PIPELINE AND PROCESS SERVICES

Pipeline Services
Subsea Technology

Remote Flooding, Pigging, and Testing Services


Subsea Pigging and Hydrostatic Testing Improves Efficiency and Reduces Cost

Subsea Pigging Unit (SPU)


The subsea pigging unit (SPU) has the capability to lter and
chemically treat the water that lls the pipeline during the
ooding operation. The water is continuously and autonomously
regulated and monitored during the ooding and pigging
operation without the need for umbilical cables or constant
attendance by a support vessel. The ability to independently
complete pipeline ooding and pigging operations oers distinct
advantages. Plus, it typically brings signicant value to oshore
projects by allowing more exible and ecient vessel usage.
Subsea Hydrostatic Testing Unit (SHU)
The subsea hydrostatic testing unit (SHU) provides a step-change
in the overall safety of subsea hydrostatic testing operations. This
unit allows hydrostatic testing operations to be completed entirely
on the seabed, moving the risks posed by high-pressure uids to a
location far removed from personnel. The SHU utilizes the power
available from a remotely operated vehicle (ROV) to operate
pumps within the SPU / SHU unit. The ROV is used to control the
rate of pressure increase in the pipeline by varying the ow rate
provided by the ROV-driven pressurizing pump. Once the
pipeline reaches its hydrostatic test pressure, the ROV may be
disconnected and used for other activities such as "ying the line"
for visual location and conrmation of any suspected leaks
indicated by the ongoing hydrostatic testing operations.
The hydrostatic pressure may be monitored by either an onboard
or external data logging system, either of which can monitor and
log up to four simultaneous hydrostatic testing operations. The
data logging systems can be adapted with acoustic technology to
transmit data to the surface through the use of telemetry systems.

HAL37479

Halliburtons subsea pigging unit and subsea hydrostatic testing


units are proven technologies for remote ooding and testing of
newly fabricated pipelines in water depths up to
13,123 ft (4,000 m).

Benefits
Safety
Personnel exposure to equipment containing
high-pressures uids (common during hydrostatic
testing operations) is eliminated.
Vessel Flexibility
The SPU operates independently of a host or support vessel.
This enables the vessel to continue with other operations
while the ooding operation is ongoing, maximizing vessel
utilization throughout the project.
Minimal Deck Space
The compact size of the SPU / SHU maximizes the vessel
deck space available for other activities. Only minimal deck
space is required during the transportation of the
equipment to and from the eld location.
Signicantly less space is required compared to
conventional pipeline ooding and testing equipment.
Minimal Personnel
Oshore personnel required for pipeline ooding and
hydrostatic testing operations are minimized, making room
for personnel needed for other vessel activities.

PIPELINE AND PROCESS SERVICES

Features
Water ltration
down to 50 micron.

Flow control up to 2,642 gallons (10,000 liters) per minute.


Integral chemical storage; six separate bladders of
264 gallons (1,000 liters) available.
Data-logging facilities allow the logging of chemical ow, bulk
ow, hydrostatic test pressure, subsea temperature, and battery
condition. All parameters can be transmitted to a nearby vessel
with no tethered connection.
Current design allows system pressurization to
14,500 psi (1,000 bar) above seabed pressure.

HAL37477

HAL37478

Fully adjustable
chemical injection
system with the
ability to independently
inject four separate
chemical feeds.

Only two technicians


are required per 24-hr
period for ooding
operations. Four
technicians are required
per 24-hr period for
ooding and hydrostatic
testing operations.

Safety, Efficiency, and Environmental Responsibility


Halliburton is committed to the safe and ecient execution
of all projects, and to continual minimization of potential
environmental impact in all of our operations.
Halliburtons world-class project-engineering and
project-management capabilities, combined with new and
innovative technologies, bring value to the energy transportation
industry by safely completing all activities in accordance with
applicable industry, governmental, and regulatory standards.

SPU / SHU Specifications


Parameter
Water Depth
Hyperbarically Tested
Number of Chemicals Injected
Chemical Storage
Flooding Values Logged

Second Generation SPHU


6,500 ft (2,000 m)
8,200 ft (2,500 m)
2
2 264 gal (1,000L) bladders
Bulk flow
Chemical flow
Pipeline pressure
Battery percentage

Hydrostatic Test Values Logged

Hydrotest pump flow rate


Pipeline pressure
Temperature
Battery percentage

Maximum Pressure for Hydrotest

9,000 psi (620 barg)


(above subsea ambient)

Third Generation SPHU (WAAP)


11,500 ft (3,500 m)
13,100 ft (4,000 m)
4
6 264 gal (1,000L) IBC/bladder
Bulk flow
Chemical flow (in ppm)
Pipeline pressure
Hydraulic pressure (during boost pumping)
Hydraulic flow (during boost pumping)
Filter differential pressure
Battery condition
Hydrotest pump flow rate
Chemical flow (in ppm)
Pipeline pressure
Hydraulic pressure (during pumping)
Hydraulic flow (during pumping)
Temperature
Battery condition
25,000 psi (1,725 barg)
(above subsea ambient)

2012 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the
contract between Halliburton and the customer that is applicable to the sale.
H06068 8/12
www.halliburton.com

Vous aimerez peut-être aussi