BID SUMMARY
Bids shall be itemized, but not limited, in the following categories for purposes of
evaluating, awarding or price deduction (if extent of work is less or more than
specified).
ITE
M
1.
2.
3.
4.
5.
6.

DESCRIPTION
Formulation of as-built PFDs
Survey and evaluation

COST

Preparation of Package
Cost Estimation (indicative costs)
Review of Detailed Mechanical Design of Critical

___________________
___________________
___________________
___________________
___________________
___________________

Equipment
Conduct of Hazards and Operability (HAZOP) Study
SUB-TOTAL
9.
Overhead Costs
10. Contractors Profit
SUB-TOTAL BEFORE TAXES, PERMITS, & BONDS
11. Taxes (Ex. RVAT)
12. Permits (No Pass-On of VAT)
13. Bonds/Insurances (No Pass-On of VAT)
TOTAL BASE BID
Contract Duration in Calendar Days:

___________________
___________________
___________________
___________________
___________________
___________________
___________________
___________________
___________________
___________________

7.

Submitted by:
Contractors Name:

________________________________

Contractors Authorized Representative


(Print Name and Sign)

Date Signed

Vous aimerez peut-être aussi