SR.NO.

PENDING WORK
MSL From boiler to ESV

1
2
3
4

FLOW NOZZLE AFTER NRV AT BOILER FLOOR


FLOW NOZZLE BEFORE MOV NEAR GSC
ESV FITING
REMOVE TEMPORARY SUPPORT IN MAIN STEAM LINE AFTER BLOWING

BLEED FOR LP HEATER


5
6
7
8

SYPHON FULL WELDING FOR PG I/L TO LP HEATER


DRAIN 2 NEAR MOV SAFE LOCATION
VENT VALVE SAFE LOCATION
LINE FINAL FLANGE JOINT

9
10
11
12
13
14

SHELL SIDE SRV,TRV


EMERGENCY AND NORMAL DRAIN LINE BY PASS LINE CHANGED
SHELL AND TUBE DRAIN AND VENT VALVESAFE LOCATION
NORMAL DRAIN STUB FULL WELDING FOR TG AND TE
STAND PIPE INSTRUMENT PIPES FULL WELDING
COND I/L AND O/L INSTRMENT LINE FULL WELDING

15
16
17

DRAIN 2 NEAR HP HEATER SAFE LOCATION


VENT VALVE AND IT'S EXTEND UP TO SAFE LOCATION
PG LINE IBR WELDING

18
19
20
21
22

IN SHELL SIDE SRV, TRV


OPERATING AIR VENT LINE SUPPORT
EMER DRAIN LINE TO HP FLASH TANK FINAL JOINT
FW O/L LINE IBR WELDING FOR PG
BFP DISCH HEADER TT

23
24

DRAIN LINE AFTER MOV FULL LINE TAKE UP WORK

LP HEATER

BLEED FOR HP HEATER

HP HEATER

BLEED FOR DEARATOR AND DEARATOR


AT DEARATOR FLOOR BOLT FITTING REST ON 2 OR 3 THREAD IN BLEED LINE

25

DEARATOR OVER FLOW SOV

EJECTOR
26
27
28
29
30
31
32

HOGGER SILENCER DRAIN LINE


EJECTOR STEAM HEADER DRAIN LINE SAFE LOCATION
EJECTOR HEADER STEAM INLET GASKET FITING WORK
EJECTOR SHELL SIDE ONE FLANGE OPEN
COND I/L AND O/L LINE VALVE GLAN LEAKAGE
HOGER SILENCER SUPPORT
EJECTOR 1 AND 2 STEAM LINE ALIGNMENT NOT PROPER NEAR TO AIR ENTER LINE

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

DRAIN LINE SAFE LOCATION AND PIPE TAKE UP AND FUNNEL WORK
CEP BALANCING LINE TO CEP DISCHARGE LINE(IF REQUIRED)
DRAIN POT PUMP MOTOR
DRAIN POT PUMP BALANCING LINE( IF REQUIRED)
HOTWEL DRAIN TO ATMO SECOND VALVE REQUIRED
GLAND SEALING PCV SUPPORT WORK
GLAND SEALING TT
LP GLAND SEALING FINAL JOINT
LP GLAND SEALING TT AND TG
LP GLAND SEALING OUT FROM TUBINE TWO JOINT
HP GLAND SEALING FINAL JOINT
HOOD SPRAY FOR TURBINE EXHAUST INST LINE FULL WELDING AND FINAL JOINT
AT DEARATOR FLOOR PRDS 1 TCV AIR LINE TAKE UP
ARRANGEMENT TO OPEN WARM UP VENT VALVE FROM TURBINE FLOOR
WARM UP VENT SILENCER DRAIN LINE
MAINSTEM LINE PARRALITY WORK
MAIN STEM LINE DRAIN LOCATION MODIFICATION WORK
PLAT FORM WORK TO OPEN ALL BLEED DRAN ISOLATION VALVE AT COMMON DRAIN HEADER
FLOW NOZZLE BETWEEN GSC TO LP HEATER IN CANDENSATE LINE
ESV VENT FITTING
PRDS1 , PRDS2 , PRDS 3 DRAIN SAFE LOCATION BEFORE PCV
PRDS 3 SAFETY VALVE BOLT FITTING AND TIGHTING WORK
PRDS 2 SAFETY VALVE FLANGE AND EXHAUST PIPE FITTING
SAFETY VENT SUPPORT FASTENER PENDING
TEMPORARY SUPPORT REMOVE OF STEAM LINE AT EJECTOR FLOOR

MISCELLANEOUS

58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

EJECTOR SAFETY VALVE EXHAUST PIPE FITTING PENDING


PRDS 2 LINE AT TURBINE FLOOR BEND SUPPORT PENDING
PRDS 1 SAFETY VALVE FLANGE AND EXHAUST PIPE FITTING
PRDS 1 BEFORE CONTROL VALVE DRAINLINE TAKE UP AND SAFE LOCATION PENDING
PRDSI LINE MOST BOLT NEED TO REPLACE
CEP 2 DISCH NRV BOLT TIGHTING WORK
CEP 2 DISCH ISOLATION VALVE GLAND TIGHTING WORK
EJECTOR OUTLET WATER LINE AFTER ISOLATION VALVE PG LEAKAGE
EJECTOR OUTLET WATER LINE ISOLATION VALVE BONET LEAKAGE
GSC OUTLET FLOW METER FLANGE LEAKAGE
LP HEATER INLET WATER LINE DUMMY LEAKAGE
GSC OUTLET VALVE GLAND LEAKAGE
CST MAKE UP LINE BEFORE SOV ISOLATION VALVE LEAKAGE
DEARATOR LEVEL SWITCH AND FLANGE LEAKAGE
DEARATOR LCV BY PASS VALVE GLAND LEAKAGE
DEARATOR DRAIN LINE TO RODM LINE TAKE UP PENDING
DEARATOR SAFETY VALVE POSITION PENDING

STATUS

REMARKS

srv fitting work done

NOT IN DRAWING IF REQUIRED

ONLY SRV FITING DONE

stub fitting pending

only vent pending

10/17/2016
pending
pending
pending
pending

10/18/2016
pending
pending
pending
pending

10/19/2016
pending
pending
pending
pending

10/20/2016
pending
pending
pending
pending

pending
u/p
pending
pending

done
done
done
pending

done
done
done
pending

done
done
done
pending

pending
pending
u/p
pending
pending
pending

u/p
pending
done
done
done
done

u/p
done
done
done
done
done

pending
done
done
done
done
done

pending
pending
pending

pending
pending
done

pending
pending
done

pending
pending
done

pending
pending
pending
pending
pending

TRV pending
pending
pending
done
pending

trv pending
pending
pending
done
pending

trv pending
pending
pending
done
pending

pending
pending

u/p
pending

done
pending

done
pending

vent valve fitting work

DO CHANGED IF REQURED
STUB FULL WELDING

STUB FULL WELDING


only final joint pending

pending

pending

pending

pending

pending
pending
pending
pending
pending
pending
pending

pending
pending
pending
pending
pending
pending
pending

u/[p
u/p
pending
u/p
done
pending
pending

done
done
done
done
done
pending
pending

u/p
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending

done
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending

done
pending
pending
pending
pending
pending
done
pending
done
pending
pending
pending
pending
pending
u/p
pending
pending
pending
u/p

done
pending
pending
pending
pending
u/p
done
pending
done
pending
pending
pending
pending
pending
done
pending
pending
pending
done

TATUS
10/21/2016
u/p
u/p
pending
pending

done
done
done
u/p

pending
done
done
done
done
done

pending
pending
done

pending
pending
pending
done
pending

done
u/p

10/22/2016

10/23/2016

pending

done
done
done
done
done
pending
pending

done
pending
pending
pending
pending
done
done
pending
done
pending
pending
pending
done
pending
done
pending
pending
pending
done

Done

PENDING WORK

SR.NO.

MSL From boiler to ESV


1
2
3

FLOW METER AFTER NRV AT BOILER FLOOR


FLOW METER BEFORE MOV NEAR GSC
ESV PG

BLEED FOR LP HEATER


4

PG I/L TO LP HEATER

5
6
7
8

SHELL SIDE PG
CONDE. I/L BEFORE MOV PT
NORMAL DRAIN TG & TE
COND I/L AND O/L PG

9
10

TT INLET TO HP HEATER
PG IN HP BLEED LINE

11
12
13
14

IN SHELL SIDE PG
FW I/LAND O/L PG
FW I/L TG
BFP DISCH HEADER TT

15

DEARATOR OVER FLOW SOV

LP HEATER

BLEED FOR HP HEATER

HP HEATER

BLEED FOR DEARATOR AND DEARATOR


MIX
16
17
18
19
20
21

HP GLAND SEALING PG AND TG FRONT SIDE


HOOD SPRAY FOR TURB EXHAUST PG AT REAR SIDE TURBINE
DRAIN PORT PUMP PRESURE SWITCH AND DP SWITCH
AT DEARATOR FLOOR PRDS 1 (PAGGING PRDS) TCV AIR LINE
ECO I/L TE NEAR FLOW NOZZLE AT DEARATOR FLOOR
LP GLAND SEALING TT AND TG

22

LP GLAND TCV AND TURB EXHA TCV PG AND TG


AFTER PRDS 2 T

STATUS

REMARKS
NOZZLE FITTING PENDING
NOZZLE FITTING PENDING

10/17/2016 10/18/2016 10/19/2016 10/20/2016 10/21/2016


pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending
pending

MECHANICAL WORK DONE

pending

done

done

done

done

ONLY GAUGE PENDING


DUMMY FITTED
INSTRUMENT WORK PENDING
IBR WELDING PENDING

Pending
Pending
pending
pending

pending
pending
done
done

pending
pending
done
done

pending
pending
done
done

done
pending
done
done

MECHANICAL WORK DONE

pending
pending

pending
done

pending
done

pending
done

pending
done

MECHANICAL WORK DONE

pending
pending
pending
pending

pending
done
pending
pending

pending
done
pending
pending

pending
done
pending
pending

done
done
pending
pending

pending

pending

pending

pending

pending

pending
pending
pending
pending
pending
pending

pending
pending
done
pending
pending
pending

pending
pending
done
pending
pending
pending

pending
pending
done
pending
pending
pending

done
done
done
done
u/p
pending

NOT POSIBLE AVAILABLE SPACE IN LOCATION


STUB NOT AVAILABLE

MECHANICAL WORK DONE


WELDING WORK PENDING
STUB NOT AVAILABLE
MECHANICAL WORK DONE

MECHANICAL WORK DONE

pending

done

done

done

done