Vous êtes sur la page 1sur 2

PUSAT TUIYEN SKOR MINDA

Physic Test 8
Question 1:
Jayabina Cooperation would like to to build a dam at Sungai Kelian. The
contruction will take 520 days to complete. Given the information below,
find a suitable option to build the dam.
Type

Height

Material

Location

Tall

Concrete

Top of hill

Short

Rocks and
sand

Foot of hill

Tall

Concrete

Top of hill

Short

Rocks and
Sand

Foot of hill

Thickness of
wall
Equal
thickness
from the top
of the wall to
the bottom
Equal
thickness
from the top
of the wall to
the bottom
Thickness
increases
from the top
to the
bottom of
the wall
Thickness
increases
from the top
to the
bottom of
the wall

Determine which type of Dam should be build base on the characteristics


above (10m)

Question 2:

WWW.SKORMINDA.COM

PUSAT TUIYEN SKOR MINDA

1.
2.
3.
4.

Name the optical defects above


What is the best lenses used to correct the vision defect
Given the focal point is 5cm. Find the Power of the lenses?
What determine the refractive index of the lens? Explain how
refractive index influence the characteristics of light (3m)

WWW.SKORMINDA.COM

Vous aimerez peut-être aussi