Vous êtes sur la page 1sur 1

ISO 9001 :2000 FO 73 PVA

C&E CONSULTING UND ENGINEERING GMBH


LOUIS BERGER SAS;POYRY

Type of checking

NO. ID/ 12305/ D/SER /RO


I. TITLE OF PROJECT
INCHIDERE DEPOZIT DE DESEURI EXISTENT CALARASI

Launch of project
Phase of project
Final checking
Changing of project
Checking of subcontractor

X
X

Technical Assistance for project preparation in the Environment sector Romania


Technical Assistance for project preparation in the solid waste sector
II. DATE OF PROJECT

Beneficiary
Designer
Project manager

County council
C&E CONSULTING und ENGINEERING
Joachim Hbner

Project phase
Project number
.

TP+DE

III. RESPONSABILITY OF DESIGN

NAME AND SURNAME


Project manager
Specialty :
- hydraulics

SIGNATURE

Sigrun Vagt

- structures

Peter Zetzsche

- electrics

Bernd Heine

-roads

Stefan Mehnert

IV. COMMITTEE OF CHECKING

Numele i prenumele
1. President

Dr. Roland Hhne

2. Members

Vasile Pintilie

3.

Birgitt Wei

4.

Rolf Zurl

V.

After review of submitted documentation,

APPROVAL COMMITTEE

recommends for the next phases:

According with documentation of this project and the permits indicated in Urban Planning Certificate,will be
obtain the Construction Permit .

And DECIDES : APROVAL OF DOCUMENTATION


(including the above recommandations)

The document has been signed in 2 ex.


President of commission
Dr. Roland Hhne

Vous aimerez peut-être aussi