EQUIPMENT SELECTIONThe air supplied by the equipment to the space must be of proper conditions to satisfy

both the sensible and latent load estimated. Chapter , Applied Psychometrics ,
provides procedure and examples for determining the criteria from which the air
conditioning equipment is selected.

LOAD ESTIMATING

COOLING BLOCK LOAD


HEATING BLOCK LOAD
ASHRAE DATA

Carrier E-20 method of load estimating.


-

Load estimating usually begins with the establishment of a block load for a
building. This is the maximum that the entire building will.
Fig 3 illustrates the various sources of heat understanding.
The component sources and how they are combined is necessary to properly
select the various pieces of equipment in an a/c system.