1)
General
a) In order to analyse the large failures noticed during lightning, many telecom
installations affected by lightning were visited.
b) The earthing methods adopted in different places were varying as well as were not as
per any standards.
c) Some of the observations were as follows
i) When MDF was separately connected to earth and was disconnected from the
equipment earth, line card failures were reduced in many stations.
ii) Large card failures were noticed during lightning in new technology switching
systems. The case was referred to the switch vendors.
iii) M/s Ericsson has suggested the following measures
(1) Use of common earth with earth collection bar (ECB) and the following shall
be brought to the ECB
(a) DC Earth
(b) Surge Protective device
(c) Protective Earth of electrical power
(d) Lightning Protection System
(2) If the distance between various earths are less than 20 meters it shall be made
common because the moment there is a lightning strike, there will be a
potential difference between the earth pits and current starts flowing from
lightning earth to switch earth. This potential reaches the cabinets and cards
get damages.
(3) Increase the number of down conductors for the Lightning Protection System
(4) Use of plate earthing
(5) The surge arrestor earthing shall be connected to switch earth collection bar.
(6) Provision of IPMs in the MDF for all the lines irrespective of working line or
not.
iv) M/s Lucent has suggested the following
(1) The grounding arrangement suggested is the single point grounding (Single
Point Earthing is suggested in CCITT K.27)
(2) Suggests separate earths for communication, power and lightning and
interconnection of the earths on a ring for equi-potential bonding.
(3) Tower lightning protection system shall have Two down conductors
connected to separate earth pits and subsequently connected to the ring earth.
(4) Class B & C protection for the power line.
(5) MDF Tag blocks shall be installed with earth strips and the earth strips shall
not be deformed.
v) The failure during lightning in Motorola installed BTS sites of IMPCS were much
less as compared to BSNL IMPCS sites. In Motorola sites, common earthing is
adopted.
vi) Interconnection of earths in many stations have increased the failures rather than
reducing the same.
vii) The failures due to lightning in BSNL sites for the GSM as well as other
equipments have increased multifold with the installation of towers where as in
microwave stations were towers are in existence for many years, there is no such
failure.
2)
3)
4)
Earthing Network
a) The earthing network consists of multiple earth electrodes having conductive parts in
intimate contact with the earth providing electrical connection.
b) While installing such earth electrodes engineering standards shall be followed.
c) During the acceptance testing it shall be ensured that the engineering standards are
followed.
d) The earth electrodes shall further be interconnected in a ring shape as per the
engineering instructions.
e) A main earthing terminal or bar shall be provided as per the engineering
instructions.
f) The main earthing terminal shall be as close as possible to the a/c power cable and
telecommunication cable entrance facilities.
g) The main earthing terminal shall be connected to the earth electrodes via the shortest
path.
h) All the interconnections shall be done as per standards.
i) Equi-potential bonding can also be deployed. Equi-potential bonding network is a set
of copper bars laid for interconnecting all the earth electrodes to keep them at
substantial equal potential.
Equi
Potential
Bonding
Earth
Electrode
5)
Lightning
Spike Air
Termination
Network
Down
Conductor
Telecom
Building
Main Earthing Terminal
6)
provided in both the limbs of the cable for tower warning lamp. The other limb of the
arrester is to be connected to the ring earth
c) Tower lightning protection system shall have Two down conductors connected to
separate earth pits and subsequently connected to the ring earth.
d) If armored cable is used for the aviation lamp, the sheath of the cable should be
separately connected to the tower at the top end and to the ring earth at the bottom
end.
9)
a)
b)
c)
d)
e)
Cable supports
and Trays
Air Conditioning
Engine Alternator
Lighting System
Structured Steel
Common Bonding Network
10)
MDF
Equipment
Frames
DC Return
18)
Equipment installation
a) LPS shall be installed if required.
b) The earthing network with earth electrodes, interconnections, equi potential bonding,
main earth terminal etc shall be installed taking into concederation all the present and
future requirements by various units including switching, transmission, IMPCS,
Engine Alternator, A/C plant, Lighting etc.
c) Common Bonding Network shall be installed.
d) SPC Bar for interconnection of various telecom equipments shall also be provided.
e) The A/T of the above system shall be conducted who shall verify
i) Installation based on standards
ii) Earth resistance
f) A/T team shall prepare a complete check list before carrying out the A/T
g) All other subsequent equipment installations shall use this earth equipment and shall
be connected to its various points based on the standards.
19)
Earth maintenance
a) Maintenance of the earthing system is very important.
b) Whenever new equipment is connected it shall be ensured that the same is as per the
earthing standards.
c) The earth pits shall be periodically watered to ensure proper earth values. Gardening
the area and periodic watering of the plants is a suggested option.
20)
Reference documents
a) ITU-T K.27 Bonding configurations and Earthing inside a Telecommunication
Building.
b) T & D Circle Engineering Instructions on earthing - QG 1005