Vous êtes sur la page 1sur 63

Annex A ERCROS 02/12 Validation Protocol Rev.

1
Pag. 1 / 16

Performance Qualification (PQ)


Purified Water System Validation Protocol
Multipurpose Synthesis Plant (PMS)

TABLE OF CONTENTS

0- DOCUMENT HYSTORY
1- OBJECTIVE
2- DOCUMETATION
2.1 Related Documentation
2.2 Applicable Documentation
3- VALIDATION TEAM
4- SCOPE
5- METHODOLOGY
5.1 System Validation
5.2 Description of purified water system
5.3 Quality Critical Attributes for purified water
5.4 Qualification strategy
5.5 Performance Qualification tests
5.5.1 Assessment of compliance with Standard Operating Procedures
5.5.2 Testing of purified water quality
6- ACCEPTANCE CRITERIA
6.1 Acceptance criteria for compliance with SOPs
6.2 Acceptance criteria for purified water quality
6.3 Deviations and conclusions

7- PROTOCOL APPROVAL

Appendix I Site general plan 90-A3-1624 Rev. 12


Appendix II Sampling plan
Appendix III Purifying plant and loop sampling points plans

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 2 / 16

0. DOCUMENT HYSTORY
Previous document edition:
Annex A ERCROS 02/12 Validation Protocol February 2012
Changes involved:
Following FDA recommendations this document is reviewed and updated in order to complete the
validation study. The main considerations included are:
-

Identification and evaluation of the critical elements for the purified water system.
Evaluation of the quality of the water at each step in the purification process
Evaluation of the quality of the water at each point of use
Complete microbial and endotoxin concentration analysis of purified water.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 3 / 16

1. OBJECT
The aim of this study is to demonstrate the consistent and reliable performance of the purified
water production system located in Multipurpose Synthesis Plant (PMS) Building 54, which
ensures that the system produces water appropriate for its intended use in a repetitive manner.
This validation study is carried out after Operational Qualification step and is part of the
Performance Qualification study. It should be evaluated together with initial study ERCROS PQ
013/10.
In addition, this validation study is intended to assess the suitability of production, control and
maintenance of the system in the quality management system.

2. DOCUMENTATION
2.1 Related Documentation

Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients (ICH Q7)
USP 35 monograph Purified Water
European Pharmacopoeia 7.0 monograph Purified Water

2.2 Applicable Documentation

Operating and maintenance handbook Volume IV. (Afarvi)


ERCROS-1697 Purified Water Specification Sheet
ERCROS-4104 Process water sampling SOP
ERCROS-4111 Process water general testing SOP
ERCROS-4303 Process water microbiological testing SOP

3. VALIDATION TEAM
Validation team responsible of carried out this qualification step is consisted of responsible
persons of each involved department. They are shown in following table as well as their
responsibility:

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 4 / 16

Department

PMS Production

Quality Control

Quality Assurance

Responsible / Position

Responsibilities

Assistant of Synthesis Area


Production

Process data recording; defining of


process critical parameters and their
acceptance criteria; defining of
SOPs, equipment and other critical
information; protocol drafting.

Quality Control Assistant

Analytical data recording; defining of


critical quality attributes and their
acceptance criteria; defining of
SOPs, specifications and other
critical information; collaboration in
protocol drafting.

Quality Assurance Assistant

Coordinator; supervision of protocol


and recorded data; statistical
analysis; ensuring of compliance of
documentation with current legal
requirements; protocol approval and
writing of reports.

4. SCOPE
Purified water production plant which supplies water to Multipurpose Synthesis Plant (PMS)
located in Building 54. Refer to site general plan 90-A3-1624 Rev. 12 provided as Appendix I.
This validation protocol considers the performance qualification of production, storage and
distribution of the purified water produced in this plant.

5. METHODOLOGY
5.1 System Validation
Performance Qualification (PQ) step is performed after the qualification of Design (DQ); Installation
(IQ) and Operation of the purified water production plant.
These qualification steps have been properly performed and the supported documentation is
codified as described below:
-

Design qualification:
Installation qualification:
Operational qualification:
Initial Performance Qualification:

DQ 040/04 and DQ 041/04


IQ 040/04 and OQ 041/04
OQ 040/04 and PQ 041/04
PQ 013/10

For performance requalification purposes, two different steps should be considered:


-

First step: during this phase it is demonstrated that the system consistently produces the
desired water quality without failure or performance deviation when operates in
conformance with the stated SOPs.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 5 / 16

During this period the system is intensively monitored. The sampling is daily after each
step of purification process and at each point of use for three weeks (15 working days).
The validation approach includes:
-

Undertaking of chemical and microbiological testing.


Sampling the incoming feed-water daily to verify its quality.
Sampling after each step in the purification process daily.
Sampling at each point of use and at other defined sample points daily.
Demonstrate consistent production and delivery of water of the required quality
and quantity when the system is operated in accordance with SOPs.
Use and refine the SOPs for operation, maintenance and sanitization.
Verify and confirm stated alert and action levels.
Refine test-failure procedure.

After this initial step critical sampling points are confirmed as it.
After this initial study and whenever no critical deviation or failure of the system occurs, the
second step can address.
-

Second step: during this phase it is demonstrated that when the water system is operated
in accordance with stated SOPs over a long period of time.
The sampling is daily from a minimum of two critical points, with at least all points of use
tested weekly, for a full year worth of data. The validation approach includes:
- Demonstrate extended reliable performance.
- Ensure that seasonal variations are evaluated.
- The sample locations, sampling frequencies and routine monitoring.
After this validation step, final routine water monitoring program will be stated.
As appendix II is included a spreadsheet in which it is shown the samples to be taken in
both steps as well as it frequency.

5.2 Description of purified water system


The facility consists of a purified water production plant (pretreatment; reverse osmosis and water
purifying systems); a storage tank and a loop that supply purified water to the points of use.
Steps of water purifying and distribution are described as follows. In addition cleaning and
sanitization of the system is described too:

WATER PURIFYING PLANT

Pretreatment

This step is considered as critical since the objective is to treat in the first instance the incoming
potable feed water in order to avoid fluctuations of physic-chemical characteristics of water that
could affect the reverse osmosis system. Consist of the following steps:
a) Silex / anthracite filter
In this step particles in suspension larger than 30 microns are retained and colloidal matter is
minimized.
b) Duplex decalcification unit
In this step calcium and magnesium ions are retained in ion-exchange resins.
c) Microfiltration 10 microns
This additional filtration ensures the protection of reverse osmosis membranes.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 6 / 16

d) Addition of bisulphite
By means of bisulphite addition, chlorine from the water system is neutralized, which prevents
reverse osmosis membranes with polyamide composition can be damaged.
Bisulphite remove other oxidants dissolved in water by means of its reduction power and has a
bacteriostatic effect since oxygen dissolved is minimized.
This process is automatically controlled and performed.
In addition, this production plant is provided with a sanitization and cleavage tank and additional
microfiltration system that ensures the suitable flow conditioning and pressure and supports the
cleaning and sanitization procedures.
Sanitization and cleavage tank
After previous microfiltration, water is storage in the cleavage tank. From this tank water is
pumping to the reverse osmosis membranes. In addition, the tank fulfils the following functions:
-

Feeding tank: whenever the water after electrodesionization system has not the desired
quality, it is returned to this tank. The system automatically makes the feeding of
subsequent equipment independent of flow and pressure.

Cleaning of membranes: periodically, in order to avoid the potential blockage of


membranes, the tank pumps water at low pressure when the production has stopped.

Sanitization: the tank is provided with an element that can heat the water at 80 C for
sanitization purposes.
The loop is provided with a heat exchanger that heats the water to more than 80 C in
order to sanitize the complete system.

Chemical cleaning: cleaning products are dissolved in this tank.

Microfiltration 1.5 microns


This additional filtration ensures the remove of particles in suspension and the additional protection
of reverse osmosis membranes.
The system is controlled by means of a redox-meter that checks the level of chlorine in water and
sends the corresponding signals to the system in order to allow water recirculation again in case of
its presence is too higher.
The potential influence of this treatment on membranes and final quality of water justifies that
system Performance Qualification includes sampling before and after this pre-treatment in order to
verify the correct operation.
-

Reverse osmosis

By means of this treatment, water is subjected to pressure and forced to pass through a
semipermeable membranes across which salts or impurities cannot pass.
These membranes remove 90 98 % of inorganic ions, non-ionic contaminants and organic
molecules with a weight more than 200 (colloidal matter, bacteria, pyrogens), which makes that
this step is considered critical.
The system is provided with a high pressure pump that forces the water to flow through the
membrane surface.
Two different and complementary steps with two membranes per step compose the system.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 7 / 16

The potential influence of this treatment on membranes and final quality of water justifies that
system Performance Qualification includes sampling before and after reverse osmosis in order to
verify the correct operation.
-

Purifying system

This step is considered as critic since by means of this treatment, water is subjected to an electrodes-ionization E-cell system in order to perform a chemical polishing of osmotic water.
The application of electric power in the system removes salts dissolved in water by means of
conventional ionic exchange resins.
In addition, the bactericidal action is carried out by a UV lamp which treats the water after E-cell
system.
In order to verify the correct performance of the purifying system and final quality of water
Performance Qualification includes sampling before and after electro-des-ionization E-cell system
and UV-lamp.

STORAGE AND DISTRIBUTION

Alter purifying system, water is storage in a storage tank and distributed to every point of use in the
PMS manufacturing plant by means of a loop.
3
Purified water is maintained in the loop under constant flow at 1m /h which avoids point of
stagnant water. In addition and in order to ensure and avoid the microorganism presence the
system is provided with a UV lamp which treats the water after storage tank and prior to its
distribution to the points of use.

In order to verify the correct control of microorganism presence and the potential contamination of
storage tank, Performance Qualification includes sampling after storage tank and before and after
UV-lamp.
-

Points of use

The loop feeds every point of use in the manufacturing plant.


In order to verify the correct distribution of the purified water and identify potential sources of
contamination, Performance Qualification includes sampling in every point of use.
In addition, to ensure the correct recirculation of water and no influence of the loop in water quality,
sampling at return hose is performed too.

WATER PURIFYING PLANT

Sanitization

For sanitization purposes the system is provided with a heat exchanger that allows raising the loop
temperature to 80 85 C.
The procedure is automatically controlled once it is starting. The frequency converter that controls
the feeding pump (SW-P-001) as well as opening and closing of the other valves is automatically
controlled.
Osmotic water is storage in the sanitization and cleavage tank and heated to 80 85 C. Once the
temperature is reached (controlled by means of a TT-001 probe) it is distributed though the

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 8 / 16

purifying system and the loop and maintained under recirculation. During this procedure all the
points of use should be open in order to ensure that opening valves are sanitized too.
The whole sanitization procedure takes approximately 90 120 minutes.
Once the recirculation has finished, water is cooled by means of a default cooling gradient. Once
the water is at operation temperature, it is drained and the usual production cycle starts.
This procedure should be performed after a planned long stoppage (holiday period), after a break
whenever the repairs takes more than 24 hours and/or whenever an analytical parameter is out of
specifications. In addition as part of preventive maintenance program, this procedure could be
performed quarterly.
-

Chemical Cleaning

The aim of this procedure is to remove the damaging substances and materials that cold be
accumulated in the reverse osmosis membranes (colloids, metals, organic matter, biological
compounds) in order to avoid an irreversible damage.
Some evidences that could appear as it or together with other/s show that membranes should be
cleaned, these are for instance:
-

Loosing of load (10 - 15%)


Water conductivity is increased in 15%
Nominal flow decrease (at standard T 20C) in 15%
Accumulation of salts
Accumulation of organic and inorganic materials
Biological contamination in equipments or pipes

Cleaning procedure is performed in the usual operating and acid or base solution could be used.
The procedure takes the following steps:
1.
2.
3.
4.
5.
6.

Preparation of Cleaning solution


Pumping at low pressure
Recirculation of cleaning solution
Draining
Pumping at high flow
Removing of cleaning solution

Once the cleaning has finished, the rejected water and treated water is removed until conductivity
parameter decrease and operating parameters are as usual operating.

5.3 Critical Quality Attributes (CQAs) for Purified Water


According to ICH Q7 Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients,
water used in the manufacture of APIs should be demonstrated to be suitable for its intended use.
In this context and in our specific case, water should comply with requirements as laid down in
current edition of official USP and European Pharmacopoeia monographs for purified water. The
parameters established in the monograph are considered as Critical Quality Attributes.
In addition, and taking into account that the product can be used in the production of sterile drug
products, microbial and endotoxin content should be assessed and considered as Critical Quality
Attributes.
In following table are summarized the CQAs and their limits. Reference to internal code for
methods of analysis is included too:

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 9 / 16

PURIFIED WATER
TEST
1

Appearance

Nitrates

UNITS

SPECIFICATIONS*

INTERNAL SOP

Clean liquid, transparent,


colorless and odorless

ERCROS-4111

NMT 0.2

ERCROS-4111

S cm

NMT 1.3 (at 25 C)

ERCROS-4111

mg / l

NMT 0.5

ERCROS-4260

mg / l
-1

Conductivity

TOC

Total Germs Viable

Germs / ml

NMT 100

ERCROS-4303

Bacterial Endotoxin

IU/ml

NMT 0.25

ERCROS-4047

NMT: No more than


* According to official USP / European Pharmacopoeia monographs.

5.4 Qualification Strategy


The qualification strategy is based on the system validation described in section 5.1. The main
objective is to check and verify that the critical production steps identified in section 5.2 for purified
water system fulfill their functions correctly.
In a first instance, it should be ensured that incoming water is suitable for the system feeding and
from this point, the following topics should be considered for assessing:
-

Correct using of SOPs for operation, maintenance and sanitization.


Performance of pretreatment step.
Performance of reverse osmosis step.
Performance of storage and distribution steps.
Quality of water in points of use and return hose.

5.5 Performance Qualification Tests


Two different approaches should be taken into account for qualification purposes:
1- Assessment of compliance with Standard Operating Procedures
2- Testing of purified water quality

5.5.1 Assessment of compliance with Standard Operating Procedures


5.5.1.1 Objective
The aim of this test is to ensure by writing evidences that the Operating and Maintenance SOP
described properly the production and distribution of purified water.
In addition alarm system will be verified. In this context, whenever al alarm is detected and informed
by the system, it should be recorded in appropriate section of Annex B. The cause of every alarm
should be properly investigated according to ERCROS 4008 Investigation of Deviation internal SOP.
The SOPs will be checked by means of verification of every item described in the corresponding
check-list.
Every check-list has been drawn up on the basis of the procedures and steps described in internal
SOPs and taking into account the worst-case in every situation.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 10 / 16

Worst-case:
-

Production step: starting the production after a stoppage which involves a cleaning of
membranes and sanitization treatment.

Storage and distribution step: starting the system after a stoppage which involves a
sanitization treatment.

The tests should be performed by PMS Plant staff since they are usually who operates in the Water
Purifying Plant and supervised by PMS Manager.
5.5.1.3 Records
The following check-list should be fulfilled:
-

Annex B Water Purifying; Distribution and Sanitization of the system data check-list

5.5.2 Testing of Purified Water Quality


5.5.2.1 Objective
The aim of this test is to ensure by writing evidences that the purified production system produces
in a consistent and repetitive way purified water of the desired quality and only this water is
distributed to the loop.
In addition, it will be verified that the loop has no influence in water quality and bacteriostatic level
in maintained.
5.5.2.2 Methodology
Taking into account the critical production steps considered in section 5.2 Description of Purified
Water System, water quality will be tested as follows.
The first step of this performance qualification study should be considered all the sampling point
described below. After this step, critical point (defined below and remarked in bold with *) will be
sampled during the second step during a whole year of worth data.
As Appendix III is provided a sketch of the purifying plant and loop which includes sampling points and
the desired quality of water in each one.

A Purifying plant:
a) Water pretreatment checking:
1. Sampling of incoming feed water. (VHB 001)
2. Sampling at the end of pretreatment (VHD 003)
b) Reverse osmosis checking:
1. Sampling at the end of pretreatment (VHD 003). This sampling point is the same
mentioned above.
2. Sampling at the end of reverse osmosis treatment (VHD 007)
c) Purifying system checking.
1. Sampling at the end of reverse osmosis treatment (VHD 007). This sampling point is the
same mentioned above.
2. Sampling after electrodeionization treatment (VHD 010)
3. Sampling after UV lamp (VHD 011)

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 11 / 16

B Storage and distribution


a) Storage tank checking:
1. Sampling before storage tank (VHD 011). This sampling point is the same mentioned
above.
2. Sampling after storage tank (SV 541 001)
b) UV lamp checking:
1. Sampling after storage tank (SV 541 001). This sampling point is the same mentioned
above.
2. Sampling after UV lamp (SV 541 002)
c) Points of use checking:
1. Sampling at every point of use (refer to table below)*
d) Water recirculation checking:
1. Sampling at return hose*.
In table below is summarized all considered sampling points; their location their identification and
the water quality desired in each one.
Sampling points marked with * are those considered as critical and they should be sampled in the
second step of this performance qualification during a whole year of worth data.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 12 / 16

Sampling sketch

Sampling point

Identification

Location

Quality

a1) VHB 001

VHB 001

Incoming feed water

Potable water

a2) VHD 003

VHD 003

After 1.5 mc microfiltration unit

Potable water

b2) VHD 007

VHD 007

After reverse osmosis system

Osmotic water

c2) VHD 010

VHD 010

After electrodesionization
system

Purified water

c3) VHD 011

VHD 011

After UV lamp UVA

Purified water

Purifying Plant (A)

Storage and Distribution (B)


a2) SV 541 001

SV 541 001

After storage tank and before


UV lamp

Purified water

b2) SV 541 002

SV 541 002

After UV lamp

Purified water

d1) SV 541 003

SV 541 002

At return hose

Purified water

c1) Points of use


DC-0502-00
Reactor

PU-5

DC-0501-00
Reactor

PU-4

DC-0504-00
Reactor

PU-3

DC-0507-00
Reactor

PU-2

DC-0508-00
Reactor

PU-1

DF-0532-02
DF-0532-03
Dissolution Tanks
DF-0532-00
DF-0532-01
Dissolution Tanks

PU-8
PU-9

JL-0512-00
Centrifuge

PU-6

Laboratory

PU-11

DF-0531-00
DF-0531-01
Dissolution Tanks

PU-10

JL-0511-00
Centrifuge

PU-7

EI-0521-00
Drier

PU-12

Level 2.
Intake drainage valve at
DC-0502-00 reactor
Level 2.
Intake drainage valve at
DC-0501-00 reactor
Level 2.
Intake drainage valve at
DC-0504-00 reactor
Level 2.
Intake drainage valve at
DC-0507-00 reactor
Level 2.
Intake drainage valve at
DC-0508-00 reactor
Level 2.
Intake common drainage valve
at auxiliary tanks
Level 2.
Intake common drainage valve
at auxiliary tanks
Level 1.
Intake drainage valve at
JL-0512-00 centrifuge
Level 1.
Laboratory
Level 0.
Intake common drainage valve
at auxiliary tanks
Level 0.
Intake drainage valve at
JL-0511-00 centrifuge
Level 0.
Drier room

Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 13 / 16

5.5.2.2.1 Analytical test and methods


In following tables are summarized the tests performed for every quality of water and reference to
internal SOPs.

PURIFIED WATER
TEST
1

Appearance

Nitrates

UNITS

SPECIFICATIONS*

INTERNAL SOP

Clean, transparent, colorless


and odorless liquid

ERCROS-4111

NMT 0.2

ERCROS-4111

S cm

NMT 1.3 (at 25 C)

ERCROS-4111

mg / l

NMT 0.5

ERCROS-4260

mg / l
-1

Conductivity

TOC

Total Germs Viable

Germs / ml

NMT 100

ERCROS-4303

Bacterial Endotoxin

IU/ml

NMT 0.25

ERCROS-4047

NMT: No more than


* According to official USP / European Pharmacopoeia monographs.

OSMOTIC WATER
TEST
1

Appearance

Nitrates

UNITS

SPECIFICATIONS*

INTERNAL SOP

Clean, transparent, colorless


and odorless liquid

ERCROS-4111

NMT 5

ERCROS-4111

S cm

NMT 200 (at 25 C)

ERCROS-4111

mg / l

NMT 3

ERCROS-4260

mg / l
-1

Conductivity

TOC

Total Germs Viable

Germs / ml

NMT 100

ERCROS-4303

Bacterial Endotoxin

IU/ml

**

ERCROS-4047

NMT: No more than


* According to internal established specifications.
** No specification is established for endotoxins in osmotic water. Obtained result is only for
information and it should be taken into account for checking the capacity of purified water
system for endotoxins removing.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 14 / 16

POTABLE WATER
TEST

UNITS

SPECIFICATIONS*

INTERNAL SOP

Clean, transparent, colorless


and odorless liquid

ERCROS-4111

Appearance

Calcium

mg / l

NMT 500

ERCROS-4111

Chlorides

mg / l

NMT 250

ERCROS-4111

Sulfates

mg / ml

NMT 250

ERCROS-4111

Nitrates

mg / l

NMT 50

ERCROS-4111

Ammonium

mg / l

NMT 0.5

ERCROS-4111

pH

pH

6.5 9.5

ERCROS-4111

Total Solids

mg / l

NMT 1000

ERCROS-4111

Heavy metals (Pb)

g / l

NMT 0.25

ERCROS-4111

mg / l

NMT 1.3

ERCROS-4111

S cm-1

NMT 2500

ERCROS-4111

mg / l

NMT 5

ERCROS-4260

Germs / ml

NMT 100

ERCROS-4303

Absence

ERCROS-4303

IU/ml

**

ERCROS-4047

10 Organic matter
11 Conductivity
12 TOC
13 Total Germs Viable
14 Escherichia coli
15 Bacterial endotoxins

NMT: No more than


* According to internal established specifications.
** This test will be performed only at point identified as VHB 001 with the aim of knowing the
endotoxin burden of incoming water.
Endotoxins test at point VHD 003 has not been considered since any treatment to remove or
minimize endotoxins content has been performed at this point.
No specification is established for endotoxins in potable water. Obtained result is only for
information and it should be taken into account for checking the capacity of purified water
system for endotoxins removing.
Detailed description of method of analysis to be performed for each sample is described in the
corresponding internal SOPs. (Refer to section 2.2. Applicable Documentation).
5.5.2.2.2 Sampling method
Sampling should be performed once the purified plant and loop are normally working.
Sampling during this validation step will be daily for 15 working days. It should be recorded date
and time (in sample label) of sampling in every sample.
Sampling date should be recorded as follows:
Sampling point / day / month (two digits) / year (two digits)
Example: sample taken at VHD 007 on July 14th, 2012, should be identified as follows:
VHD 007 / 14 / 07 /12
Two different labels are available depending on the test. Label model is as follows:

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 15 / 16

Chemical Tests
Purified Water

Microbiological
Control
Purified Water

Sampling Point / Date

Sampling Point / Date

Analyst

Analyst

Initials / Signature

Initials / Signature

The label should be fulfilled just before sampling and stick to the bottle immediately.
The sampling should be performed according to the instructions given in ERCROS-4104 Process
water sampling internal SOP. A brief summary of this procedure is provided below:
Process water sampling should be carried out by Quality Control Laboratory staff.
It should be taken into account the test to be performed and prepare the material needed for
sampling and testing according to this.
In this context, sampling material for endotoxins test should be prepared in non-pyrogenic
conditions by Quality Control staff and material for microbiological analysis should be
prepared and maintained in sterile conditions.
For other chemical analysis is enough that the material is properly clean.
The general operating procedure is as follows:
1. Check that the drain or faucet is clean. Otherwise, clean them.
2. Open the drain or the faucet and let the water run a few minutes (5 minutes).
3. Open the bottle where it will take the sample and rinse with the same water
to be taken. Pull the water.
Sample for TOC and conductivity should be approximately 500 mL in non-sterile bottle
and sample for total viable germ should be approximately 200 mL in sterile bottle.
4. Fill the bottle completely and cover it perfectly. Label the form unequivocally dated,
internal code and plant.
5. Transfer the sample to the laboratory as soon as possible.
5.5.2.3 Records
Analytical data should be recorded in Annex C of this validation study and in ERCROS 4111
Process water general testing record data sheet.

6.

ACCEPTANCE CRITERIA

6.1 Acceptance criteria for compliance with SOPs


Acceptance criteria for this test is that check lists provided as Annex B and Annex C are fulfilled
following the tested SOP and every item is recorded as positive.
The procedure is considered valid if quality water meets established specifications after tests
described in section 5.5.2.

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Pag. 16 / 16

6.2 Acceptance criteria for purified water quality


Acceptance criteria for this test is that every sample taken and tested as described in section 5.5.2
meets established specifications for its quality.

6.3 Deviations and conclusions


Deviations occur during validation should be recorded in the deviation sheet provided at the end of
the corresponding annex.
Results and conclusions will be summarized in the Validation Report.

7.

PROTOCOL APPROVAL

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix II

APPENDIX II

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix II

First Step
Frequency
Sampling Point

Day 1

Day 2

Day 3

Day 4

Day 5

Day 6

Day 7

Day 8

Day 9

Day 10

Day 11

Day 12

Day 13

Day 14

Day 15

VHB 001

VHD 003

VHD 007

VHD 010

VHD 011

SV 541 001

SV 541 002

SV 541 002

PU-5

PU-4

PU-3

PU-2

PU-1

PU-8

PU-9

PU-6

PU-10

PU-7

PU-11

PU-12

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix II

Second Step

Even-numbered weeks:

Day 1

Sampling
Point

Chemical

SV 541 002

PU-5

PU-4

PU-3

Day 2

Microbiological

Chemical

Day 3

Microbiological

Chemical

Day 4

Microbiological

Day 5

Chemical

Microbiological

PU-6

PU-10

PU-7

Chemical

Microbiological

PU-2

PU-1

PU-8

PU-9

PU-11

PU-12

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix II

Odd-numbered weeks:

Sampling
Point
SV 541 002
PU-5
PU-4
PU-3
PU-2
PU-1
PU-8
PU-9
PU-6
PU-10
PU-7
PU-11
PU-12

Day 1

Day 2

Chemical

Microbiological

Day 3

Chemical

Microbiological

Day 4

Chemical

Microbiological

Chemical

Day 5

Microbiological

Chemical

Microbiological

x
x

x
x
x

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix III

APPENDIX III

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix III

Water Purifying System

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix III

Points of use

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix III

Annex A ERCROS 02/12 Validation Protocol Rev. 1


Appendix III

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 1 / 8

Compliance with Standard Operating Procedures Check-list

TABLE OF CONTENTS

1- TABLE 1 Purifying step


2- TABLE 2 Distribution and sanitization steps

PREPARED BY:

Date and signature

SUPERVISED BY:

Date and signature

APPROVED BY:

Date and signature

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 2 / 8

TABLE 1
Starting and operating of purifying system after stoppage
Step

Operation

Results

Bisulphite
removing

Press button:
Proceso despus de
parada de larga
duracin

Manual

Bisulphite
removing

Send Bisulphite
Solution to sewage

Manual

Bisulphite
removing

PLC shows:
CONECTAR LAS
CONEXIONES DE
LIMPIEZA DE
PERMEADO Y
RECHAZO CON
DRENAJE.

Automatic

Bisulphite
removing

Connect and press


ACCEPT

Manual

Bisulphite
removing

Decalcified water
loading starts

Automatic

Bisulphite
removing

High and low


pressure pumping
start

Automatic

Bisulphite
removing

Stop pumps

Automatic

Bisulphite
removing

Bisulphite
removing
E-cell system
regeneration
E-cell system
regeneration
E-cell system
regeneration
E-cell system
regeneration
E-cell system
regeneration

PLC shows:
VOLVER A
CONECTAR
CLAMP CIEGO EN
LAS
CONEXIONES DE
LIMPIEZA.
Connect the Clamp
and press ACCEPT
Opening of valves:
VHB-010, VHB-011,
VHD-012 and
VHD-008.
Close VPD-008 and
open VPD-009
Starting the preosmosis and
reverse osmosis for
this valve
Stabilize the inlet
flow
Starting the
concentrate
recirculation pump

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No

Manual

Yes
No

Manual

Yes
No

Yes
No

Manual

Manual

Manual

Manual

Supervised by

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Yes
No

Automatic

Performed by:

Yes
No

Yes
No

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 3 / 8

Step

Operation

E-cell system
regeneration

Stabilize the flow of


concentrate:
Inlet Pressure from
0.3 to 0.6 bars
Outlet Pressure
from 0.3 to 0.6 bars

Manual

E-cell system
regeneration

Adjust the flow of


purge concentrate

Manual

E-cell system
regeneration

Verification of
suitability of flow
rates and pressures

E-cell system
regeneration
E-cell system
regeneration

Normal Start
Normal Start

Normal Start

Normal Start
Normal Start
Normal Start
Normal Start
Normal Start
Normal Start

Starting the rectifier


Water quality and
flow (parameters
shown at PLC) are
suitable
Press button:
NORMAL
OPERATION
Enter Password
Confirm the
password for the
computer and the
screen
Message appears:
NORMAL
OPERATION
Operation of UV
Lamp
Correct
Pretreatment Cycle
Correct
Osmosis Cycle
Correct Water Cycle
of Refinement
Correct water return
to sanitization and
cleavage tank

Results

Yes
No

Yes
No

Manual

Yes
No

Manual

Yes
No

Manual

Manual
Automatic

Yes
No

Yes
No

Yes
No

Automatic

Yes
No

Manual

Yes
No

Automatic

Yes
No

Automatic

Automatic

Yes
No
Yes
No

Yes
No

Automatic

Supervised by

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Date / Sign.

Yes
No

Manual

Performed by:

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 4 / 8

Alarms Detected:

Date / Signature:

Remarks:

Date / Signature:

Results and conclusion:


Number of Positive responses:
Number of Negative responses:
Conclusion*:
*The test is considered valid only if all the questions are positive.

Performed by:
Date / Signature

Supervised by:
Date / Signature

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 5 / 8

TABLE 2

Starting and operating of distribution and sanitization after stoppage


Step
Starting

Starting

Starting

Operation
Verify that all the
points of use are
closed.
Verified that storage
tank valve is closed.
Verify that all the
pumping and
intaking valves are
closed.

Starting

Verify that purifying


system is operation.

Starting

Verify the availability


of comprised air.

Starting

Verify the availability


of electric power.

Starting

Starting

Starting

Starting
Starting

Starting

Turn off the general


switch in the electric
frame.
Release emergency
stop.
Connect all the
switches and fuses
in electric frame.
Verify screen is on.
Press button:
CONSIGNAS.
Verify that operating
parameters shown in
the screen are
correct and no
alarms are shown.

Starting

Press button:
AUTOMATICO.

Starting

Press button:
MARCHA LOOP.

Starting

Verify that water is


entering in storage
tank.

Results
Manual

Manual

Manual

Manual

Manual

Manual

Manual

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No

Yes
No
Yes
No

Manual

Yes
No

Manual

Manual

Yes
No
Yes
No

Manual

Yes
No

Manual

Manual

Automatic

Supervised by

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Yes
No

Manual

Performed by:

Yes
No

Yes
No

Yes
No

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 6 / 8

Step

Starting

Operation
Verify the correct
level of water for
pumping starts.

Starting

Pumping system
starts.

Starting

Speed of water
return is regulated.

Starting

Starting

Starting

Sanitization

Sanitization

Sanitization

Sanitization

Sanitization

Sanitization
Sanitization

Sanitization

Sanitization

UV lamp starts.
Valves at points of
use operate
correctly.
Valves at sampling
points operate
correctly.
Verify the operating
program is:
AUTOMATICO
Verify the system is
operating.
Verify that no
consume is any
point of use.
Verify availability of
cool water and
steam.
Verify valves at
steam entrance;
condenser returns;
cool water entrance
and cool water
return are open.
Start sanitization
program.
Confirmation.
Storage tank
draining.
Valve in storage
tank is in draining
position.
UV lamp starts.

Results

Automatic

Yes
No

Automatic

Yes
No

Automatic

Yes
No

Automatic

Yes
No

Automatic

Manual

Manual

Manual

Manual

Manual

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Yes
No
Yes
No

Yes
No

Date

Yes
No

Supervised by

Yes
No

Automatic

Performed by:

Yes
No

Yes
No

Manual

Yes
No

Automatic

Yes
No

Automatic

Yes
No

Automatic

Yes
No

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 7 / 8

ETAPA
Sanitization
Sanitization

Sanitization

Sanitization
Sanitization
Sanitization
Normal
operation

ACCIN
Purge
Heating
Water is maintained
hot during
sanitization.
Purge.
Cooling.
Water is at operating
temperature.
Water is available at
every point of use.

CONFORMIDAD
Automatic

Automatic

Yes
No
Yes
No

Automatic

Yes
No

Automatic

Automatic

Yes
No
Yes
No

Automatic

Yes
No

Yes
No

Automatic

REALIZADO

VERIFICADO

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Date

Annex B ERCROS 02/12 Validation Protocol Rev. 1


Pag. 8 / 8

Alarms Detected:

Date / Signature:

Remarks:

Date / Signature:

Results and conclusion:


Number of Positive responses:
Number of Negative responses:
Conclusion*:
*The test is considered valid only if all the questions are positive.

Performed by:
Date / Signature

Supervised by:
Date / Signature

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 1 / 29

Sampling Control and Data Record

TABLE OF CONTENTS

1. Introduction

2. Sampling record template

3. Analytical data record template

PREPARED BY:

Date and signature

SUPERVISED BY:

Date and signature

APPROVED BY:

Date and signature

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 2 / 29

1.

INTRODUCTION

A very important part of Performance Qualification step of this purifying water system involves
sampling and testing of water along the whole production and distribution.
This annex covers and compiles sampling, codification of samples, acceptance criteria and
obtained results.
In table below is summarized considered sampling points; their location their identification and
the quality desired in each one.
During the first step of this qualification study, every point listed below should be sampled
during 20 days. After this step and whenever no critical deviation or failure of the system occurs,
only critical points (marked in bold) will be tested during a whole year of worth data.

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 3 / 29

Sampling sketch

Sampling point

Identification

Location

Quality

VHB 001

VHB 001

Incoming feed water

Potable water

VHD 003

VHD 003

After 1.5 mc microfiltration unit

Potable water

VHD 007

VHD 007

After reverse osmosis system

Osmotic water

VHD 010

VHD 010

After electrodesionization
system

Purified water

VHD 011

VHD 011

After UV lamp UVA

Purified water

SV 541 001

SV 541 001

After storage tank and before


UV lamp

Purified water

SV 541 002

SV 541 002

After UV lamp

Purified water

SV 541 003

SV 541 002

At return hose

Purified water

Purifying Plant

Storage and Distribution

Points of use
DC-0502-00
Reactor

PU-5

DC-0501-00
Reactor

PU-4

DC-0504-00
Reactor

PU-3

DC-0507-00
Reactor

PU-2

DC-0508-00
Reactor

PU-1

DF-0532-02
DF-0532-03
Dissolution Tanks
DF-0532-00
DF-0532-01
Dissolution Tanks

PU-8
PU-9

JL-0512-00
Centrifuge

PU-6

Laboratory

PU-11

DF-0531-00
DF-0531-01
Dissolution Tanks

PU-10

JL-0511-00
Centrifuge

PU-7

EI-0521-00
Drier

PU-12

Level 2.
Intake drainage valve at
DC-0502-00 reactor
Level 2.
Intake drainage valve at
DC-0501-00 reactor
Level 2.
Intake drainage valve at
DC-0504-00 reactor
Level 2.
Intake drainage valve at
DC-0507-00 reactor
Level 2.
Intake drainage valve at
DC-0508-00 reactor
Level 2.
Intake common drainage valve
at auxiliary tanks
Level 2.
Intake common drainage valve
at auxiliary tanks
Level 1.
Intake drainage valve at
JL-0512-00 centrifuge
Level 1.
Laboratory
Level 0.
Intake common drainage valve
at auxiliary tanks
Level 0.
Intake drainage valve at
JL-0511-00 centrifuge
Level 0.
Drier room

Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water
Purified water

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 4 / 29

2.

SAMPLING RECORD TEMPLATE

Purifying Plant

Sampling Point:
Sampling Date
VHB 001
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 5 / 29

Sampling Point:
Sampling Date
VHD 003
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 6 / 29

Sampling Point:
Sampling Date
VHD 007
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 7 / 29

Sampling Point:
Sampling Date
VHD 010
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 8 / 29

Sampling Point:
Sampling Date
VHD 011
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 9 / 29

Storage and Distribution

Sampling Point:
Sampling Date
SV 541 001
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 10 / 29

Sampling Point:
Sampling Date
SV 541 002
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 11 / 29

Sampling Point:
Sampling Date
SV 541 003
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 12 / 29

Points of use

Sampling Point:
Sampling Date
PU-5
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 13 / 29

Sampling Point:
Sampling Date
PU-4
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 14 / 29

Sampling Point:
Sampling Date
PU-3
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 15 / 29

Sampling Point:
Sampling Date
PU-2
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 16 / 29

Sampling Point:
Sampling Date
PU-1
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 17 / 29

Sampling Point:
Sampling Date
PU-8
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 18 / 29

Sampling Point:
Sampling Date
PU-9
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 19 / 29

Sampling Point:
Sampling Date
PU-6
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 20 / 29

Sampling Point:
Sampling Date
PU-11
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 21 / 29

Sampling Point:
Sampling Date
PU-10
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 22 / 29

Sampling Point:
Sampling Date
PU-7
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 23 / 29

Sampling Point:
Sampling Date
PU-12
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 10
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 20

Sample taken by:


(Initials and
signature)

Verify by:
(Initials and
signature)

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 24 / 29

Deviations
Description

Affect the
validation study:

Date / Sign.

Yes
No

Remarks

Conforms

Non conforms

Final result:

Performed by:

Signature:

Date:

Verify by:

Signature:

Date:

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 25 / 29

3.

ANALYTICAL DATA RECORD TEMPLATE

Complete the following record data sheet per taken sample and enclose copy of raw data
record:

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 26 / 29

POTABLE WATER

Sampling Point:

Sampling date:

Test

Specification

Appearance

Clean, transparent,
colorless and odorless
liquid

Calcium

NMT 500 mg / l

Chlorides

NMT 250 mg / l

Sulfates

NMT 250 mg / ml

Nitrates

NMT 50 mg / l

Ammonium

NMT 0.5 mg / l

pH

6.5 9.5 pH

Total Solids

NMT 1000 mg / l

Heavy metals (Pb)

NMT 0.25 g / l

Organic matter

NMT 1.3 mg / l

Conductivity

NMT 2500S cm-1

TOC

NMT 5 mg / l

Total Germs Viable

NMT 100 Germs / ml

Escherichia coli

Absence

Bacterial
endotoxins*

(informative)
IU/ml

Result

* Only to be tested at point identified as VHB 001


Remarks

Analysis Date

Analyzed
by:

Verify by:

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 27 / 29

OSMOTIC WATER

Sampling Point:

Sampling date:

Test

Specification

Appearance

Clean, transparent,
colorless and odorless
liquid

Nitrates

NMT 5 mg / l

Conductivity

NMT 200 (at 25 C)


S cm-1

TOC

NMT 3 mg / l

Total Germs Viable

NMT 100 Germs / ml

Bacterial Endotoxin

(informative)
IU/ml

Remarks

Result

Analysis Date

Analyzed
by:

Verify by:

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 28 / 29

PURIFIED WATER

Sampling Point:

Sampling date:

Test

Specification

Appearance

Clean, transparent,
colorless and odorless
liquid

Nitrates

NMT 0.2 mg / l

Conductivity

NMT 1.3 (at 25 C)


S cm-1

TOC

NMT 0.5 mg / l

Total Germs Viable

NMT 100 Germs / ml

Bacterial Endotoxin

NMT 0.25 IU/ml

Remarks

Result

Analysis Date

Analyzed
by:

Verify by:

Annex C ERCROS 02/12 Validation Protocol Rev. 1


Pag. 29 / 29

Deviations
Description

Affect the
validation study:

Date / Sign.

Yes
No

Remarks

Conforms

Non conforms

Final result:

Performed by:

Signature:

Date:

Verify by:

Signature:

Date:

Vous aimerez peut-être aussi