Académique Documents
Professionnel Documents
Culture Documents
1.
Incoming & Outgoing panels shall be two (2) separate panels. GA to be revised accordingly.
2.
The panel shall be suitable for Internal arc capability of 40kA/1sec. (AFLR)
3.
4.
5.
6.
7.
8.
9.
All indication lamps shall have cluster LEDs with LVOG protection.
10. PT Core shall have maximum burden of 50VA for each core.
11. MFM shall be considered instead of TVM. The MFM shall have dual RS-485 port on
Modbus port. BOM to be revised accordingly. The MFM shall be fed from external DC
source.
12. The Master trip relay shall be High burden only. Same to be confirmed.
13. 5/15A, 5pin socket to be considered. BOM to be revised accordingly.
14. PT selector switch, AC Source selector switch & DC source selector switch to be provided.
BOM to be revised accordingly.
15. Space heater shall be provided for each compartment separately. The space heater shall be
provided with digital ammeter & ON/FF switch.
16. Detailed GTP of Panel, LA & Breaker to be submitted.
17. In data sheet two different rating of surge arrestor has been proposed. Same to be corrected.
The rating of arrestor shall be considered as per BOM.
18. Logic diagram for breaking closing & tripping shall be revised as per attached sheet. Wring
diagram to be revised accordingly.
19. Explosion vent shall be provided for each chamber. Also, furnish the Isometric view of gas
duct arrangement for safe release of hot gas above man height level.
Page 1 of 3
Breaker ON
Breaker OFF
TNC Switch Close.
86 operated.
Local Mode ON
Remote Mode ON
Spring charge
Earthing truck in Service
i)
j)
k)
l)
Close Permissive
Remote Close
Remote Trip.
50 Optd.
50N Optd.
51 Optd.
51N Optd.
81U Optd
81O Optd
67 + 67N Optd.
27 Optd.
59 Optd.
TCS Unhealthy.
20% Spare DO.
(SL.