
3.00
2.55
2.00
1.40
1.00
0.59
1.00
0.45
1/2"
5/8"
CAM DIST
Pg 158 de 237
6.00
5.22
3.00
4.20
2.00
2.22
1.00
0.93
1.00
0.66
28.00
42.00
8.00
67.60
6.00
2.88
6.00
2.04
CAM DIST
Pg 159 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
4.34
0.10
0.43
4.34
1.20
5.21
3.60
1.20
4.32
0.27
0.30
0.32
rea=
3.68
1.20
3.68
0.10
ANCHO(m)
14.09
ALTO(m)
0.12
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
2.50
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.00
5.00
TANQUE IMHOFF
Pg 160 de 237
PLANTA DE TRATAMIENTO
04.04
04.04.01
TANQUE IMHOFF
TRABAJOS PRELIMINARES
PARTIDA
04.04.01.01
GRAFICO
N VECES
PARTIDA
04.04.01.02
GRAFICO
N VECES
04.04.02
MOVIMIENTO DE TIERRAS
PARTIDA
GRAFICO
04.04.02.01
N VECES
1
1
1
PARTIDA
GRAFICO
N VECES
4
4
TANQUE IMHOFF
Pg 161 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
4
PARTIDA
04.04.02.04
GRAFICO
N VECES
2
1
2
1
1
1
1
PARTIDA
GRAFICO
04.04.02.05
N VECES
1.20
4
TANQUE IMHOFF
Pg 162 de 237
PLANTA DE TRATAMIENTO
TANQUE IMHOFF
04.04
PARTIDA
04.04.02.06
GRAFICO
N VECES
1.30
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
1
1
1
CONCRETO ARMADO
04.04.03
PARTIDA
GRAFICO
04.04.03.02
N VECES
1
1
PARTIDA
GRAFICO
N VECES
5.71
TANQUE IMHOFF
Pg 163 de 237
PLANTA DE TRATAMIENTO
TANQUE IMHOFF
04.04
5.71
0.2
0
2
5.70
0.45
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
2
2
PARTIDA
GRAFICO
N VECES
4
4
4
4
2
2
2
2
TANQUE IMHOFF
Pg 164 de 237
PLANTA DE TRATAMIENTO
TANQUE IMHOFF
04.04
PARTIDA
GRAFICO
5.71
N VECES
1
0.45
0.2
0
1
1
5.70
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
2
2
PARTIDA
GRAFICO
N VECES
4
4
4
2
2
2
2
2
TANQUE IMHOFF
Pg 165 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
2
PARTIDA
GRAFICO
N VECES
32
24
24
32
17
13
17
13
18
38
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
0.00
1555.60
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
1586.71
TOTAL Kg
1586.71
TANQUE IMHOFF
Pg 166 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
PARTIDA
GRAFICO
N VECES
68
68
52
52
56
56
56
56
50
50
50
50
26
28
28
28
10
10
14
10
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
1342.00
3798.50
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
778.36
3874.47
TOTAL Kg
4652.83
PARTIDA
TANQUE IMHOFF
Pg 167 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
PARTIDA
GRAFICO
N VECES
24
36
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
141.48
0.00
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
82.0584
0.00
TOTAL Kg
82.06
04.04.04
ENLUCIDOS Y MOLDURAS
PARTIDA
GRAFICO
04.04.04.01
N VECES
1
1
1
1
1
1
1
1
2
2
TANQUE IMHOFF
Pg 168 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
1
1
1
1
2
2
2
04.04.05
INSTALACION DE ACCESORIOS
PARTIDA
GRAFICO
04.04.05.01
N VECES
1
4
1
1
PARTIDA
GRAFICO
N VECES
TANQUE IMHOFF
Pg 169 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
PARTIDA
GRAFICO
N VECES
PARTIDA
GRAFICO
N VECES
PARTIDA
GRAFICO
N VECES
PARTIDA
GRAFICO
N VECES
07.00
BARANDAS
PARTIDA
TANQUE IMHOFF
Pg 170 de 237
PLANTA DE TRATAMIENTO
04.04
TANQUE IMHOFF
PARTIDA
GRAFICO
N VECES
08.00
VARIOS
PARTIDA
GRAFICO
N VECES
1
1
PARTIDA
GRAFICO
N VECES
TANQUE IMHOFF
Pg 171 de 237
ANCHO(m)
12.00
10.00
ALTO(m)
ANCHO(m)
12.00
10.00
m2
METRADO
PARCIAL
METRADO
TOTAL
120.00
O DE NIVELES Y REPLANTEO
LARGO(m)
UND
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
120.00
m3
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
6.50
rea=
73.00
474.50
6.50
rea=
7.56
49.14
6.50
rea=
6.84
44.46
LARGO(m)
ANCHO(m)
ALTO(m)
120.00
UND
LARGO(m)
120.00
568.10
UND
METRADO
PARCIAL
METRADO
TOTAL
7.65
30.60
7.50
30.00
131.00
TANQUE IMHOFF
Pg 172 de 237
17.60
70.40
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
7.50
rea=
4.80
7.50
rea=
2.20
16.50
9.30
rea=
6.39
118.85
9.30
rea=
1.20
11.16
7.65
0.60
2.00
9.18
7.50
0.60
2.00
9.00
17.60
0.60
2.00
21.12
ANCHO(m)
7.00
6.50
1.20
1.20
ALTO(m)
72.00
257.81
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
54.60
54.60
TANQUE IMHOFF
Pg 173 de 237
ANCHO(m)
ALTO(m)
310.29
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
403.37
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
9.40
7.50
1.00
70.50
1.30
0.95
1.00
1.24
1.40
0.80
1.00
1.12
m3
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
7.90
rea=
5.60
44.24
9.60
rea=
5.60
53.76
LARGO(m)
ANCHO(m)
ALTO(m)
72.86
UND
LARGO(m)
403.37
115.45
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
TANQUE IMHOFF
Pg 174 de 237
6.50
rea=
0.25
3.25
8.50
rea=
0.25
4.25
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
7.00
rea=
0.20
2.80
7.00
rea=
0.20
2.80
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
1.20
1.10
0.10
0.53
1.60
1.20
0.15
1.15
1.20
1.20
0.15
0.86
1.00
1.00
0.05
0.20
1.40
0.60
0.20
0.34
2.60
0.20
0.80
0.83
0.80
0.80
0.15
0.19
2.70
0.15
0.30
0.24
TANQUE IMHOFF
Pg 175 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
6.50
5.70
0.15
5.56
6.50
5.71
0.73
27.09
8.50
5.70
0.38
18.41
8.50
5.71
0.35
16.99
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
5.50
5.70
62.70
6.83
5.70
77.86
ANCHO(m)
ALTO(m)
208.61
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
4.60
0.10
1.84
3.00
1.20
14.40
3.40
1.20
16.32
2.60
0.20
1.04
1.80
0.80
2.88
2.60
0.80
4.16
2.40
0.15
0.72
2.40
0.30
1.44
44.60
TANQUE IMHOFF
Pg 176 de 237
3.00
0.30
1.80
1/4"
3/8"
1/2"
7.00
224.00
7.00
168.00
7.00
168.00
7.00
224.00
6.42
109.14
6.42
83.46
6.42
109.14
6.42
83.46
6.90
124.20
6.90
262.20
TOTAL
5/8"
6321.60
TANQUE IMHOFF
Pg 177 de 237
1/4"
3/8"
1/2"
10.65
724.20
11.10
754.80
10.65
553.80
11.10
5/8"
577.20
6.50
364.00
6.50
364.00
4.80
268.80
4.80
268.80
3.00
150.00
3.17
158.50
3.52
176.00
3.52
176.00
4.80
124.80
4.80
134.40
4.80
134.40
4.80
134.40
1.80
18.00
1.30
13.00
2.10
29.40
1.60
16.00
TANQUE IMHOFF
Pg 178 de 237
1/4"
3/8"
3.42
82.08
1.65
59.40
INT. CON MORTERO 1:5, ESP. 1,5CM ACABADO PULIDO CON IMPERMEAB.
ALTO(m)
1/2"
5/8"
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
1.63
7.00
11.41
0.60
7.00
4.20
2.23
7.00
15.61
0.17
7.00
1.19
0.50
7.00
3.50
0.70
7.00
4.90
1.20
7.00
8.40
0.20
7.00
1.40
1.20
7.00
16.80
1.20
7.00
16.80
327.31
TANQUE IMHOFF
Pg 179 de 237
EXT. CON MORTERO 1:5, ESP. 1,5CM ACABADO PULIDO CON IMPERMEAB.
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
9.60
7.00
67.20
9.60
7.00
67.20
7.60
7.00
53.20
7.60
7.00
53.20
0.25
0.25
0.13
4.00
0.25
2.00
0.35
0.25
0.18
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
7.65
7.65
9.05
36.20
7.50
7.50
17.60
17.60
LARGO(m)
ANCHO(m)
ALTO(m)
68.95
UND
METRADO
PARCIAL
METRADO
TOTAL
3.00
3.00
TANQUE IMHOFF
Pg 180 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.00
5.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
4.00
4.00
A COMPUERTA DE F G DE 8"
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
4.00
4.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
8.00
8.00
UND
TANQUE IMHOFF
Pg 181 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.60
LARGO(m)
22.40
22.40
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
30.00
30.00
30.00
30.00
LARGO(m)
ANCHO(m)
1.10
0.95
ALTO(m)
60.00
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
4.18
4.18
LECHO DE SECADO
Pg 182 de 237
PLANTA DE TRATAMIENTO
04.05
04.05.01
LECHO SECADO
TRABAJOS PRELIMINARES
PARTIDA
04.05.01.01
GRAFICO
N VECES
PARTIDA
04.05.01.02
GRAFICO
N VECES
04.05.02
MOVIMIENTO DE TIERRAS
PARTIDA
04.05.02.01
GRAFICO
N VECES
1
2
1
4
2
2
PARTIDA
GRAFICO
04.05.02.02
N VECES
LECHO DE SECADO
Pg 183 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
2
2
PARTIDA
04.05.02.03
GRAFICO
N VECES
2
2
2
PARTIDA
GRAFICO
04.05.02.04
N VECES
1.30
LECHO DE SECADO
Pg 184 de 237
PLANTA DE TRATAMIENTO
04.05
04.05.03
LECHO SECADO
FILTROS AGREGADOS
PARTIDA
04.05.03.02
GRAFICO
ARENA FINA
ESPECIFICACIONES
N VECES
PARTIDA
04.05.03.03
GRAFICO
ARENA GRUESA
ESPECIFICACIONES
N VECES
PARTIDA
04.05.03.04
GRAFICO
GRAVA FINA
ESPECIFICACIONES
N VECES
PARTIDA
04.05.03.05
GRAFICO
GRAVA MEDIANA
ESPECIFICACIONES
N VECES
PARTIDA
04.05.03.06
GRAVA GRUESA
LECHO DE SECADO
Pg 185 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
GRAFICO
ESPECIFICACIONES
N VECES
04.00
CONCRETO SIMPLE
PARTIDA
GRAFICO
N VECES
2
2
1
2
LECHO DE SECADO
Pg 186 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
PARTIDA
GRAFICO
N VECES
10
PARTIDA
GRAFICO
N VECES
2
2
PARTIDA
GRAFICO
ENCOFRADO Y DESENCOFRADO
ESPECIFICACIONES
N VECES
20
40
40
4
04.05.04
GRAFICO
04.05.04.05
N VECES
14
LECHO DE SECADO
Pg 187 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
7
2
2
PARTIDA
GRAFICO
N VECES
2
1
2
2
2
1
LECHO DE SECADO
Pg 188 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
10
10
10
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
2
2
PARTIDA
GRAFICO
N VECES
2
2
2
4
2
4
4
4
40
20
4
LECHO DE SECADO
Pg 189 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
2
4
2
10
10
14
7
PARTIDA
GRAFICO
N VECES
2
17
3
3
3
3
3
17
32
8
144
24
12
133.3333333333
LECHO DE SECADO
Pg 190 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
151.40
129.60
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
87.812
132.19
TOTAL Kg
220.00
04.05.05
REVOQUES Y ENLUCIDOS
PARTIDA
GRAFICO
04.05.05.01
N VECES
2
2
2
4
2
4
2
4
4
40
40
4
2
4
2
2
10
10
10
14
7
LECHO DE SECADO
Pg 191 de 237
PLANTA DE TRATAMIENTO
04.05
07.00
LECHO SECADO
04.05.06.01
GRAFICO
N VECES
2
1
1
PARTIDA
GRAFICO
04.05.06.02
N VECES
12
LECHO DE SECADO
Pg 192 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
PARTIDA
04.05.06.03
GRAFICO
N VECES
08.00
COBERTURA
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
10
PARTIDA
04.05.06.07
GRAFICO
N VECES
14
PARTIDA
04.05.06.08
GRAFICO
N VECES
14
PARTIDA
04.05.06.09
LECHO DE SECADO
Pg 193 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
GRAFICO
ESPECIFICACIONES
N VECES
14
PARTIDA
04.05.06.10
GRAFICO
N VECES
14
PARTIDA
04.05.06.11
GRAFICO
N VECES
14
PARTIDA
04.05.06.12
GRAFICO
CARTELA TIPO 1
ESPECIFICACIONES
N VECES
14
PARTIDA
GRAFICO
04.05.06.13
CARTELA TIPO 2
ESPECIFICACIONES
N VECES
LECHO DE SECADO
Pg 194 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
14
PARTIDA
04.05.06.14
GRAFICO
CARTELA TIPO 3
ESPECIFICACIONES
N VECES
14
PARTIDA
04.05.06.15
GRAFICO
CARTELA TIPO 4
ESPECIFICACIONES
N VECES
14
PARTIDA
04.05.06.16
GRAFICO
CARTELA TIPO 5
ESPECIFICACIONES
N VECES
14
PARTIDA
GRAFICO
04.05.06.17
CUMBRERA GALVANIZADA N 30
ESPECIFICACIONES
N VECES
LECHO DE SECADO
Pg 195 de 237
PLANTA DE TRATAMIENTO
04.05
LECHO SECADO
PARTIDA
GRAFICO
04.05.06.18
N VECES
LECHO DE SECADO
Pg 196 de 237
ANCHO(m)
10.80
4.50
ALTO(m)
ANCHO(m)
10.80
4.50
m2
METRADO
PARCIAL
METRADO
TOTAL
48.60
O DE NIVELES Y REPLANTEO
LARGO(m)
UND
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
48.60
m3
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
10.80
4.50
1.80
87.48
0.63
0.77
1.80
1.75
2.33
0.40
1.80
1.68
0.90
0.90
1.80
5.83
rea=
4.69
1.20
11.26
rea=
4.82
1.20
11.57
LARGO(m)
ANCHO(m)
ALTO(m)
48.60
UND
LARGO(m)
48.60
119.56
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LECHO DE SECADO
Pg 197 de 237
10.80
2.55
55.08
10.80
0.35
7.56
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
16.90
AREA=
1.50
50.70
17.30
0.18
1.47
8.90
6.30
0.10
1.47
1.85
58.11
ANCHO(m)
ALTO(m)
62.64
61.45
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
75.54
75.54
LECHO DE SECADO
Pg 198 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
10.50
4.50
0.15
LARGO(m)
ANCHO(m)
ALTO(m)
10.50
4.50
0.08
LARGO(m)
ANCHO(m)
ALTO(m)
10.50
4.50
0.08
LARGO(m)
ANCHO(m)
ALTO(m)
10.50
4.50
0.08
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
14.18
14.18
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
7.09
7.09
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
7.09
7.09
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
7.09
7.09
UND
m3
LECHO DE SECADO
Pg 199 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
10.50
AREA=
0.60
METRADO
PARCIAL
12.60
METRADO
TOTAL
12.60
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
17.30
0.50
0.10
1.73
6.30
0.50
0.10
0.63
17.30
0.90
0.10
1.56
0.80
0.77
0.10
0.12
4.04
LECHO DE SECADO
Pg 200 de 237
ANCHO(m)
ALTO(m)
1.00
1.00
0.31
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
17.30
1.28
0.10
4.43
17.30
1.25
0.10
4.33
FRADO Y DESENCOFRADO
LARGO(m)
ANCHO(m)
ALTO(m)
m2
METRADO
PARCIAL
METRADO
TOTAL
10.00
0.30
12.00
0.30
12.00
0.10
0.40
ANCHO(m)
ALTO(m)
0.30
0.15
2.50
8.75
UND
0.50
LARGO(m)
3.10
3.10
34.40
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
1.58
42.10
LECHO DE SECADO
Pg 201 de 237
0.30
0.20
2.50
1.05
2.37
0.10
1.30
0.62
0.80
0.77
0.15
0.18
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
rea=
11.20
0.40
8.96
17.65
0.90
0.40
6.35
17.30
0.15
1.71
8.87
17.30
0.35
0.18
2.12
6.30
0.15
1.71
3.23
17.00
0.20
1.46
4.96
LECHO DE SECADO
Pg 202 de 237
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
6.00
0.15
0.40
3.60
0.80
0.80
0.05
0.32
0.80
0.10
0.31
0.25
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
17.00
rea=
0.06
2.04
17.00
0.35
0.06
0.71
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
17.30
0.30
10.38
6.30
0.30
3.78
17.00
2.28
77.52
rea=
3.57
14.29
17.00
1.18
40.12
17.00
0.15
10.20
17.00
0.08
5.44
0.38
0.08
0.12
0.40
46.40
2.90
2.90
0.20
0.70
285.81
11.60
1.30
3.64
LECHO DE SECADO
Pg 203 de 237
0.80
0.57
1.30
1.48
0.80
1.40
4.48
0.77
1.40
2.16
0.50
4.00
2.40
0.05
1.20
0.90
2.50
31.50
1.00
2.50
17.50
O ESTRUC. GRADO 60, FY=4200KG/CM2 PARA COLUMNAS, CANALETA, VIGAS MUROS ETC.
LONGITUDES
LONG/PZA
1/4"
3/8"
5.20
10.40
0.70
11.90
5.20
15.60
5.20
15.60
0.70
2.10
0.70
2.10
4.70
14.10
2.40
40.80
1.00
32.00
0.85
6.80
0.90
1/2"
129.60
2.50
60.00
12.50
150.00
0.55
5/8"
73.33
LECHO DE SECADO
Pg 204 de 237
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
17.30
0.30
10.38
6.30
0.30
3.78
2.28
77.52
17.00
rea=
3.57
14.29
17.00
1.18
40.12
17.00
0.15
10.20
17.00
0.35
11.90
17.00
0.08
5.44
0.38
0.08
0.12
2.90
0.40
46.40
2.90
0.20
23.20
0.70
1.30
3.64
0.57
1.30
1.48
0.80
1.40
4.48
0.77
1.40
2.16
0.70
0.57
0.80
0.80
0.50
4.00
2.40
0.05
1.20
0.90
2.50
31.50
1.00
2.50
17.50
0.80
316.51
0.80
6.40
LECHO DE SECADO
Pg 205 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
16.35
32.70
2.34
2.34
4.08
4.08
ANCHO(m)
ALTO(m)
39.12
UND
METRADO
PARCIAL
METRADO
TOTAL
12.00
12.00
LECHO DE SECADO
Pg 206 de 237
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
8.00
8.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
10.00
10.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
UND
LECHO DE SECADO
Pg 207 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
LECHO DE SECADO
Pg 208 de 237
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
14.00
14.00
LARGO(m)
17.90
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
17.90
17.90
LECHO DE SECADO
Pg 209 de 237
NA GALVANIZADA DE 11 CANALES N 30
LARGO(m)
ANCHO(m)
17.90
3.80
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
136.04
136.04
FILTRO BIOLOGICO
Pg 210 de 237
FILTRO BIOLOGICO
TRABAJOS PRELIMINARES
PARTIDA
04.06.01.01
GRAFICO
N VECES
PARTIDA
04.06.01.02
GRAFICO
N VECES
04.06.02
MOVIMIENTO DE TIERRAS
PARTIDA
04.06.02.01
GRAFICO
N VECES
PARTIDA
GRAFICO
04.06.02.02
N VECES
FILTRO BIOLOGICO
Pg 211 de 237
FILTRO BIOLOGICO
PARTIDA
04.06.02.03
GRAFICO
N VECES
1
1
1
PARTIDA
GRAFICO
04.06.02.04
N VECES
1.30
FILTRO BIOLOGICO
Pg 212 de 237
FILTRO BIOLOGICO
FILTROS AGREGADOS
PARTIDA
04.06.03.01
GRAFICO
N VECES
PARTIDA
01.06.03.02
GRAFICO
N VECES
PARTIDA
01.06.03.03
GRAFICO
N VECES
PARTIDA
01.06.03.04
GRAFICO
N VECES
04.06.04
CONCRETO SIMPLE
FILTRO BIOLOGICO
Pg 213 de 237
FILTRO BIOLOGICO
PARTIDA
01.06.04.01
GRAFICO
N VECES
1
1
PARTIDA
04.06.04.02
GRAFICO
N VECES
PARTIDA
GRAFICO
01.06.04.05
VEREDAS F`C=175KG/CM2
ESPECIFICACIONES
N VECES
FILTRO BIOLOGICO
Pg 214 de 237
FILTRO BIOLOGICO
PARTIDA
04.06.04.04
GRAFICO
ESPECIFICACIONES
N VECES
05.00
GRAFICO
01.06.05.01
N VECES
1
1
2
2
2
2
2
1
1
PARTIDA
GRAFICO
DADO DE CONCRETO
ESPECIFICACIONES
N VECES
1
1
1
FILTRO BIOLOGICO
Pg 215 de 237
FILTRO BIOLOGICO
1
1
PARTIDA
GRAFICO
01.06.05.02
N VECES
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
FILTRO BIOLOGICO
Pg 216 de 237
FILTRO BIOLOGICO
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
2
2
2
2
2
PARTIDA
GRAFICO
ESPECIFICACIONES
N VECES
PARTIDA
GRAFICO
01.06.05.03
N VECES
190
64
64
44
52
70
16
12
FILTRO BIOLOGICO
Pg 217 de 237
FILTRO BIOLOGICO
13
DIAMETRO
1/4"
3/8"
1/2"
5/8"
LONG TOTAL
0.00
1821.00
712.50
0.00
PESO Kg/ml
0.39
0.58
1.02
1.58
TOTAL Kg
1056.18
726.75
TOTAL Kg
1782.93
04.06.05
REVOQUES Y ENLUCIDOS
PARTIDA
GRAFICO
04.06.05.01
N VECES
1
1
1
1
1
1
1
FILTRO BIOLOGICO
Pg 218 de 237
FILTRO BIOLOGICO
PARTIDA
DERRAMES E=0.20MTS.
GRAFICO
ESPECIFICACIONES
N VECES
2
2
2
2
2
2
04.06.06
04.06.06.01
GRAFICO
N VECES
PARTIDA
04.06.06.02
GRAFICO
N VECES
PARTIDA
04.06.06.03
GRAFICO
FILTRO BIOLOGICO
Pg 219 de 237
FILTRO BIOLOGICO
GRAFICO
ESPECIFICACIONES
N VECES
04.06.07
ACCESORIOS
PARTIDA
04.06.07.01
GRAFICO
N VECES
PARTIDA
GRAFICO
04.06.07.02
N VECES
FILTRO BIOLOGICO
Pg 220 de 237
FILTRO BIOLOGICO
PARTIDA
04.06.07.03
GRAFICO
N VECES
PARTIDA
04.06.07.04
GRAFICO
N VECES
PARTIDA
04.06.07.05
GRAFICO
N VECES
PARTIDA
04.06.07.06
GRAFICO
TAPON DE UF DE 110MM
ESPECIFICACIONES
N VECES
PARTIDA
04.06.07.07
FILTRO BIOLOGICO
Pg 221 de 237
FILTRO BIOLOGICO
GRAFICO
ESPECIFICACIONES
N VECES
PARTIDA
04.06.07.08
GRAFICO
N VECES
12
09.00
VARIOS
PARTIDA
GRAFICO
01.06.09.01
N VECES
FILTRO BIOLOGICO
Pg 222 de 237
ANCHO(m)
5.60
5.66
ALTO(m)
ANCHO(m)
5.60
5.66
m2
METRADO
PARCIAL
METRADO
TOTAL
31.70
O DE NIVELES Y REPLANTEO
LARGO(m)
UND
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
31.70
ANCHO(m)
ALTO(m)
2.50
rea=
23.83
ANCHO(m)
ALTO(m)
rea=
8.20
2.30
31.70
31.70
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
59.58
59.58
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
18.85
18.85
FILTRO BIOLOGICO
Pg 223 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
5.60
5.66
31.70
1.15
5.66
6.51
1.10
5.55
6.11
40.72
ANCHO(m)
ALTO(m)
44.31
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
52.94
52.94
FILTRO BIOLOGICO
Pg 224 de 237
ANCHO(m)
ALTO(m)
5.60
4.86
0.95
ANCHO(m)
ALTO(m)
5.60
4.86
0.55
ANCHO(m)
ALTO(m)
5.60
4.86
0.30
ANCHO(m)
ALTO(m)
5.60
4.86
0.50
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
25.86
25.86
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
14.97
14.97
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
8.16
8.16
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
13.61
13.61
FILTRO BIOLOGICO
Pg 225 de 237
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
7.20
5.66
40.75
1.00
0.90
0.90
LARGO(m)
ANCHO(m)
4.64
1.05
LARGO(m)
ANCHO(m)
4.64
1.05
ALTO(m)
UND
ALTO(m)
41.65
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
4.87
4.87
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
4.87
5.16
FILTRO BIOLOGICO
Pg 226 de 237
ANCHO(m)
ALTO(m)
4.64
0.25
0.25
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
0.29
0.29
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
7.20
5.66
0.20
8.15
1.00
0.90
0.10
0.09
5.26
0.20
3.10
6.52
6.80
0.20
3.10
8.43
0.80
0.20
2.30
0.74
1.98
0.20
2.30
1.82
1.20
0.20
2.30
1.10
0.50
0.20
2.30
0.23
0.50
0.20
1.10
0.11
27.20
UND
m3
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
ALTO(m)
1.35
0.40
0.80
0.43
4.64
0.20
0.36
0.33
4.64
0.30
0.60
0.84
2.44
FILTRO BIOLOGICO
Pg 227 de 237
4.64
0.60
0.25
0.70
4.64
0.20
0.15
0.14
ANCHO(m)
ALTO(m)
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
7.20
0.20
2.88
5.66
0.20
2.26
1.00
0.10
0.20
0.90
0.10
0.18
5.26
2.50
26.30
4.86
2.50
24.30
6.80
2.50
34.00
6.40
2.50
32.00
0.60
2.30
2.76
2.18
2.30
10.03
1.00
2.30
4.60
0.50
2.30
2.30
0.50
1.10
1.10
0.80
2.30
3.68
2.38
2.30
10.95
1.00
2.30
4.60
0.90
2.30
4.14
182.75
FILTRO BIOLOGICO
Pg 228 de 237
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
ALTO(m)
1.35
0.80
2.16
4.64
0.36
3.34
4.64
0.60
5.57
4.64
0.25
2.32
4.64
0.15
1.39
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
ANCHO(m)
6.74
0.25
ALTO(m)
14.78
1.69
1.69
1/4"
3/8"
3.75
1/2"
5/8"
712.50
7.00
448.00
6.25
400.00
7.85
345.40
6.65
345.80
1.65
115.50
2.00
32.00
7.40
88.80
FILTRO BIOLOGICO
Pg 229 de 237
3.50
45.50
UND
m2
METRADO
PARCIAL
METRADO
TOTAL
LARGO(m)
ANCHO(m)
7.20
5.26
37.87
5.26
0.60
3.16
1.00
0.50
0.50
22.52
2.50
56.30
24.12
2.50
60.30
6.06
1.10
6.67
6.86
1.10
7.55
203.82
FILTRO BIOLOGICO
Pg 230 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
5.60
11.20
5.66
11.32
0.60
1.20
2.18
4.36
1.20
2.40
0.50
1.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
36.60
73.20
73.20
31.48
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
6.50
6.50
6.50
UND
METRADO
PARCIAL
METRADO
TOTAL
FILTRO BIOLOGICO
Pg 231 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL
2.30
LARGO(m)
METRADO
TOTAL
13.80
13.80
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
3.00
3.00
FILTRO BIOLOGICO
Pg 232 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
3.00
3.00
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
3.00
3.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
6.00
6.00
UND
FILTRO BIOLOGICO
Pg 233 de 237
LARGO(m)
ANCHO(m)
ALTO(m)
METRADO
PARCIAL
METRADO
TOTAL
6.00
6.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
12.00
12.00
LARGO(m)
ANCHO(m)
ALTO(m)
UND
METRADO
PARCIAL
METRADO
TOTAL
1.00
1.00
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
VECES
04.07
CERCO PERIMETRICO(MALLA OLIMPICA Y TUB. DE FG TRAT AGUA POTABLE)
04.07.01
OBRAS PRELIMINARES
04.07.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADAS
1
04.07.01.02 LIMPIEZA DE TERRENO MANUAL
1
04.07.02
MOVIMIENTO DE TIERRAS
04.07.02.01 EXCAVACION PARA CIMIENTOS (ZAPATAS, VIGAS CONEXION)
1
04.07.02.02 ELIMINACION DE MATERIAL EXCEDENTE
1.3
04.07.03
OBRAS DE CONCRETO SIMPLE
04.07.03.01 CONCRETO 1:10 +30% P.M. PARA CIMIENTOS CORRIDOS
1
04.07.04
CARPINTERIA DE MADERA Y METALICA
04.07.04.01 CERCO DE MALLA DE GANADERA H=2.00
1
# ELEMEN
LONG.
ANCHO
ALTURA
1.00
125.00
1.00
1.00
125.00
1.00
1.00
125.00
0.40
0.80
41.67
0.50
0.60
0.80
1.00
125.00
26.00
PLANILLA DE METRADOS
SUB-TOTAL
TOTAL
UNID.
125.00
125.00
M2
125.00
125.00
M2
40.00
40.00
M3
33.80
33.80
M3
10.00
10.00
M3
125.00
125.00
ML
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
VECES
08.01.01
08.01.02
08.02
PLAN DE SEGURIDAD
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.03
PLAN DE CONTINGENCIA
08.03.01
08.04
08.04.01
08.04.02
METRADOS
# ELEMEN
LONG.
ANCHO
ALTURA
SUB-TOTAL
TOTAL
UNID.
1.00
1.00
1.00
1.00
UND
1.00
1.00
1.00
1.00
UND
1.00
1.00
1.00
GBL
1.00
1.00
1.00
UND
0.50
1.00
1.00
UNI
1.00
1.00
1.00
GBL
1.00
1.00
UND
1.00
1.00
1.00
GBL
1.00
1.00
1.00
GBL
1,200.00
1.00
1,200.00
M2