Site Engineer Training Course


Radio Network Optimization

TK Service Department
Jan 31st, 2011

Internal Only

Learning Objective

2011-5-19

From this course, you will learn:

Frequently used abbreviations about RNO

Basic RNO flow and key actions

Control point of each action

Input and output documents

Supporting documents for RNO.

Internal Only

Content
Network Optimization - Actions List for NOE
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix the RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

No.

Stage

Single Site
Verification

Action for NOE

Review the single site verification report..


CP
Confirm the optimization plan.

Confirm the DT plan and Hand over the


engineering details.

Review the detailed plan.

RNO project kickoff meeting

8
9

10
11
12
13

Perform
RNO Test
and confirm
RNO
Scheme

Verify test preparations.

Implement
Cluster
Optimizatio
n

Monitor the (cluster) optimization effects.

Implement
Entire
Network
Optimizatio
n

Monitor the (entire network) optimization


effects.

15
16

Comprehensive RNO analysis

Network
Acceptance

100% site inspection

20% site inspection

Review network evaluation report/RNO


scheme.
Document inspection
Review cluster optimization report.

Review the network optimization report.


Submit RNO reports and documents.

14

KCP

Review resource preparations

Internal Only

Illustration

2
RNO Plan
Preparation
s

Illustration

RNO project review meeting

Archive the documents.

Internal Only

Frequently Used Abbreviations about RNO


SSV

Single Site Verification

SUB

Subcontractor

RNO

Radio Network Optimization

NOM

Network Optimization Manager

NOE

Network Optimization Engineer

DT

Drive Test

CQT

Call Quality Test

CP

Control Point

KCP

Key Control Point

Abbreviations

Internal Only

Content
Network Optimization - Actions List for NOE
Single Site Verification

RNO Plan Preparations


Perform RNO Test and Fix the RNO Scheme
Implement Cluster Optimization
Implement Entire Network Optimization

Network Optimization Acceptance

Internal Only

Subcourse Content
Single Site Verification
Action 1: Review the Single Site Verification Report

Internal Only

Single Site Verification Flow


Level 4

Level 5

Network
Planning

Site
Survey

Single Site
Verification

From:
Equipment
commissio
ning

Site
Acquisition

RNO Plan
Preparations

Site
Design

Material
Delivery

Perform RNO
Test and Fix
RNO Scheme

Civil
Work

TE
Installation

Implement
Cluster
Optimization

Site
Integration

Network
Optimization

Implement Entire
Network
Optimization

PAT

Network
Optimization
Acceptance

0.25 day
The actions listed in the blue cells are the site
engineers' actions.
The actions listed in the orange cells are the
subcontractors' actions.

Site
antenna
inspection

Single Site Verification Flow


0.25 day
Plan test
routes

0.25 day
Check
configurati
on
parameters

0.25 day
Check and
handle
alarms

0.25 day
Check
testing
equipment

1 day
Compile
the single
site
verification
report.

1 day
Review
single site
verification

1 day
NOEs
Action 1

Internal Only

Action 1: CP Review the single Site Verification


Report
Input - Single site verification report

Key Actions
Review the
single site
verification
report

Relevant Documents
1. Single Site Verification
Report
2. Single Site Verification
Work Guidebook

Action Points
When reviewing the Single Site Verification Report,
the engineers should pay attention to the KPIs and
functions of each site.
1.Check whether the antenna installation
parameters in the Single Site Verification Report
are consistent with those from the network
planning data.
2.For all sites included in the Single Site
Verification Report, check whether each sector of
the site can correctly launch the services, for
example, voice and data services, high-speed
data service and also check whether call quality,
cell coverage, and handover with adjacent cells
are normal.

Work Day
1 day

Output - Single site verification report


After the NOEs finish reviewing of the single site verification report of the related products, they should submit the report to
the NOM and the customer for reexamination.

Internal Only

Content
Network Optimization - Actions List for NOEs
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix the RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

Internal Only

Subcourse Content
RNO Plan Preparations
Action 1: Fix DT Plan and Hand over the
Engineering details
Action 2: Review Resource Preparations and
Test Plan

Internal Only

RNO Plan Preparations


Level 4

Level 5

Network
Planning

Site
Survey

Single Site
Verification

Site
Acquisition

Site
Design

RNO Plan
Preparations

Material
Delivery

Perform RNO
Test and Fix
RNO Scheme

Civil
Work

Implement
Cluster
Optimization

Fix the RNO


plan

Site
Integration

Implemen Entire
Network
Optimization

Network
Optimization

PAT

Network
Optimization
Acceptance

The actions listed in the blue cells are


the site engineers' actions.
The actions listed in the orange cells
are the subcontractors' actions.

Test Plan Preparations


2 days

TE
Installation

0.5 day

Fix the DT
plan/hand over
the engineering
materials

NOEs
Action 1

1 day

Fix the detailed test


plan
Review resource
preparations

1 day

Review resource
preparations.
Review the test plan

NOEs
Action 2

0.5 day

RNO project
kickoff meeting

Action 1: Fixing DT Plan and Hand over the


Engineering Details

Internal Only

Input - Main RNO plan


Key Actions
Hand over
the
engineering
materials

Relevant Documents
Collect information
including but not limited to:
1. Optimization
Responsibility Matrix
2. Network Optimization
Acceptance Standard
3. Main RNO Plan

Fix the DT
plan

Action Points

Work Day
0.5 day

The NOEs should hand over the engineering details


together with the operator's NOM and the subcontractor.
The NOEs, the customer, and the subcontractor should
discuss the main RNO plan and define the RNO interface,
RNO work flow, RNO acceptance criteria, and coordination
requirements of the customer.
The NOEs should negotiate with the customer to fix the DT
area, site, parameters, calling mode and the CQT test
spots.
The NOEs should fix the RNO test plan, and provide the
following information to the subcontractor: site information,
main RNO plan, RNO document templates, and technical
guidelines.
The subcontractor should fix the RNO test plan, test routes
and accept the engineering details.

Output - Meeting minutes


After the handover, the NOEs should produce the meeting minutes. The minutes should be signed by all the three parties.

Internal Only

Action 2: CP Review Resource Preparations and Test


Plan
Input - RNO test plan
Key Actions
Review the
RNO test
plan

Relevant Documents
Area Network
Optimization Test Plan

Review
resource
preparations

Action Points
Review contents:
Check whether the test plan is feasible and
that it can satisfy the requirements of the
project and the customer.

Review contents:
The NOEs should check the preparations and
qualifications of the test engineers, test
vehicles, test equipment, test software, analytic
software, test cell phone, portable computer,
and GPS.

Output - Area Network Optimization Test Plan


Area Network Optimization Test Plan

Work Day
1 day

Internal Only

Content
Network Optimization- Actions List for NOE
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix the RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

Internal Only

Subcourse Content
Perform RNO Test and Fixing RNO Scheme
Action 1: Verify DT Preparations
Action 2: Comprehensively Analyze RNO Problems
Action 3: Review Evaluation Report/RNO Scheme

Internal Only

Perform RNO Test and Fix RNO Scheme


Level 4

Level 5

Network
Planning

Single Site
Verification

Site
Survey

Site
Acquisition

RNO Plan
Preparations

Site
Design

Material
Delivery

Perform RNO
Test and Fix
iRNO Scheme

Civil
Work

Implement
Cluster
Optimization

DT
prepara
tions

1 day

Verify the
engineers'
preparations

NOEs' Action 1

5 days

Collect
DT data

Site
Integration

Network
Optimization

Implement Entire
Network
Optimization

PAT

Network
Optimization
Acceptance

The actions listed in the blue cells are the site


engineers' actions.
The actions listed in the orange cells are the
subcontractors' actions.

Perform RNO Test and Fix RNO Scheme


2 days

TE
Installation

2 days

Analyze and
evaluate the
network
performance

1 day

Compreh
ensive
RNO
analysis

NOEs'
Action 2

2 days

Review
network
evaluation
report/RNO
scheme

NOEs'
Action 3

Internal Only

Action 1: CP Verify DT Preparations


Input - Area Network Optimization Test Plan
Key Actions
Verify DT
preparations

Relevant
Documents
Area Network
Optimization Test
Plan

Action Points
The NOEs should review the Area Network Optimization
Test Plan
1.Review the feasibility of the test plan.
2. Review the preparations of the test engineers and
vehicles.
3. Check whether the test devices, for example, test
software, analytic software, test cell phone, portable
computer, and GPS, satisfy the test requirements.
4.Check whether the test routes are rational.
5. Check whether the test procedures satisfy the
customer's requirements.

Work Day
1 day

Output - Null
1.Record the comments about the RNO test plan.
2. If the test plan does not pass the review, the subcontractor has to rearrange the personnel, vehicle, and tools,
and submit a more detailed test plan.

Internal Only

Action 2: Comprehensively Analyze RNO Problems


Input - Network performance evaluation report
Key
Actions
Comprehen
sive RNO
analysis

Relevant
Documents
1.Evaluation Report
Template
2. Network
Evaluation
Guidebook

Action Points
The subcontractor, NOEs and NOM
should analyze the key RNO issues of
the network comprehensively, and draw
up the final RNO scheme. For the
problems that cannot be solved, the
NOEs and NOM should escalate the
problems to a higher level to request
further support.

Work
Day
1 day

Output - Network evaluation report and RNO scheme


The NOEs should focus on the RNO problems and produce the network evaluation report
and RNO scheme.

Internal Only

Action 3: KCP Review the Evaluation Report/RNO


Scheme
Input - Network evaluation report and RNO scheme
Key Actions

Relevant Documents

Action Points

Review
network
evaluation
report/RNO
scheme

1. Network
Evaluation Report
2. Network
Optimization Work
Guide

Review contents:
1.Check whether the test method is correct.
2.Check whether the test data and KPIs are
aligned.
3.Check whether there are any problems
with the network, and analyze and solve
any problems.
4.Check whether the scheme is feasible.
5.Check whether the documents are
correct .

Output - Network evaluation report and final RNO scheme


Network Performance Evaluation Report and RNO Scheme

Work Day
2 days

Illustration of Action 3: KCP Review Network


Evaluation Report/RNO Scheme
Check whether the test
method is standard.

Check whether the test


data and KPIs are
integrated.

Example of the network evaluation report

Check whether there are


any problem about
network, and analyze the
problem if any.

Check whether the


RNO scheme is
reasonable.

Check whether the


documents are
normative.

Internal Only

Internal Only

Content
Network Optimization- Actions List for NOE
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix the RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

Internal Only

Subcourse Content
Implement Cluster Optimization
Action 1: Monitor the Cluster Optimization Effects
Action 2: Review Cluster Optimization Report

Internal Only

Implement Cluster Optimization


Level 4

Level 5

Network
Planning

Site
Survey

Single Site
Verification

Site
Acquisition

RNO Plan
Preparations

Site
Design

Material
Delivery

Perform RNO
Test and Fix
RNO Scheme

Check the
alarms
Adjust radio
network
parameters
Adjust
neighbor
cell relations

3 days
Check the
radio
coverage
Adjust the
antenna
feeder
system

Implement
Cluster
Optimization

Site
Integration

Network
Optimization

Implement Entire
Network
Optimization

PAT

Network
Optimization
Acceptance

The actions listed in the blue cells are the


site engineers' actions.
The actions listed in the orange cells are
the subcontractors' actions.

Implement Cluster Optimization


1 days

TE
Installation

Civil
Work

2 days
Monitor the
optimization
effects

NOEs'
Action 1

2 days
Handle
subscribers
complaints

4 days
Verify the
cluster
optimization
Cluster
optimization
report

2 days
Review
cluster
optimization
report.

NOEs'
Action 2

Action 1: CP Monitor the Cluster Optimization


Effects

Internal Only

Input - RNO adjustment work order


Key Actions

Monitor the
optimization
effects

Relevant Documents

1. Network Evaluation
Guidebook

Action Points

The NOEs should monitor the execution status


of the RNO adjustment work order and the
RNO effects.
Contents:
1.Check whether the network indicators have
improved after the radio parameter adjustment,
for example, call drop rate, call setup success
rate, and handover success rate.
2.Check whether the indicators of the
network/cell have improved after the
optimization, for example, coverage, signal
quality, call quality and handover.

Work Day

2 days

Output - RNO adjustment work order


The NOEs should monitor the execution status of the RNO adjustment work order and the RNO effects.

Internal Only

Action 2: KCP Review Cluster Optimization Report


Input - Cluster optimization report
Key Actions

Relevant Documents

Review
cluster
optimization
report

1. Cluster
Optimization
Report(Template)
2. Remaining RNO
Problems Tracing
Table

Action Points

Work Day

Review contents:
2 days
1.Check whether the test method is correct.
2.Check whether the test data and KPIs are
aligned.
3.Confirm whether the KPIs meet the
requirements.
4.Check whether the network problems are
solved, and whether the reports are clear.
5.Check whether the documents are correct.

Output - Cluster optimization report


Submit the Cluster Optimization Report to the NOM and the customer for review.

Illustration of Action 2: KCP Review Cluster


Optimization Report
Check whether the test
method is standard.

Check whether the test data


and KPIs are integrated.

Example of the cluster optimization report

Confirm whether the KPIs


meet the requirements.
Check whether the network
problems are solved, and
whether the description is
clear.

Check whether the


documents are normative.

Internal Only

Internal Only

Content
Network Optimization- Actions List for NOE
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix the RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

Internal Only

Subcourse Content
Implement Entire Network Optimization
Action 1: Monitor the Network Optimization Effects
Action 2: Review Network Optimization Report

Internal Only

Implement Entire Network Optimization


Level 4

Level 5

Network
Planning

Site
Survey

Single Site
Verification

Site
Acquisition

RNO Plan
Preparations

Site
Design

Material
Delivery

Perform RNO
Test and Fix
RNO Scheme

Implement Entire Network Optimization


1 day

Check the
alarms
Adjust radio
network
parameters
Adjust
neighbor cell
relations

3 days

Check the
radio
coverage
Adjust the
antenna
feeder system.

2 days
Monitor the
optimization
effects

NOEs
Action 1

TE
Installation

Civil
Work

Implement
Cluster
Optimization

Site
Integration

Network
Optimization

Implement Entire
Network
Optimization

PAT

Network
Optimization
Acceptance

The actions listed in the blue cells are the site


engineers' actions.
The actions listed in the orange cells are the
subcontractors' actions.
2 days
Handle
subscribers
complaints

4 days

Network
optimization
acceptance
Network
optimization
report

2 days
Review the
network
optimization
report

NOEs
Action 2

Internal Only

Action 1: CP Monitor the Network Optimization


Effects
Input - RNO adjustment work order
Key
Actions
Monitor the
optimization
effects

Relevant
Documents
1. Network
Evaluation
Guidebook

Action Points

The NOEs should monitor the execution


status of the RNO adjustment work order
and the RNO effects.
Contents:
Check whether the network indicators have
improved after the radio parameter
adjustment, for example, call drop rate, call
setup success rate, and handover success
rate.

Work
Day
2 days

Output - RNO adjustment work order


The NOEs should monitor the execution status of the RNO adjustment work order and the
RNO effects.

Internal Only

Action 2: KCP Review Network Optimization Report


Input - Network optimization report
Key Actions

Relevant Documents

Review the
network
optimization
report

1. Network
Optimization
Report(Template)
2. Remaining RNO
Problems Tracing
Table

Action Points

Work Day

Review contents:
2 days
1. Check whether the test method is
standard.
2. Check whether the test data and KPIs
are aligned.
3. Confirm whether the KPIs meet the
requirements.
4. Check whether the network problems are
solved, and whether the description is clear.
5. Check whether the documents are
correct.

Output - Network optimization report


Submit the Network Optimization Report to the NOM and the customer for review.

Internal Only

Explanation of Action 2: KCP Review Network


Optimization Report
Check whether the test
method is standard.

Check whether the test data


and KPIs are integrated.

Example of the network optimization report

Confirm whether the KPIs


meet the requirements.
Check whether the network
problems are solved, and
whether the description is
clear.

Check whether the


documents are normative.

Internal Only

Content
Actions List for NOE
Single Site Verification
RNO Plan Preparations

Perform RNO Test and Fix RNO Scheme


Implement Cluster Optimization
Implement Entire Network Optimization
Network Optimization Acceptance

Internal Only

Subcourse Content
Network Optimization Acceptance
Action 1: Archive the Documents

Internal Only

Network Optimization Acceptance


Level 4

Level 5

Network
Planning

Site
Survey

Single Site
Verification

Site
Acquisition

Site
Design

Material
Delivery

Perform RNO
Test and Fix
RNO Scheme

RNO Plan
Preparations

Civil
Work

Implement
Cluster
Optimization

1 day

Classify and
submit the RNO
documents

Review the RNO


documents

Site
Integration

Network
Optimization

Implement Entire
Network
Optimization

PAT

Network
Optimization
Acceptance

The actions listed in the blue cells are the


site engineers' actions.
The actions listed in the orange cells are the
subcontractors' actions.

Network Optimization Acceptance


1 day

TE
Installation

1 day

1 day

RNO project
reviewing
meeting

Archive the
documents

NOEss
Action 1

Internal Only

Action 1: Archive the Documents


Input - All documents involved in the RNO process
Key Actions

Relevant Documents

Archive the
documents

Action Points
Relevant documents

1.Base station information table


2.Single site verification report

3.Network evaluation report


4.Cluster optimization report
5.Network optimization report
6.Remaining RNO problems tracing table
7.RNO adjustment work order
8.Backup of the test data

Output - RNO documents


Ensure the timeliness, accuracy, integrity, and validity of all documents.

Work Day
1 day

Internal Only

Review

CPs/KCPs

Control Point
of Each Action