THE BURJ TOWER

The Burj is a landmark high rise structure part of a very important


development scheme in downtown Dubai

Model

THE BURJ TOWER

Some artistical impressions

THE BURJ TOWER

Model

THE BURJ TOWER

Model

THE BURJ TOWER

Model

THE BURJ TOWER

Model

Project Brief
Pinnacle
Spire

Project Name

The Burj Tower

Duration

47Months (Feb. 05 ~ Dec. 08)

Communication (L160)
Office (L153)

THE BURJ TOWER

Cost

876,000,000 USD

Owner

EMAAR Properties

Floors

Above 160 floors

Height

Above 800m

Usage

Hotel, Residence, Office

Observatory
(L123)
Residence (L108)

Hotel (L39)

Project Brief
.Client

Emaar Properties PJSC

THE BURJ TOWER

.Consultants
Project Manager

Turner Construction Intl.

Design

Skidmore, Owings & Merill (SOM)

Supervision

Hyder Consulting

Quantity Surveyor

DG Jones Intl.

.Construction Period

01 Feb 2005 30 Dec 2008

Figures & Quantities

Some salient figures and quantities:


Total height of the tower : More than 800 M
Gross area tower : 279,000 sq. M

THE BURJ TOWER

Gross area podium : 186,000 sq. M


Total concrete quantity tower : 145,000 cubic M
Total concrete quantity podium : 115,000 cubic M
Overall concrete quantity : 260,000 cubic M
Overall rebar quantity : 34,000 tons

Structural Overview

Y-shaped floor plan is ideal for residential program


Maximizes window perimeter to floor plate area
Is inherently stable

Buttressed core
Three wings arranged around central core
Each wing supports other two

Setbacks occur at each wing in a spiraling pattern


Reduces vortex shedding by changing building shape 24 times

THE BURJ TOWER

2003 All rights reserved.

THE BURJ TOWER

Structural Overview

Analysis Model

Structural Overview

THE BURJ TOWER

Hotel Residential
Floor plan

Typical Floor Plan

Structural Overview
Tower Seismic Design
500 year Event
Wind Typically Governs

THE BURJ TOWER

Seismic Only Governs near Top

Structural Overview

THE BURJ TOWER

Predicted Wind
Drift
Location

Elevation Drift
(m)
(mm)

Top Communications

+604.9 1450

Top Office

+569.7 1250

Observatory

+442.1

750

Top Residential

+375.3

540

50 year wind event

THE BURJ TOWER

Structural Overview

3D View Under Construction

Sequence of Work
Typical Work Sequence
wing-A

C-1

[Section A-A]

C-3

C-2

wing-C

wingB

THE BURJ TOWER

[Work Sequence]
Level 0
Level -1

3 to 5 levels below

2 levels below

Level -2
Level -3
Level -4
Level -5
Level -6

2 levels below
6 to 8 levels below

Level -7

Wing
Slab

Level -8

3levels below
Wing Corridor
Slab

Corner Slab
Center Lobby Slab

Level -9
Nose Slab

Wing Corewall

Center Corewall

Corner Slab

Sequence of Work
Work Sequence & Shoring Plan
Day 0

Day 1

Day 2

Day 3

: Conc Pouring

: Slab formwork

: Slab formwork

: Conc Pouring

: Rebar Installation
: MEP
N+1

THE BURJ TOWER

N+0

N-1

Additional
Raking Shore

Form

Form
Form

Form
N-2

N-3

1/2 of Raking
Shore

1/2 of Raking
Shore
2/3 of
Prop

N-4

N-5

1/2 of
Raking
Shore

2/3 of
Prop

1/3 of
Prop

Tower Slab Formwork

2/3 of
Prop

Cranage & Hoisting


Overall Equipments Layout
. Tower Crane - 3 nos.
T/C#M1 : Favco M440D (25ton)
T/C#M2 : Favco M380D (25ton)
T/C#M3 : Favco M220D (11ton)
Pump#1~#3

. Hoist - 14 cages

THE BURJ TOWER

Phase 1 (Ground ~ L100) : H/C#1~#4 (8cages) T/C#M2


Phase 2 (L100 ~ L142)

: H/C#5~#6 (4 cages)

Phase 3 (L142 ~ SL2)

: H/C#7

T/C#M3

(2 cages)

Jump Hoist : Jump#1, Jump#2 (2 cages)

H/C#3~4
H/C#7

. Concrete Pump - 4 nos.


Pump#1~#3 (Ground Level) : High Pressure
Pump#4 (L124) for Secondary Pumping

H/C#5~6
H/C#1~2

. Concrete Placing Boom - 4 nos.


CPB#1. for Center core : 32m Boom
CPB#2~#4. for Wing core : 28m Boom

T/C#M1

Cranage & Hoisting


Tower Crane Installation Method

T/C#M3
M220D

T/C#M2
M380D

Conc Placing
Boom
Climbing

Core wall form

THE BURJ TOWER

3rd Bracket
Installation

Installation
Height : 48m
Top
collar
T/C#M1 :
M440D
Clamping Height
: 15.5 ~ 17m
Bottom
collar

Cranage & Hoisting


Tower Crane - Dismantling Method

Multi Step Method

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

23

22

1 Station
st

21

20

19

18

- 1st Station : L161

17

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

16
SPI RE LEVEL 2 - MEZZANI NE1
T/STEEL EL: +620. 8

15

14

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

13

- 2nd Station: L99

12

11
LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 160

LEVEL 160
8

LEVEL 159

THE BURJ TOWER

3nos. Recovery Crane


- Favco 242R, Ogawa OT4520, Favco SDD3/10

2nd Station

LEVEL 158

LEVEL 157

LEVEL 160

LEVEL 159

LEVEL 159

LEVEL 158

LEVEL 158

LEVEL 157

LEVEL 157

LEVEL 156

LEVEL 156

LEVEL 157

LEVEL 156

LEVEL 160
8

LEVEL 159

LEVEL 158

LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 156

LEVEL 155

LEVEL 155

LEVEL 155

LEVEL 155

LEVEL 154

LEVEL 154

LEVEL 154

LEVEL 154

LEVEL 153

LEVEL 153

LEVEL 153

LEVEL 153

LEVEL 152

LEVEL 152

LEVEL 152

LEVEL 152

LEVEL 151

LEVEL 151

LEVEL 151

LEVEL 151

LEVEL 150

LEVEL 150

LEVEL 150

LEVEL 150

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

LEVEL 147

LEVEL 147

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 143

LEVEL 143

LEVEL 143

LEVEL 143

LEVEL 142

LEVEL 142

LEVEL 142

LEVEL 142

LEVEL 141

LEVEL 141

LEVEL 141

LEVEL 141

LEVEL 140

LEVEL 140

LEVEL 140

LEVEL 140

LEVEL 135

LEVEL 135

LEVEL 135

LEVEL 135

LEVEL 130

LEVEL 130

LEVEL 130

LEVEL 130

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 120

LEVEL 120

LEVEL 120

LEVEL 120

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 105

LEVEL 105

S6

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 100

LEVEL 100

LEVEL 100

LEVEL 100

LEVEL 99

LEVEL 99

LEVEL 99

LEVEL 99

Cranage & Hoisting


TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

23

22

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

21

20

19

18

17

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

16
SPI RE LEVEL 2 - MEZZANI NE1
T/STEEL EL: +620. 8

15

14

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601. 9

13

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601. 9

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

12

Step 1 : Main T/C Dismantling

11

10

LEVEL 160
8

LEVEL 159

1) Main T/C Descending to L161

10

LEVEL 160

LEVEL 158

LEVEL 158
LEVEL 157

LEVEL 156

LEVEL 158

LEVEL 157

LEVEL 157

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

LEVEL 156

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

LEVEL 155

LEVEL 154

LEVEL 154

LEVEL 153

LEVEL 153

LEVEL 152

LEVEL 152

LEVEL 151

LEVEL 151

3) Dismantled Components moved to Ground


by Ogawa OT4520

LEVEL 150

LEVEL 150

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

LEVEL 145

LEVEL 145

LEVEL 143

LEVEL 143

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

LEVEL 156

SPI RE LEVEL 5
T/STEEL EL: +656. 1

LEVEL 155

2) Main T/C Dismantled to L99 by Favco 242R

THE BURJ TOWER

LEVEL 159

LEVEL 158

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

LEVEL 156

LEVEL 160

LEVEL 159

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

LEVEL 157

LEVEL 160
8

LEVEL 159

SPI RE LEVEL 5
T/STEEL EL: +656. 1

LEVEL 155

LEVEL 155

LEVEL 154

LEVEL 154

LEVEL 153

LEVEL 153

LEVEL 152

LEVEL 152

LEVEL 151

LEVEL 151

LEVEL 150

LEVEL 150

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

23

22

21

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

20

19

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3
T/STEEL EL: +633. 6

18

17

LEVEL 142

LEVEL 142

LEVEL 141

LEVEL 141

LEVEL 140

LEVEL 140

Favco
242R

LEVEL 145

16

LEVEL 145

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 143
LEVEL 142

15

14

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 143

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

LEVEL 142

SPI RE LEVEL 2
T/STEEL EL: +617. 6

LEVEL 141
LEVEL 140

SPI RE LEVEL 2
T/STEEL EL: +617. 6

LEVEL 141
LEVEL 140

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

13
LEVEL 162 / SPI RE LEVEL 1
T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

12

LEVEL 135

LEVEL 135

LEVEL 135
11
LEVEL 161
T/SLAB EL: +601. 9

L161

LEVEL 135
LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 160

LEVEL 130

LEVEL 130

10

LEVEL 160

LEVEL 130

LEVEL 130

LEVEL 159
LEVEL 125

LEVEL 159

LEVEL 125

LEVEL 125
6

LEVEL 158
LEVEL 157

LEVEL 120

LEVEL 158

LEVEL 120

LEVEL 125

LEVEL 120

LEVEL 157

Main T/C

LEVEL 156

LEVEL 115

LEVEL 115

LEVEL 155

LEVEL 110

LEVEL 115

LEVEL 155

LEVEL 110

LEVEL 154

LEVEL 152

S6

S5

4500

LEVEL 100
LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 151
LEVEL 150

LEVEL 110

LEVEL 154

LEVEL 153
LEVEL 105

LEVEL 153
LEVEL 105

LEVEL 105

S6

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 156

LEVEL 115

LEVEL 110

LEVEL 120

LEVEL 152

S6

4500

S5

4500

LEVEL 100

LEVEL 100

LEVEL 99

LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 151
LEVEL 150

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 105

S6

S5

4500

LEVEL 100
LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

Cranage & Hoisting


TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

22

1 Station

TOP OF SPI RE
T/STEEL EL: +704. 9

23

21
SPI RE LEVEL 3 - MEZZANI NE
T/STEEL EL: +640. 0

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3
SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

st

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

20

19

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

18

17

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

16
SPI RE LEVEL 2 - MEZZANI NE1
T/STEEL EL: +620. 8

15

14

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6
SPI RE LEVEL 1 - MEZZANI NE
T/STEEL EL: +614. 4

13

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601. 9

SPI RE LEVEL 2
T/STEEL EL: +617. 6
SPI RE LEVEL 1 - MEZZANI NE
T/STEEL EL: +614. 4

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

12

Step 2 : Favco 242R Dismantling

11
LEVEL 161
T/SLAB EL: +601. 9

10

10

LEVEL 160

LEVEL 160

LEVEL 160

LEVEL 159

SPI RE LEVEL 5 - MEZZANI NE2


LEVEL 158
T/STEEL EL: +665. 7

LEVEL 157

LEVEL 157

LEVEL 158

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

LEVEL 156

LEVEL 157

LEVEL 156

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

LEVEL 156

LEVEL 155

LEVEL 155

LEVEL 155

LEVEL 154

LEVEL 154

LEVEL 154

LEVEL 153

LEVEL 153

LEVEL 152

LEVEL 152

LEVEL 151

LEVEL 151

LEVEL 151

LEVEL 150

LEVEL 150

2) Favco 242R Dismantled to L99 by Favco SDD3/10


SPI RE LEVEL 4 - MEZZANI NE
T/STEEL EL: +652. 9

23

LEVEL 153
LEVEL 152

22

LEVEL 151

SPI RE LEVEL 4
T/STEEL EL: +646. 4

3) Dismantled Components moved to Ground


21

LEVEL 150

LEVEL 150
SPI RE LEVEL 3 - MEZZANI NE
T/STEEL EL: +640. 0

LEVEL 149

THE BURJ TOWER

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

LEVEL 158

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

LEVEL 157

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

20

LEVEL 148

19

LEVEL 147

by Ogawa OT4520.

LEVEL 159

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

LEVEL 156

LEVEL 159

T/STEEL EL: +668. 9

1) Favco SDD 3/10 Installed on L161

LEVEL 160

LEVEL 159
SPI RE LEVEL 6 BASE

LEVEL 158

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

LEVEL 145

LEVEL 145

SPI RE LEVEL 3
T/STEEL EL: +633. 6

LEVEL 155
SPI RE LEVEL 4 - MEZZANI NE
T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

LEVEL 154
LEVEL 153
LEVEL 152

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

LEVEL 149
LEVEL 148
LEVEL 147

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

18

LEVEL 145
17

LEVEL 143

16

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 143

LEVEL 143

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

LEVEL 142

LEVEL 142
W

LEVEL 141
LEVEL 140

15

14

LEVEL 145

LEVEL 142

SPI RE LEVEL 2
+617. 6

LEVEL 141
T/STEEL EL:

LEVEL 141

SPI RE LEVEL 1 - MEZZANI NE


LEVEL 140
T/STEEL EL: +614. 4

LEVEL 140

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 143
SPI RE LEVEL 2 - MEZZANI NE1
T/STEEL EL: +620. 8

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

LEVEL 142

SPI RE LEVEL 2
T/STEEL EL: +617. 6

Favco 242R

LEVEL 141
LEVEL 140

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

13
LEVEL 162 / SPI RE LEVEL 1
T/SLAB EL: +608. 0

12

LEVEL 135

LEVEL 135

LEVEL 135

11
LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 130
LEVEL 160

LEVEL 160

LEVEL 130

LEVEL 130

LEVEL 159
LEVEL 125

LEVEL 125
6

LEVEL 158

LEVEL 120

LEVEL 157

LEVEL 120

LEVEL 120

LEVEL 156

LEVEL 115

LEVEL 115

LEVEL 155

LEVEL 110

LEVEL 156

LEVEL 115

LEVEL 155

LEVEL 110

LEVEL 154

LEVEL 110

LEVEL 155

LEVEL 110

LEVEL 154

2nd Station

LEVEL 153

LEVEL 154

LEVEL 153

LEVEL 105

LEVEL 105

LEVEL 152
LEVEL 151

LEVEL 157

LEVEL 156
LEVEL 115

LEVEL 158

LEVEL 120

LEVEL 157

LEVEL 159

LEVEL 125

LEVEL 158

LEVEL 160

LEVEL 130

LEVEL 125

S6

LEVEL 100

LEVEL 150
LEVEL 99

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 159

L161

LEVEL 135

LEVEL 152

S6

4500

S5

4500

LEVEL 100
LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 151
LEVEL 150

LEVEL 153
LEVEL 105

LEVEL 105

S6

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 152

S6

4500

S5

4500

LEVEL 100

LEVEL 100

LEVEL 99

LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 151
LEVEL 150

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 148

Favco
SDD3/10

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

LEVEL 147

LEVEL 147

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 143

LEVEL 143

LEVEL 142

LEVEL 142

LEVEL 141

LEVEL 141

LEVEL 140

LEVEL 140

Cranage & Hoisting

LEVEL 143

TOP OF SPI RE
T/STEEL EL: +704. 9

LEVEL 135

LEVEL 143

LEVEL 142

TOP OF SPI RE
T/STEEL EL: +704. 9

TOP OF SPI RE
T/STEEL EL: +704. 9

LEVEL 142

TOP OF SPI RE
T/STEEL EL: +704. 9

LEVEL 141

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

LEVEL 141

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 8 BASE


T/STEEL EL: +691. 3

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 7 BASE


T/STEEL EL: +681. 7

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 6 BASE


T/STEEL EL: +668. 9

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE2


T/STEEL EL: +665. 7

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5 - MEZZANI NE1


T/STEEL EL: +659. 3

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 5
T/STEEL EL: +656. 1

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4 - MEZZANI NE


T/STEEL EL: +652. 9

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 4
T/STEEL EL: +646. 4

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3 - MEZZANI NE


T/STEEL EL: +640. 0

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 3
T/STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 135

LEVEL 140

LEVEL 135

LEVEL 140

LEVEL 135

23

22

21

20

19

18

17

LEVEL 130

16

LEVEL 130
SPI RE LEVEL 2 - MEZZANI NE1
T/STEEL EL: +620. 8

15

14

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2 - MEZZANI NE2


T/STEEL EL: +627. 2

LEVEL 130

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

LEVEL 130

SPI RE LEVEL 2 - MEZZANI NE1


T/STEEL EL: +620. 8

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 2
T/STEEL EL: +617. 6

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

SPI RE LEVEL 1 - MEZZANI NE


T/STEEL EL: +614. 4

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608.0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

LEVEL 162 / SPI RE LEVEL 1


T/SLAB EL: +608. 0

13

12

Step 3 : Ogawa OT4520 Dismantling


11

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 161
T/SLAB EL: +601.9

10

LEVEL 160

LEVEL 125

LEVEL 159
7

LEVEL 125

LEVEL 159

LEVEL 125

LEVEL 159

1) Favco SDD 3/10 Re-installed on L99


LEVEL 157

LEVEL 156

LEVEL 160

LEVEL 158

LEVEL 157

LEVEL 156

LEVEL 158

LEVEL 157

LEVEL 157

LEVEL 156

LEVEL 156

2) Ogawa OT4520 Dismantled to Ground by Favco


SDD3/10

THE BURJ TOWER

LEVEL 120

LEVEL 154

LEVEL 115

LEVEL 155
LEVEL 154

LEVEL 153

LEVEL 153

LEVEL 153

LEVEL 152

LEVEL 152

LEVEL 152

LEVEL 152

LEVEL 151

LEVEL 151

LEVEL 151

LEVEL 151

LEVEL 150

LEVEL 150

LEVEL 150

LEVEL 150

LEVEL 149

LEVEL 149

LEVEL 149

LEVEL 148

LEVEL 148

LEVEL 148

LEVEL 147

LEVEL 147

LEVEL 145

LEVEL 145

LEVEL 143

LEVEL 143

LEVEL 115

LEVEL 143

LEVEL 110

LEVEL 142

LEVEL 149
LEVEL 148

LEVEL 115

LEVEL 145

LEVEL 143

LEVEL 110

LEVEL 142

LEVEL 141

LEVEL 141

LEVEL 141

LEVEL 140

LEVEL 140

LEVEL 140

LEVEL 140

LEVEL 135

LEVEL 135

LEVEL 135

LEVEL 105

LEVEL 105

S5

4500

S4

4500

S3

4500

S2

4500

LEVEL 130

S1

4500

S6

S5

4500

LEVEL 125

LEVEL 100

S4

S3

4500

4500

S2

4500

LEVEL 125

LEVEL 130

S1

4500

S6

S5

4500

LEVEL 125

S4

4500

S3

4500

S2

LEVEL 120

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 110

2nd Station

LEVEL 105

4500

4500

S3

4500

S2

4500

S1

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

S4

4500

S3

4500

S2

4500

S1

4500

LEVEL 100

LEVEL 120

S4

S5

4500

L99

LEVEL 99
LEVEL 120

S5

S6

4500

LEVEL 100

LEVEL 99

S6

S1

4500

LEVEL 125

LEVEL 120

LEVEL 105

Ogawa
OT4520
LEVEL 105

LEVEL 130

LEVEL 100

LEVEL 99

LEVEL 110

LEVEL 142

LEVEL 105

1) Favco SDD 3/10 Dismantled Manually


LEVEL 130

LEVEL 115

LEVEL 147

LEVEL 142

LEVEL 135

LEVEL 120

LEVEL 154

LEVEL 141

Step 4 : Favco SDD3/10 Dismantling


S6

LEVEL 155

LEVEL 120

LEVEL 154

LEVEL 145

LEVEL 110

LEVEL 155

LEVEL 153

LEVEL 147

LEVEL 125

LEVEL 159

LEVEL 158

LEVEL 155

LEVEL 120

LEVEL 161
T/SLAB EL: +601. 9

LEVEL 160
8

LEVEL 158

LEVEL 161
T/SLAB EL: +601. 9

10

LEVEL 160

Favco
SDD3/10

LEVEL 105

S6

4500

S5

4500

LEVEL 100

LEVEL 100

LEVEL 100

LEVEL 100

LEVEL 99

LEVEL 99

LEVEL 99

LEVEL 99

LEVEL 99

S4

4500

S3

4500

S2

4500

S1

4500

BW

B11

C11

B10
BV

C10

Concrete Placement
B9

C9

B8

BU

C8

B7

Concrete Placement Method


Level

C7

B6

BT

C6

BS

BR

Height

Pouring Method

Remarks

Direct Pumping

Target Height
(RC Structure)

Re-pumping

Secondary Pump on
L124 (East wing 442m)

Hopper by T/C

From Ground Level

BQ

Ground ~ L145

531 m

BP

BN

L146 ~ L160M

624 m

BM

BL

L160M ~ Spire1

681.7 m
BK

. Concrete Pump

Pumping Area
(Ground Level)

BJ

BH

THE BURJ TOWER

Level

Pressure

Output

Engine

Remarks

71 / 36 m3/hr

470 kw

2 nos. of Main
1 no. of Stand by

110 m3/hr

200 kw

Secondary
Pumping

Pipe Lines

BG

Pump#1~#3

185 / 320 bar

BF

BE

Pump#4

220 / 260 bar


BD

BC

. Concrete Placing Boom

CPB#4

BB

BA

- 32m boom for Center Core


- 3nos. of 28m boom for Wing Core

CPB#1

CPB#3

. Pipe Lines
CPB#2

- D150mm, THK 11mm


- 5 Lines (1 for back up)

Concrete Placement
Pipe Line Schedule

T. O. F

Line#1. (L160)
for Center Core

TI ER 24 FI NI AL HI GH
TI ER 23 FI NI AL MI D
TI ER 22 FI NI AL LOW
TI ER 21 SPI RE L5
TI ER 20 SPI RE L4

Pinnacle
Top of Finial : Spire

TI ER 19 SPI RE L3
TI ER 18 SPI RE L2

Line#5. (L160)
for Back up

TI ER 17 LEVEL 161
TI ER 16 LEVEL 158

L160Mezzanine : Steel Structure

TI ER 15 LEVEL 155
TI ER 14 LEVEL 151
TI ER 13 LEVEL 147

L154 : RC Structure

TI ER 12 LEVEL 142

Pump#4.
TI ER 11 LEVEL 126
(Secondary Pump on L124)

THE BURJ TOWER

TI ER 10 LEVEL 112

Line#2. (L139)
for South Wing

TI ER 9 LEVEL 99

TI ER 8 LEVEL 87

TI ER 7 LEVEL 76

TI ER 6 LEVEL 64

TI ER 5 LEVEL 53

TI ER 4 LEVEL 43

TI ER 3 LEVEL 34
TI ER 2 LEVEL 26

Pumping Area
Pump#1~#3

TI ER 1 LEVEL 19

TI ER 0 LEVEL 7

Line#3. (L124)
for East Wing
Line#4. (L112)
for West Wing

WN2

WN1

WS1

Concrete Placement

WS2

Re-pumping

WS2

4500

WS1

4500

4500

WN1

4500

WN2

Spire1
(682m)

Line#5
LEVEL: Back
160 up (~L154)

THE BURJ TOWER

Direct pumping Target Height


: Ground ~ L145 (531m)

WS1

4500

Line#1 (~L154)

W1

S1
LEVEL
158

Concrete Hopper
: L160 ~ Spire1
(58m)
LEVEL
157
W

W2

LEVEL 159

LEVEL 158

WN1

W3

4500

LEVEL 160
LEVEL 159

WN2

4500

W4

E1

S2
S3

E2
E3

LEVEL 157

WS2

LEVEL 156

LEVEL 156

LEVEL 155

LEVEL 155
CPB#2

L160 Mezzanine (624m)


2
LEVEL SW154

LEVEL 154

LEVEL 153
SW1

LEVEL 153

LEVEL 152
LEVEL 160
Secondary Pumping
LEVEL 151

: L142 ~ L160M (182m)


LEVEL 159
150

EN1

LEVEL 152

LEVEL 160
LEVEL 151

SE1

SE2

LEVEL 150
159

LEVEL 149
LEVEL 158

LEVEL 149
LEVEL 158

LEVEL 148

LEVEL 148

LEVEL 157
LEVEL 147

LEVEL 157
LEVEL 147

Secondary LEVEL
Pump156

LEVEL 156

L124 (442m)

CPB#1

LEVEL 155

LEVEL 145
LEVEL 155

LEVEL 154

LEVEL 154

LEVEL 153

LEVEL 143
LEVEL 153

L124
Secondary
Pumping Location
Line#2 (~L139)

: Vertical Line Position

ES1

ES2

Survey & Monitoring

Low Level Tower Control


Classical Control Method
XYZ

THE BURJ TOWER

XYZ
XYZ

XYZ

Survey & Monitoring


XYZ

High Level Tower Control


GPS RTK

XYZ
XYZ
XYZ

ANTENNA

THE BURJ TOWER

ANTENNA

REFERENCE
STATION

ANTENNA

Survey & Monitoring


Monitoring Program

Level 146
Level 138

. Main Control Room


- Location ; B2 Level
- Plan for Integrating Raft and Survey
Monitoring
. Strain Gauge & Extensometer

Level 112
Level 108

Level 92

- Total number ; 211EA (except Raft)

THE BURJ TOWER

- Location
: Outrigger Floor Level
: Middle Floor Level between Outrigger Floors
: Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92,
108, 112, 138, 146 (14 Floors)

. Wind Speed/Direction, Temperature, Humidity


- Location ; Level 5, 43, 76, 112, 146
(Tower Outside)

. Communication Control Module (CCM)


- LAN/Network Interface

Level 76
Level 72

Level 58

Level 43
Level 39
Level 26
Level 19
Level 16
Level 5

THE BURJ TOWER

Spire Erection

Spire Erection
Spire Erection Method

Support Beam & Lifting Equipment Installation

Lifting Block Installation & Assembling

THE BURJ TOWER

Spire Assembly Lifting & Connection Block Erection

Temporary Spire Bottom Block Engaging

Completion of Lifting

Dismantling of Temporary Spire Bottom Block

THE BURJ TOWER

Spire Erection

THE BURJ TOWER

THE BURJ TOWER

Thank you !

THE BURJ TOWER

THE BURJ TOWER

THE BURJ TOWER

Photographs

22/01/2005

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Thank you !

Vous aimerez peut-être aussi