DESIGN OF AQUEDUCT AT Km. 100.

100
CONTENTS
S. No

DESCRIPTION

PAGE No

NOTE ON DESIGN FEATURES

II

DESIGN CALCULATIONS
1 HYDRAULIC PARTICULARS OF CANAL

III

2 STREAM PARTICULARS

3 MAX FLOOD DISCHARGE AND VENTWAY

4 VENTWAY FOR CANAL FLOW

5 TRANSITIONS

6 T.E.L'S IN THE CANAL

7 SCOUR DEPTH CALCULATION

15

8 DESIGN OF ABUTMENT

17

9 DESIGN OF ABUTMENT UNDER ROAD BRIDGE

24

10 DESIGN OF WINGS & RETURNS FOR CANAL

27

11 DESIGN OF RCC APPROACH SLAB

29

12 DESIGN OF PIER AND FOUNDATION

36

13 DESIGN OF WINGS FOR STREAM

52

14 DESIGN OF RETURNS FOR STREAM

54

15 ANALYSIS OF TROUGH / STAAD INPUT

55

16 DESIGN OF SUPER STRUCTURE

75

17 ANALYSIS OF BEAMS & COLUMNS / STAAD INPUT

108

18 DESIGN OF BEAMS & COLUMNS

109

DRAWINGS
1 INDEX AND CATCHMENT AREA MAP
2 GRID PLAN
3 L.S & C.S OF STREAM
4 LS OF CANAL
5 GENERAL PLAN & SECTION
6 DETAILS OF SECTIONS

CHECK SLIP TO ACCOMPANY THE SITE SURVEY OF AQUEDUCTS


0
0
0
AQUEDUCT @ Km. 100.100
SL.
NO.
1
2

DESCRIPTION
Has an Index Map showing the location and any alternatives been
enclosed?

REMARKS
Yes

Has site plan to a scale of 1:500 giving the following information been
enclosed.

Yes

a. Has the names of roads or drains with direction been

Yes

given?

b. Has the canal proposals been shown?

c.If the structure is in skew, have the angle and direction of skew
given?

Yes
This structure is
proposed to be
constructed
been
perpendicular to canal.
The skew if any may be
adjusted in approach and
tail channel.

d. Has the reference to B.M been given?

Yes

e. Are the levels and identification number of C.S given?

Yes

f.

Yes

Are the trial pit particulars given?

g. Have the spot levels of adjacent country been given?

Yes

i. Has the L.S of the drain been given?

Yes

ii. Are the scales adopted as 1:1000 and 1:100?

Yes

Has the L.S of canal showing the site of crossing been enclosed?

Yes

Has a note on the important details of masonry works along the drain
enclosed?

Nil

ii.If so, are the hydraulic particulars furnished?

N.A

Is a list of Masonry works for 3 kms U/s and D/s of structure furnished?

Nil

Is the necessity for the structure explained clearly?

Have the canal chainages been given?

Have the leads for materials of construction been given?

N.A

10

Has any proposal depending on site conditions been marked?

Yes

Structure is proposed in
view of canal is
interrupting existing drain.
As per Approved H.Ps

11

If the structure is on a curve or skew is it possible to


i. To alter:

----

ii. If not have the reasons been furnished?

----

12

Have the possibilities or diversion been examined? It is a major stream


cannot be diverted.

Yes

13

Has the catchment map of the drain been furnished?

Yes

14

Have the Hydraulic particulars of the drain furnished?

Yes

15

Has any special features or relevant information been furnished?

Nil

16

Has certificate of levels given?

---

17

Have plans been indexed?

Yes

18

Are the L.S and C.S levels of corresponding points tallying?

Yes

19

Are the north points and scales noted in the plans?

Yes

REPORT TO ACCOMPANY THE SITE SURVEY FOR


STREAM CROSSING AT Km.100.100

The HP's of the canal at Km. 100.1 is as follows.


S.NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

DESCRIPTION

Discharge (R/D)
Bed width
F.S.D.
Side Slopes (inner / outer)
Bed fall
Value of Rugosity
Free board
Velocity
Top width of banks R/L
C.B.L.
F.S.L.
T.B.L.
SBL Crossing

UNITS

Cumecs
m
m
---m
m / sec
m
m
m
m
m

PARTICULARS

5.920 / 6.130
4.200
1.400
1.5 :1 / 2.0:1.0
1 in 6000
0.018
0.750
0.695
6.0 / 2.5
+ 478.833
+ 480.233
+ 480.983
+ 472.489

0
0
DESIGN OF AQUEDUCT AT Km. 100.100
1. Hydraulic particulars of canal at the location of the structure :
S.NO.

DESCRIPTION

UNITS

PARTICULARS

Cumecs

5.920

Cumecs

6.130

4.200

Full supply depth

1.400

Free board

0.750

Bed fall

1 in 6000

Velocity

m/sec

0.695

Discharge Required

Bed Width

3
4
5
6
7

Value of 'n'

Side slopes (I/O)

Designed

0.0180
1.5 :1

2.0:1.0

Top width of banks (L/R)

6.000

2.500

10

Canal bed level

478.833

478.533

11

Full supply level

480.233

479.933

12

Top of bank

480.983

480.683

2 Stream Particulars:
1. Catchment Area

2. Stream bed level at crossing

+ 472.489 m

316.799 Sq. Km

3. Computed M.F.D.

1096.329 cumecs

4. Average Bed fall

5. Value of rugoisty

1 in 235
0.030

2.1 Bed Fall Caluclations:


From the longitudinal sections ,the drain bed fall is
2.1 Bed fall of Stream:
1. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 100 m U/S

472.812

2. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 50 m U/S

472.683

3. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 20 m U/S

472.572

4. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 20 m D/S

472.407

Slope 1 in

309.6

Slope 1 in

257.7

Slope 1 in

241.0

Slope 1 in

243.9

5. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 50 m D/S

472.283

6. Bed level at Km 0.000 (Crossing)

472.489

Bed level at 100 m D/S

471.631

Average of 1-6 = ( 309.6 + 257.7 + 241 + 243.9+242.7+116.61


Adopt a bed fall of 1 in

235.000

Slope 1 in

242.7

Slope 1 in

116.6

235.24

and the value of n as

0.0300

say

235.000

for calculating M.F.L's

1 in 235
3. Maximum Flood Discharge & Vent Way:
Catchment Area

Dickens Formula

Q=

where C =
=

316.799 Sq. Km
CM

3/4

14.600

for catchment areas from > 2.5 & < 75 Sq. Kms

1096.329

cumecs
laceys width

158.932 m

60% of width
provide
Chainage

12 vents of

8.0

Stream bed levels

MFL

Q-passed

472.812

476.865

3.763

1096.329

50 u/s

472.683

476.573

3.696

1096.329

20 u/s

472.572

476.491

0.000

1096.329

472.489

476.501

3.830

1096.329

20 d/s

472.407

476.513

3.872

1096.329

50 d/s

472.283

476.464

4.023

1096.329

100 d/s

471.631

476.371

4.349

1096.329

Average velocity

3.362 m/s

Fall in MFL

0.002

1 in 404.48

M.F.L. calculations:-

Adopt a bed fall of


3.1.1

Velocity

100 u/s

3.1.0

95.359 m
m clear span with central Pier

1 in 235.0

and the value of n as

0.0300 for calculating M.F.L's

M.F.L at Section 100m (U/s) : Assuming the MFL as

M.F.L.

Stream bed
levels

Cal

Depth

476.87

Average Depth Distance

Area
(Sq.m)

Cross
Chainage

476.87
476.87

480.848

476.865

0.00

476.87

480.872

476.865

0.00

0.000

0.000

0.000

-94.15

-100

476.87

480.866

476.865

0.00

0.000

0.000

0.000

-94.072

476.87

480.856

476.865

0.00

0.000

0.000

0.000

-93.807

476.87

478.503

476.865

0.00

0.000

0.000

0.000

-48.54

476.87

476.126

476.126

0.74

0.370

4.660

1.722

-33.556

476.87

473.992

473.992

2.87

1.806

9.753

17.616

-23.803

476.87

473.857

473.857

3.01

2.941

1.033

3.038

-22.77

476.87

473.145

473.145

3.72

3.364

3.126

10.517

-19.644

476.87

472.951

472.951

3.91

3.817

11.131

42.490

-8.513

476.87

472.795

472.795

4.07

3.992

4.333

17.298

-4.180

476.87

472.812

472.812

4.05

4.062

4.180

16.978

.000

476.87

472.739

472.739

4.13

4.090

3.507

14.343

3.507

476.87

473.021

473.021

3.84

3.985

2.586

10.306

6.093

476.87

473.254

473.254

3.61

3.728

11.057

41.218

17.150

476.87

473.426

473.426

3.44

3.525

1.091

3.846

18.241

476.87

473.610

473.610

3.26

3.347

1.168

3.910

19.409

476.87

474.879

474.879

1.99

2.621

22.744

59.606

42.153

476.87

475.462

475.462

1.40

1.695

5.378

9.114

47.531

476.87

475.529

475.529

1.34

1.370

6.897

9.447

54.428

476.87

475.450

475.450

1.42

1.376

11.697

16.092

66.125

476.87

477.691

476.865

0.00

0.708

19.510

13.806

97.019

476.87

478.208

476.865

0.00

0.000

0.000

0.000

100.000

123.851

291.347

123.9

2/3

(A/P)

291.347

4.13

127.98

127.98 )2/3

1.731 m
1

1.731

x 1/

235.000

0.0300

3.763 m/sec

2/3

Ax V

291.347

3.763

1096.329 cumecs

>

1096.329 cumecs

HENCE O.K.

MFL @ 100 m U/S


480.00

Elevation

478.00
M.F.L.
Stream bed levels

476.00
474.00
472.00
470.00
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage

M.F.L at Section 50m(U/s) : Assuming the MFL as


Stream bed
levels

M.F.L.

Cal

476.573

Depth

Average Depth Distance

Area
(Sq.m)

Cross
Chainage

476.57
476.57

479.265

476.573

0.00

476.57

478.358

476.573

0.00

0.000

0.000

0.000

-85.725

476.57

477.845

476.573

0.00

0.000

0.000

0.000

-79.198

476.57

477.284

476.573

0.00

0.000

0.000

0.000

-68.862

476.57

475.448

475.448

1.12

0.562

17.804

10.014

-39.806

476.57

475.057

475.057

1.52

1.320

8.004

10.569

-31.802

476.57

474.103

474.103

2.47

1.993

4.361

8.691

-27.441

476.57

473.354

473.354

3.22

2.844

5.718

16.265

-21.723

476.57

473.210

473.210

3.36

3.291

0.634

2.086

-21.089

476.57

473.126

473.126

3.45

3.405

4.794

16.323

-16.295

476.57

472.932

472.932

3.64

3.544

8.357

29.617

-7.938

476.57

472.683

472.683

3.89

3.765

7.938

29.890

.000

476.57

472.939

472.939

3.63

3.762

22.257

83.730

22.257

476.57

473.069

473.069

3.50

3.569

6.187

22.081

28.444

476.57

-100.000

473.896

473.896

2.68

3.090

5.250

16.225

33.694

476.57

473.940

473.940

2.63

2.655

0.280

0.743

33.974

476.57

474.414

474.414

2.16

2.396

8.488

20.337

42.462

476.57

475.607

475.607

0.97

1.562

14.454

22.584

56.916

476.57

478.308

476.573

0.00

0.483

15.408

7.442

100.000

129.934

296.600

R2/3

129.9

=
=

296.600

=
=
=

3.89

133.82

133.82 )2/3

1.6999 m
1

1.700

x 1/

235.000

0.0300
3.696 m/sec

(A/P)2/3

Ax V
296.600

1096.329 cumecs

3.696
>

1096.329 cumecs

HENCE O.K.

MFL @ 50 m U/S
480.00
478.00
Elevation

3.1.2

476.00

M.F.L.
Stream bed levels

474.00
472.00
470.00
-80.000
-40.000
.000
40.000
80.000
-100.000
-60.000
-20.000
20.000
60.000
100.000
Cross Chainage

M.F.L at Section 20m(U/s) : Assuming the MFL as


Stream bed
levels

M.F.L.

476.491

Depth

Cal

Area
(Sq.m)

Average Depth Distance

Cross
Chainage

476.491
476.4907

479.459

476.491

0.00

476.4907

479.806

476.491

0.00

0.000

0.000

0.000

-89.691

476.4907

479.829

476.491

0.00

0.000

0.000

0.000

-79.184

476.4907

476.95

476.491

0.00

0.000

0.000

0.000

-49.268

476.4907

474.096

474.096

2.39

1.197

19.353

23.173

-26.203

476.4907

473.676

473.676

2.81

2.605

1.937

5.045

-24.266

476.4907

473.37

473.370

3.12

2.968

2.787

8.271

-21.479

476.4907

473.167

473.167

3.32

3.222

0.560

1.804

-20.919

476.4907

472.965

472.965

3.53

3.425

8.277

28.347

-12.642

476.4907

472.677

472.677

3.81

3.670

9.251

33.949

-3.391

476.4907

472.655

472.655

3.84

3.825

1.135

4.341

-2.256

476.4907

472.572

472.572

3.92

3.877

2.256

8.747

476.4907

472.995

472.995

3.50

3.707

28.899

107.136

28.899

476.4907

472.999

472.999

3.49

3.494

0.065

0.227

28.964

476.4907

473.017

473.017

3.47

3.483

0.187

0.651

29.151

476.4907

474.071

474.071

2.42

2.947

6.568

19.354

35.719

476.4907

474.268

474.268

2.22

2.321

3.307

7.676

39.026

476.4907

478.404

476.491

0.00

1.111

32.768

36.418

100

117.351

285.140

2/3

117.4

= (A/P)

R
V

-100

3.92

121.27

2/3

=(

285.140

1.7682
1

121.27 )2/3

1.768

x 1/

235.000

0.0300
=
Q

3.845

m/sec

= Ax V
=
=

285.140

1096.329

cumecs

3.845
>

1096.329 cumecs

HENCE O.K.

MFL @ 20 m U/S
480.000
478.000
Elevation

3.1.3

M.F.L.
Stream bed levels

476.000
474.000
472.000
470.000
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage

M.F.L at Section @ crossing: Assuming the MFL as


Stream bed
levels

M.F.L.

Cal

Depth

476.501

Average Depth Distance

Area (Sq.
Cross
m)
Chainage

476.50
479.867

476.501

0.00

479.919

476.501

0.00

0.000

478.941

476.501

0.00

0.000

474.075

474.075

2.43

1.213

473.735

473.735

2.77

2.596

473.488

473.488

3.01

2.890

-100.000

0.000

0.000

-75.988

0.000

0.000

-65.821

19.606

23.784

-26.500

1.564

4.061

-24.936

2.250

6.502

-22.686

473.118

473.118

3.38

3.198

1.020

3.262

-21.666

472.955

472.955

3.55

3.465

6.703

23.224

-14.963

472.722

472.722

3.78

3.663

7.491

27.438

-7.472

472.673

472.673

3.83

3.804

2.501

9.513

-4.971

476.50

472.489

472.489

4.01

3.920

4.971

19.488

.000

476.50

472.834

472.834

3.67

3.840

23.548

90.418

23.548

476.5012

472.954

472.954

3.55

3.607

2.064

7.445

25.612

476.5012

472.972

472.972

3.53

3.538

2.977

10.533

28.589

476.5012

473.527

473.527

2.97

3.252

2.879

9.362

31.468

476.5012

474.383

474.383

2.12

2.546

5.338

13.592

36.806

476.5012

476.908

476.501

0.00

1.059

35.519

37.619

79.146

478.322

476.501

0.00

0.000

0.000

0.000

100

118.431

286.241

476.5012

P
R

2/3

118.4

=
=

(A/P)

=
=
=
=
=

4.01

122.44

122.44 )2/3

1.7614 m
1

1.761

x 1/

235.00

0.0300
3.830 m/sec

2/3

286.241

Ax V
286.241

1096.329 cumecs

3.830
>

1096.329 cumecs

HENCE O.K.

MFL @ Crossing
480.00
478.00
Elevation

3.1.3

476.00

M.F.L.
Stream bed levels

474.00
472.00
470.00
-80.000
-40.000
.000
40.000
80.000
-100.000
-60.000
-20.000
20.000
60.000
100.000
Cross Chainage

M.F.L at Section 20m(d/s) : Assuming the MFL as


Stream bed
levels

M.F.L.

476.513

Depth

Cal

Area
(Sq.m)

Average Depth Distance

Cross
Chainage

476.513
479.046

476.513

0.00

479.147

476.513

0.00

0.000

0.000

0.000

-87.006

-100

479.095

476.513

0.00

0.000

0.000

0.000

-74.777

476.5129

479.175

476.513

0.00

0.000

0.000

0.000

-68.188

476.5129

474.053

474.053

2.46

1.230

19.878

24.449

-26.797

476.5129

473.794

473.794

2.72

2.589

1.191

3.084

-25.606

476.5129

473.607

473.607

2.91

2.812

1.713

4.818

-23.893

476.5129

473.07

473.070

3.44

3.174

1.481

4.701

-22.412

476.5129

472.945

472.945

3.57

3.505

5.128

17.975

-17.284

476.5129

472.766

472.766

3.75

3.657

5.732

20.964

-11.552

476.5129

472.691

472.691

3.82

3.784

3.866

14.630

-7.686

476.5129

472.407

472.407

4.11

3.964

7.686

30.466

476.5129

472.673

472.673

3.84

3.973

18.197

72.294

18.197

476.5129

472.909

472.909

3.60

3.722

4.063

15.122

22.26

476.5129

472.945

472.945

3.57

3.586

5.859

21.010

28.119

476.5129

474.037

474.037

2.48

3.022

5.665

17.119

33.784

476.5129

474.696

474.696

1.82

2.146

4.109

8.819

37.893

476.5129

478.399

476.513

0.00

0.908

30.472

27.682

100

115.041 283.133
P

2/3

115.0

= (A/P)

R
V

4.11

119.15

2/3

=(

283.133

1.7808
1

119.15 )2/3

1.781

x 1/

235.000

0.0300
=
Q

3.872

m/sec

= Ax V
=
=

283.133

1096.329

cumecs

3.872
>

1096.329 cumecs

HENCE O.K.

MFL @ 20 m D/S
480.000
478.000
Elevation

3.1.5

M.F.L.
Stream bed levels

476.000
474.000
472.000
470.000
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage

10

M.F.L at Section 50m(D/s): Assuming the MFL as


Stream bed
levels

M.F.L.

476.464

Depth

Cal

Average Depth Distance

Area
(Sq.m)

Cross
Chainage

476.46
476.46

478.588

476.464

0.00

476.46

477.684

476.464

0.00

0.000

0.000

0.000

-76.931

-100

476.46

477.943

476.464

0.00

0.000

0.000

0.000

-73.789

476.46

476.57

476.464

0.00

0.000

0.000

0.000

-62.56

476.46

476.733

476.464

0.00

0.000

0.000

0.000

-49.163

476.46

474.021

474.021

2.44

1.222

19.749

24.124

-27.241

476.46

473.884

473.884

2.58

2.512

0.630

1.582

-26.611

476.46

473.784

473.784

2.68

2.630

0.907

2.386

-25.704

476.46

472.997

472.997

3.47

3.074

2.172

6.676

-23.532

476.46

472.93

472.930

3.53

3.501

2.767

9.686

-20.765

476.46

472.833

472.833

3.63

3.583

3.092

11.078

-17.673

476.46

472.718

472.718

3.75

3.689

5.914

21.815

-11.759

476.46

472.283

472.283

4.18

3.964

11.759

46.608

476.46

472.432

472.432

4.03

4.107

10.171

41.769

10.171

476.46

472.841

472.841

3.62

3.828

7.061

27.027

17.232

476.46

472.904

472.904

3.56

3.592

10.182

36.570

27.414

476.46

474.802

474.802

1.66

2.611

9.846

25.709

37.26

476.46

475.166

475.166

1.30

1.480

2.265

3.353

39.525

476.46

478.428

476.464

0.00

0.649

21.773

14.132

94.236

476.46

478.759

476.464

0.00

0.000

0.000

0.000

100

108.287 272.514
P

108.3

2/3

(A/P)

0.00

108.29

108.29 )2/3

1.8502 m
1

1.850

x 1/

235.00

0.0300

4.023 m/sec

2/3

272.514

Ax V

272.514

4.023

1096.329 cumecs

>

1096.329

cumecs

HENCE O.K.

MFL @ 50 m D/S
480
478
Elevation

3.1.4

M.F.L.
Stream bed levels

476
474
472
470
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage
11

470
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage

3.1.5

M.F.L at Section 100m(d/s) : Assuming the MFL as


Stream bed
levels

M.F.L.

476.371

Depth

Cal

Average Depth Distance

Area
(Sq.m)

Cross
Chainage

476.37
476.37

479.121

476.371

0.00

476.37

479.242

476.371

0.00

0.000

0.000

0.000

-97.486

-100

476.3708

479.172

476.371

0.00

0.000

0.000

0.000

-68.748

476.3708

479.164

476.371

0.00

0.000

0.000

0.000

-68.415

476.3708

478.621

476.371

0.00

0.000

0.000

0.000

-63.79

476.3708

477.351

476.371

0.00

0.000

0.000

0.000

-49.878

476.3708

474.969

474.969

1.40

0.701

12.454

8.729

-28.715

476.3708

475.019

475.019

1.35

1.377

0.956

1.316

-27.759

476.3708

472.656

472.656

3.71

2.533

2.900

7.347

-24.859

476.3708

472.584

472.584

3.79

3.751

3.754

14.080

-21.105

476.3708

472.471

472.471

3.90

3.843

5.461

20.988

-15.644

476.3708

471.734

471.734

4.64

4.268

14.251

60.827

-1.393

476.3708

471.631

471.631

4.74

4.688

1.393

6.531

476.3708

471.743

471.743

4.63

4.684

0.751

3.518

0.751

476.3708

471.733

471.733

4.64

4.633

0.917

4.248

1.668

476.3708

472.586

472.586

3.78

4.211

19.644

82.726

21.312

476.3708

473.649

473.649

2.72

3.253

8.524

27.731

29.836

476.3708

475.702

475.702

0.67

1.695

6.590

11.172

36.426

476.3708

476.124

476.124

0.25

0.458

4.358

1.995

40.784

476.3708

477.1

476.371

0.00

0.123

7.174

0.885

69.157

476.3708

478.664

476.371

0.00

0.000

0.000

0.000

100

89.127 252.094
P
R

2/3

89.1

(A/P)

252.094

1x

0.0300

89.13

89.13 )2/3

2.0000 m
2.000

x 1/

235.00

4.349 m/sec

0.00

2/3

Ax V

252.094

4.349

1096.329 cumecs

>

1096.329

cumecs

HENCE O.K.

MFL @ 100 m D/S


480

Elevation

478
M.F.L.
Stream bed levels

476
474
472
470
-100

-80

-60

-40

-20

20

40

60

80

100

Cross Chainage

12

4. Ventway for Canal flow


Area of canal flow =

4.200 x 1.40

+ 1.50

Adopting 60% fluming the area of trough =


3.800

Provide 1 vents of trough size

x 1.40

x 1.40

8.82 x 0.60

x 1.400

8.82 Sq.m

5.29 Sq.m

gives an area of

Thickness of bottom Slab

0.400 m

Sealing coat

0.040 m

Fillet

0.150 x 0.15

Haunch

0.150 x 0.30

Thickness of Deck

0.300 m

Wearing coat

0.075 m

Thickness of Deck +WC

0.375 m

Carriage way adopted

4.250 m

Total width outer to outer of parapets

5.020 m
4.25

5.32

Sq.m

0.160

+480.683 RL/ TBL

0.225

0.3
+480.308
0.375
+479.933

FSL
1 vent

1.775

0.5

3.80

1.40

0.5

2.72

1.400
+478.533

CBL

0.4

Velocity =

6.130

0.640

( 0.3 + 0.3 + 0.075 )

1.152 m/s

5.32

<

0.6950

m/s

(more than the velocity)

The difference in normal bed width and trough width is negotiated by providing splayed wings on either side

5. Transitions
Normal bed width of canal

The bed width of the trough (including trough nternal wall)

4.200 m

8.100 m

Upstream Transition
Providing a splay of

3 :1

The length of Transition

{ 4.2 - 8.1 } x 3
2

=
However, Provide a Transition of

5.850 m
8.000 m

Downstream Transition
Providing a splay of

5 :1

The length of Transition

{ 4.2 - 8.1 } x 5
2

=
However, Provide a Transition Length of

9.750 m
12.000 m

6. Total Energy Levels in the Canal:


ENERGY LINES

(Line diagram)
8 7
6 5

4 3
D/S

U/S

3.8

+ 478.833

3.800

4.20 BW

+ 478.533

+ 478.533

+ 478.533

+ 478.533

0.5
4.20

3.8

Canal Waterway
0

6 5

4 3

8 7
8.000 m

480.042
T.E.L.

4-4

96

12.000 m

3-3
2-2

+ 479.984

1-1

+ 480.040
+ 479.958
Water Profile
479.703

480.213
480.214
479.933

1.169

1.38
1.38

C.B.L.

+ 478.533

1.400

478.8335
+478.533

Section : 1 - 1 (Just Outside the exit transition)


Cross Section

4.200

Side slopes

1.500

Area

4.200

+ 1.50

8.820

sq.m

Velocity

x 1.400

x 1.400

x 1.400

6.130
8.820

Velocity Head @ section 1 - 1

0.695

V2

m/s

2g
=
1.5 :1

0.695

2 x 9.81
1.400

0.025

4.200
CBL

FSL

T E L

478.533
479.933
FSL

V2

10

2g
T E L @ section 1 - 1

479.933

479.958 m

0.0246

11

Section 2 - 2: (Just inside the transition at the exit end)


+ 479.917
1.383
+ 478.533
4.200
Assume a depth of flow of

1.383 m

4.200 x 1.383

5.810 sq.m.

6.130 / 5.810

1.055 m/sec

V
V2/2g

1.055

2 x

9.81

0.0567 m

Loss of head due to sudden Expansion=

0.5 x
=

( 0.057

0.025)

0.0161

(Due to change in velocity from section 2 - 2 to section 1 - 1)


TEL at 2 - 2 wrt section 1 - 1.

479.958

479.974

478.533

479.974

0.0161

TEL at section 2 - 2 wrt assumed depth


+ 1.383

+ 0.0567

HENCE O.K.
Section : 3 - 3 (Just outside the exit of Barrel)
Cross Section

3.800

x 1.381

Area

3.800

x 1.381

5.246 sq.m

+ 479.914
1.381

Velocity
3.800

6.130

+ 478.533

5.246
=

Velocity Head @ section 3 - 3

1.168 m/s

V2
2g

1.168 2
2 x 9.81

0.0696 m

Loss of head due to Gradual Expansion from section 3-3 to 2-2


=

0.300

0.004

0.0696

0.057

Friction Losses:
At section 3-3
Area (A)

5.246

Perimeter (P)

2.00 x

6.561

=
=
=

2/3

sq.m
1.381 +

3.800

A/P
5.246 / 6.561
0.8
0.862
1/ n x R2/3 x S11/2

12

1.168

S1

x S1^(1/2)

x 0.862^(2/3)

1
0.018
0.00054

At section 2-2
Area (A)

5.810

Perimeter (P)

2.00 x

6.967

sq.m
1.383 +

4.200

A/P

5.810 / 6.967

0.834

R2/3

0.886

1.055

S2

Length of Transition L

1/ n x R2/3 x S21/2
x S2^(1/2)

x 0.886^(2/3)

1
0.018

Loss of head due to Friction

=
hf

0.00042
12.00
(S1+S2)/2

m
x L

0.0058

T E L @ section 2 - 2 (w.r. to previous section)


=

479.974

479.984 m

0.0039

0.006

T E L @ section 2 - 2 (w.r. to Assumed depth)


=

478.533

479.984 m

+ 1.381

+ 0.070

Hence, Assumed depth of the section is OK


Section : 4 - 4 (Just Inside the exit of waterway)
+ 479.913
1.380
3.800

+ 478.533

Assume a depth of flow of


A
V
V /2g
2

1.380 m

1.380 x 3.800

5.199 sq.m.

6.130 / 5.199

1.179 m/sec

1.179

0.0709 m

0.0003

Loss of head due to sudden Contraction=

0.2

- 4 x 0.5 x 0.15 x 0.15

2 x
( 0.07

9.81
0.070)

(Due to change in velocity from section 4-4 to section 3-3)


TEL at 4-4 wrt section3-3

479.984

479.984

478.533

479.984

0.000

TEL at section 4-4 wrt assumed depth


+ 1.380

+ 0.0709

HENCE O.K.
Section : 5 - 5 (Just Inside the Entrance of Barrel)

+ 479.913

Cross Section

3.800

x 1.380

Area

3.800

x 1.380

5.199 sq.m

- 4 x 0.5 x 0.15 x 0.15

13

1.380
+ 478.533

Velocity

3.800

6.130
5.199

=
Velocity Head @ section 5 -5

1.179 m/s
V

2g

14

1.179 2
2*9.81

0.071 m

Loss of head in the waterway portion from section 5 - 5 to 4 - 4


Wetted Perimeter (P)

Hydraulic Radius (R)

b + 2* d Sqrt(1+x^2)

3.800

3.800

6.560

5.199

x 1.38

2.76

0.793

x 1.00

P
6.560
Mannings Roughness coefficient (n)

0.018

Surface fall (By Manning Equation)

Vn

R 2/3
S

1.1791
0.7926

S
Length of waterway

0.00061

96.000

x 0.018 2
2/3

Loss of head in the waterway portion from section 5 - 5 to 4 - 4


=

0.0006

0.0590 m

x 96.00

479.984

480.040 m

0.0590

Section : 6 - 6 (Just Outside the Entrance of Waterway)


Cross Section

3.800

Area

3.800

x 1.444

5.49

sq.m

+ 479.978

x 1.444

1.444
Velocity
3.800

6.130

+ 478.533
Velocity Head @ section 6-6

5.489
=

1.117

V2

m/s

2g
=

1.117 2
2 x 9.81

0.0636 m

Loss of head due to Sudden Contraction from section 6 - 6 to 5 - 5


=

0.200

0.0015

T E L @ section 6 - 6 (w.r. to previous section)

T E L @ section 6 - 6 (w.r. to Assumed depth)

0.0709

+ 480.040

+ 480.041 m

=
=

0.0636

+ 0.0015

+ 478.533
+ 480.041

+ 1.444

+ 0.0636

Hence, Assumed depth of the section is OK

15

Section : 7 - 7 (Just Inside the Entry Transition)


Cross Section

4.200

x 1.465

Area

4.200

x 1.465

6.151 sq.m

+ 479.998
1.465
+ 478.533

Velocity

6.130

4.200

6.151
Velocity Head @ section 7 - 7

0.997

V2

m/s

2g
=

0.997

9.810
=

0.0506 m

Loss of head due to Gradual Expansion from section 3-3 to 2-2


=

0.300

0.004

0.0506

0.0636

Friction Losses:
At section 7-7
Area (A)

6.151

Perimeter (P)

2.00 x

7.129

sq.m
1.465 +

A/P

6.151 / 7.129

0.863

R2/3

0.997

4.200

0.906
1/ n x R2/3 x S11/2
x S1^(1/2)

x 0.906^(2/3)

1
0.018

S1

0.00037

At section 6-6
Area (A)

5.489

Perimeter (P)

2.00 x

6.689

R2/3

sq.m
1.444 +

A/P

5.489 / 6.689

0.821

1.117

3.800

0.877
1/ n x R2/3 x S21/2
x 0.877^(2/3)

x S2^(1/2)

0.018
S2

0.00048

Length of Transition L

8.00

Loss of head due to Friction

=
hf

(S1+S2)/2

m
x L

0.0034

T E L @ section 7 7 (w.r. to previous section)


=

480.041

480.049 m

0.0039

0.003

T E L @ section 7 7 (w.r. to Assumed depth)


=

478.533

480.049 m

+ 1.465

+ 0.051

Hence, Assumed depth of the section is OK

16

Section : 8 - 8 (Just Outside the entry transition)


Cross Section

4.200

Side slopes

1.500

Area

q=
0 . 475
Velocity

Q
f

x 1.169

4.200

6.961

6.130

+ 1.50

x 1.169

x 1.169

sq.m

1/3

( )

6.961
=

Velocity Head @ section 8 - 8

0.881 m/s

2g
+ 480.003
1.5 :1

0.881 2

1.17

2*9.81
=

4.200

0.040 m

+ 478.833

Loss of head due to gradual Contraction from section 8 - 8 to 7 - 7


=

0.200

0.002

T E L @ section 8 - 8 (w.r. to previous section)

=
=

T E L @ section 8 - 8 (w.r. to Assumed depth)

+ 480.040

0.0395

0.0022

+ 480.042 m

=
=

0.0506

+ 478.833 + 1.169

+ 0.0395

+ 480.042 m

Hence, Assumed depth of the section is OK


1/3

7. Scour Depth Calculations: Stream


q= 0 . 475
Ksfc is Silt factor -

( Qf )

(assumed)

q=

0.475 x (1096.329/2)^(1/3)

max scour depth =

7.775

scour level =

= 3.8874

x 3.887
m

MFL - scour depth


=

476.50

- 7.775

468.726

drain bed level =

472.489 m

Depth =

3.763 m

However Pier foundation is taken as 1.5 m below Drain Bed Level


=

+472.489

470.989

However Pier foundation is kept @

- 1.5 m
468.730 m

The bed of stream @ the structure and on either side transition are proposed to be protected with 300 mm
thick pitching

8 Scour Depth Calculations: Canal


Ksfc is Silt factor -

2
q=

(assumed)

0.475 x (6.13/2)^(1/3)

= 0.6900

17

max scour depth =

1.380

scour level =

x 0.690
m

FSL - scour depth


=

480.2335

- 1.380

478.854

Canal bed level =

478.833 m

Depth =

-0.020 m

However canal wing & return wall foundation is taken as 1.5 m below Canal Bed Level
=

+478.833

477.333

- 1.5 m

However canal wing & return wall foundation is kept @

477.330 m

The bed of stream @ the structure and on either side transition are proposed to be protected with 300 mm
thick pitching

18

8.DESIGN OF ABUTMENT UNDER TROUGH


CASE1:

CANAL FULL CONDITION


0.16
0.6
0.225

0.16
0.6

4.25
0.075
0.3

0.225

RL + 480.983

0.375
1.775

+ 480.608
FSL + 479.933
1.4

0.5

3.8

0.5
CBL + 478.533

0.4

0.4
+ 477.793
4.8

Details of deck :1
Carriage width
2
Bottom width of deck
3
Thickness of the deck + depth of beam
4
Thickness of slab
5
Thickness of sealing coat
6
Height of Kerb
7
Width of parapet
8
Height of parapet
9
extra projection
10
Length of abutment
11
bearing width

=
=
=
=
=
=
=
=
=
=
=

4.250
5.020
3.115
0.300
0.040
0.225
0.160
0.600
0.150
5.100
492.5

m
m
m
m
m
m
m
m
m
m
mm

Equivalent height of surcharge = Ht. of water x ( unit weight of water / unit weight of earth)
Equivalent Height of Surcharge
1.78
x 1.00
=
0.845
2.1
Total height of earth @ top of foundation = Ht. of surcharge + Ht. of abutment
=
0.845
+

For

2.033

Total height of earth @ bottom = Ht. of surcharge + Ht. of abutment + ht. of foundation
=
0.845
+
2.033
=
M 25 grade of concrete
Unit weight of RCC
=
2.500 t / cm3
Unit weight of PCC
=
2.400 t / cm3
0.160
0.225

4.250
0.075
0.300

=2.879

+0.5
3.379

0.160
0.225
RL

+480.983
+480.608

Loads on Abutments
1
Deck
2
Beams 2 Nos
3
Bottom Slab
4
Wearing coat
5
Kerbs
6
solid parapet
7
Haunches
8
Fillets
9
Sealing coat
10
Weight of Water

8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x

4.250 x
2.175 x
3.800 x
4.250 x
0.225 x
0.160 x
0.150 x
0.150 x
3.800 x
3.800 x

0.300 x
0.500 x
0.300 x
0.075 x
0.225 x
0.600 x
0.300 x
0.150 x
0.040 x
1.400 x

2.5
2.5
2.5
2.4
2.5
2.5
2.5
2.5
2.4
1

=
=
=
=
=
=
=
=
=
=

28.640
48.856
25.607
6.874
2.274
4.313
1.011
0.505
3.278
47.800
169.16

t
t
t
t
t
t
t
t
t
t
t

17

Dead load on abutment

Dead load on abutment road bridge

=
=
=

169.158
2

84.579 t

84.58 t

Live Load Reaction:


11.4

11.4

6.8

1.20

4.30

2.99

B
8.493

Taking moments about - B


RA x

8.493 =

RA
RB

11.40 x

8.493 +

11.40 x

7.293 +

96.815 +

83.135

+ 20.349

200.298
8.493

=
=

6.80 x

2.993 +

23.585 t

23.585 t
6.015 t

Braking Force
As per the Clause 214.2 of IRC 6: 2000 the braking effect on a simply supported slab is
20 % of the actual total load on span
Total load on the span
=
29.600 t
Braking force =
0.200
x
29.600
=
5.920 t
Force felt by each bearing =
2.960 t
( considering two bearings)
Force / m run of abutment =

2.960
5.100

0.580 t

Change in vertical reaction due to braking effect.


Force acting at
1.2
m above the road level
Height of this force above the abutment
=
4.390
(Assuming depth of bearing as =
0.300
Change in vertical load
=
2.960
x
4.390
8.493
0.300
Impact Load:
As the abutment height below the bed block is
1.143 m
As per Clause 211.7 (b) the impact factor for the abutment height of
1.143
As per the Fig 5 of the IRC 6 : 2000 the impact percentage for the span
Impact Load =
0.309
Total load per length of the abutment

0.375
84.58 +

=
=

m
m)
=

1.530 t

m)

is

0.309
8.493 m is

x
23.585
23.59 +
1.53 +
5.100

=
2.733

37.5
2.733

22.045 t

Frictional Load
Frictional force

Frictional force/m width =

=
=
=

0.4
x dead load
0.400
x
33.832 t
33.832
5.100

84.579

6.634 t

18

0.015
W1

+ 478.533
+ 478.493
+ 478.093
+ 477.943
+ 477.643

w3
W7

W2

2.033

0.493

1.143
0.900
0.500

0.3 A

W4

W5

1.000

0.3

1.100

476.50

3.000
476.00
3.600

Canal or Trough Full Condition


Taking moments about A
Load
W1
W2
W3
W4
W5
W6
Pv
Ph
Bf
Ff

Particulars
Height
As Calculated
0.493 x
0.890 x
1.143 x
1.143 x
1.883 x
2.033^ 2 x
2.033^ 2 x
Braking force
Frictional force

0.500 x
0.500 x
0.0384 x
0.1340 x

Breadth
0.300
0.493
1.100
1.000
0.900

Density

x
x
x
x
x

2.5
2.5
2.4
2.4
2.4
2.1
2.1

Allowable e
Stress in concrete =

Max
Min

e=
=
30.131
3.000

58.160
30.131
1.930
0.500

30.13

1.930

>

1.50
0.430

6x

10.044

=
=

18.686 t/m2
1.401 t/m2

LA

Moment

1.65
1.40
1.15
2.27
1.40
0.60

36.46
0.52
1.26
3.42
3.84
1.22

0.81
1.59
1.44
M=

0.95
0.92
9.58
58.16

1.16
0.58
6.63
V=

lever arm =

Force
V
22.04
0.37
1.10
1.51
2.74
2.03
0.33

0.430
m
HENCE OK
0.430
3

0.860

Compressive stress
Compressive stress

Taking moments about B


Load
W1
W2
W3
W4
W5
W6
W7
W8
Pv
Ph
Bf

Particulars
Height
As calculated
As calculated
As calculated
As calculated
As calculated
As calculated
0.500 x
0.0384
0.134
As calculated
As calculated

1.883 x
0.500 x
2.533^ 2 x
2.533^ 2 x

Breadth

0.900 x
3.600

Density

2.1
2.4
2.1
2.1

Force
V
22.04
0.37
1.10
1.51
2.74
2.03
1.78
4.32
0.52

LA

1.81
0.58
6.63
V=

36.415

Moment

H
1.95
1.70
1.45
2.57
1.70
0.90
0.60
1.80

43.07
0.63
1.58
3.87
4.67
1.83
1.07
7.78

1.01
2.09
1.44
M=

1.83
1.22
9.58
77.12

19

lever arm =
e
Allowable e

=
=

Stress on soil

Max
Min

77.118
36.415
0.32 m
3.600
6

2.118

0.600
HENCE OK

36.415
3.60

0.530

10.115

=
=

15.476 t/m2
4.754 t/m2

>

0.32

0.32
3.60

Compressive stress
Compressive stress

Design of Bed Blocks under Abutments:


Total Load on bed Block

112.427

Providing a bed block of

0.508 m x

5.02 m

0.508 x

1.911

Weight of bed block

Total load on the abutment under the bed block

t
x 0.300 m
5.02 x

size
0.300

2.5

t
=

112.427

114.338

1.911

t
0.508

Intensity of pressure under the bed block

44.880

4.488

114.34
0.5075 x 5.02
t/m2

X
0.493
3.190

Kg /cm2

Which is Permissible.
1.00

Adopting the bed blocks in RCC M 20


8 No.s 16 mm Bars
Providing 1% of G.S.A.

1 x
30 x
100
15.23 Sq. cm

50.75

17 No.s 8 mm Bars

5.02 m
Section X-X
No. of

16

mm diameter bars

Provide
Provide

4
8

bars at top&
mm bars

=
4
17

7.572

No.s

bars at bottom
No.s hoops in transverse direction.

20

21

%
t

22

23

0.3

24

CASE 2:
CANAL EMPTY CONDITION
Details of deck :1
Carriage width
2
Bottom width of deck
3
Thickness of the deck + depth of beam
4
Thickness of slab
5
Thickness of sealing coat
6
Height of Kerb
7
Width of parapet
8
Height of parapet
9
extra projection
10
Length of abutment

For

=
=
=
=
=
=
=
=
=
=

4.250
5.020
3.115
0.300
0.040
0.225
0.160
0.600
0.150
5.320

m
m
m
m
m
m
m
m
m
m

Equivalent height of surcharge = Ht. of water x ( unit weight of water / unit weight of earth)
Equivalent Height of Surcharge
1.78
x 1.00
=
0.845 m
2.1
Total height of soil on foundation concrete = Ht. of surcharge + Ht. of abutment
=
0.845
+
2.333
=3.179 m
Total height of soil on foundation soil = Ht. of surcharge + Ht. of abutment + ht. of foundation
=
0.845
+
2.3335
+0.5
M 20 grade of concrete
= 3.679 m
Unit weight of RCC
=
2.500 t / cm3
Unit weight of PCC
=
2.400 t / cm3
0.160
0.160
0.225

Loads on Abutments
1
Deck
2
Beams 2Nos
Bottom Slab
3
Wearing coat
4
5
Kerbs
6
solid parapet
7
Haunches
8
Fillets
9
Sealing coat

4.25

8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x
8.985 x

4.250 x
2.175 x
3.800 x
4.250 x
0.225 x
0.160 x
0.150 x
0.150 x
3.800 x

Dead load on abutment

Dead load on abutment


Dead load on abutment road bridge

=
=
=

Live Load Reaction:


11.4

11.4
1.20

0.300 x
0.500 x
0.300 x
0.075 x
0.225 x
0.600 x
0.300 x
0.150 x
0.040 x

0.225

2.5
2.5
2.5
2.4
2.5
2.5
2.5
2.5
2.4

=
=
=
=
=
=
=
=
=

28.640
48.856
25.607
6.874
2.274
4.313
1.011
0.505
3.278
121.36

t
t
t
t
t
t
t
t
t
t

121.357
2
60.68
15.03
75.710 t
6.8

4.30

2.99
8.493

Taking moments about - B


RA x

8.493 =

RA
RB

11.40 x

8.493 +

11.40 x

7.293 +

96.815 +

83.13

+ 20.349

200.298
8.493

=
=

6.80 x

2.993 +

23.585 t

23.585 t
6.015 t

Braking Force
As per the Clause 214.2 of IRC 6: 2000 the braking effect on a simply supported slab is
20 % of the actual total load on span
21

Total load on the span


=
Braking force =
0.200
Force felt by each bearing =

29.600 t
x
29.600
2.960 t

Force / m run of abutment =

2.960
5.320

=
5.920 t
( considering two bearings)

0.556 t

Change in vertical reaction due to braking effect.


Force acting at
1.2
m above the road level
Height of this force above the abutment
=
4.390
(Assuming depth of bearing as =
Change in vertical load
=
2.960
x
4.390
8.493
Impact Load:
As the abutment height below the bed block is
1.393 m
As per Clause 211.7 (b) the impact factor for the abutment height of
1.393
As per the Fig 5 of the IRC 6 : 2000 the impact percentage for the span
8.493
Impact Load =
0.27 x
Total load per length of the abutment

0.38 x
=

23.585
75.71 +

=
Frictional Load
Frictional force

=
=
=

Frictonal force/m width =

1.530 t

is
m is

0.2678
37.5

=
2.370 t
23.585 +
1.530 +
2.370
5.100

75.71

5.692 t

+ 478.833

+ 478.793
+ 478.493
+ 478.193
+ 477.893

w3

0.300 m)
=

20.234 t

0.4
x dead load
0.400
x
30.284 t
30.284
5.320
0.015

W2

2.333

0.493

1.393
0.900
0.3
0.500
B

0.3

W4

1.000
3.000

1.100

+ 476.500

W
6

+ 476.000

3.600
Canal or Trough Empty Condition
Taking moments about A
Load
W1
W2
W3
W4
W5
W6
Pv
Ph
Bf
Ff

0.500 x
0.500 x
0.0384 x
0.1340 x

Particulars
Height
As Calculated
0.493 x
0.940 x
1.393 x
1.393 x
2.183 x
2.333^ 2 x
2.333^ 2 x
Braking force

Breadth
0.300
0.493
1.100
1.000
0.900

x
x
x
x
x

Density
2.500
2.500
2.400
2.400
2.400
2.100
2.100

Force
V
20.234
0.369
1.157
1.839
3.344
2.358
0.439

1.532
0.556
5.692

As Calculated

V=

LA

29.742

Moment

H
1.654
1.400
1.146
2.267
1.400
0.600

33.463
0.517
1.327
4.169
4.682
1.415

0.933
1.993
1.843
M=

1.430
1.109
10.494
58.606

22

lever arm =
e=
Allowable e
Stress in concrete =

=
29.742
3.000
=

Max
Min

58.606
29.742
1.970

=
=

0.500
1

9.914

1.970

>

1.50
0.470

6 x

0.470
3
+

19.2 t/m2
0.59 t/m2

0.470 m
HENCE OK

0.94

Compressive stress
Compressive stress

Taking moments about B


Load
W1
W2
W3
W4
W5
W6
W7
W8
Pv
Ph
Bf
Ff

Particulars
Height
As calculated
As calculated
As calculated
As calculated
As calculated
As calculated
0.500 x

2.333 x
0.500 x
2.833^ 2 x
2.833^ 2 x

0.0384
0.134
As calculated

Breadth

Force
V
20.234
0.369
1.157
1.839
3.344
2.358
2.450
4.320
0.647

Density

1.000 x
3.600 x

2.1
2.4
2.1
2.1

LA

2.259
0.556
5.692

As Calculated

V=
lever arm =
e
Allowable e

=
=

Stress on soil

=
Max
Min

=
=

79.760
36.721
0.372 m
3.600
6

2.172

0.600
HENCE OK

36.721
3.60
10.200
16.5 t/m2
3.88 t/m2

36.721

Moment

H
1.95
1.70
1.45
2.57
1.70
0.90
0.60
1.80

39.533
0.628
1.674
4.721
5.685
2.122
1.470
7.776

1.13
2.49
2.14
M=

2.561
1.387
12.202
79.760

>

6 x

0.620

0.372

0.372
3.60

Compressive stress
Compressive stress

23

9. DESIGN OF ROAD ABUTMENT


The road abutment is checked for the tractive force when the live load is over the bridge. For Maximum live load reaction on the
road abutment, the portion of the vehicle / train of live loads placed as below.

11.4 t

11.4 t
1.2

3.09

4.290

Taking moments about B


RA

4.290

11.4

3.090

+ 11.4
RA

84.132

Braking force
=

4.290

4.290

84.132 t

19.611 t

20% of the live loads over the bridge

20

x(

11.4

)=

4.56 t

2.28 t

2.280

5.02

0.400

4.56

100
=

Force felt by each bearing

4.56

Braking force per metre run of road abutment

The braking force will act at a height =


of

1.200

Change in reaction due to braking effect

0.45 t

0.075
=
1.675 m
above the top of bed block.
1.675
= 1.780
t
4.290
Say

1.780 t

Self weight of super structure


i) Deck =

0.400 X

4.780

5.020

2.500

23.996 t

ii) w.c.=

0.075 X

4.780

4.250

2.400

3.657

t
t

iii) kerbs =

0.225

0.225

4.780

2.50

1.210

iv) Parapet =

0.16

0.600

4.780

2.50
Total

=
=

1.200 t
30.062 t

30.062

480.683

Dead load over Level wing wall

Bottom of bed block =


Height of road abutment below bed block =

15.03

0.075 - 0.4 - 0.3


479.608

476.608

t
= + 479.608
=+

3.000

<=
Impact factor =

4.5
6

3.000

0.437

4.290

As per IRC:6-2000, section(II), cl. 211.70, the road abutment height is more than 3m below the
bed block, hence, impact multiplying factor is

0.0000

Total weight over the road abutment = L.L. + V.R. + D.L. + Impact load
24

19.611

1.780 +

15.03

19.611 x

0.0000

Load per meter run

36.422

5.02 =

7.255

Frictional Force

0.500

15.03 =

7.516

5.020

Frictional force per metre run of road abutment =

Density of soil

2.1 t/m3

Density of concrete

2.4 t/m3

Density of RCC

2.5 t/m

Live load Surcharge

1.2 m

7.516

480.683

480.608

480.358

W3

W1

0.240

W2

36.422

1.50 t

+ 480.683

W8

480.608

+
+

480.208

0.49
0.020

479.608

W7
4.68

W9

W6

CBL + 478.53

W5

0.30

0.750

W4

2.030

0.650

476.50

0.812 0.3

A
+

476.00

W10

2.212
2.812

STRESS IN CONCRETE: ( Taking moments about 'A' )


S.NO

Description

As calculated

Load

LA

in Tons

in mts

7.255

1.155

W1

0.49 x

0.400

2.500

0.490

1.145

W2

0.49 x

0.600

2.500

0.735

1.145

0.240 x

1.075

2.400

0.619

0.770

2.030 x

0.812

2.400

1.978

1.400

W3
W4

0.5 x

W5

0.750 x

3.108

2.400

5.595

1.025

W6

0.5 x

0.650 x

3.858

2.400

3.010

0.433

W7

0.5 x

0.650 x

3.858

2.100

2.633

0.217

Pv

0.0384 x (

4.183 )

2.100

1.411

V=
Ph

0.134 x (

4.183

-----

23.727

2.100 )

4.925

1.673

T1

As calculated

0.454

3.108

Fr

As calculated

1.497

3.108
M=

Lever arm

Eccentricity

Permissible 'e'
=

M/V
1.473

34.95

2.212 /2

=
(

2.21
23.727

23.73
/6

1.473 m

0.367 m

=
2.212

0.369
) x { 1 + (6 x

>

0.367
0.367 ) /

2.212 }

Comp. Stress
25

Comp. Stress

21.40
=

Tensile Stress

23.73
0.05

T/ Sqm
/

2.212
T/ Sqm

( Compression )
) x { 1 - (6 x

0.367 ) /

2.212 }

( Compression )

26

STRESS ON SOIL: ( Taking moments about 'B' )


S.NO

Description

Load

LA

in Tons

in mts

As calculated

7.255

1.455

W1

As calculated

0.490

1.445

W2

As calculated

0.735

1.445

W3

As calculated

0.619

1.070

W4

As calculated

1.978

1.700

W5

As calculated

5.595

1.325

W6

As calculated

3.010

0.733

W7

As calculated

2.633

0.517

W8

0.3

4.183 x

2.1

2.636

0.150

W9

2.8

0.500 x

2.4

3.374

1.406

0.0384 x (

4.683

Pv

2.1

1.769

V=

-----

30.095

Ph

0.134

6.170

1.673

T1

As calculated

0.454

3.108

Fr

As calculated

1.497

x(

4.683

2.1 )

3.108
M=

Lever arm

Eccentricity

M/V
1.624

Permissible 'e'
Max. Comp. Stress
Min. Comp. Stress =

=
=

48.86

2.812 /2

30.10

=
(

2.81
30.10

15.68
30.10

T/ Sqm
/
2.812

5.72

/6

1.624 m

0.218 m

=
2.812

T/ Sqm

0.469
) x { 1 + (6 x

>

( Compression )
) x { 1 - (6 x

0.218
0.218 ) /

2.812 }

0.218 ) /

2.812 }

( Compression )

27

rce when the live load is over the bridge. For Maximum live load reaction on the
f live loads placed as below.

above the top of bed block.

28

3.708

478.53

0.5

Moment
in T.m
8.380
0.561
0.842
0.477
2.769
5.735
1.304
0.571
-----20.64
8.24

1.412
4.654
34.95

29

30

Moment
in T.m
10.556
0.708
1.062
0.663
3.363
7.414
2.207
1.361
0.395
4.744
-----32.47
10.325

1.412
4.654
48.86

31

10a .DESIGN OF CANAL WING WALL:


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+

480.308

479.9335

W3
W4

FSL

W1
W2
0.750

+ 478.533

0.60

CBL

0.703

0.30

1.350

0.30

477.830
0.5

W5
1.950

+ 477.330

Taking moments about a

(Stresses in concrete)

Load

Force

Particulars

W1

0.75

2.478

2.4

W2

0.600

2.478

2.4

0.5

W3

0.600

1.775

2.1

Pv

0.0384

2.478

2.4785

Ph

0.134

2.478

2.4785

2.1

= M/V

Eccentricity

=
-

0.891

Permissible 'e' =

7.002

4.46

0.975

4.35

0.400

0.714

0.5

1.118

0.200

0.224

2.1

0.495

--1.729

7.86

/2

/6

7.86

1.35

1.35

Max. comp. Stress

x(

0.225

>

1 +

1.350
Min. Stress

7.86

7.859
0.891

0.216

0.216

0.991

1.714

7.002

HENCE OK

0.216

11.411

t/sq.m.

0.216

0.233

t/sq.m.

1.350
x(

1 -

1.350
Taking moments about B

Moment

1.785

V
Lever arm

L.A.

1.350
(Stresses on soil)

Load

Particulars

Force (kN)
H

L.A.

Moment

W1

0.75

1.775

2.4

3.19

1.275

4.074

W2

0.600

2.478

2.4

0.5

1.785

0.700

1.25

W3

0.600

1.775

2.1

0.5

1.118

0.500

0.56

W4

0.300

2.478

2.1

1.56

0.975

1.523

W5

0.500

1.950

2.4

2.34

0.975

2.282

Pv

0.0384

2.978

2.9785

2.1

0.240

---

Ph

0.134

2.978

2.9785

2.1

0.838
V

Lever arm

= M/V

Eccentricity

Permissible 'e' =
Max. comp. Stress

10.688
-

1.044
1.95
=

10.24

x(

/2

1.950
/6

10.24

=
1 +

0.325

>

1.95
Min. Stress

10.24
1.95

10.239
1.044

0.069

0.069

1.191

1.00

10.688

HENCE OK

0.069

6.366

t/sq.m.

0.069

4.136

t/sq.m.

1.950
x(

1 -

x
1.950

27

10b .DESIGN OF CANAL RETURN WALL:


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+

480.308

480.2335

W3
W4

FSL

W1
W2
0.750

+ 478.833

0.85

CBL

1.003

0.30

1.600

0.30

477.830
0.5

W5
2.200

+ 477.330

Taking moments about a

(Stresses in concrete)

Load

Force

Particulars

L.A.

Moment

W1

0.75

2.478

2.4

4.46

1.225

5.466

W2

0.850

2.478

2.4

0.5

2.528

0.567

1.433

W3

0.850

1.475

2.1

0.5

1.316

0.283

0.373

Pv

0.0384

2.478

2.4785

2.1

0.495

---

Ph

0.134

2.478

2.4785

2.1

1.729
V

Lever arm

= M/V

Eccentricity

=
-

1.021

Permissible 'e' =

8.986

8.80

/2

/6

8.80

1.60

1.60

Max. comp. Stress

x(

0.267

>

1 +

1.600
Min. Stress

8.80

1.021

0.221

0.221

0.991

1.714

8.986

HENCE OK

0.221

10.059

t/sq.m.

0.221

0.942

t/sq.m.

1.600
x(

1 -

1.600
Taking moments about B

8.801

1.600
(Stresses on soil)

Load

Particulars

Force (kN)
H

L.A.

Moment

W1

0.75

1.475

2.4

2.65

1.525

4.049

W2

0.850

2.478

2.4

0.5

2.528

0.867

2.191

W3

0.850

1.475

2.1

0.5

1.316

0.583

0.768

W4

0.300

2.478

2.1

1.56

1.100

1.718

W5

0.500

2.200

2.4

2.64

1.100

2.904

Pv

0.0384

2.978

2.9785

2.1

0.240

---

Ph

0.134

2.978

2.9785

2.1

0.838
V

Lever arm

= M/V

Eccentricity

Permissible 'e' =
Max. comp. Stress

12.629
-

1.154
2.20
=

10.94

x(

/2

2.200
/6

10.94

=
1 +

0.367

>

2.20
Min. Stress

10.94
2.20

10.941
1.154

0.054

0.054

1.191

1.00

12.629

HENCE OK

0.054

5.706

t/sq.m.

0.054

4.241

t/sq.m.

2.200
x(

1 -

x
2.200

28

12.DESIGN OF PIER AND FOUNDATION


5.0
0.16
4.25

0.6

0.16

+ 481.508

0.225

+ 480.683

0.3
0.375
1.775

0.5

1.400

RL

+ 480.308
0.375

+ 479.933

3.8

FSL

3.715
0.5
0.4

+ 478.533

0.3

0.15

6.100
0.5

CBL

+ 478.093

0.15

pier top level + 477.793

5.100

0.5
9.063

VRCC PIER
+ 472.489
0.5
1.500

SBL

0.5

0.5

pier bottom level

0.5

468.73

0.5

468.23 m

7.10 m
DETAIL OF PIER & FOUNDATION

7.100 m

3.00 m
1.00

6.1

7.1

m
PLAN

Hydraulic Particulars :1

Discharge through the Bridge

2 Maximum Mean Velocity of Flow at FSL

1096.33 Cumecs

3 stream Bed Level

SBL

+472.489 m

4 Full Supply Level

FSL

+480.233 m

+468.726 m

+468.730 m

5 Scour Level :6 Founding levels of


7 Safe Bearing Capacity of Soils.

Pier
(assumed)

8 Number of Spans.

3.36 m/sec

30.000

t/m2

12.000 Nos

9 Span c/c. of bearings

8.493 m

10 Bottom of Deck =

+480.308 m

11 Road Level

+480.683 m

12 Height of trough + W.C.=

2.890 m
36

13 Thickness of Wearing Coat

0.075 m

14 Top of RCC Footing

+468.730 m

15 Thickness of Footing

0.500 m

16 Max. mean Velocity of water flow at FSL

3.362 m/sec.

17 Width of pier

1.000 m

18 Expansion joint

19 Bearing

0.493

1 Span length c/c. of bearings

8.493 m

2 Total width of the Decking

5.020 m

3 Carriageway Width

4.250 m

15 mm or

0.015 m

Superstructure and Loadings & Type of Substructure :-

4 Thickness of Uniform Wearing coat in CC M30

5 Type of Substructure

Piers

0.075 m
VRCC

1.000 m thick

Unit Weight of RCC

2.500 t/m3

Unit Weight of PCC

2.400 t/m3

Design Loadings :1 Unit Weight of Dead Loads :-

As per IRC: 6 - 2000.

2 Type of Live loads :-

Expansion Joints :-

one Lane of Class - A

15mm Simple Expansion Joints.

( I ) DEAD LOADS :(i) Calculation of Vertical Loads from Superstructure :Span C/C of bearings

Thickness of Expansion Joints

Total length

Clear Span

8.000

8.49 m
15 mm
+
+

( 2 x Bearing Width )

0.985

8.985 m

Dead Load from super structure on the pier


Deck

8.985 x

4.250 x

0.300 x

2.5

28.640 t

Side Beams 2Nos

8.985 x

2.890 x

0.500 x

2.5

64.917 t

Bottom Slab

8.985 x

3.800 x

0.400 x

2.5

34.143 t

Wearing coat

8.985 x

4.250 x

0.075 x

2.4

6.874 t

Kerbs

8.985 x

0.225 x

0.225 x

2.5

2.274 t

solid parapet

8.985 x

0.160 x

0.600 x

2.5

4.313 t

Haunch

8.985 x

0.150 x

0.300 x

2.5

2.022 t

Fillets

8.985 x

0.150 x

0.150 x

2.5

1.011 t

Beam Bottom

8.985 x

0.150 x

0.300 x

2.5

2.022 t

Additional

8.985 x

0.150 x

0.150 x

2.5

0.505 t

Sealing coat

8.985 x

3.800 x

0.040 x

2.4

3.278 t

Weight of Water

8.985 x

3.800 x

1.400 x

1.0

47.800 t

37

197.797 t
Shared by each bearing

98.90

Load coming on bearings per span

197.80 t

(ii) Dead weight of Sub Structure :0.5

5.100

0.5

1.000

Plan of Pier
(a) Dead Weight of pier
Size of Pier
Bottom of Pier
M.F.L
Height of Pier

Area of Pier

6.10 x

468.730 m ;

480.233 m ;

477.793
=

0.50 x

1.000 with Triangular cut waters.

468.730

1.00 +

5.10

9.063 m

x 1.00

5.600 m2

5.600 m2

Weight of Pier :=

5.60 x

9.06 x

2.500

126.89 t

15% Buoyancy

Dry

5.60 x

9.06 x

2.350

119.28 t

100% Buoyancy

5.60 x

9.06 x

1.500

76.13 t

( b )Dead Weight of footing :


Size of Footing

Thickness Footing

7.100 m

3.000 m

0.50 m

Area of Footing

7.10 x

3.00

21.300 m2

volume of Footing

21.30 x

0.50

10.650 m3

Total Volume

10.650 m3

100% Buoyancy - Footing

10.650

1.500

15.975 t

Without Buoyancy

10.650

2.500

26.625 t

VRCC

Pier

6.100 m
0.50
0.50

7.100 m

0.500

0.5
1.000 m
3.000 m

VRCC Footing.

38

( II LIVE LOAD REACTIONS FROM SUPERSTRUCTURE :Effective Span

8.4925 m

b) Class - A Loading ( 1-lane ) :I

II

11.4

III

11.4

IV
6.8

1.20

6.8

4.30

3.00

0.239

0.246

0.246
A

8.493 m

c/c.

Diagram for C.G. of Loads


11.4x(1.20) + (6.8 x 5.5)
C.G. of Loads =

+ 6.800 x 8.50

11. 4 x 2 + 6.8
=

108.880

36.4

x 2
=

2.991 M from Load I ( 11.4 t)

Class - `A' : contd..


36.40 t
2.991
0.246

2.745 m

5.748 m

B
8.493 m

c./c.

Final Load Diagram


Maximum reaction without Impact =

36.40

5.748

24.635 t

8.49
For single lane Maximum reaction without Impact

Minimum reaction without Impact

24.635

x 1.00

24.635 t @ A

36.400

11.765 t

24.635

@B

(III) ECCENTRICITIES AND LONGITUDINAL FORCES :Bearing Width of pier

1.00 m

0.493 m

A Eccentricities :Bearing width

1.00
0.500

0.500

0.246

0.246

a). Dead load Eccentricity :Along Traffic (Longitudinal )


Moment due to DL eccentricity of S.S :

197.80

0.500

0.254 m

0.254

(0.49/2)

25.096 t-m

2
b) Live Load Eccentricity :Eccentricity along traffic
Class A

0.25 m

Transverse Eccentricity across traffic


C/L of load
0.15

0.5
e=

1.8

C/L of deck
0.5

0.825
2.125

39

Distance of cg of LL from the edge of the bridge

1.300

Eccentricity of loads from centre line of bridge


ET

2.125

1.300

24.635

3.580

0.825 m

Max. Moments due to L.L .Ecentricities :(Including Braking Force Reaction

3.580 t )

( without Impact)
Load

=
=

Longitudinal
Transverse

28.215 t

28.215

0.254

7.159 t-m

28.215

0.825

23.277 t-m

30.437 t-m

Net moment
B Longitudinal Forces :a) Braking Force :As per IRC:6-2000 cl:214.2

The braking force will be 20% of Train of Loads occupying the Span and will be acting at 1.20m above
RFL of +

480.683 m

Consider Class A Load :


Braking force =

Height of S.S =
20% of

36.400

36.400

Force to be considered on each


pier

7.280

Reaction due to Braking force

7.280

2.965 m

(Super Structure)

20%

7.280 t

1.2

=
+

up to Bearings

3.640 t
2.965

8.493
=

3.57 t

say

3.580 t

Hence Moments due to Braking force


At Bottom of Pier

+468.730

3.640

=
x

At Bottom of Foundation

(
+ 468.230

3.640

+480.308

+468.730

42.15 t-m

+480.308

+468.230

43.97 t-m

4.754 m/sec

b) Water Current :Presumed to be hitting the Pier at 20o to flow.


IRC:6-2000 Cl.213.5
Mean velocity of Water Current
Max. Velocity @ FSL
Square of Max. Velocity

=
=

V
V^2

3.362 m/sec

x v

4.754 ^2

x 3.4

22.605

40

The Intensity of Pressure on Pier


Where

k =
k =
V

Inclination of flow considered =

0.7

for triangular cut waters Cl.213 of IRC :6 - 2000

1.5

for square ended piers as per Cl.213 of IRC :6 - 2000

Max. Velocity of Water Current.


20 degrees.

Cos 20

0.940

Sin20o

0.342

52 k X V^2

length of Pier
Thickness of Pier ( Cut Waters )
Scour level for Pier

6.100 m

1.000 m

+468.726

Bottom of Footing

22.605

+476.501

+468.230

M.F.L

Ht =

7.775 m
Scour level

+468.726

Ht =

+468.230

0.496 m

Bottom of Pier

Water Current Intensity Diagram.


( i ) Water Current on Pier :
The Intensity of Pressure on Pier =

Average Pressure on Pier in Longitudinal direction :


52.00 x

0.70 x

52 k V2
V2=(V Sin o )2

22.605

x Sin 20^2

48.12 Kg/m2

363.29 Kg/m2

2
Average Pressure on Pier in Transverse direction :
52.00 x

0.70 x

V2=(V Cos o )2

22.605

x Cos 20^2
2

Pressure at the base of column is zero


Lever arm

7.77 x

5.183 m

Forces due to water current on Pier :


Longitudinal

48.12 x

6.10 x

7.775

363.29 x

1.00 x

7.775

2.282 t

2.825 t

1000
Transverse

1000
Moments due to Water current on Pier :Longitudinal

2.282

5.183 +

0.496 )

12.962 t-m

Transverse

2.825

5.183 +

0.496 )

16.042 t-m

14.103 t-m

( ii ) Water Current on Footing :


Length of footing

7.100 m

Width of footing

3.000 m

There is no Water current effect on Footing.


Moments due to Water current on Pier :Longitudinal

2.28 x

for Footing design.


( 5.183 +

0.496 +

0.500 )

41

Transverse

2.82 x

( 5.183 +

0.496 +

0.500 )

17.455 t-m

c) Wind Force :As per IRC:6-2000.

Maximum wind load acts when the Stream is Dry.


Wind force as per Cl. 212.3 should be doubled.

Case - 1 :- Dry Condition.


stream Bed Level

+472.489

Road level

+480.683

Bottom of Deck

+477.793

Wind force on Deck :


Deck Length

8.985 m ;
0.6
Kerb

0.225

Slab

2.890

Exposed height of Deck and Trough


half of Parapet of (

0.6

railing

2.890

Kerb

0.225

m height)

0.300
3.415

c.g of exposed area from Bottom of trough


=
=
Height of Deck above SBL

+477.79
3.12 x

1.858 m
=

Total Deck length =

1.558

3.115

0.60 x

wind force acting at RL of


+479.651

3.415

0.600
479.651

+472.489

7.162 m

8.985 m

As per Cl. 212.3 of IRC:6-1966 - Table - wind pressures,


H

So, for

for

2m

52 kg/m

for

4m

63 kg/m2

6m

73 kg/m2

8m

82 kg/m2

10 m

91 kg/m2

15 m
Avg Wind force on Deck

Say

H=

7.162 m

P=

78.229 kg/m2

107 kg/m2
78.23 x

3.42 x

8.99

2.00 x

1000

3.415

1.200 t

This force will be acting at half of Railing =


477.793

+ 481.208

42

Wind force on Moving Loads :-

As per Cl. 212.4 of IRC:-6:2000.

The Intensity of wind force on moving loads

300 kg/m

Acting @ 1.5 m above RFL

482.183 m

Length of Class -A , vehicle

5.50 m

Hence force acting on Live Load

300.00 x

5.500

1.650 t

0.825 t

1000
Force effected on each Pier

1.650

Calculation of wind force moments on Deck :Due to Wind force on Superstructure :At Bottom of Pier

1.200 x

479.651

468.730

13.107 t-m

At Footing

1.200 x

479.651

468.230

13.707 t-m

due to wind force on moving loads :At Bottom of Pier

0.825 x

482.183

468.730

11.099 t-m

At Footing

0.825 x

482.183

468.230

11.512 t-m

Total Wind moments on Deck :-

(LWL condition)

At Bottom of Pier

13.107

11.099

24.206 tm

At Footing

13.707

11.512

25.219 tm

But Wind force as per Cl.212.6 of IRC:6-2000 Dead Load from super structure on the pier
Hence force on Deck

RFL
450

1000

480.683 m

8.985

2.022 t

Moments due to this force :


At Bottom of Pier
At Footing

2.022

+480.683

+468.730 )

24.165 t-m

2.022

+480.683

+468.230 )

25.176 t-m

The Moments as per Cl.212.3 & Cl. 212.4, will be considered.


Wind force as per Cl. 212.7 :On Unloaded Structure :
Intensity of wind =

One span Laid

8.985 m ;

240 kg/m2 ;
This is acting @ half the height of Deck

Wind Force on Deck

8.985

1.558

=
x

240

+481.208 m
=

3.359 t

1000
Force on Pier

Moments due to this force :

3.359

1.679 t

Cl.212.7 of IRC:6-1966,

At Bottom of Pier

1.679

+481.208

+468.730 )

20.955 t-m

At Footing

1.679

+481.208

+468.230 )

21.795 t-m

Case - 2 :-

M.F.L Condition :60

FSL

Span Length

Height of Deck above FSL

480.233 m
8.985 m
=

480.683

480.233

0.450 m

43

As per Cl. 212.3 of IRC:6-1966 - Table - wind pressures,


H

So, for

0.00

40.00 kg/m

for

2.00

52.00 kg/m2

for

4.00

63.00 kg/m2

6.00

73.00 kg/m2

8.00

82.00 kg/m2

Wind force on Deck

H=

0.450 m

42.700 x

Say

P=

42.700 kg/m2

3.415 x

8.985

2.000 x

1000

<

1.200 t

481.208 m

This force will be acting at half the height of Parapet

0.655 t

THE DESIGN MOMENTS DUE TO WIND FORCE


Resolving along and across Traffic :
Maximum Wind Forces for SBL & M.F.L Conditions ( along Stream) :
For Pier Design
For footing design
for Unloaded Condition :

Transverse

Transverse

One span laid =

8.985

24.206 x

1.000

24.206 t-m

25.219 x

1.000

25.219 t-m

m ; span laid.

For Pier Design

Transverse

20.955 x

1.000

20.955 t-m

For footing design

Transverse

21.795 x

1.000

21.795 t-m

(V) DESIGN OF RCC PIER AT

+468.730

The main conditions for the design of Pier are :For Both the spans laid condition :For One span Laid Condition

Both the Spans Laid and One span Laid.


1

Service and LWL Condition

Service and FSL Condition.

:-

No Live load acting.

BOTH THE SPANS LAID CONDITION


Case - 1 : Service and LWL condition :Vertical Loads :Dead Loads :1

Reaction from Superstructure

Weight of Pier ( Dry )

197.797

Total Dead loads


Live Loads

Total Live Load

Braking force Reaction on Bearings


Total Live Loads

Total Dead + Live Loads for Pier Design=


Moments about Pier Level
S. No.

324.686

126.889 t

324.686 t

24.635

Dead Load

Live load

28.275

3.640 t

28.275 t

352.961 t
Moments

Load

LA

324.686

0.500

28.215

0.254

352.901
Braking force

3.640

Moments without Wind

2.022
Moments with Wind
=

169.503

0.000

Trans.

162.343 t - m

0.000

7.159 t - m

23.277

t-m

0.000 t - m

0.000

169.503 t - m

23.277

t-m

24.206

t-m

47.483

t-m

11.974

358.563

Long.

169.503 t - m

356.541

Wind Force
X

+468.730
Type of Force

197.797 t

:-

169.503 t - m
352.901

44

0.480

0.480

0.020

Longitudinal Moment ML

Total Moment

0.500

352.901

6.948 tm

6.948

6.948 tm

0.020

0.000

Section Properties :Size of Pier

Area =

6.100
=

6.100

x
x

Considering Rectangle - Side =

6.100

1.000 m
1.000

6.100 m2.

6.100 m2.

6.100 m

1.000
Section Modulus =
Long.

ZL =

6.100

1.000 ^2

ZT =

1.000

6.100 ^2

1.017 m3

6.202 m3

6
6
Stresses in Pier :CBL Condition : a). Without wind

356.541

(+/-)

6.100
=

58.449

(+/-)

6.834

6.948

(+/-)

23.277

69.037

1.017
(+/-)

6.202

3.753

Direct compressive Stress allowable =


Bending compressive Stress allowable =
(Cl. 303.3, Table - 11, of IRC:21-2000)
b). With wind
58.781 ( + / - )

47.862 t/m2.

500 t/m2

(IRC-21, Clause 303)

667 t/m

(IRC-21, Clause 303)

Hence provide reinforcement.


=

358.563

(+/-)

6.948

6.100
=

6.83 ( + / - )

From IRC:78 - 2000, cl.706.1.2

(+/-)

1.017
7.66

667.00

47.483
6.202

73.271
1.333

44.290 t/m2
=

889.111 t/m2

197.797 t

Case - 2 : Service and FSL condition :Vertical Loads :Dead Loads :1

Reaction from Superstructure

Weight of Pier ( 15% buoyancy )


Total Dead loads

Live Loads

119.276 t

317.073 t

28.215 t

:-

Live Load

Braking force Reaction on Bearings


Total Live Loads
Total Dead + Live Loads for Pier Design

317.073 +

31.855

3.640 t

31.855 t

348.928 t

45

Moments about Pier Level


S. No.

+468.730

Moments

Type of Force

Load

LA

Dead Load

317.07

0.500

Live load Eccentricity

28.215

0.254

Long.

345.29
3

Braking force

Water Current

3.640

6.01
184.664 t-m

39.319 t-m
24.21

184.664 t-m

184.664

0.528 m

0.528

=
Moment

184.664

6.100

349.583

0.500

0.028

63.526 t-m

5.215 t -m

Size of Pier
=

0.028 m

=
=

0
16.042

0.655

23.28

1.650

Moments with Wind

Area

7.159

12.962

Wind Force

Section Properties :-

0.00

165.696

Moments without Wind


5

Trans.

158.537

m2

6.100

ZL =

1.017 m3

1.000 m
ZT =

6.202

m3

Stresses in Pier :a). Without wind =

348.928

(+/-)

5.215

6.100
=

57.201 ( + / - )
b). With wind =
57.309 ( + / - )

39.319

1.017

6.202

5.130

(+/-)

6.340

68.671

349.583

(+/-)

5.215

(+/-)

63.526

(+/-)

10.243

72.682

6.100
=

(+/-)

1.017

5.130

45.732 t/m2

41.936 t/m2

6.202

ONE SPAN LAID CONDITION


In this case No Live load will be acting. But Temparature effect on Bearings considered.
The Superimposed dead load is not considered.
Case - 1, Empty condition :Vertical Loads :Dead Loads :1

Reaction from Superstructure =

Weight of Pier ( Dry )

197.797

2 )

=
Total Dead loads

Moments about Pier Level


S. No.
1
2

+468.730

98.899 t

126.889 t

225.788 t

Moments

Type of Force

Long.

Dead load Eccentricity

Trans.

25.096
Moments without Wind

25.096

Moments with Wind

25.096

Wind Force

24.206

Section Properties :Area =

6.100

Size of Pier

6.100

m2

ZL =

1.017 m3;

24.206

1.000 m
ZT =

6.202

m3 ;

Stresses in Pier :a). Without wind =

225.788

(+/-)

6.100
=

37.014

(+/-)

24.684

(+/-)

25.096

(+/-)

1.0167
0.000

0.000
6.202

61.699

12.330 t/m2

46

b). With wind =

225.79

(+/-)

25.096

6.100
=

37.014 ( + / - )

24.684

(+/-)

1.0167

(+/-)

3.903

24.21
6.202

65.602

-8.427 t/m2

Case - 2 : Full condition :- ( One Span Laid )


Vertical Loads :Dead Loads :1

Reaction from Superstructure =

Weight of Pier ( 15% buoyancy )

198 /

=
Total Dead loads

Moments about Pier Level


S.No.

98.899 t

119.276 t

218.174 t

+468.730

Moments

Type of Force

1 Dead load Eccentricity


2 Water Current

Long.

Trans.

25.096

0.000

12.962

16.042

Moments without Wind

25.096

16.042

Moments with Wind

25.096

40.249

3 Wind Force

24.206

Section Properties :-

6.100

218.17

(+/-)

m2

ZL =

1.017

ZT=

6.202 m3

Stresses in Pier :a). Without wind =

6.100
=

35.77

(+/-)

24.68

b). With wind =

(+/-)

218.17

35.77

(+/-)

(+/-)

16.0423
6.202

2.587

(+/-)

6.100
=

25.10
1.0167

25.10

63.037

8.495 t/m2

(+/-)

40.25
66.940

-4.592 t/m2

11.578 m

1.0167

24.684

(+/-)

6.202

6.490

( III ) CALCULATION OF PIER REINFORCEMENT


From the above the Tensile forces in Pier are more in case of Empty & Full
Section Properties :Size of Pier

Area

6.1
=

61000 cm

468.730

11.578

1.000

Service Condition :As per Cl.306.1 of IRC:21-2000, Table - 13 , Note (3).


Effective Length of Pier =
In this case

1.200 L

`L'=

Effective Length =

480.308
Le

Least radius of Gyration ( r ) =


Ratio =

1.200
t 12

Effective length

0.289

13.894

Radius of Gyration

13.894 m
12

48.131

0.289

One span Laid Condition :Effective Length of Pier =


Ratio =

Effective length

1.75 L

1.750
=

Radius of Gyration

20.26

11.578

70.191

20.262 m

0.289

Hence the permissible stresses are considered.


47

Design of Reinforcement :For M20grade the allowable stresses in Concrete :


Direct Compression
Bending Stress
The allowable Steel Stress :
Percentage of Reinforcement

Tensile stress =
=

Modular Ratio

Area of Section =

50 kg/cm2.

fc

70 kg/cm2.

fs

1900 kg/cm2.

0.30% min.

13

(Cl.306.2.2 IRC:21:2000)

61000 cm2.

Min steel as per Cl.306.2.1 = 0.3 %


Provide
6 Nos

=
40 Nos.

183.000 cm2.

25 mm. tor.

25 mm. Tor. In Cut waters &

Area =

196.350 cm2.

(A)

34 Nos. in Straight portion - face side. )

Lateral ties :
According to IS 456 :2000 the diameter of the lateral ties shall not be less than
1)

1/4 th of the diameter of the longitudinal bar

2)

6 mm

The diameter of the lateral ties shall not be less than


Therefore provide

<

6.25 mm
6 mm

8 mm as the diameter of the tie bar

Pitch of transverse reinforcement should be least of the following


1)

Least lateral dimension of compression member

2)

Sixteen times the smallest diameter of the longitudinal bar

3)

300mm

1)

100.000

Pitch of transverse ties


Least of following

Pitch of ties

cm

2)

40 cm

3)

30 cm

30 cm

Provide 8mm tor. Ties at 300 mm c/c.


(VI)DESIGN OF FOUNDATION @

(B)
+ 468.730

The Foundations are designed for Both the Spans Laid and One span Laid conditions.

Scour Level

Foundation Level

+468.730

+468.726

2 dsm

1.000
0.5
0.500
Foundation Level.

+468.726

0.5
3.0000

R.C.C. Footing.

468.230 m

DETAIL OF PIER FOUNDATION.


1

Both the Spans laid Condition :-

48

a). Service + LWL Condition :Vertical loads :1

Dead Load From Superstructure

197.797 t

Weight of Pier

126.889 t

Weight of Footing - with out buoyancy

26.625 t

351.311 t

Total Dead loads


Live Load Reactions :1 Total Live Loads
Total Dead + Live loads for Design
2 Braking Reaction

28.215 t

379.526 t

Moments about foundation

3.640 t

468.230 m Level :-

Moments

S. No.

Type of Force

Load

LA

Long.

Dead Load Moments

351.31

1.500

526.967

Live Load Eccentricity

28.215

0.604

17.035

379.53
3

Braking Force

3.640

Moments without Wind


4

Wind Force

Moments with Wind


X

Ml

1.433 m

1.433

0.067 m

379.526

589.332

23.277
25.219

589.332

379.53

1.5

0.067

48.496

25.287 t -m
Size of Footing

45.331

385.188
544.00

Section Properties :=

12.453

2.022

=
Area

23.277

544.002

383.17

Trans.

7.10

7.10

3.00

3.00 m

21.3 m2

Section Modulus=
Zl

7.10

3.00 ^2

10.650 m3

Zt

3.00

7.10 ^2

25.205 m3

14.691 t/m2

Foundation Pressures :a). Without Wind :

Service + LWL.
383.17 ( +/- )
21.3

17.99

( +/- )

2.37

( +/- )

b) With Wind :

25.29 ( +/- )

23.28

10.65

25.21

0.92

385.19 ( +/- )

50.5 ( +/- )

21.3
=

18.08 ( +/- )

4.74 ( +/- )

21.287

48.50

10.65
1.92

25.21

24.750

11.417 t/m2

b). Service + M.F.L - Condition :Vertical loads :1

Dead Load From Superstructure

197.797 t

Weight of Pier ( 100% buoyancy ) =

76.133 t

Weight of Footing - 100% buoyancy =

26.625 t

300.556 t

28.215 t

328.770 t

Total Dead loads


Live Load Reactions :Total Dead + Live Loads

49

Moments about foundation

468.230 m Level :-

S. No.

Type of Force

Dead Load Moment

Moments
Long.

Trans.

526.967

Live Load Eccentricity

17.035

23.277

Braking Force

45.331

0.000

Water Current

12.962

17.455

589.33

40.73

Moments without Wind


5

Wind Force

( On Loaded structure)

25.219

Moments with Wind


Section Properties :Area

Size of Footing
=

21.3 m2
=

544.002

1.655 m

1.655

0.155 m

Moment about centre

589.33

7.10

Zl

328.770

1.500

328.77

50.846 tm

10.650 m3

x
Zt

65.95
3.00 m

25.205 m3

0.155

Foundation Pressures :a) Without Wind :


=

15.435 ( +/- )

4.774

15.435 ( +/- )

7.142
2

50.846 ( +/- )

40.732

21.300

10.650

25.205

( +/- )

b) With Wind :
=

328.77 ( +/- )
1.616

21.826

9.045 t/m2

328.77 ( +/- )

76.065 ( +/- )

65.951

21.300

10.650

25.205

( +/- )

2.617

25.194

5.676 t/m2

197.80

98.899 t

126.889 t

One Span laid Condition :-

a). LWL Condition :Vertical loads :1

Dead Load From Superstructure

Weight of Pier ( Dry )

Weight of Footing - 100% buoyancy

Total Dead loads

26.625 t

252.413 t
28.215 t

Total Live Load

Braking force

3.640 t

284.267 t

Total DL + LL
Moments about

+468.230 m Level :-

S. No.

Type of Force

Dead Load Eccentricity

Total LL Moments

Braking force Moment

Load

LA

Long.

252.41

1.500

378.619

28.21

0.604

17.035

3.64

13.153

Wind Force

443.532
(Unloaded Section)

Area

Size of Footing

21.300 m
X
e

443.532

=
Zl

0.000
21.795

Moments with Wind


Section Properties :-

0.000

47.879

Moments without Wind


4

Trans.

7.10
=

10.650 m

443.53

284.27

1.560 m

1.560

0.440 m

m
Zt

x
=

21.795
3.00

25.205 m3

50

ML

284.27

0.440

125.002 tm

Foundation Pressures :a) Without Wind :

284.267 ( +/- )

125.002 ( +/- )

21.300
=

13.346

( +/- )

11.737

10.650

( +/- )

b) With Wind :

0.000
284.267 ( +/- )

13.346

( +/- )

0.000

25.08

0.000 ( +/- )

0.865

1.609 t/m2

21.795

10.650

( +/- )

b). Service + M.F.L - Condition :-

25.205

21.300
=

0.000

25.205

14.21

12.48 t/m2

One span Laid condition.

Dead Load From Superstructure

98.899 t

Weight of Pier ( 100% buoyancy ) =

76.133 t

Weight of Footing - 100% buoyancy =


Total Dead loads

26.625 t

201.657 t

Total Live Load

28.215 t

Braking force

3.640 t

233.512 t

Total Load
Moments about

+468.230 m Level :-

S. No.

Type of Force

Load

LA

Long.

Trans.
0.000

Dead Load Eccentricity

201.657

1.500

302.486

Total LL Moments

28.215

0.604

17.035

Braking force Moment

3.640

1.650

Moments without Wind


4

Water Current
Moments without Wind

Wind Force

e
Moment

338.488

1.450

1.450

0.050

201.66

Section Properties :Area

17.455

338.49 t - m

17.455
21.795

338.49 t - m

21.300 m2

39.249

233.512
1.500

m
x

Size of Footing
=

12.962
( On Unloaded structure)
Moments with Wind

6.006
325.526 t - m

0.050
=

Zl

10.173 t

7.10
Zt

10.650 m3

3.000 m

25.205 m3

Foundation Pressures :a) Without Wind :

201.657 ( +/- )
21.300

=
=

9.47 ( +/- )
11.12

b) With Wind :

0.955 ( +/- )
7.82

201.657
9.467

( +/- )

0.955

11.98

6.96

17.455 t

10.650

25.205 t

0.693

t/m2

( +/- )

21.300
=

10.173 ( +/- )

10.173
10.650

( +/- )

( +/- )

39.249
25.205

1.557

t/m2

51

DESIGN OF RCC FOOTING -

+468.230

The maximum pressures are due to Service + LWL (without wind ) condition.
Pressure on Soil :Without Wind :

383.166

( +/- )

25.287

21.300
=

17.989 ( +/- )

( +/- )

23.277

10.650

2.374 ( +/- )

25.205

0.924

21.287

14.691 t/m2

1.000 m
RCC Pier
1.000 m
1.00

0.500

3.00 M

x
Foundation

0.5625

3.00
DETAIL OF PIER FOUNDATION.
3.00 m
0.5625
Y

14.691
Pier
1.000

20.050

21.287

Y
X
19.088

1.000

PRESSURE DIAGRAM
With 50mm Cover and

25

Effective depth =

mm Bars :

500

Check for Bending :-

50

At the Face of Pier .

Moment due to Uniform Pr. =

19.088

L.A. =

1.000 ^2

12.5

438 mm ;

43.75 Cms ;

1.000 m ;
=

9.544 t-m

2
Deduct :Self weight

0.50 x

1.40 x

1.000 ^2

0.350 t-m

2
Net Moment for Footing Design =

9.544

Using M-20 Grade Concrete : and 16mm tor bars Depth of section required =
Area of steel =
2000
Minimum steel @ 0.12 % =

Q =

9.19

100000

100

13.330

9.194

100000

0.350

26.26 cms.
=

0.886

43.750

0.12

43.750

0.300

9.19 tm/m

13.330 t/m2

100

100
Distribution steel =

11.860 cm2

5.25 cm2
25 mm ; tor

11.860

3.558 cm2
52

Pro

12 mm; tor. @

300.00 mm c/c.

@ Bottom. Longitudinals.

3.770

(E)

and

12 mm; tor. @

300.00 mm c/c.

at Bottom Transverse.

3.770

(G,H)

Check for Shear at`d' from face of Abutment =


Shear Force / meter = (

21.29

X-X=
+

20.050

562.5 mm ; from Edge.


0.5625

11.626 t

0.5625

0.394 t

11.232 t

2
Deduct Self Weight

Net Shear for Design =


Shear Stress =
100 As / bd =

0.500

1.400

11.626

0.394

11.23

1000

100

43.750

2.567 kg/cm2

2.438 kg/cm2

<

2.567 kg/cm2

0.086 Allowable
c

HENCE NO SHEAR REINFORCEMENT IS REQUIRED.


At Top provide nominal steel

12 mm, tor @

200 mm, c/c. Both ways.

(F)

5.655 cm2

53

13 .DESIGN OF STREAM WING WALL (Sloped)


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+

480.308

477.6435

W3
W5

W1
W2
0.500
W4

0.30

1.00

0.90

0.30

476.50

2.400
B

0.5

W6
3.000

+ 476.00

Taking moments about a

(Stresses in concrete)

Load

Force

Particulars

L.A.

Moment

W1

0.50

3.808

2.4

4.57

1.250

5.713

W2

1.000

3.808

2.4

0.5

4.570

0.667

3.047

W4

0.900

1.143

2.4

0.5

1.235

1.800

2.223

Pv

0.0384 x

14.505

2.1

Ph

0.134

14.505

2.1

1.170
V

Lever arm

= M/V

Eccentricity

=
-

1.49

Permissible 'e' =

17.201

Max. comp. Stress

11.55

/6
11.55

/2

2.40

2.40

x(

0.400

>

1 +

2.400
Min. Stress

11.55

Load

11.545
1.49

0.290

0.290

1.523

6.218

17.201

HENCE OK

0.290

8.298

t/sq.m.

0.290

1.323

t/sq.m.

2.400
x(

1 -

2.400
Taking moments about B

--4.082

2.400
(Stresses on soil)

Particulars

Force (kN)
H

L.A.

Moment

W1

0.50

3.808

2.4

4.57

1.550

7.084

W2

1.000

3.808

2.4

0.5

4.570

0.967

4.418

W3

1.000

3.808

2.1

0.5

3.999

0.633

2.533

W4

0.900

1.143

2.4

0.5

1.235

2.100

2.594

W5

0.300

3.808

2.1

2.40

0.150

0.36

W6

0.500

3.000

2.4

3.60

1.500

5.4

Pv

0.0384 x

18.563

2.1

1.497

---

Ph

0.134

18.563

2.1

5.224
V

21.871

1.723

9.00

31.391
52

Lever arm

= M/V

Eccentricity

Permissible 'e' =
Max. comp. Stress

31.391
-

1.435
3.00
=

21.87
/2

3.000
/6
21.87

=
x(

=
=

0.500

>

1 +

3.00
Min. Stress

21.87
3.00

1.435

0.065

0.065

HENCE OK

0.065

8.238

t/sq.m.

0.065

6.342

t/sq.m.

3.000
x(

1 -

x
3.000

53

14.DESIGN OF U/S RETURN WALLS


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


0.5
+ 476.500
W2
1.500
W1

0.30 0.400

0.30 B +

0.50

475.000

W3

0.900

0.5

1.500

Taking moments about A

474.500

(Stresses in concrete)

Load

Force

Particulars

W1

0.400

1.500

2.4

W2

0.50

1.500

2.4

Pv

0.0384 x

1.500

1.500

2.1

Ph

0.134

1.500

1.500

2.1

0.5

= M/V

Eccentricity

1.286

0.476

Permissible 'e' =

Max. comp. Stress

2.70

x(

0.150

>

1 +

0.900
Min. Stress

2.70

0.633

0.456

1.80

0.250

0.45

---

2.701
0.476

0.026

0.026

0.600

0.38

1.286

HENCE OK

0.026

3.522

t/sq.m.

0.026

2.481

t/sq.m.

0.900
x(

1 -

0.900
Taking moments about B

0.720

0.633

/2

/6

2.70

0.90

0.90

Moment

0.181
V

Lever arm

L.A.

0.900
(Stresses on soil)

Load

Force (kN)
V
H

Particulars
0.5

Moment

W1

0.400

1.500

2.4

0.720

0.933

0.672

W2

0.50

1.500

2.4

1.80

0.550

0.99

W3

0.500

1.500

2.4

1.80

0.750

1.35

Pv

0.0384 x

2.000

2.00

2.1

Ph

0.134

2.000

2.00

2.1

L.A.

0.161
V

Lever arm

= M/V

Eccentricity

Permissible 'e' =
Max. comp. Stress

0.773

3.463
-

1.50
=

4.48

1.500
/6

4.48

x(

/2
=
1 +

--0.563

0.250

>

4.481
0.773

0.023

0.023

0.800

0.451

3.463

HENCE OK

0.023

3.262

t/sq.m.
54

1.50
Min. Stress

4.48
1.50

1.500
x(

1 -

0.023

2.713

t/sq.m.

1.500

55

17. STAAD Input for Beams & Columns


( under Approach Slab)
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 13-Jul-12
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 11 5 6.465 -1.58342e-015; 12 0 8.89 -2.17735e-015;
13 5 8.89 -2.17735e-015;
MEMBER INCIDENCES
10 12 13; 11 1 12; 12 11 13;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
11 12 PRIS YD 0.5
10 PRIS YD 0.4 ZD 0.3
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
1 11 FIXED
LOAD 1 LOADTYPE None TITLE LOAD CASE 1
MEMBER LOAD
10 UMOM GX -20.871
SELFWEIGHT Y -1 LIST 10 TO 12
PERFORM ANALYSIS
PRINT ANALYSIS RESULTS
START CONCRETE DESIGN
CODE INDIAN
FYMAIN 415000 ALL
FC 20000 ALL
FYSEC 415000 ALL

108

DESIGN BEAM 10
DESIGN COLUMN 11 12
END CONCRETE DESIGN
FINISH

109

18. Design of Beams & Columns under Approach Slab


B E A M N O.

10 D E S I G N R E S U L T S

LENGTH: 5000.0 mm

SIZE: 300.0 mm X 450.0 mm COVER: 25.0 mm

SUMMARY OF REINF. AREA (Sq.mm)


---------------------------------------------------------------------------SECTION

0.0 mm

1250.0 mm

2500.0 mm

3750.0 mm

5000.0 mm

---------------------------------------------------------------------------TOP

536.12

REINF.

(Sq. mm)

BOTTOM
REINF.

257.46

257.46

(Sq. mm)

474.03

(Sq. mm)

256.23

(Sq. mm)

256.23

(Sq. mm)

(Sq. mm)

293.31

653.47

(Sq. mm)
341.47
(Sq. mm)

(Sq. mm)
583.71
(Sq. mm)

---------------------------------------------------------------------------SHEAR DESIGN RESULTS AT 665.0 mm AWAY FROM START SUPPORT


VY =

5.77 MX =

33.57 LD=

Provide 2 Legged 10 @ 150 mm c/c

SHEAR DESIGN RESULTS AT 665.0 mm AWAY FROM END SUPPORT


VY =

-5.90 MX =

33.57 LD=

Provide 2 Legged 10 @ 150 mm c/c


C O L U M N N O.

11 D E S I G N R E S U L T S

LENGTH: 8890.0 mm CROSS SECTION: 500.0 mm dia. COVER: 40.0 mm


REQD. STEEL AREA :

625.63 Sq.mm.

TIE REINFORCEMENT : Provide 8 mm dia. circular ties @ 190 mm c/c


C O L U M N N O.

12 D E S I G N R E S U L T S

LENGTH: 2425.0 mm CROSS SECTION: 500.0 mm dia. COVER: 40.0 mm


REQD. STEEL AREA :

1022.83 Sq.mm.

TIE REINFORCEMENT : Provide 8 mm dia. circular ties @ 190 mm c/c

109

15.BEAM UNDER APPROACH SLAB ALONG THE TROUGH


Moments from the top slab

27.666 Kn-m

Shear Force from top slab

15.533 Kn

assuming

beam of size

0.3 m

0.4
0.40 m

thickness of Approach Slab

400 mm

Clear cover

40 mm

Thickness of wearing coat

75 mm

Main reinforcement

20 mm dia Hysd bars

0.300

DESIGN OF BEAM :
1) Effective depth (d)

400

- 40

350 mm

0.35 m

- 10

2) Effective span (l) :


(I) C/C of Supports
(ii) Clear span + Effective depth
Adopt effective span as least of above two

5.000

5.300 m

5.000

5.350 m

5.300 m

0.30

0.350

2.50 x

3) Bending moment due to self wt of beam :


SelfWeight of beam

0.30 x

0.40 x

0.30

kn

1.000

=
BM due to Dead load

w l2
8

0.300

5.300 2

x
8

=
Total moment acting on the beam

=
=
=

1.05

kn-m

Max moment from slab + moment due to self wt of beam


27.6661767

1.053

28.720 kn-m

110

4)Shear force due to self wt of beam :


shear due to self wt of beam

WL

0.3

2
x 5.300
2
=
Maximum shear due to dead load

0.8 kn
SF from slab + shear due to self wt of beam

15.533

16.33 kn

Grade of Concrete

M 25

Grade of Reinforcement

Fe 415

0.80

5) Eff depth required :


Design constants

Permissible Bending Comp Stress

in concrete cbc

Permissible Direct Comp Stress

in concrete s cbc

Permissible Bending Tensile Stress

in concrete cbt

1.765 MPa

1.864 MPa

(from IS 3370)

186 MPa

(from IS 3370)

Permissible Stress in Shear


in steel st

8.5 MPa
6 MPa

Modular Ratio m

10.98

k = m cbc /(m*cbc+st)

0.334

j =1-k/3

0.889

Q = 0.5 k j cbc

1.2603

Design of section
Effective Depth Required d =

M/QB

B = width of Section =

300
d=

which is less than the provided

276

mm
<

350 mm
HENCE OK

111

6) Reinforcement Caluclation :
Required Area of steel

28.720

x 10 ^6

186.39 x 0.89

x 275.60

629.040 mm2

=
Minimum Area of Steel :
Ast

0.850
fy

b*d
Ast

Minimum

169.346 mm2

=
Provide Design Steel

Provide

20 mm dia. bars.
Area of one bar

No. of bars

Provide

bars of

314.159 mm2
2 no.
20 mm dia.

628.319 mm2

Width of beam

300.000 mm

S.F. ( V )

16.328 kN

Nominal shear stress

Provided Area of steel


2. Check for Shear:

16.328

x 10 ^3

300.000

x 275.60

0.197 N/mm2
% of steel

100

x 628.32

300.000

x 275.60

0.760 %

0.352 N/mm2

Ref : Table No.23 of IS 456.


Pt

0.50

0.30

0.75

0.35

Pemissible shear stress

Provide Nomimal Shear Reinforcement


Minimum Shear Reinforcement :
Provide

8 mm dia.

Area of Stirrup
Asv
b Sv

4 legged stirrups
=

201.062 mm2

0.4
0.87 f y

112

16.BEAM UNDER APPROACH SLAB ACROSS THE TROUGH


Moments from the top slab

27.666 Kn-m

Shear Force from top slab

15.533 Kn

assuming

beam of size

0.3 m

0.3
0.30 m

thickness of Approach Slab

400 mm

Clear cover

40 mm

Thickness of wearing coat

75 mm

Main reinforcement

20 mm dia Hysd bars

0.300

DESIGN OF BEAM :
1) Effective depth (d)

300

- 40

250 mm

0.25 m

- 10

2) Effective span (l) :


(I) C/C of Supports
(ii) Clear span + Effective depth
Adopt effective span as least of above two

3.400

3.700 m

3.400

3.650 m

3.650 m

0.30

0.250

2.50 x

3) Bending moment due to self wt of beam :


SelfWeight of beam

0.30 x

0.30 x

0.23

kn

1.000

=
BM due to Dead load

w l2
8

0.225

3.650 2

x
8

=
Total moment acting on the beam

=
=
=

0.37

kn-m

Max moment from slab + moment due to self wt of beam


27.6661767

0.375

28.041 kn-m

113

4)Shear force due to self wt of beam :


shear due to self wt of beam

WL

0.2

2
x 3.650
2
=
Maximum shear due to dead load

0.4 kn
SF from slab + shear due to self wt of beam

15.533

15.94 kn

Grade of Concrete

M 25

Grade of Reinforcement

Fe 415

0.41

5) Eff depth required :


Design constants

Permissible Bending Comp Stress

in concrete cbc

Permissible Direct Comp Stress

in concrete s cbc

Permissible Bending Tensile Stress

in concrete cbt

1.765 MPa

1.864 MPa

(from IS 3370)

186 MPa

(from IS 3370)

Permissible Stress in Shear


in steel st

8.5 MPa
6 MPa

Modular Ratio m

10.98

k = m cbc /(m*cbc+st)

0.334

j =1-k/3

0.889

Q = 0.5 k j cbc

1.2603

Design of section
Effective Depth Required d =

M/QB

B = width of Section =

300
d=

which is less than the provided

272

mm
>

250 mm
NOT OK

114

6) Reinforcement Caluclation :
Required Area of steel

28.041

x 10 ^6

186.39 x 0.89

x 272.33

621.563 mm2

=
Minimum Area of Steel :
Ast

0.850
fy

b*d
Ast

Minimum

167.333 mm2

=
Provide Design Steel

Provide

20 mm dia. bars.
Area of one bar

No. of bars

Provide

bars of

314.159 mm2
2 no.
20 mm dia.

628.319 mm2

Width of beam

300.000 mm

S.F. ( V )

15.943 kN

Nominal shear stress

Provided Area of steel


2. Check for Shear:

15.943

x 10 ^3

300.000

x 272.33

0.195 N/mm2
% of steel

100

x 628.32

300.000

x 272.33

0.769 %

0.354 N/mm2

Ref : Table No.23 of IS 456.


Pt

0.50

0.30

0.75

0.35

Pemissible shear stress

Provide Nomimal Shear Reinforcement


Minimum Shear Reinforcement :
Provide

8 mm dia.

Area of Stirrup
Asv
b Sv

4 legged stirrups
=

201.062 mm2

0.4
0.87 f y

115

Column
17.DESIGN OF COLUMN UNDER APPROACH SLAB
Size of the column

0.5

Grade of concrete

M20

N/mm2

Grade of Steel

Fe415

N/mm2
9

Area of Column

xd
4

0.19625 mm2

Load Caluclation :

0.5

Self weight of Column=

44.16

kN

Moment due to live & dead load of slab

0.20 x

9.00 x

25

27.67

kN

Moment due to dead load of Beam along the Trough

1.05

kN

Moment due to dead load of Beam across the Trough

0.37

kN

water load

17.75

kN

73.25

kN

109.88

kN

Total load
Factored load Pu :
Pu

1.5 X

Total load

1.50 x

73.25

Factored load

Pu

109.88 Kn

Mux

549.38 kN-m

Muy

384.57 kN-m

Let us assume %ge of reinforcement

p=
p
Fck

Effective cover

1.52
=

0.076

40

80.00

10987.575

0.08

mm

Uniaxial moment capacity of the section about x-x axis.


d'
D
Pu
fckbD
Referring to chart 44 of SP16
Mu
fckbD2
Mux1

0.08

fckbD2

64.8

N-mm

0.0000648

kN-m

Uniaxial moment capacity of the section about y-y axis.


d'
B
Pu
fckbD

80.00

1220.842

Page 116

Column
Referring to chart 44 of SP16
Mu

fckbD2
Muy1

0.08

Calculation of Puz

fckbD2

0.45

64.8

N-mm

0.0000648

kN-m

ckAc +
0.45

+0.75

x 90

Pu

0.04

Mux

549.38

Mux1

0.0000648

Muy

384.57

Muy1

0.0000648

Pu/Puz

0.2

0.8

2563.27

4272.78

42.87

0.04

kN

2563.27

8478066.788

5934646.75

n
Muy

Mux1

Muy1

0.74
8478066.788

x3

n
Mux

yAs

+0.75

109.88

PuZ

0.08

236824.61

>

0.74
+

5934646.75
not ok

Area of steel Ast =


1.52

x 1 m

0.0076

mm2

2512

mm2

100
Provide

20mm dia

8Nos.

Page 117

footing
18 DESIGN OF FOOTING:
Unit Weight of Concrete =
Safe Bearing Capacity of soil =
Load from Super Structure =
Weight of Column =
Weight of footing (W) =
Total Weight =
Area of Footing required =
Dimensions of footing =
Depth of footing =
Volume of footing =
Clear Cover =

2.5
20
46.84
44.156
91.000
4.550
0.50
0.50
0.00
25

t/m3
t/m2
t
t
t
t
m2
m
m
m3
mm

1.10
0.50

1.1

Stress at bottom:
Maximum Stress =
Minimum Stress =

0.000 t/m2
0.000 t/m2

0.000
0.000

Stress @ face of Column =

0.00 t/m2

Average Pressure intensity =

0.000 t/m2

-0.300

Maximum Bending Moment = 0x0.5x-0.3x-0.3/2


=
0 t - m.
M = Q bd2
0=
1096.33
0.00
d2 =
1096.33
d=
0 cm

t m.

x 1000 x d2
x 1000
<
HENCE SAFE

46.25

Area of Steel for footing = M / st x j x d


=
=
Provide
spacing

0.00
1900
#DIV/0!

x0

25 mm dia bars @

#DIV/0! cm c/c

Provide

25

=
calculated spacing
=
300
mm
=
3 x effective depth
mm dia,spacing of Main Reinforcement

Provide

25

mm dia @

#DIV/0!

x 46.25
cm2

whichever is less

#DIV/0! cm
30 cm
138.75 cm
spacing
=
#DIV/0! cm
whichever is less
cm2
cm c/c, which gives an area of
#DIV/0!
2
against
#DIV/0! cm Main reinforcement required.
#DIV/0!

Page 118

0.50

footing
Check for One Way Shear:
Overall depth at a distance d from the face of footing
0.00
=
0.000 =
=

0.000 0.000 m

- 0.00
-0.3

1.10

x 0.4625

-0.300

0
0.4625

Effective depth at the critical section =


-37.5
Shear force at the critical section = 0x0.5x-0.7625=
=
0.00
=
0.00
Breadth of footing at the critical section =
2.025
Nominal Shear Stress at the critical section =

mm

0.00

t
kg
m
qv =

0.00

0.50
0.00
-3.75
x 202.5
0.000 kg/cm2

=
100 Ast

Percentage of Steel at Critical Section =

bd
=

For

100
#DIV/0!
202.5
-x 3.750
#DIV/0! %
#DIV/0! N/mm2
#DIV/0! kg/cm2
#DIV/0!

=
c =
c =

#DIV/0!

As v < c
Check for two way Shear

1.10
Overall depth at a distance d/2 from the face of footing

=
=
=

0.000 0.000 0.000 m

0.00

-0.300
- 0.00

-0.3

0.231

x 0.23125

x0

0.00

0.00

0.50
Effective depth at the critical section =
-37.5
Shear force at the critical section = 0x0.5x-0.53125=
=
0.00
=
0.00
Perimeter at the critical section =
6.25
Nominal Shear Stress at the critical section =

mm
t
kg
m

qv =
=

As per Clause 31.6.3.1 of IS 456 : 2000


The Calculated Shear Stress at the critical section shall not exceed K sc
where c =
Permissible Shear Stress = Ks*0.16sqrt(fck)
= 1 x0.16
20
N/mm2
=
0.716
kg/cm2
=
7.155
HENCE SAFE

Page 119

0.00
-3.75
x 625
0 kg/cm2

aarvee associates
Lower Pen Ganga Inter State Project

May'2012
Revision R0

0
0
Detailed Estimate of Quantities for Aqueduct @ Km . 100.100
S.
No.

Description

Excavation in all kinds of soil including boulders


upto 0.30 m dia. for foundations of canalcross
drainage and other appurtenant structures and
placing the excavated stuff neatly inspecified dump
area or disposing off the same as directed etc.,
complete with initial lead upto50 m and initial lift
upto 3 m.
Abutments under trough
Piers
Abutment under Road Bridge
U/S (Stream)
Canal Wings
Canal Returns(inspection path side )
Stream wing walls
Stream Returns
Floor
Profile walls
D/S (Stream)
Canal Wings
Canal Returns(non inspection path side )
Stream wing walls
Stream Returns
Floor
Profile walls
Total

Unit

No.

Qty

2
11
4

5.700
7.100
5.02

3.600
3.000
2.812

131.200
4.159
2.833

5384.45
974.45
159.99

2
1
2
2
1
1

8.100
5.000
11.43
5.000
8.000
10.500

1.950
3.000
5.100
1.500
5.900
0.450

1.503
1.503
131.200
132.700
0.450
0.500

47.50
22.55
15290.06
1990.50
21.24
2.36

2
1
2
2
1
1

12.000
8.100
11.425
5.000
12.000
10.500

1.950
1.950
5.100
1.500
5.900
0.450

1.503
1.503
131.200
132.700
0.450
0.500

70.36
23.75
15290.06
1990.50
31.86
2.36
40656.29

2
4
4
4
4
4
11
1
1
1
1

5.700
5.000
8.100
5.000
11.425
5.000
7.100
8.000
12.000
10.500
10.500

3.600
2.812
1.950
3.000
5.100
1.500
3.000
5.900
5.900
0.450
0.450

0.500
0.500
0.500
0.500
0.500
0.500
0.100
0.450
0.450
0.450
0.450

20.52
28.12
31.59
30.00
116.54
15.00
23.43
21.24
31.86
2.13
2.13
323.16

Cum

Providing and laying insitu vibrated M-15 ( 28 days


cube compressive strength not less than15 N / sq
mm ) grade cement concrete using 80 mm down
size approved, clean, hard, gradedaggregates for
foundation filling including cost of all materials,
machinery, labour, formwork,cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto
50 m and all lifts.
Foundation
Abutment under trough
Road Abutment
Canal Wings
Canal returns
Stream wing walls
Stream Returns
Under Pier footing
Floor U/S
Floor(D/s)
Profile walls(U/s)
Profile walls(D/s)
Total

Draft Detailed Project Report

Cum

aarvee associates
Lower Pen Ganga Inter State Project
Vibrated Cement concrete with
M-15 grade
concrete confirming to compressive strength of
15.00 N/mm2 concrete using well graded machine
crushed Hard broken Granite metal
maximum
size of 40 mm down graded
confirming to IS
Code including cost and conveyance of all
3
materials, labour charges all leads and lifts,
seigniorage, and compacting concrete with
vibrates, curing etc complete for piers,
abutments, walls etc.as directed by the Engineer
in charge.

May'2012
Revision R0

Abutments under trough


Body Wall
Inner face
Outer face
Dirt wall

2
2
2
2

5.700
5.700
5.700
5.700

1.000
0.766
1.016
0.493

1.393

4
4
4
4

5.020
5.020
5.020
5.020

0.750
1.400
0.594
0.240

2.030
2.030
0.750

30.57
57.07
11.93
3.61

2
2
2

8.100
8.100
8.100

0.750
1.350

1.775
0.703
0.532

21.57
15.39
8.63

1
1
1

5.000
5.000
5.000

0.500
1.500

1.775
0.703
0.532

4.44
5.28
2.66

2
2

12.000
12.000

0.750
1.350

1.775
0.703

31.95
22.79

12.000

0.532

12.78

2
2
2

5.000
5.000
5.000

0.500
1.500
0.532

1.775
0.703

8.87
10.55
5.32

4
4
4

11.425
11.425
11.425

0.500
0.000
0.300

3.808

87.03
0.00
13.71

4
4

5.000
5.000

0.500
0.300

1.500

15.00
6.00
415.24

0.690

15.89
8.74
11.59
3.87

Abutment under Road Bridge


Body Wall
Base Below CBL
Outer face
Dirt wall
Canal wings(U/s)
Body Wall
Base Below CBL
Outer face
Canal returns(U/s)
Body Wall
Base Below CBL
Outer face
Canal wings(D/s)
Body Wall
Base Below CBL
Outer face
Canal Returns( D/s)
Body Wall
Base Below CBL
Outer face
Stream wing walls(U/s & D/s)
Body Wall
Inner face
Outer face
Stream Returns(U/s & D/s)
Body Wall
Outer face
Total

Draft Detailed Project Report

Cum

aarvee associates
Lower Pen Ganga Inter State Project
Providing and laying 75 mm thick in-situ M-15 ( 28
days cube compressive strength not lessthan 15 N
/ sqmm ) grade cement concrete with 20 mm down
size approved, clean, hard,graded aggregates for
canal lining using vibrating cylinder type
mechanical paver includingcost of all materials,
4
machinery, labour, cleaning, batching, mixing,
placing in position,finishing, forming contraction
joints, fixing PVC joint sealing strips, curing,
shifting of paver

May'2012
Revision R0

Canal Bed Lining


Sqm
Canal Side Slopes Lining
Sqm
Providing and laying insitu vibrated M-20 ( 28 days
cube compressive strength not less than20 N / sq
mm ) grade cement concrete using 20 mm down
size approved, clean, hard, graded aggregates for
deck slab & kerb including cost of all
materials,machinery, labour, formwork,scaffolding,
cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curingetc., complete
with initial lead upto 50 m and all lifts. ( Cement
content : 300 kg / cum )
Trough slab
Bed Block
Bottom slab
Side walls
Top slab
Haunches
Fillets
Kerb
Solid parapet walls
for vents
Approach slab
Deck slab for Connection Road
Kerb
Solid parapet walls
Bed Block
Piers
Rectangular footing
Pier
Total

10
10

4.200
3.225

84.000
129.000

2
1
2
1
2
4
1
2

5.700
9.015
9.015
9.015
9.015
9.015
9.015
9.015

0.508
9.400
0.500
9.100
0.023
0.011
0.225
0.160

0.300
0.400
1.775
0.300

0.300
0.600

12

1.736
33.896
16.002
24.611
0.406
0.406
0.609
1.731
79.395
952.74

2
2
2
2

12.600
12.600
12.600
5.020

5.02
0.225
0.160
0.510

0.400
0.300
0.300
0.600

11
11

7.100
6.100

3.000
1.000

0.500
117.150
9.063 608.16084999
1734.640

1
1
1
2
1

8.000
15.000
107.985
4.280
107.985

5.900
0.450
4.250
4.250
7.600

0.075
0.075
0.075
0.075
0.040

Cum

50.602
1.701
1.210
3.072

Providing and laying insitu M- 20 ( 28 days cube


compressive strength not less than 20 N /sqmm )
grade cement concrete using 20 mm down size
approved, clean, hard, gradedaggregates for
wearing coat including cost of all materials,
machinery, labour, formwork,cleaning, batching,
mixing, placing in position in alternate panels,
levelling, compacting,finishing, curing, packing
joints with asphalt mortar etc., complete with initial
lead upto 50 m
Floor U/S
Floor(D/s)
Road over Trough
For Connection Road
Sealing coat
Total

2
4

Providing, fabricating and placing in position


reinforcement steel for RCC,below 36 dia rods
overlaps and wastages wherever required, tying
with 1.25 mm diameter soft annealed steel wire,
including cost of all materials, machinery, labour
etc., complete with initial lead upto 1 km and all
lifts.

Draft Detailed Project Report

Cum

MT

3.540
0.506
34.420
2.729
32.827
74.022

87.551

aarvee associates
Lower Pen Ganga Inter State Project
Providing and filling murum / gravely soil ( CNS soil
) for foundation or above pipesincluding breaking
clods, spreading in layers of 10 to 15 cm, watering,
compaction by power roller to achieve density
8
control of not less than 98 percent etc., complete
with lead upto50 m and all lifts.

May'2012
Revision R0

Cum

10

11

12

42427.848

Providing and fixing 20 mm thick 150 mm depth


tarfelt expansion joint filler boards forcement
concrete lining of canal including cost of all
materials, labour etc., complete with allleads and
lifts.Consider 100 m length of expansion joint.
For Road Bridge slab
For Trough slab
Total
Providing and forming 35 mm wide and 10 mm
thick construction / contraction joints for
concrete lining by mastic filler including cost of all
materials, labour etc., complete withall leads and
lifts.Consider 100 m length mastic filler joint.
U/s & D/s
Total
Providing and fixing 100 mm dia perforated PVC
pipes 40 cm long for Weep holes including cost of
all materials, labour, drilling 8 mm dia holes etc.
complete with allleads and lifts.Consider 10 Nos
100 mm dia PVC pipes 40 cm long each
For trough slab
Total
Supply and fixing of guide stones ( granite
variety)1200mm x 200mm x200mm size including
cost and conveyance of material and labour
charges etc. complete as directed by the Engineer
in charge.

Draft Detailed Project Report

Rmt

5
4

5.020
7.600

25.100
30.400
55.500

3.225

6.450
6.450

8.900

35.600
35.600

Rmt

Rmt

Nos

64

64

aarvee associates
Lower Pen Ganga Inter State Project

May'2012
Revision R0
0
0
Abstract Estimate of Quantities for Aqueduct @ Km . 100.100
Unit

Rate

Amount in
Lakhs

Excavation in all kinds of soil including boulders upto


0.30 m dia. for foundations of canalcross drainage
and other appurtenant structures and placing the
IRR-CCDW-1-1
40656.287
excavated stuff neatly inspecified dump area or
disposing off the same as directed etc., complete with
initial lead upto50 m and initial lift upto 3 m.

Cum

47.25

19.220

Providing and laying insitu vibrated M-15 ( 28 days


cube compressive strength not less than15 N / sq
mm ) grade cement concrete using 80 mm down size
approved, clean, hard, gradedaggregates for
IRR-CCDW-2-4 foundation filling including cost of all materials,
machinery, labour, formwork,cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50
m and all lifts.

323.160

Cum

5077.22

16.410

Vibrated Cement concrete with M-15 grade concrete


confirming to compressive strength of 15.00 N/mm2
concrete using well graded machine crushed Hard
broken Granite metal maximum size of 40 mm down
IRR-CCDW-2-3 graded
confirming to IS Code including cost and
conveyance of all materials, labour charges all leads
and lifts, seigniorage, and compacting concrete with
vibrates, curing etc complete for piers, abutments,
walls etc.as directed by the Engineer in charge.

415.239

Cum

5953.66

24.730

IRR-CAW-7-6

Providing and laying 75 mm thick in-situ M-15 ( 28


days cube compressive strength not lessthan 15 N /
sqmm ) grade cement concrete with 20 mm down
size approved, clean, hard,graded aggregates for
canal lining using vibrating cylinder type mechanical
paver includingcost of all materials, machinery,
labour, cleaning, batching, mixing, placing in
position,finishing, forming contraction joints, fixing
PVC joint sealing strips, curing, shifting of paver

213.000

Sqm

5953.66

12.690

Providing and laying insitu vibrated M-20 ( 28 days


cube compressive strength not less than20 N / sq
mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for deck
IRR-CCDW-2-24 slab & kerb including cost of all materials,machinery,
labour, formwork,scaffolding, cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curingetc., complete with initial lead upto 50
m and all lifts. ( Cement content : 300 kg / cum )

1734.640

Cum

6938.32

120.360

Providing and laying insitu M- 20 ( 28 days cube


compressive strength not less than 20 N /sqmm )
grade cement concrete using 20 mm down size
approved, clean, hard, gradedaggregates for wearing
coat including cost of all materials, machinery, labour,
IRR-CCDW-2-26
formwork,cleaning, batching, mixing, placing in
position
in
alternate
panels,
levelling,
compacting,finishing, curing, packing joints with
asphalt mortar etc., complete with initial lead upto 50
m

74.022

Cum

4900.06

3.630

S.no

Ref

Draft Detailed Project Report

Description

Quantity

aarvee associates
Lower Pen Ganga Inter State Project
Providing, fabricating and placing in position
reinforcement steel for RCC,below 36 dia rods
overlaps and wastages wherever required, tying with
1.25 mm diameter soft annealed steel wire, including
cost of all materials, machinery, labour etc., complete
with initial lead upto 1 km and all lifts.

May'2012
Revision R0

IRR-DAW-2-1A

Providing and filling murum / gravely soil ( CNS soil )


for foundation or above pipesincluding breaking
clods, spreading in layers of 10 to 15 cm, watering,
IRR-CCDW-7-3
42427.848
compaction by power roller to achieve density control
of not less than 98 percent etc., complete with lead
upto50 m and all lifts.

10

11

12

87.551

MT

51641.00

45.220

Cum

195.70

83.040

IRR-CAW-7-35

Providing and fixing 20 mm thick 150 mm depth


tarfelt expansion joint filler boards forcement concrete
lining of canal including cost of all materials, labour
etc., complete with allleads and lifts.Consider 100 m
length of expansion joint.

55.500

Rmt

99.60

0.060

IRR-CAW-7-36

Providing and forming 35 mm wide and 10 mm thick


construction / contraction joints for concrete lining by
mastic filler including cost of all materials, labour etc.,
complete withall leads and lifts.Consider 100 m
length mastic filler joint.

6.450

Rmt

18.00

0.010

IRR-CAW-7-23

Providing and fixing 100 mm dia perforated PVC


pipes 40 cm long for Weep holes including cost of all
materials, labour, drilling 8 mm dia holes etc.
complete with allleads and lifts.Consider 10 Nos 100
mm dia PVC pipes 40 cm long each

35.600

Rmt

173.90

0.070

64.000

Nos

100.00

0.070

IRR-CAW-19

Supply and fixing of guide stones ( granite


variety)1200mm x 200mm x200mm size including
cost and conveyance of material and labour charges
etc. complete as directed by the Engineer in charge.

Total Amount
Total Amount in Crores

Draft Detailed Project Report

325.510
3.260

13b. DESIGN OF D/S RETURN WALLS


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


0.5
476.500

+
W2

-126.31
W1

0.30 0.900

0.30 B +

0.50

602.812

W3

1.400

0.5

2.000

602.312

Taking moments about A

(Stresses in concrete)

Load

Force

Particulars

W1

0.900

-126.312

2.4

W2

0.50

-126.312

2.4

Pv

0.0384 x

-126.312

-126.31

2.1

Ph

0.134

-126.312

-126.31

2.1

0.5

= M/V

Eccentricity

= -227.305

Permissible 'e' =

= -226986.131
-

Max. comp. Stress

998.60

1.40

1.40

/2

/6

998.60 x (

0.233

<

1 +

0.800

-109.134

-151.57

0.250

-37.894

---

998.597

-227.305

228.005

-50.525

-226839.103

-226986.131

228.005 REVISE THE SECTION


228.005

= 697708.773 t/sq.m.

= -696282.205 t/sq.m.

1.400

998.60 x (

1 -

1.400
Taking moments about B

-136.417

4489.659

1.400
Min. Stress

Moment

1286.589
V

Lever arm

L.A.

228.005
1.400

(Stresses on soil)

Load

Force (kN)
V
H

Particulars
0.5

Moment

W1

0.900

-126.312

2.4

-136.417

1.100

-150.059

W2

0.50

-126.312

2.4

-151.57

0.550

-83.366

W3

0.500

2.000

2.4

2.40

1.000

2.4

Pv

0.0384 x

-125.812

-125.81

2.1

Ph

0.134

-125.812

-125.81

2.1

L.A.

1276.423
V

Lever arm

= M/V

Eccentricity

= -226.463

Permissible 'e' =
Max. comp. Stress

###
-

2.00
=

/
2.000

/6
990.83

990.83

x(

/2
=
1 +

--4454.185

=
=

0.333

<

990.832

-226.463

227.463

-50.325

-224155.957

-224386.982

227.463 REVISE THE SECTION


227.463

= 338561.752 t/sq.m.
38

2.00
Min. Stress

990.83 x (
2.00

2.000
1 -

227.463

= -337570.921 t/sq.m.

2.000

39

aarvee associates
Lower Pen Ganga Inter State Project

May'2012
Revision R0

Conditions

In Pier

In Foundation

Stresses in Concrete

Stresses in Soil

Without Wind

With Wind

Without Wind

With Wind

Max.

Min.

Max.

Min.

Max.

Min.

Max.

Min.

69.037

47.862

73.271

44.290

21.287

14.691

24.750

11.417

68.671

45.732

72.682

41.936

21.826

9.045

25.194

5.676

Upto LWL

61.699

12.330

65.602

-8.427

25.083

1.609

14.211

12.481

Upto FSL

63.037

8.495

66.940

-4.592

11.115

7.820

11.980

6.955

Two Span Condition


Upto LWL
Upto FSL
One Span Condition

Draft Detailed Project Report

9b .DESIGN OF CANAL RETURN WALL


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+

480.983

TBL

480.2335

FSL

W3
W4

W1
W2
0.750

+ 478.833

1.50

CBL

1.003

0.30

2.250

0.30

477.830
0.5

W5
2.850

+ 477.330

Taking moments about a

(Stresses in concrete)

Load

Force

Particulars

L.A.

Moment

W1

0.75

3.153

2.4

5.68

1.875

10.644

W2

1.500

3.153

2.4

0.5

5.676

1.000

5.677

W3

1.500

2.150

2.1

0.5

3.386

0.500

1.694

2.1

0.802

2.1

Pv

0.0384 x

3.153

3.1535

Ph

0.134

3.153

3.1535

V
Lever arm

= M/V

Eccentricity

=
-

1.386

Permissible 'e' =

21.545

15.54

/2

/6

15.54

2.25

2.25

Max. comp. Stress

x(

0.375

>

1 +

2.250
Min. Stress

15.54

15.541
1.386

0.261

0.261

1.261

3.530

21.545

HENCE OK

0.261

11.714

t/sq.m.

0.261

2.1

t/sq.m.

2.250
x(

1 -

2.250
Taking moments about B

--2.798

2.250
(Stresses on soil)

Load

Particulars

Force (kN)
H

L.A.

Moment
8.418

W1

0.75

2.150

2.4

3.87

2.175

W2

1.500

3.153

2.4

0.5

5.676

1.300

7.38

W3

1.500

2.150

2.1

0.5

3.386

0.800

2.709

W4

0.300

3.153

2.1

1.99

1.425

2.832

W5

0.500

2.850

2.4

3.42

1.425

4.874

Pv

0.0384 x

3.653

3.6535

2.1

1.076

---

Ph

0.134

3.653

3.6535

2.1

3.756
V

Lever arm

= M/V

Eccentricity

Permissible 'e' =
Max. comp. Stress

31.702
-

1.633
2.85
=

19.42

x(

/2

2.850
/6

19.42

=
1 +

0.475

>

19.416
1.633

0.208

0.208

1.461

5.49

31.702

HENCE OK

0.208

9.796

t/sq.m.

28

2.85
Min. Stress

19.42
2.85

2.850
x(

1 -

0.208

3.829

t/sq.m.

2.850

29

9b .DESIGN OF CANAL RETURN WALL


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+

480.208

480.2335

W3
W4

FSL

W1
W2
0.750

+ 478.833

7.00
0.30

7.750

0.30

477.830
0.5

W5
8.350

+ 477.330

Taking moments about a

(Stresses in concrete)

Load
W

CBL

1.003

Force

Particulars

7.375

258.125

7.375

31.575

0.5

19.979

4.667

93.238

0.5

10.106

2.333

23.582

2.4

0.5

0.000

7.750

2.3785

2.1

0.456

---

2.1

2.378

2.4

W2

7.000

2.378

2.4

W3

7.000

1.375

2.1

W4

0.000

2.403

Pv

0.0384 x

2.378

Ph

0.134

2.378

2.3785

1.592
V

= M/V

Eccentricity

Permissible 'e' =

408.035
-

5.844

Max. comp. Stress

69.82

/2

/6

69.82

7.75

7.75

x(

1.292

<

1 +

7.750
Min. Stress

69.82

5.844

1.969

1.969

x(

1 -

1.969

22.743

t/sq.m.

1.969

-4.724

t/sq.m.

7.675

291.65

7.675

18.996

0.5

19.979

4.967

99.232

0.5

10.106

2.633

26.614

2.1

1.50

4.175

6.257

2.4

10.02

4.175

41.834

1.375

2.4

W2

7.000

2.378

2.4

W3

7.000

1.375

2.1

W4

0.300

2.378

W5

0.500

8.350

Pv

0.0384 x

2.878

2.8785

2.1

Ph

0.134

2.878

2.8785

2.1

0.668

5.889

487.268
-

8.350

82.75
/2

=
=

--2.332

Moment

38

Eccentricity

L.A.

2.47

0.75

Force (kN)
H

Load from slab

= M/V

408.035

7.750

W1

Lever arm

1.515

REVISE THE SECTION

Particulars

0.951

(Stresses on soil)

Load
W

69.823

7.750

7.750
Taking moments about B

Moment

35

0.75

Lever arm

L.A.

4.28

Load from slab

W1

82.747
5.889

1.714

1.151

2.68

487.268

30

Permissible 'e' =
Max. comp. Stress

8.35
=

/6
82.75

x(

1.392

<

1 +

8.35
Min. Stress

82.75
8.35

1.714

REVISE THE SECTION

1.714

22.115

t/sq.m.

1.714

-2.295

t/sq.m.

8.350
x(

1 -

x
8.350

31

13. DESIGN OF STREAM WING WALLS


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


0.50

480.983

W3
4.48
W4
0.30

W2

W1

2.500

0.50

+ 476.500

0.30

W5

0.5

3.600

+ 476.000

Taking moments about A

(Stresses in concrete)

Load

Force

Particulars

L.A.

Moment

W1

0.50

4.483

2.4

5.38

0.250

1.346

W2

2.500

4.483

2.4

0.5

13.450

1.333

17.934

Pv

0.0384

4.483

4.483

2.1

1.621

---

4.483

2.1

Ph

0.134

4.483

5.657
V

Lever arm

= M/V

Eccentricity

29.425

1.439

Permissible 'e' =

20.45

/2

/6

20.45

3.00

3.00

Max. comp. Stress

x(

0.500

>

1 +

3.000
Min. Stress

20.45

1.439

0.061

0.061
0.061

7.649

t/sq.m.

x(

1 -

0.061

5.986

t/sq.m.

3.000

Force (kN)
V
H

W1

0.500

4.483

2.4

W2

2.50

4.483

2.4

0.5

W3

2.500

4.483

2.1

0.5

W4

0.300

4.483

2.1

W5

0.500

3.600

2.4

4.320

Pv

0.0384

4.983

4.983

2.1

Ph

0.134

4.983

4.983

2.1

Permissible 'e' =
Max. comp. Stress

1.717

68.247
-

3.60
=

3.60

=
x(

1 +

0.600

>

Moment

5.380

0.550

2.96

13.45

1.633

21.97

11.77

1.800

21.185

2.825

0.150

0.424

1.800

7.776

--6.989

/2

3.600
/6

39.75

39.75

L.A.

2.003
V

Eccentricity

29.425

HENCE OK

Particulars

= M/V

10.145

(Stresses on soil)

Load

Lever arm

1.793

3.000

3.000
Taking moments about B

20.452

39.747
1.717

0.083

0.083
0.083

1.993

13.932

68.247

HENCE OK
)

12.568

t/sq.m.

3.600

36

Min. Stress

39.75
3.60

x(

1 -

0.083

9.514

t/sq.m.

3.600

37

12. DESIGN OF STREAM WING WALLS


unit wt of concrete

2.400

unit wt of earth

2.100

CALCULATION OF STRESSES IN CONCRETE :


+ 480.308

0.50

+ 477.643
W2
0.30

W1

4.000

0.50

+ 476.500

0.30

W5

0.5

5.100

+ 476.000

Taking moments about A

(Stresses in concrete)

Load

Force

Particulars

L.A.

Moment

W1

0.50

3.808

2.4

4.57

0.250

1.143

W2

4.000

3.808

2.4

0.5

18.281

1.833

33.515

Pv

0.0384

3.808

3.808

2.1

1.170

Ph

0.134

3.808

3.808

2.1
V

Lever arm

= M/V

Eccentricity

40.876

1.702

Permissible 'e' =

24.02

/2

/6

24.02

4.50

4.50

Max. comp. Stress

x(

0.750

>

1 +

4.500
Min. Stress

24.02

24.021
1.702

0.548

0.548

x(

1 -

0.548

9.238

t/sq.m.

0.548

1.438

t/sq.m.

4.500

Force (kN)
V
H

W1

0.500

3.808

2.4

W2

4.00

3.808

2.4

W3

0.500

5.100

2.4

Pv

0.0384

4.308

Ph

0.134

4.308

0.5

4.308

2.1

4.308

2.1

Permissible 'e' =
Max. comp. Stress

2.17

66.123

30.47

5.10
=

/6
30.47
5.10

/2

- 5.100
=
x(

1 +

L.A.

Moment

4.570

0.550

2.514

18.28

2.133

39

6.120

2.550

15.606

1.497

--5.224

Eccentricity

40.876

HENCE OK

Particulars

= M/V

6.218

(Stresses on soil)

Load

Lever arm

1.523

4.500

4.500
Taking moments about B

--4.082

0.850

>

30.468
2.17

0.380

0.380
0.380

1.723

9.003

66.123

HENCE OK
)

8.645

t/sq.m.

5.100

36

Min. Stress

30.47
5.10

x(

1 -

0.380

3.303

t/sq.m.

5.100

37

11. RCC APPROACH SLAB


The Single lane road bridge is to be designed for IRC Class 'A' Loading
Clear Span

3.800 m

Clear width of Carriage way

4.250 m

Width of Kerbs

0.225 m

Width of Parapet

0.160 m

Overall width of Approach Slab

5.020 m

Width of Bearing

Allowable stresses :

490 mm

Mix Proposed is M20


Q

70

10

0.259

8.290

Kg/cm2

2000 Kg/cm2

0.914

MR

Qbd2

Dead Loads
Assume the thickness Approach Slab

400 mm

Clear cover

40 mm

Thickness of wearing coat

75 mm

Main reinforcement

16 mm dia Hysd bars

Effective depth

400

352 mm

40.0

Effective Span (L)


(I) C/C of Supports
(ii) Clear span + Effective depth
Adopt effective span as least of above two
Carriage way
Width of Deck slab
Impact factor =

3.800

4.290 m

3.800

4.152 m

4.152 m

=
=

4.250 m
5.020 m

4.500
6.000

Impact factor =

0.49

0.352

( As per Cl 211.1 of IRC 6 - Page 22)

4.500
6.000

0.443

4.152

BENDING MOMENT DUE TO DEAD LOAD


Weight of slab + wearing coat

0.4

Bending Moment due to Dead load

0.075

2.5

w l2
8

Bending Moment due to Dead load

1.188

4.152 2

8
=

2.56

t-m
or

255893

kgcm

BENDING MOMENT DUE TO LIVE LOAD


Live load B.M as per I.R.C.21-2000 : clause 305.16.2 of section III
29

Effective dispersion width (bef)

a ( 1 - a/lo)

b1

Where
bef

The effective width of slab on which the load acts

30

A Constant having the following values depending upon the ratio of b/lo

The distance of the centre of gravity of the concentrated load


from the nearer support

l0

The effective span

b1

The breadth of concentration area of the load . I.e.,

The dimension of the Tyre or track contact area over the road surface of the slab in a direction at right
angles to the span plus twice the thickness of wearing coat or surface finish above the structural slab
b/lo

width of slab
effective span

5.020
4.152

=
0.700

----

2.120

0.800

----

2.240

0.100

----

0.120

a for

1.209

1.209

-->
=

2.120

0.611

2.731

For maximum B.M the wheel loads 5.7 t should be kept such that the resultant of the two
loads and one of the loads are equidistant from the centre of the span.
The position of loads shown in the sketch
C/L
5.7

5.7

1.176

1.20

1.776

Mid Span

0.300

Resultant of Loads
0.300

2.076

2.076
4.152

Center of Gravity of Loads "C"


=

5.70

x 1.20

5.70
=

+ 5.70

6.840
11.400

0.600 m
C.G of loads

The distance between C.G of loads and 5.7 T load

0.600

0.600 m

0.300 m

The distance between centre of span and 5.7 T load

0.600 m
-

1.200

DISPERSION UNDER ' C ' (5.7 t)


bef

( 1

a / lo

2.731

lo

a =

1.176

b1

=
=

bef

2.731

1.176

b1

+
4.152 m
500

2*

0.650 m
-

1.176

4.152

31

Effective dispersion width ( bef )

3.211

2.952 m

1
>

0.283
1.800

+
m

Hence ,The Dispersion width over laps

32

Combined width of dispersion = (thickness of kerb+distance between kerb and wheel+ half of contact width +axle length)+( half of
dispersion width of second wheel)
160
1800
b

225 150
75
400

Therefore combined width of dispersion

Intensity of load

0.225

+ 0.150

2.425

+ 1.476

3.901

5.7

+ 0.3

+ 1.8

1.443

3.901
=

2.109 t

DISPERSION UNDER ' D ' (5.7 t)


bef

( 1

2.731

a =

1.776

a / lo

lo

=
b1

4.152 m

500

=
bef

2.731

b1

2*

0.650 m

x2

1.776

4.152

Effective dispersion width ( bef )

4.850

3.425 m

x1

0.43

>

1.800

Hence ,The Dispersion width overlaps


Therefore combined width of dispersion

Intensity of load

0.225

2.425

4.138

5.7

+ 0.150

+ 0.25

+ 1.800

+ 1.713
m
1.443

4.138
=

1.988 t

FOR THE MAXIMUM BENDING MOMENT THE POSITION OF LOAD SYSTEM IS AS SHOWN BELOW:
2.109
1.176

1.988
1.2

1.776
0.300 0.300

2.076
4.152

33

Taking moments about B


RA

x 4.152

RA

1.988

+ 3.53

1.776

2.109

2.976

+ 6.28
4.152

RA

2.362 t

Maximum live load bending moment Under load "c"

RB

2.362

=
Maximum live load bending moment Under load "D"
=

Live Load BM +

308147

=
Effective depth required

564040

1.735

or

277771.7

1.776

3.081 t m

or

308147.4

Dead Load BM

255893

Kg cm

sqrt

564040
100

1.176

2.778 t m

=
Total B.M

1.735 t

26.08

cm

8.290

<

35.2 cm

HENCE OK
MAIN REINFORCEMENT
Area of Steel (Ast)

MR
tjd

564040
2000

(Ast) required

Provide

16

mm dia bars @

8.77 cm

18

0.914

35.200

cm c/c which gives an area of

(Ast) Provided

11.17

cm2

27.93

cm

HENCE OK

Every third bar is bent upwards, ie., 2/3 bars are carried on support
Ast on support at bottom = 2/3 * Ast =

7.447

cm2

O=

Ast on support at top = 1/3 * Ast =

3.723

cm

O=

DISTRIBUTION STEEL
As per clause 305.18.1 of IRC 21 : 2000 section III
BM Considered for distribution steel
=

0.300

=
x

308147

0.300 x LLBM
+

0.200

0.2 x

DLBM

255892.95

= 143622.795 Kg cm
Area of steel

143622.795
2000

=
Minimum area of steel required

0.914

100

35.200

2.233 cm2
0.120

40.00

100
Provide Minimum area of steel

4.800

cm2

34

Provide

12

mm dia bars @
(Ast) Provided

22
=

5.14

cm c/c which gives an area of


cm2

HENCE OK

35

CHECK FOR SHEAR


Maximum shear due to dead load

WL
2

1.2

x4
2

Maximum shear due to dead load

2.3 Kgs

Maximum shear due to live load as per clause 305.12.2 of I.R.C 21 : 2000 Section III
Longitudinal dispersion

0.250

1.200

Therefore load of 5.7 tons may be kept @

1.200

0.400

0.600

from the support for maximum shear


5.7 t
0.600
A

5.7 t
1.200

2.35

B
4.152

DISPERSION UNDER ' C ' (5.7 t)


bef

( 1

2.731

a =

0.600

bef

lo

=
b1

2.731

a / lo

b1

+
4.152 m

500

0.65

0.600

2*

0.600

4.152
Effective dispersion width ( bef )

2.052

>

1.8

Hence ,The Dispersion width overlaps


Therefore combined width of dispersion

0.225

+ 0.150

2.425

+ 1.026

=
Intensity of load

3.451

5.7

2.384 t

+ 0.25

+ 1.80

m
1.443

3.451

DISPERSION UNDER ' D ' (5.7 t)


bef

=
=

( 1

2.731

3.435 m

a / lo
=

b1

1.800

lo

2.731

a =

bef

1.800

b1

+
4.152 m

500

0.65

2*

1.800

4.152
>

1.800 m

36

Hence ,The Dispersion width overlaps

37

Therefore combined width of dispersion

0.225

+ 0.150

2.425

+ 1.717

=
Intensity of load

+ 0.25

+ 1.80

4.142 m
5.7

1.443

4.142
=
2.384 t
0.600
A

1.986 t

1.986 t
1.200

2.35
D

B
4.152

Taking moments about B


RA

4.152

2.384

3.552

RA

8.47

4.671

1.986

4.152
RA
RB
Total Shear

3.164 t

1.205 t

Shear due to Dead Load + Live Load

2.3

=
Shear stress

3166.7

3164

Kgs
3166.7

100
=

35.200

0.900 Kg/cm2

The permissible shear stress in concrete without shear reinforcement from table '12B' of 1RC-21-2000
100 As

bd

100

7.447

100

35.200

0.250

----

0.220

0.500

----

0.300

0.250

----

0.080

0.212 %

0.212
=

0.220

?
-0.080

-0.038

-0.250
=
or

0.208
2.077

N/mm2
Kg/cm2

>

0.900

Kg/cm2

HENCE OK

CHECK FOR BOND


Max shear
Bond stress

3166.7

3166.7
0.914

Kgs

5.289 Kg/m2

35.200
<

18.617
12.800 Kg/m2

HENCE OK

38

REINFORCEMENT SCHEDULE

TYPE

LONGITUDINAL REINFORCEMENT

Type a
(bottom)

Clearspan

3800

mm

Effective span

4152

mm

Bearing Width

490

mm

Overall length of slab

4780

mm

Overall Width of slab

5020

mm

Overall depth of slab

400

mm

Dia (mm)

Spacing
(mm)

16

180

No. of bars X (mm)

Y(mm)

Z(mm)

19

Length of each
bar (mm)

Total length (m)

4680

88.920

5146

51.460

4680

79.560

4940

108.680

4940

83.980

2/3 bars
4680
Type b
(bottom)

16

540

10

1/3 bars

690

452.5

2660
x

y
z

Type e
(Top)

12

300

17

TRANSVERSE REINFORCEMENT

4680
Type c
(bottom)

12

220

22

4940

Type d
(Top)

12

300

17

4940

39

16
2

1.1875 t

40

41

75.0
0.650

42

0.650

43

+distance between kerb and wheel+ half of contact width +axle length)+( half of
persion width of second wheel)

2.952
2

75.0
0.650

0.650

3.425
2

44

Kg-cm
Kg-cm

18.62 cm
9.31 cm

4.800 cm2

45

46

0.075

75.0

0.650

2.052
2

75.0

0.650

47

48

3.435
2

2.35

49